Scheduling/Leveling Report - 08-Dec-15 - PM.

exe
===============================================
Default Project..................................................U031215
-1
Projects:
U031215-1.......................................................
.Al Zorah Resort One - Updated Programme - As of 03-12-2015
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................Yes
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each pr
oject
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Advanced
-------Calculate multiple float paths...................................No
Statistics:
----------# Projects.......................................................1
# Activities.....................................................12208
# Not Started....................................................5396
# In Progress....................................................1928
# Completed......................................................4884
# Relationships..................................................27828
# Activities with Constraint.....................................17
Project:
U031215-1
Activity:
A16140 Project
Start - Contract signing Date
Project:
U031215-1
Activity:
A17740 Mileston
e 1 : Temporary water, sewage and power connections to permit start-up of wild-a
ir
Project:
U031215-1
Activity:
A17750 Mileston
e 2 : Building fully enclosed, Temporary Water & Power Connections and commencem
ent of Testing & Commissioning
Project:
U031215-1
Activity:
A17760 Mileston
e 3 : Substantial Completion of Back of House of Hotel Basement Areas (as per cl
ient ins without CD and cause &
Project:
U031215-1
Activity:
A18030 Hotel Op
erator on board to start snagging works

Project:
U031215-1
Activity:
AZ1 - MOCK-1310
Final Cleaning, Snagging & Desnagging
Project:
U031215-1
Activity:
AZ1-CONS -2BV4-1
870
EIFS (Final Coat) -2BR/V4
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
660
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
870
EIFS (Final Coat) -2BR/V5
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
40
Milestone 4 : Substantial Completion of Main Hotel Buildings
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
50
Project Completion
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
60
MEP Works Completion
Project:
U031215-1
Activity:
BOH7805 Waterpro
ofing to wet areas
Project:
U031215-1
Activity:
BOH8025 Waterpro
ofing to wet areas
Project:
U031215-1
Activity:
BOH840 Carpet CPT-1
Project:
U031215-1
Activity:
FEWA-1620
Application to customer service
Project:
U031215-1
Activity:
V0 - 18790
Aluminum louver doors
Errors:
------Warnings:
--------Activities without predecessors..................................6
Project:
U031215-1
Activity:
A16140 Project
Start - Contract signing Date
Project:
U031215-1
Activity:
A16260 Excavati
on / Blinding / Road base construction
Project:
U031215-1
Activity:
A18540 Alu glas
s - Prelims
Project:
U031215-1
Activity:
AZ1 -DELAY-3750
Technical Submittal Approval
Project:
U031215-1
Activity:
AZ1-RC-PREL-0100
Roof care Prelims
Project:
U031215-1
Activity:
AZ1-SC-PREL-0100
Schindler Prelims
Activities without successors....................................6
Project:
U031215-1
Activity:
A18540 Alu glas
s - Prelims
Project:
U031215-1
Activity:
A189150 Raft con
struction / Slab at grade works
Project:
U031215-1
Activity:
AZ1 -DELAY-3750
Technical Submittal Approval
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
50
Project Completion
Project:
U031215-1
Activity:
AZ1-RC-PREL-0100
Roof care Prelims
Project:
U031215-1
Activity:
AZ1-SC-PREL-0100
Schindler Prelims
Out-of-sequence activities.......................................944
Project:
U031215-1
Activity:
10
Install
Concealed Pipes

Project:
U031215-1
Activity:
Concealed Pipes
Project:
U031215-1
Activity:
Installation
Project:
U031215-1
Activity:
Installation
Project:
U031215-1
Activity:
Installation
Project:
U031215-1
Activity:
Installation
Project:
U031215-1
Activity:
Installation
Project:
U031215-1
Activity:
Installation
Project:
U031215-1
Activity:
Cable Trays/ Trunking
Project:
U031215-1
Activity:
lighting & Small Power Point wiring
Project:
U031215-1
Activity:
cable Ladder in trench
Project:
U031215-1
Activity:
concealed conduits for lighting protection system
Project:
U031215-1
Activity:
Ducts/dampers
Project:
U031215-1
Activity:
Approval of ID ElevationShop drawings - Hotel (Basement)
Project:
U031215-1
Activity:
pression Material Order
Project:
U031215-1
Activity:
FCUs + Valve packages
Project:
U031215-1
Activity:
700
Doors & door frames
Project:
U031215-1
Activity:
980
Ironmongery
Project:
U031215-1
Activity:
050
Doors & door frames
Project:
U031215-1
Activity:
060
Other joinery items
Project:
U031215-1
Activity:
620
Custom Equipments Fabrication
Project:
U031215-1
Activity:
Grouting of Floor & Wall Tiles
Project:
U031215-1
Activity:
Glass Installation
Project:
U031215-1
Activity:
Final Coat Painting on walls & Ceiling
Project:
U031215-1
Activity:
Wallpaper Installation in Walk in closet & Bathroom
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Preparation of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Submission of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings

80

Install

A17360 Cistern
A17420 Cistern
A17590 Cistern
A17600 Cistern
A17700 Cistern
A17710 Cistern
A18490 Install
A18500 Install
A18510 Install
A18660 Install
A18860N Install
A188960 Review &
A189020 Fire sup
A23790N Install
AZ1 - MAT-APP--3
AZ1 - MAT-PROC-2
AZ1 - MAT-PROC-3
AZ1 - MAT-PROC-3
AZ1 - MAT-PROC-3
AZ1 - MOCK-1260
AZ1 - MOCK-1270
AZ1 - MOCK-1300
AZ1 - MOCK-1340
AZ1 - SD-1350
AZ1 - SD-1420
AZ1 - SD-1470
AZ1 - SD-1490
AZ1 - SD-1500
AZ1 - SD-1530

Project:
U031215-1
Activity:
Custom Fabrication Equipments Shop Drawing Approval
Project:
U031215-1
Activity:
Fire Suppression shop drawings submittal
Project:
U031215-1
Activity:
060
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
170
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
210
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
230
Install flexible ducts+plenums
Project:
U031215-1
Activity:
350
Water proofing works
Project:
U031215-1
Activity:
380
Ceiling stud works
Project:
U031215-1
Activity:
490
Floor screed
Project:
U031215-1
Activity:
640
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
660
Floor screed
Project:
U031215-1
Activity:
700
Wall boards closing
Project:
U031215-1
Activity:
830
Finishing works(Flashing/Handrail/Silicon) - 2BR/V1
Project:
U031215-1
Activity:
900
EIFS (Without Final Coat) after Framing -2BR/V1
Project:
U031215-1
Activity:
080
Equipment fitout- 2BRV1
Project:
U031215-1
Activity:
50
Install IDF Panels
Project:
U031215-1
Activity:
010
Install Sanitary Wares
Project:
U031215-1
Activity:
250
Install IDF Panels
Project:
U031215-1
Activity:
350
Water proofing works
Project:
U031215-1
Activity:
490
Floor screed
Project:
U031215-1
Activity:
700
Wall boards closing
Project:
U031215-1
Activity:
900
EIFS (Without Final Coat) after Framing -2BR/V2
Project:
U031215-1
Activity:
70
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
80
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
20
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
40
Install flexible ducts+plenums
Project:
U031215-1
Activity:
060
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
170
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
210
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
230
Install flexible ducts+plenums

AZ1 - SD-1840
AZ1 - SD-1860
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-3
AZ1-CONS -2BV1-9
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-7
AZ1-CONS -2BV2-8
AZ1-CONS -2BV2-9
AZ1-CONS -2BV2-9
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1

300
350
490
640
660
700
900
890
70
090
130
150
220
350
380
400
490
540
560
870
790
70
80
030
170
210
230
300
350
380

Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
EIFS (Without Final Coat) after Framing -2BR/V3
Project:
U031215-1
Activity:
Epoxy on Floor
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
EIFS (Final Coat) -2BR/V4
Project:
U031215-1
Activity:
Epoxy on Floor
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Ceiling stud works

AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-2
AZ1-CONS -2BV3-6
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-2
AZ1-CONS -2BV4-6
AZ1-CONS -2BV4-9
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1

400
490
540
660
700
870
680
50
000
020
090
250
350
380
400
490
540
700
860
580
50
60
250
350
380
400
540
660
700
860

Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
EIFS (Final Coat) -2BR/V5
Project:
U031215-1
Activity:
Equipment fitout- 2BRV5
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
EIFS (Final Coat) -2BR/V6
Project:
U031215-1
Activity:
Equipment fitout- 2BRV6
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
EIFS (Final Coat) -2BR/V7

AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-2
AZ1-CONS -2BV5-9
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-2
AZ1-CONS -2BV6-8
AZ1-CONS -2BV6-9
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1

900
480
70
80
20
40
10
060
170
210
230
300
350
380
400
540
700
380
50
000
090
170
250
350
380
400
490
660
700
810

Project:
U031215-1
Activity:
EIFS (Without Final Coat) after Framing -2BR/V7
Project:
U031215-1
Activity:
Equipment fitout- 2BRV7
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Equipment fitout- 2BRV8
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Alum & Glass - Glass works - 3BR/V1

AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-2
AZ1-CONS -2BV7-5
AZ1-CONS -2BV7-6
AZ1-CONS -2BV7-7
AZ1-CONS -2BV7-7
AZ1-CONS -2BV7-8
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-2
AZ1-CONS -2BV8-9
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1

820
890
190
50
60
80
050
060
170
210
300
350
380
400
490
570
700
820
890
090
90
10
20
70
60
350
380
400
490
560

Project:
U031215-1
Activity:
Finishing works(Flashing/Handrail/Silicon) 3BR/V1
Project:
U031215-1
Activity:
EIFS (Without Final Coat) after Framing - 3BR/V1
Project:
U031215-1
Activity:
Epoxy on Floor
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Wet Area)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Finishing works(Flashing/Handrail/Silicon) - 3BR/V2
Project:
U031215-1
Activity:
EIFS (Without Final Coat) after Framing - 3BR/V2
Project:
U031215-1
Activity:
Epoxy on Floor
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Boarding, taping & jointing

AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-2
AZ1-CONS -3BV1-8
AZ1-CONS -3BV1-9
AZ1-CONS -3BV1-9
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-2
AZ1-CONS -3BV2-5
AZ1-CONS -3BV2-6
AZ1-CONS -3BV2-6
AZ1-CONS -3BV2-6
AZ1-CONS -3BV2-8
AZ1-CONS -3BV3-1
AZ1-CONS -3BV3-1
AZ1-CONS -3BV3-1
AZ1-CONS -3BV3-1
AZ1-CONS -3BV3-1

660
700
810
820
860
890
60
70
00
20
90
1
70
090
130
150
220
350
380
400
410
660
700
810
820
860
89
890
90
40

Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Alum & Glass - Glass works - 3BR/V3
Project:
U031215-1
Activity:
Finishing works(Flashing/Handrail/Silicon)- 3BR/V3
Project:
U031215-1
Activity:
EIFS (Final Coat) - 3BR/V3
Project:
U031215-1
Activity:
EIFS (Without Final Coat) after Framing - 3BR/V3
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Wet Area)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Epoxy on Floor
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
Install Conduits/Pipes - G.B Partition
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Alum & Glass - Glass works - 3BR/V4
Project:
U031215-1
Activity:
Finishing works(Flashing/Handrail/Silicon)- 3BR/V4
Project:
U031215-1
Activity:
EIFS (Final Coat) - 3BR/V4
Project:
U031215-1
Activity:
Epoxy on Floor
Project:
U031215-1
Activity:
EIFS (Without Final Coat) after Framing - 3BR/V4
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
DB Termination & testing

AZ1-CONS -3BV3-1
AZ1-CONS -3BV3-1
AZ1-CONS -3BV3-1
AZ1-CONS -3BV3-1
AZ1-CONS -3BV3-1
AZ1-CONS -3BV3-1
AZ1-CONS -3BV3-5
AZ1-CONS -3BV3-5
AZ1-CONS -3BV3-7
AZ1-CONS -3BV3-7
AZ1-CONS -3BV3-8
AZ1-CONS -3BV3-9
AZ1-CONS -3BV3-9
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-7
AZ1-CONS -3BV4-8

70
80
010
030
350
380
400
700
810
820
860
890
90
20
50
43N
44N
90
150
220
320
350
370
380
670
790
830
90
40
50

Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Alum & Glass - Glass works - 3BR/V5
Project:
U031215-1
Activity:
Finishing works(Flashing/Handrail/Silicon) - 3BR/V5
Project:
U031215-1
Activity:
EIFS (Final Coat) - 3BR/V5
Project:
U031215-1
Activity:
EIFS (Without Final Coat) after Framing- 3BR/V5
Project:
U031215-1
Activity:
Epoxy on Floor
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Wet Area)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Finishing works(Flashing/Handrail/Silicon) - 3BR/V6
Project:
U031215-1
Activity:
EIFS (Final Coat) - 3BR/V6
Project:
U031215-1
Activity:
Epoxy on Floor
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install ELV Cable tray/truking

AZ1-CONS -3BV4-8
AZ1-CONS -3BV4-9
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-7
AZ1-CONS -3BV5-7
AZ1-CONS -3BV5-8
AZ1-CONS -3BV5-8
AZ1-CONS -3BV5-9
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-8
AZ1-CONS -3BV6-8

Project:
U031215-1
Activity:
AZ1-CONS -3BV6-8
Install IDF Panels
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-9
00
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-9
40
MEP Clearance - Ceiling Stud/Grid (Wet Area)*
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-9
40N
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
000
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
400
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
490
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
530
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
660
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
700
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
810
Alum & Glass - Glass works - 3BR/V7
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
820
Finishing works(Flashing/Handrail/Silicon) - 3BR/V7
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
890
EIFS (Without Final Coat) after Framing - 3BR/V7
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-2
290
Epoxy on Floor
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-5
60
MEP Clearance - Ceiling Stud/Grid (Wet Area)*
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-5
70
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-7
20
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-7
40
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-8
10
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-9
70
Install IDF Panels
Project:
U031215-1
Activity:
AZ1-CONS -BR-111
0
EIFS (Without Final Coat) including all brackets - Beach Restaurant
Project:
U031215-1
Activity:
AZ1-CONS -BR-119
0
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -BR-690
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS -BR-820
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS -BR-850
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -BR-890
Access to area
Project:
U031215-1
Activity:
AZ1-CONS -DAY- 1880
Equipment fitout- 3BRV6
Project:
U031215-1
Activity:
AZ1-CONS -DAY-13
80
EIFS (Without Final Coat) - including all brackets -Day Care
Project:
U031215-1
Activity:
AZ1-CONS -DAY-20
20
EIFS (Final Coat) -Day Care
Project:
U031215-1
Activity:
AZ1-CONS -DAY-24
0
Install Concealed P&D Pipes
70

0
0
0
0
0
0
0
0
0
0
0
0
Install
Install
Install
Install
Install
Install
Install
00
30
40
4N
50
00
10
1N
1N
0
0

Project:
U031215-1
Install Concealed conduits
Project:
U031215-1
Install Concealed conduits
Project:
U031215-1
Install Concealed Piping
Project:
U031215-1
Install Concealed Piping
Project:
U031215-1
Access to area
Project:
U031215-1
Install Ducts/dampers
Project:
U031215-1
Install Ducts/dampers
Project:
U031215-1
Install Cable ladder in trench
Project:
U031215-1
Install Isolators+flexible cables
Project:
U031215-1
Install LV Cables
Project:
U031215-1
EIFS (Without Final Coat) including all
Project:
U031215-1
EIFS (Final Coat) - Energy center
Project:
U031215-1
Concealed conduits
Project:
U031215-1
FA+CB point wiring
Project:
U031215-1
PD pipes & test
Project:
U031215-1
CHW Pipes+valves
Project:
U031215-1
FCU+Valve package
Project:
U031215-1
MV Cables
Project:
U031215-1
MV Swichgear
Project:
U031215-1
Install flexible ducts+plenums
Project:
U031215-1
Install LV Cables
Project:
U031215-1
Install Ceiling roses+flexible wires
Project:
U031215-1
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Install FF droppers + test
Project:
U031215-1
Install flexible ducts+plenums
Project:
U031215-1
Install Ceiling roses+flexible wires
Project:
U031215-1
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Access to area
Project:
U031215-1
Install FF droppers + test

Activity:

AZ1-CONS -DAY-32

Activity:

AZ1-CONS -DAY-37

Activity:

AZ1-CONS -DAY-39

Activity:

AZ1-CONS -DAY-41

Activity:

AZ1-CONS -DAY-45

Activity:

AZ1-CONS -DAY-85

Activity:

AZ1-CONS -DAY-96

Activity:

AZ1-CONS -ER-109

Activity:

AZ1-CONS -ER-123

Activity:

AZ1-CONS -ER-154

Activity:
AZ1-CONS -ER-161
brackets - Energy center
Activity:
AZ1-CONS -ER-188
Activity:

AZ1-CONS -ER-330

Activity:

AZ1-CONS -ER-460

Activity:

AZ1-CONS -ER-520

Activity:

AZ1-CONS -ER-600

Activity:

AZ1-CONS -ER-630

Activity:

AZ1-CONS -ER-960

Activity:

AZ1-CONS -ER-990

Activity:

AZ1-CONS -GYM-10

Activity:

AZ1-CONS -GYM-10

Activity:

AZ1-CONS -GYM-10

Activity:

AZ1-CONS -GYM-10

Activity:

AZ1-CONS -GYM-10

Activity:

AZ1-CONS -GYM-11

Activity:

AZ1-CONS -GYM-11

Activity:

AZ1-CONS -GYM-12

Activity:

AZ1-CONS -GYM-15

Activity:

AZ1-CONS -GYM-50

Activity:

AZ1-CONS -GYM-96

0
010
040
050
080
130
180
230
240
260
370
540
620
650
660
700
790
290
380
3N
440
60
680
70
890
370
390
420
440
630

Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
SMDB Termination & testing
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Alum & Glass - Glass works - S1;Ground Floor
Project:
U031215-1
Activity:
LV Cables arrange+dressing (to be tied with riser)
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install GRP Tanks x 6 Nos -phase 1
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Floor tiles installation

AZ1-CONS -GYM-97
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12

670
720
740
910
120
130
230
280
360
490
560
770
870
880
910
940
010
020
120
240
360
400
440
610
720
740
760
770
790
810

Project:
U031215-1
Activity:
AZ1-CONS -HS1-12
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-12
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-12
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-12
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
LV Panels Cable termination
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sanitary wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
MEP Clearance - Ceiling Stud/Grid (Wet Area)*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install DB/Termination
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install DB/Termination
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install DB/Termination
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install DB/Termination
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install DB/Termination
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install DB/Termination
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
EIFS (Without Final Coat) - including all brackets - Sec 1;3rd F
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
LV Cable testing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Sanitary wares

920
930
980
050
090
10
100
170
340
360
40
410
420
510
520
790
130
620
790
800
820
830
860
40
60
3N
80
510
520
530

Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install DB/Termination
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
LV Cable termination
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Install DB/Termination
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
EIFS (Final Coat) - Sec 1 GF
Project:
U031215-1
Activity:
EIFS (Final Coat)- Sec 1;1st F
Project:
U031215-1
Activity:
EIFS (Final Coat) - Sec 1;2nd F
Project:
U031215-1
Activity:
EIFS (Final Coat) - Sec 1;3rd F
Project:
U031215-1
Activity:
Chequer Plate Installation
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Install PD pipes & test
Project:
U031215-1
Activity:
Install FF pipes+valves/test

AZ1-CONS -HS1-14
AZ1-CONS -HS1-14
AZ1-CONS -HS1-14
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-15
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-17
AZ1-CONS -HS1-17
AZ1-CONS -HS1-18
AZ1-CONS -HS1-19
AZ1-CONS -HS1-20
AZ1-CONS -HS1-20
AZ1-CONS -HS1-20

90
70
50
50
80
40
20
40
50
70
40
20
3N
60
30
20
80
90
2N
80
20
40
10
80
90
20
40
70
00
70

Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install Cable ladder in trench
Project:
U031215-1
Activity:
Install PD pipes & test
Project:
U031215-1
Activity:
Install CHW Pipes+valves
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Install FCU+Valve package
Project:
U031215-1
Activity:
Install CHW Pipes+valves
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install Attenuators/Ducts
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Cable tray/truking
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
Install SMDBs

AZ1-CONS -HS1-23
AZ1-CONS -HS1-24
AZ1-CONS -HS1-25
AZ1-CONS -HS1-27
AZ1-CONS -HS1-28
AZ1-CONS -HS1-29
AZ1-CONS -HS1-30
AZ1-CONS -HS1-30
AZ1-CONS -HS1-30
AZ1-CONS -HS1-30
AZ1-CONS -HS1-33
AZ1-CONS -HS1-36
AZ1-CONS -HS1-36
AZ1-CONS -HS1-36
AZ1-CONS -HS1-37
AZ1-CONS -HS1-40
AZ1-CONS -HS1-41
AZ1-CONS -HS1-41
AZ1-CONS -HS1-44
AZ1-CONS -HS1-47
AZ1-CONS -HS1-50
AZ1-CONS -HS1-50
AZ1-CONS -HS1-51
AZ1-CONS -HS1-51
AZ1-CONS -HS1-51
AZ1-CONS -HS1-54
AZ1-CONS -HS1-54
AZ1-CONS -HS1-55
AZ1-CONS -HS1-57
AZ1-CONS -HS1-59

30
40
40
10
1N
20
3N
50
10
80
60
30
80
30
3N
60
00
90
80
30
50
30
70
20
34N
70
00
10
20
80

Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Wet Area)*
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Attenuators/Duct connections
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Alum & Glass - Glass works - S1;3rd Floor
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires

AZ1-CONS -HS1-60
AZ1-CONS -HS1-60
AZ1-CONS -HS1-61
AZ1-CONS -HS1-62
AZ1-CONS -HS1-62
AZ1-CONS -HS1-62
AZ1-CONS -HS1-62
AZ1-CONS -HS1-62
AZ1-CONS -HS1-64
AZ1-CONS -HS1-64
AZ1-CONS -HS1-65
AZ1-CONS -HS1-68
AZ1-CONS -HS1-68
AZ1-CONS -HS1-69
AZ1-CONS -HS1-69
AZ1-CONS -HS1-69
AZ1-CONS -HS1-70
AZ1-CONS -HS1-72
AZ1-CONS -HS1-73
AZ1-CONS -HS1-74
AZ1-CONS -HS1-74
AZ1-CONS -HS1-76
AZ1-CONS -HS1-76
AZ1-CONS -HS1-77
AZ1-CONS -HS1-77
AZ1-CONS -HS1-78
AZ1-CONS -HS1-79
AZ1-CONS -HS1-79
AZ1-CONS -HS1-79
AZ1-CONS -HS1-79

40
60
70
50
60
20
50
60
80
60
10
30
80
10
00
20
60
10
20
60
70
80
90
60
80
90
10
70
0
50

Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Install Cable Ladder in trench
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
Install Panels
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Alum & Glass - Glass works- S1;1st Floor
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
Plaster Work
Project:
U031215-1
Activity:
Install Concealed Pipes - Block wall

AZ1-CONS -HS1-80
AZ1-CONS -HS1-80
AZ1-CONS -HS1-82
AZ1-CONS -HS1-83
AZ1-CONS -HS1-84
AZ1-CONS -HS1-85
AZ1-CONS -HS1-85
AZ1-CONS -HS1-85
AZ1-CONS -HS1-87
AZ1-CONS -HS1-89
AZ1-CONS -HS1-94
AZ1-CONS -HS1-94
AZ1-CONS -HS1-94
AZ1-CONS -HS1-95
AZ1-CONS -HS1-96
AZ1-CONS -HS1-96
AZ1-CONS -HS1-96
AZ1-CONS -HS1-97
AZ1-CONS -HS1-97
AZ1-CONS -HS1-97
AZ1-CONS -HS1-97
AZ1-CONS -HS1-97
AZ1-CONS -HS1-97
AZ1-CONS -HS1-98
AZ1-CONS -HS1-98
AZ1-CONS -HS1-98
AZ1-CONS -HS1-99
AZ1-CONS -HS2-10
AZ1-CONS -HS2-11
AZ1-CONS -HS2-15

00
10
50
20
50
80
10
20
80
10
30
00
30
40
30
80
60
70
90
0
70
30
50
20
0
0
0
0
0
0

Project:
U031215-1
Activity:
AZ1-CONS -HS2-17
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -HS2-19
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS -HS2-19
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS -HS2-20
Install Underground CHW Pipes+test+insulate
Project:
U031215-1
Activity:
AZ1-CONS -HS2-20
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -HS2-20
Install Attenuators/Ducts
Project:
U031215-1
Activity:
AZ1-CONS -HS2-21
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS -HS2-21
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS -HS2-21
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS -HS2-22
Install CHW header pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS -HS2-22
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS -HS2-23
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS -HS2-24
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -HS2-24
EIFS (Without Final Coat) including all brackets - Sec 2
Project:
U031215-1
Activity:
AZ1-CONS -HS2-35
Install Attenuators/Duct connections
Project:
U031215-1
Activity:
AZ1-CONS -HS2-38
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -HS2-41
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS -HS2-41
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS -HS2-41
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS -HS2-42
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS -HS2-42
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS -HS2-44
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS -HS2-44
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS -HS2-45
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS -HS2-53
Install Concealed conduits
Project:
U031215-1
Activity:
AZ1-CONS -HS2-63
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS -HS2-75
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS -HS2-79
Install Concealed conduits
Project:
U031215-1
Activity:
AZ1-CONS -HS2-82
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS -HS2-83
Install FA+CB point wiring

0
0
0
020
030
100
140
230
360
520
670
780
820
840
850
940
042N
050
090
130
180
190
30
300
610
640
660
680
770
780

Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed conduits
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace ceiling cement board - S3;1st floor
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Finishing works(Flashing/Handrail/Silicon) -S3;2ndFloor
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glass - Glass works -S3;Ground floor
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable ladder in trench
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW header pipes+Insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable ladder in trench
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace ceiling cement board - S3;Ground floor
Project:
U031215-1
Activity:
AZ1-CONS
Install Attenuators/Ducts
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Panels (LV Panel-1/2/3/4/5, 1xEMDB, 4xPFC,ATS)
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS
Install DBs

-HS2-93
-HS2-98
-HS2-99
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11

820
850
870
940
10
110
140
280
330
350
460
500
510
670
750
800
90
900
3N
410
4N
800
840
950
310
450
470
490
4N
520

Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
SMDB Termination & testing
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install Control Panels
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Transformer Installation (T1/2/3/4/5)
Project:
U031215-1
Activity:
LV Cables arrange+dressing (to be tied with riser)
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
QRM Installation (QRM01/02)
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Dominico mori wall tiles installation - wet area
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Install Cable ladder in trench
Project:
U031215-1
Activity:
Install MV (Primary) Cables
Project:
U031215-1
Activity:
Vanity counters fixing - wet area
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Wall cladding installation - wood finish - Corridore

AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14

560
5N
6N
70
710
740
780
790
7N
940
970
980
030
060
100
120
360
3N
530
540
590
60
660
670
680
770
810
830
870
920

Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
Install Cable tray/truking
Project:
U031215-1
Activity:
Install LV (Secondary) + Control Cables
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
LV Panels Cable termination
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Install CHW Pipes+valves
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Sanitary wares
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Wall covering installation

AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15

020
030
240
270
300
310
450
460
550
580
590
680
700
720
730
810
821N
850
160
220
260
280
290
40
50
500
630
690
710
750

Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install & Earthing system
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sanitary wares
Project:
U031215-1
Activity:
Install DB/Termination
Project:
U031215-1
Activity:
Install Sanitary wares
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install DB/Termination
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
Install DB/Termination
Project:
U031215-1
Activity:
Install DB/Termination
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
LV Cable testing
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install DB/Termination
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install DB/Termination
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sanitary wares

AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17

800
830
840
890
930
960
010
050
070
180
220
350
560
780
020
240
320
520
730
790
030
070
30
37N
70
50
20
30
60
30

Project:
U031215-1
Install Room Management/ELV Devices
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install Sanitary wares
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install Room Management/ELV Devices
Project:
U031215-1
Install Room Management/ELV Devices
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Sanitary wares
Project:
U031215-1
EIFS (Final Coat) - Sec 3; GF
Project:
U031215-1
Install Room Management/ELV Devices
Project:
U031215-1
Install Room Management/ELV Devices
Project:
U031215-1
Install Sanitary wares
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
EIFS (Final Coat) - Sec 3; 1st F
Project:
U031215-1
Install Room Management/ELV Devices
Project:
U031215-1
EIFS (Final Coat) - Sec 3; 2nd F
Project:
U031215-1
Install CHW Pipes Cladding
Project:
U031215-1
EIFS (Final Coat) - Sec 3; 3rd F
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install flexible ducts+plenums
Project:
U031215-1
Install flexible ducts+plenums
Project:
U031215-1
Install Ceiling roses+flexible wires
Project:
U031215-1
Access required for MEP Second Fix*
Project:
U031215-1
Install flexible ducts+plenums
Project:
U031215-1
Install FF droppers + test
Project:
U031215-1
Access required for MEP Second Fix*
Project:
U031215-1
Install Ceiling roses+flexible wires

Activity:

AZ1-CONS -HS3-17

Activity:

AZ1-CONS -HS3-17

Activity:

AZ1-CONS -HS3-17

Activity:

AZ1-CONS -HS3-17

Activity:

AZ1-CONS -HS3-17

Activity:

AZ1-CONS -HS3-17

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-20

Activity:

AZ1-CONS -HS3-20

Activity:

AZ1-CONS -HS3-20

Activity:

AZ1-CONS -HS3-20

Activity:

AZ1-CONS -HS3-21

Activity:

AZ1-CONS -HS3-24

Activity:

AZ1-CONS -HS3-26

Activity:

AZ1-CONS -HS3-30

Activity:

AZ1-CONS -HS3-31

Activity:

AZ1-CONS -HS3-32

50
20
30
90
80
10
80
90
50
00
10
90
70
80
60
40
10
00
00
50
50N
90
90
10
50
10
80
40
50
00

Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Cable tray/truking
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Cable tray/truking
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Alum & Glazing - Frame -S3;3rd Floor
Project:
U031215-1
Activity:
Install CHW Pipes+valves
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install CHW Pipes+valves
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Install Concealed Piping
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Install Attenuators/Ducts
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Alum & Glass - Glass works -S3;3rd Floor
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *

AZ1-CONS -HS3-32
AZ1-CONS -HS3-33
AZ1-CONS -HS3-35
AZ1-CONS -HS3-36
AZ1-CONS -HS3-37
AZ1-CONS -HS3-38
AZ1-CONS -HS3-40
AZ1-CONS -HS3-40
AZ1-CONS -HS3-41
AZ1-CONS -HS3-43
AZ1-CONS -HS3-43
AZ1-CONS -HS3-45
AZ1-CONS -HS3-46
AZ1-CONS -HS3-48
AZ1-CONS -HS3-49
AZ1-CONS -HS3-51
AZ1-CONS -HS3-52
AZ1-CONS -HS3-55
AZ1-CONS -HS3-57
AZ1-CONS -HS3-57
AZ1-CONS -HS3-58
AZ1-CONS -HS3-60
AZ1-CONS -HS3-61
AZ1-CONS -HS3-62
AZ1-CONS -HS3-63
AZ1-CONS -HS3-64
AZ1-CONS -HS3-65
AZ1-CONS -HS3-66
AZ1-CONS -HS3-67
AZ1-CONS -HS3-70

00
60
50
20
25N
26N
00
60
80
90
20
30
60
90
20
60
20
40
70
70
00
60
10
60
40
60
70
70
10
20

Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed - Corridore
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Install Ecology Units (TBA)
Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace ceiling cement board - S3;2nd floor
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring

-HS3-73
-HS3-73
-HS3-74
-HS3-75
-HS3-75
-HS3-75
-HS3-79
-HS3-79
-HS3-79
-HS3-80
-HS3-81
-HS3-81
-HS3-81
-HS3-81
-HS3-82
-HS3-82
-HS3-83
-HS3-83
-HS3-83
-HS3-84
-HS3-87
-HS3-87
-HS3-88
-HS3-88
-HS3-89
-HS3-89
-HS3-89
-HS3-90
-HS3-91
-HS3-92

60
50
60
70
70
20
70
30
50
00
10
70
50N
80N
00
10
20
90
00
10
50
70
70
90
70
90
00
50
10
20

Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
Alum & Glass - Glass works -S3;First Floor
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install CHW Pipes+valves
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
Surface Preparation for Screed
Project:
U031215-1
Activity:
Install Concealed Piping
Project:
U031215-1
Activity:
Install Concealed P&D Pipes & Conduits
Project:
U031215-1
Activity:
Install AHU's
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Screeding
Project:
U031215-1
Activity:
Install Attenuators/Ducts
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install PD pipes & test

AZ1-CONS -HS3-92
AZ1-CONS -HS3-93
AZ1-CONS -HS3-93
AZ1-CONS -HS3-93
AZ1-CONS -HS3-94
AZ1-CONS -HS3-95
AZ1-CONS -HS3-95
AZ1-CONS -HS3-97
AZ1-CONS -HS3-97
AZ1-CONS -HS3-98
AZ1-CONS -HS3-99
AZ1-CONS -HS3-99
AZ1-CONS -HS4-10
AZ1-CONS -HS4-10
AZ1-CONS -HS4-11
AZ1-CONS -HS4-11
AZ1-CONS -HS4-11
AZ1-CONS -HS4-11
AZ1-CONS -HS4-12
AZ1-CONS -HS4-13
AZ1-CONS -HS4-13
AZ1-CONS -HS4-13
AZ1-CONS -HS4-14
AZ1-CONS -HS4-14
AZ1-CONS -HS4-15
AZ1-CONS -HS4-15
AZ1-CONS -HS4-17
AZ1-CONS -HS4-17
AZ1-CONS -HS4-18
AZ1-CONS -HS4-18

30
00
70
50
50
0
80
0
0N
50
80
40
0
0
0
0
0
0
0
0
0
0N
0N
0
0
1000
1010
1060
1070
1120

Project:
U031215-1
Install CHW header pipes+valves/test
Project:
U031215-1
Install Control Panels
Project:
U031215-1
Install Cable trays**
Project:
U031215-1
Install Panels
Project:
U031215-1
Install Cable trays high level
Project:
U031215-1
Install Concealed conduits
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install Concealed conduits
Project:
U031215-1
Install Concealed conduits
Project:
U031215-1
LV Cable testing
Project:
U031215-1
Final Painting works
Project:
U031215-1
Install AHU's (new AHU)
Project:
U031215-1
Install PD pipes & test
Project:
U031215-1
Install FF pipes+valves/test
Project:
U031215-1
Install FA+CB point wiring
Project:
U031215-1
Install CHW Pipes+valves
Project:
U031215-1
Install FCU+Valve package
Project:
U031215-1
Install CHW Pipes test & insulation
Project:
U031215-1
Install ELV point wiring (BMS)
Project:
U031215-1
Install Kitchen Extract Fans x 2 Nos
Project:
U031215-1
Install FA+CB+PA point wiring
Project:
U031215-1
Install Concealed conduits
Project:
U031215-1
Install Concealed conduits
Project:
U031215-1
Plaster works
Project:
U031215-1
Install Ducts/dampers
Project:
U031215-1
External MV Cabling Works (2)
Project:
U031215-1
External LV Cabling Works (2)
Project:
U031215-1
External ELV Ducts Works (2)
Project:
U031215-1
External ELV Ducts Works (2)
Project:
U031215-1
External ELV Ducts Works (2)

Activity:

AZ1-CONS -HS4-19

Activity:

AZ1-CONS -HS4-21

Activity:

AZ1-CONS -HS4-21

Activity:

AZ1-CONS -HS4-23

Activity:

AZ1-CONS -HS4-25

Activity:

AZ1-CONS -HS4-30

Activity:

AZ1-CONS -HS4-31

Activity:

AZ1-CONS -HS4-33

Activity:

AZ1-CONS -HS4-34

Activity:

AZ1-CONS -HS4-35

Activity:

AZ1-CONS -HS4-37

Activity:

AZ1-CONS -HS4-39

Activity:

AZ1-CONS -HS4-47

Activity:

AZ1-CONS -HS4-53

Activity:

AZ1-CONS -HS4-54

Activity:

AZ1-CONS -HS4-59

Activity:

AZ1-CONS -HS4-62

Activity:

AZ1-CONS -HS4-68

Activity:

AZ1-CONS -HS4-75

Activity:

AZ1-CONS -HS4-76

Activity:

AZ1-CONS -HS4-83

Activity:

AZ1-CONS -HS4-83

Activity:

AZ1-CONS -HS4-89

Activity:

AZ1-CONS -HS4-94

Activity:

AZ1-CONS -HS4-97

Activity:

AZ1-CONS -INFRA-

Activity:

AZ1-CONS -INFRA-

Activity:

AZ1-CONS -INFRA-

Activity:

AZ1-CONS -INFRA-

Activity:

AZ1-CONS -INFRA-

1150
1200
1220
1230
1240
1260
1320
1330
1350
1360
1370
1450
1480
1490
1540
1560
220
260
430
490
510
520
580
650
690
830
930
940
990
430

Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-1 : Concrete Encasement for Electrical services / Trench Backfilling
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-1 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-8 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-7 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-2 : Concrete Encasement for Electrical services / Trench Backfilling
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-2 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6) -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6) -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6)-phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6)-phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6)-phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-2 : Construction of Manholes - Plumbing & Drainage Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Construction of Manholes - Fire Fighting Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Construction of Manholes - Plumbing & Drainage Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-4 : Construction of Manholes - LPG Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-5 : Construction of Manholes - Fire Fighting Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-8 : Construction of Manholes - CHW Pipe
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-5 : Construction of Manholes - CHW Pipe
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-4 : Construction of Manholes - CHW Pipe
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Backfilling up to Formation level - Stage 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Construction of Trenches - for MEP Services
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-7 : Construction of Manholes - CHW Pipe
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Construction of Manholes - CHW Pipe
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-9 : Construction of Manholes - CHW Pipe
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Drainage Supply Piping Works (4)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Drainage Supply Piping Works (4)
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-5 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6)-phase 1
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Telco Ducts Works (2)
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Vapour Barrier & Water proofing (Bottom of Footing)

Project:

Activity:

AZ1-CONS -LAND-1

Project:
U031215-1
Activity:
Footing Reinforcement
Project:
U031215-1
Activity:
510
Footing & Wall Water proofing
Project:
U031215-1
Activity:
540
Backfilling
Project:
U031215-1
Activity:
690
Excavation & Levelling up to formation level
Project:
U031215-1
Activity:
830
Excavation & Levelling up to formation level
Project:
U031215-1
Activity:
900
R.Wall Reinforcement
Project:
U031215-1
Activity:
250
Excavation & Levelling up to formation level
Project:
U031215-1
Activity:
30
Backfilling
Project:
U031215-1
Activity:
50
Excavation & Levelling up to formation level
Project:
U031215-1
Activity:
10
Brackes & Rails Installation
Project:
U031215-1
Activity:
30
Shaft Wiring
Project:
U031215-1
Activity:
40
Shaft Wiring
Project:
U031215-1
Activity:
00
Templete Fixing by lift contractor - PL 05 to 07
Project:
U031215-1
Activity:
30
Install FF pipes+valves/test
Project:
U031215-1
Activity:
70
Install CHW Pipes+valves
Project:
U031215-1
Activity:
80
Install flexible ducts+plenums
Project:
U031215-1
Activity:
00
Install FF pipes+valves/test
Project:
U031215-1
Activity:
10
Install CHW Pipes+valves
Project:
U031215-1
Activity:
20
EIFS (Without Final Coat) - SPA -Phase 1
Project:
U031215-1
Activity:
80
EIFS (Final Coat) - SPA
Project:
U031215-1
Activity:
0
Install Concealed Piping
Project:
U031215-1
Activity:
0
Install Attenuators/Ducts
Project:
U031215-1
Activity:
Spray Gunite- Hotel Swm pool
Project:
U031215-1
Activity:
Tiling- Hotel Swm pool
Project:
U031215-1
Activity:
Equipment fitout- Hotel Swm pool -phase 2
Project:
U031215-1
Activity:
Wall painting (SIXCO)
Project:
U031215-1
Activity:
Wall painting (SIXCO)
Project:
U031215-1
Activity:
Epoxy flooring and skirting (SIXCO)
Project:
U031215-1
Activity:
Final Coat of painting on walls, Ceiling & Floor

AZ1-CONS -LAND-1

440

U031215-1

Screed

450

AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-8
AZ1-CONS -LIFT-1
AZ1-CONS -LIFT-3
AZ1-CONS -LIFT-3
AZ1-CONS -LIFT-7
AZ1-CONS -SPA-11
AZ1-CONS -SPA-11
AZ1-CONS -SPA-11
AZ1-CONS -SPA-13
AZ1-CONS -SPA-13
AZ1-CONS -SPA-20
AZ1-CONS -SPA-24
AZ1-CONS -SPA-79
AZ1-CONS -SPA-81
AZO1-POOL-2360
AZO1-POOL-3200
AZO1-POOL-3275
BOH10005
BOH10225
BOH10545
BOH11665

Project:
U031215-1
Final Coat of painting on walls, Ceiling &
Project:
U031215-1
stering (SIXCO)
Project:
U031215-1
Final Coat of painting on walls, Ceiling &
Project:
U031215-1
Final Coat of painting on walls, Ceiling &
Project:
U031215-1
Final Coat of painting on walls, Ceiling &
Project:
U031215-1
stering (SIXCO)
Project:
U031215-1
stering (SIXCO)
Project:
U031215-1
stering (SIXCO)
Project:
U031215-1
stering (SIXCO)
Project:
U031215-1
stering (SIXCO)
Project:
U031215-1
stering (SIXCO)
Project:
U031215-1
stering (SIXCO)
Project:
U031215-1
d ceiling layout
Project:
U031215-1
e & Flooring layout
Project:
U031215-1
ishes layout
Project:
U031215-1
and screed (SIXCO)
Project:
U031215-1
and screed (SIXCO)
Project:
U031215-1
Wall painting (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
painting (SIXCO)
Project:
U031215-1
ooring and skirting (SIXCO)
Project:
U031215-1
and wall plastering (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
painting (SIXCO)

Activity:

BOH11695

Activity:

BOH1170 Wall pla

Activity:

BOH11915

Activity:

BOH11925

Activity:

BOH12085

Activity:

BOH1245 Wall pla

Activity:

BOH1275 Wall pla

Activity:

BOH1280 Wall pla

Activity:

BOH1315 Wall pla

Activity:

BOH1330 Wall pla

Activity:

BOH1340 Wall pla

Activity:

BOH1350 Wall pla

Activity:

BOH1380 Reflecte

Activity:

BOH1385 Referenc

Activity:

BOH1390 Wall fin

Activity:

BOH1675 Cement s

Activity:

BOH1690 Cement s

Activity:

BOH189300

Activity:

BOH2005 Wall pai

Activity:

BOH2110 Wall pai

Activity:

BOH2170 Wall pai

Activity:

BOH2200 Wall pai

Activity:

BOH2215 Wall pai

Activity:

BOH2385 Wall pai

Activity:

BOH2435 Wall pai

Activity:

BOH2440 Ceiling

Activity:

BOH2785 Epoxy fl

Activity:

BOH2960 Cement s

Activity:

BOH2980 Wall pai

Activity:

BOH3245 Ceiling

Floor

Floor
Floor
Floor

Project:

U031215-1

Activity:

BOH3575 Wall pai

U031215-1

Activity:

BOH3580 Ceiling

U031215-1

Activity:

BOH3680 Carpet -

U031215-1

Activity:

BOH3690 Epoxy fl

U031215-1

Activity:

BOH3830 Wall pai

U031215-1

Activity:

BOH3850 Wall pai

U031215-1

Activity:

BOH3870 Cement s

U031215-1

Activity:

BOH3915 Cement s

U031215-1

Activity:

BOH4040 Epoxy fl

U031215-1

Activity:

BOH4260 Ceiling

U031215-1

Activity:

BOH4335 Epoxy fl

U031215-1

Activity:

BOH4470 Ceiling

U031215-1

Activity:

BOH4625 Epoxy fl

U031215-1

Activity:

BOH4845 Wall pai

U031215-1

Activity:

BOH4875 Epoxy fl

U031215-1

Activity:

BOH4890 Ceiling

U031215-1

Activity:

BOH4950 Ceiling

U031215-1

Activity:

BOH5005 Wall pai

U031215-1

Activity:

BOH5095 Epoxy fl

U031215-1

Activity:

BOH5100 Ceiling

U031215-1

Activity:

BOH5195 Epoxy fl

U031215-1

Activity:

BOH5230 Wall pai

U031215-1

Activity:

BOH5275 Wall pai

U031215-1

Activity:

BOH5330 Wall Pai

U031215-1

Activity:

BOH5715 Metal do

U031215-1

Activity:

BOH7765 Cutting

U031215-1

Activity:

BOH7795 Wall pla

U031215-1

Activity:

BOH7815 Cement s

U031215-1

Activity:

BOH7985 Cutting

U031215-1

Activity:

BOH7995 Installa

nting (SIXCO)
Project:
painting (SIXCO)
Project:
CPT-1
Project:
ooring & skirting (SIXCO)
Project:
nting (SIXCO)
Project:
nting (SIXCO)
Project:
and wall plastering (SIXCO)
Project:
and screed (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
painting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
painting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
nting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
painting (SIXCO)
Project:
painting (SIXCO)
Project:
nting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
painting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
nting (SIXCO)
Project:
nting (SIXCO)
Project:
nting
Project:
or installation
Project:
& chasing (SIXCO)
Project:
stering (SIXCO)
Project:
and screed (SIXCO)
Project:
& chasing (SIXCO)
Project:
tion of conduits by JLW

Project:

U031215-1

Activity:

BOH8015 Wall pla

Project:
U031215-1
Activity:
and screed (SIXCO)
Project:
U031215-1
Activity:
nting (SIXCO)
Project:
U031215-1
Activity:
d ceiling layout
Project:
U031215-1
Activity:
CPT-1
Project:
U031215-1
Activity:
stering (SIXCO)
Project:
U031215-1
Activity:
k for ceiling
Project:
U031215-1
Activity:
nting (SIXCO)
Project:
U031215-1
Activity:
painting (SIXCO)
Project:
U031215-1
Activity:
& chasing (SIXCO)
Project:
U031215-1
Activity:
tion of conduits by JLW
Project:
U031215-1
Activity:
stering (SIXCO)
Project:
U031215-1
Activity:
nting (SIXCO)
Project:
U031215-1
Activity:
& chasing (SIXCO)
Project:
U031215-1
Activity:
tion of conduits by JLW
Project:
U031215-1
Activity:
stering (SIXCO)
Project:
U031215-1
Activity:
and screed (SIXCO)
Project:
U031215-1
Activity:
by JLW
Project:
U031215-1
Activity:
& chasing (SIXCO)
Project:
U031215-1
Activity:
tion of conduits by JLW
Project:
U031215-1
Activity:
tiles - Walls
Project:
U031215-1
Activity:
nting (SIXCO)
Project:
U031215-1
Activity:
Install RO System
Project:
U031215-1
Activity:
Allow Provisional Sum for Electrical Works -phase 1
Project:
U031215-1
Activity:
Excavation, Leveling & Preparation of Drainage Pit
Project:
U031215-1
Activity:
Supply & Placing of Concrete Base for Paving Band
Project:
U031215-1
Activity:
Excavation of Irrigation Lateral line Trench
Project:
U031215-1
Activity:
Excavation of Palm & Tree Pits
Project:
U031215-1
Activity:
Supply & Lay of Geotextile Membrane
Project:
U031215-1
Activity:
Supply & Lay of Geotextile Membrane

BOH8035 Cement s

stering (SIXCO)
BOH8075 Wall pai
BOH820 Reflecte
BOH840 Carpet BOH8675 Wall pla
BOH8715 Framewor
BOH9035 Wall pai
BOH9045 Ceiling
BOH9105 Cutting
BOH9115 Installa
BOH9145 Wall pla
BOH9335 Wall pai
BOH9395 Cutting
BOH9405 Installa
BOH9425 Wall pla
BOH9445 Cement s
BOH9685 Marking
BOH9695 Cutting
BOH9705 Installa
BOH9755 Ceramic
BOH9785 Wall pai
VO - 18610
Z1-ELEC-010
Z1-HL-D.P-010
Z1-HL-PAV1-010
Z1-IR-060
Z1-SL-010
Z2A-HL-D.P-010
Z2B-HL-D.P-010

Project:
U031215-1
Activity:
Excavation, Leveling & Preparation of Landscape Wall areas
Project:
U031215-1
Activity:
Excavation, Leveling & Preparation of Drainage Pit
Project:
U031215-1
Activity:
Supply & Lay of Geotextile Membrane
Project:
U031215-1
Activity:
Supply & Lay of Geotextile Membrane
Project:
U031215-1
Activity:
Excavation, Leveling & Preparation of Landscape Wall areas
Project:
U031215-1
Activity:
Handing Over and Access to Zone 5
Project:
U031215-1
Activity:
Pressure Test for Irrigation Mainline
Project:
U031215-1
Activity:
Excavation of Irrigation Lateral line Trench
Project:
U031215-1
Activity:
Excavation of Palm & Tree Pits
Project:
U031215-1
Activity:
Supply & Fill of Planting Medium
Project:
U031215-1
Activity:
Excavation, Leveling & Preparation of Drainage Pit
Project:
U031215-1
Activity:
Pressure Test for Irrigation Mainline
Project:
U031215-1
Activity:
Supply & Laying of Lateral Lines Pipes

380
660
010
660
380
660
80
Install
N
0
Install
Install
Install
50
0N
0N

Z2B-HL-LW-010
Z3-HL-D.P-010
Z4-HL-D.P-010
Z5-HL-D.P-010
Z5-HL-LW-010
Z5-IR-010
Z5-IR-050
Z5-IR-060
Z5-SL-010
Z5-SL-020
Z6-HL-D.P-010
Z6-IR-050
Z6-IR-070

Activities with Actual Dates > Data Date.........................116


Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS -2BV2-1
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -2BV2-1
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS -2BV4-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -2BV6-1
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS -3BV4-8
Install IDF- Terminations
Project:
U031215-1
Activity:
AZ1-CONS -BR-330
Concealed Piping
Project:
U031215-1
Activity:
AZ1-CONS -BR-570
Install Concealed Piping
Project:
U031215-1
Activity:
AZ1-CONS -ER-124
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS -ER-460
FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS -ER-830
Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS -ER-850
FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS -GYM-10
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS -GYM-21
Install Concealed Piping Floor
Project:
U031215-1
Activity:
AZ1-CONS -GYM-27
Install Concealed Piping Floor

0
0
0
0
130
120
360
490
940
240
00
80
60
40
40
30
20
20
2N10
4N10
10
20
80
90
80
40
70
80
73N
75N

Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Install DB/Termination
Project:
U031215-1
Activity:
AZ1-CONS
Install DB/Termination
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Attenuators/Ducts
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*

-GYM-68
-GYM-69
-GYM-72
-GYM-74
-HS1-10
-HS1-13
-HS1-13
-HS1-13
-HS1-13
-HS1-14
-HS1-20
-HS1-23
-HS1-24
-HS1-27
-HS1-29
-HS1-33
-HS1-34
-HS1-36
-HS1-36
-HS1-36
-HS1-44
-HS1-47
-HS1-47
-HS1-47
-HS1-48
-HS1-52
-HS1-56
-HS1-56
-HS1-58
-HS1-58

80
90
63N
65N
10
90
80
80
20
40
70
40
60
90
50
20
60
50
70
90
10
30
10
10
80
10
80
30
90
160N

Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install PD pipes & test (wet area)
Project:
U031215-1
Activity:
Install Cable Ladder in trench
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Install PD pipes & test (wet area)
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Install PD pipes & test (wet area)
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install CHW Pipes+valves
Project:
U031215-1
Activity:
Install Attenuators/Duct connections
Project:
U031215-1
Activity:
Install CHW Pipes+valves
Project:
U031215-1
Activity:
Access required for MEP First Fix*

AZ1-CONS -HS1-59
AZ1-CONS -HS1-59
AZ1-CONS -HS1-62
AZ1-CONS -HS1-62
AZ1-CONS -HS1-66
AZ1-CONS -HS1-68
AZ1-CONS -HS1-71
AZ1-CONS -HS1-72
AZ1-CONS -HS1-75
AZ1-CONS -HS1-78
AZ1-CONS -HS1-79
AZ1-CONS -HS1-83
AZ1-CONS -HS1-84
AZ1-CONS -HS1-85
AZ1-CONS -HS1-86
AZ1-CONS -HS1-88
AZ1-CONS -HS1-90
AZ1-CONS -HS1-91
AZ1-CONS -HS1-92
AZ1-CONS -HS1-93
AZ1-CONS -HS1-94
AZ1-CONS -HS1-94
AZ1-CONS -HS1-97
AZ1-CONS -HS1-98
AZ1-CONS -HS1-98
AZ1-CONS -HS1-99
AZ1-CONS -HS2-21
AZ1-CONS -HS2-35
AZ1-CONS -HS2-41
AZ1-CONS -HS3-12

161N
2N
440
1N
4N
710
530
770
030
240
680
820
820N
0N
1N
4N
1N
4N
50
80
40N
60
0N
80N
81N
22N
25N
50
00N
01N

Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Access required for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Install LV (Secondary) + Control Cables
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install & Earthing system
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Install CHW header pipes+valves/test
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Install Attenuators/Ducts
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix (High Level)*

AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-14
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-17
AZ1-CONS -HS3-20
AZ1-CONS -HS3-20
AZ1-CONS -HS3-21
AZ1-CONS -HS3-21
AZ1-CONS -HS3-24
AZ1-CONS -HS3-26
AZ1-CONS -HS3-27
AZ1-CONS -HS3-31
AZ1-CONS -HS3-36
AZ1-CONS -HS3-58
AZ1-CONS -HS3-58
AZ1-CONS -HS3-63
AZ1-CONS -HS3-63
AZ1-CONS -HS3-63
AZ1-CONS -HS3-70
AZ1-CONS -HS3-70

00
0
23N
10
0
ooring
ooring
Supply
Supply
Supply

Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
and skirting (SIXCO)
Project:
U031215-1
Activity:
and skirting (SIXCO)
Project:
U031215-1
Activity:
& Lay of Geotextile Membrane
Project:
U031215-1
Activity:
& Lay of Drain Pipe
Project:
U031215-1
Activity:
& Lay of Gravel Drainage Layer

AZ1-CONS -HS3-73
AZ1-CONS -HS3-74
AZ1-CONS -HS3-75
AZ1-CONS -SPA-11
AZ1-CONS -SPA-80
BOH2700 Epoxy fl
BOH2705 Epoxy fl
Z5-HL-LW-060
Z5-HL-LW-070
Z5-HL-LW-080

Milestone Activities with invalid relationships..................4


Project:
U031215-1
Activity:
A17740 Mileston
e 1 : Temporary water, sewage and power connections to permit start-up of wild-a
ir
Project:
U031215-1
Activity:
A188719N10
Receive Butler Paging System (Ref: )
Project:
U031215-1
Activity:
AZ1 - DELAY-3830
Revised UPS Load Calculation for Hotel Main Server Room and Security Equipment R
oom
Project:
U031215-1
Activity:
Z3-IR-010
Handing Over and Access to Zone 3
Finish milestone and predecessors have different calendars.......0
Scheduling/Leveling Results:
---------------------------# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................12208
# Relationships with other projects..............................0
Data Date........................................................03-Dec15
Earliest Early Start Date........................................03-Dec15
Latest Early Finish Date.........................................03-Aug16
Exceptions:
----------Critical Activities..............................................6192
Project:
U031215-1
Activity:
20
Access r
equired for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
30
Access r
equired for MEP Final Fix*
Project:
U031215-1
Activity:
40
Access r
equired for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
50
Access r
equired for MEP First Fix*
Project:
U031215-1
Activity:
60
Access r
equired for MEP Second Fix*
Project:
U031215-1
Activity:
70
Access r

equired for MEP Final Fix*


Project:
U031215-1
Activity:
A15160 Main Poo
l & Water feature : Final snagging & De snagging
Project:
U031215-1
Activity:
A15170 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15180 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15190 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15200 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15210 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15220 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15230 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15240 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15280 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15290 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15300 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15310 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15320 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15330 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15340 Structur
al steel for Rafters
Project:
U031215-1
Activity:
A15350 Structur
al Steel for Pergola
Project:
U031215-1
Activity:
A15360 Structur
al Steel for Pergola
Project:
U031215-1
Activity:
A16770 Material
delivery to site - Smoke Management system
Project:
U031215-1
Activity:
A16790 Install
fans @ Sector 1 Roof (Required duration is 15 days, Cleint instruction is 10 da
ys)
Project:
U031215-1
Activity:
A16800 Install
fans @ Sector 3 Roof (Required duration is 15 days, Cleint instruction is 10 da
ys)
Project:
U031215-1
Activity:
A17740 Mileston
e 1 : Temporary water, sewage and power connections to permit start-up of wild-a
ir
Project:
U031215-1
Activity:
A17750 Mileston
e 2 : Building fully enclosed, Temporary Water & Power Connections and commencem
ent of Testing & Commissioning
Project:
U031215-1
Activity:
A17760 Mileston
e 3 : Substantial Completion of Back of House of Hotel Basement Areas (as per cl
ient ins without CD and cause &
Project:
U031215-1
Activity:
A17790 Bond pac
kage-03 - Prelims
Project:
U031215-1
Activity:
A17850 3 BRV Co
mpletion
Project:
U031215-1
Activity:
A17860 2 BRV Co
mpletion

Project:

U031215-1

Activity:

A17870 Gym Comp

Project:

U031215-1

Activity:

A17880 Spa Comp

Project:

U031215-1

Activity:

A17890 Day Care

letion
letion
Completion
Project:
U031215-1
Activity:
A17900
staurant Completion
Project:
U031215-1
Activity:
A17920
c 1 Completion
Project:
U031215-1
Activity:
A17930
c 2 Completion
Project:
U031215-1
Activity:
A17940
c 3 Completion
Project:
U031215-1
Activity:
A17950
c 4 Completion
Project:
U031215-1
Activity:
A17960
ater Features Completion
Project:
U031215-1
Activity:
A17990
ping works Completion
Project:
U031215-1
Activity:
A18000
& Commissioning Completion
Project:
U031215-1
Activity:
A18030
erator on board to start snagging works
Project:
U031215-1
Activity:
A18480
DB
Project:
U031215-1
Activity:
A18490
Cable Trays/ Trunking
Project:
U031215-1
Activity:
A18520
nation & Testing
Project:
U031215-1
Activity:
A18530
LV Cables
Project:
U031215-1
Activity:
A18590
m Testing
Project:
U031215-1
Activity:
A18850
Extract fans New IFC
Project:
U031215-1
Activity:
A18860N
Ducts/dampers
Project:
U031215-1
Activity:
A188950
and Submit ID Elevation Shop drawings - Hotel (Basement)
Project:
U031215-1
Activity:
A188960
Approval of ID ElevationShop drawings - Hotel (Basement)
Project:
U031215-1
Activity:
A189030
pression Material delivery
Project:
U031215-1
Activity:
A189050
ry equipments Material delivery
Project:
U031215-1
Activity:
A22110
arm / Door Monitoring System - Network Schematic & Cable Route
Project:
U031215-1
Activity:
A22260
sual / BGM System - Hotel Basement Floor Main Server Room Details
Project:
U031215-1
Activity:
A22460
al Services - Penthouse Corner Elevation & Details Typical Layout
Project:
U031215-1
Activity:
A22660
Management System - Equipment Schematic
Project:
U031215-1
Activity:
A22710
Management System - Equipment Schematic
Project:
U031215-1
Activity:
A23110
rdination Layout - Hotel Basement Sector 03 Sections
Project:
U031215-1
Activity:
A23130
ted MEP Services - Hotel Basement Sector 04 Plan

Beach Re
Hotel Se
Hotel Se
Hotel Se
Hotel Se
Pool & w
Landscap
Testing
Hotel Op
Install
Install
DB Termi
Install
RO Syste
Install
Install
Prepare
Review &
Fire sup
New Pant
Panic Al
Audio Vi
Electric
Building
Building
MEP Co-o
Coordina

Project:
U031215-1
Activity:
A23790N Install
FCUs + Valve packages
Project:
U031215-1
Activity:
A23800N Install
CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1 - MAT-APP--3
690
Head boards
Project:
U031215-1
Activity:
AZ1 - MAT-APP-22
0
Stone / tiles
Project:
U031215-1
Activity:
AZ1 - MAT-APP-24
0
Glass / metal
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-1
870
Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-1
90
Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-1
930
Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-1
990
Material Delivery to site -LV Switchgear (MDB's)
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
090
Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
150
Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
350
Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
410
Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
470
Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
530
Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
591N
Material Delivery to site for New Disabled Alarm*
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
690
Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
800
Material Delivery to site - SMDB
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
850
Material Delivery to site - LV Switchgear (Control Panels)
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
90
Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-2
900
Material Delivery to site - LV Switchgear (DB's)
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
000
Carpet (TBC)
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
040
Head boards
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
050
Doors & door frames
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
060
Other joinery items
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
080
Pavigres tiles - Floor Tile at Dry Areas
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
170
Veneer / wood
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
180
Fabrics for headboard (TBC)
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
220
Doors & door frames
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
230
Other joinery items

Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
Stone / tiles
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
260
Glass / metal
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
300
Operable partitions
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
400
Frame Delivery - Micellaneous Building
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
420
Glass Delivery - Micellaneous Building
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
430
Frame Delivery for Spa & Ballroom
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
440
Glass order & Delivery for Spa & Ball room
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
460
Glass Fabrication & Delivery - Hotel
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
480
Procurement of WPC Panels - Hotel & Villa
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
490
Procurement of WPC tracks - Hotel & Villa
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
530
Kitchen & Laundry Equipment Production
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
540
Kitchen & Laundry Equipments Shipping & Delivery on Site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
550
Consultant Material Inspection for Kitchen & Laundry
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
560
Hoods Ordering, Production & Shipping
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
570
Delivery of Hoods to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
580
Consultant Material inspection for Hoods
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
600
Cold Room works Material Delivery to site
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
630
Custom Equipments Delivery to Site & Inspection
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
640
Procurement of WPC Panels - Micellaneous Building
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
660
Dominico Mori - Phase 4 (20 Nos Guest rooms hotel, 2 rooms- 2 BV & 1 roo
m 3 BV) - Client supply
Project:
U031215-1
Activity:
AZ1 - MAT-PROC-3
670
Dominico Mori - Phase 5 (All Other Areas) - Client supply
Project:
U031215-1
Activity:
AZ1 - MAT-SUB-25
0
Stone / tiles
Project:
U031215-1
Activity:
AZ1 - MAT-SUB-27
0
Glass / metal
Project:
U031215-1
Activity:
AZ1 - MAT-SUB-37
20
Head boards
Project:
U031215-1
Activity:
AZ1 - ML-110
Availability of Temporary Water, Sewage & Elec Connection for Wild Air
Project:
U031215-1
Activity:
AZ1 - MOCK-1240
Joinery Installation for Vanity, Main door & Walk in closet
Project:
U031215-1
Activity:
AZ1 - MOCK-1280
Sanitary ware installation
Project:
U031215-1
Activity:
AZ1 - MOCK-1290
MEP Final Fix on wall & Ceiling
Project:
U031215-1
Activity:
AZ1 - MOCK-1310
Final Cleaning, Snagging & Desnagging
Project:
U031215-1
Activity:
AZ1 - MOCK-640
240

Stucco, Primer & Paint all area Partition


Project:
U031215-1
Activity:
Desert leisure Prelims
Project:
U031215-1
Activity:
Site access
Project:
U031215-1
Activity:
Elenco prelims
Project:
U031215-1
Activity:
Submission of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Submission of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Preparation of shop drawings
Project:
U031215-1
Activity:
Submission of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Preparation of shop drawings
Project:
U031215-1
Activity:
Submission of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Submission of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Preparation of shop drawings
Project:
U031215-1
Activity:
Submission of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
Shop drawing submittal - Wooden decks
Project:
U031215-1
Activity:
Shop drawing Approval - Wooden decks
Project:
U031215-1
Activity:
Kitchen Hood Drawings Approval
Project:
U031215-1
Activity:
Custom Fabrication Equipments Shop Drawing Submission
Project:
U031215-1
Activity:
Custom Fabrication Equipments Shop Drawing Approval
Project:
U031215-1
Activity:
Fire Suppression shop drawings Approval
Project:
U031215-1
Activity:
Submission of shop drawings - As per new ID Dwgs
Project:
U031215-1
Activity:

AZ1 - PREL-110
AZ1 - PREL-600
AZ1 - PREL-650
AZ1 - SD-1020
AZ1 - SD-1030
AZ1 - SD-1090
AZ1 - SD-1140
AZ1 - SD-1150
AZ1 - SD-1290
AZ1 - SD-1320
AZ1 - SD-1330
AZ1 - SD-1340
AZ1 - SD-1350
AZ1 - SD-1390
AZ1 - SD-1400
AZ1 - SD-1410
AZ1 - SD-1460
AZ1 - SD-1470
AZ1 - SD-1510
AZ1 - SD-1520
AZ1 - SD-1530
AZ1 - SD-1560
AZ1 - SD-1630
AZ1 - SD-1640
AZ1 - SD-1800
AZ1 - SD-1830
AZ1 - SD-1840
AZ1 - SD-1870
AZ1 - SD-1890
AZ1 - SD-1900

Approval of shop drawings - As per new ID Dwgs


Project:
U031215-1
Activity:
Submission of shop drawings - As per new ID Dwgs
Project:
U031215-1
Activity:
Approval of shop drawings - As per new ID Dwgs
Project:
U031215-1
Activity:
0
Door shop drawings submission
Project:
U031215-1
Activity:
0
Door shop drawings Approval
Project:
U031215-1
Activity:
0
Preparation of shop drawings
Project:
U031215-1
Activity:
0
Submission of shop drawings
Project:
U031215-1
Activity:
0
Receipt of commented drawings
Project:
U031215-1
Activity:
0
Resubmission & final approval
Project:
U031215-1
Activity:
0
Preparation of shop drawings
Project:
U031215-1
Activity:
0
Submission of shop drawings
Project:
U031215-1
Activity:
0
Receipt of commented drawings
Project:
U031215-1
Activity:
0
Resubmission & final approval
Project:
U031215-1
Activity:
Preparation of shop drawings
Project:
U031215-1
Activity:
Submission of shop drawings
Project:
U031215-1
Activity:
Receipt of commented drawings
Project:
U031215-1
Activity:
Resubmission & final approval
Project:
U031215-1
Activity:
Preparation of shop drawings
Project:
U031215-1
Activity:
0
Door shop drawings submission
Project:
U031215-1
Activity:
Submission of shop drawings
Project:
U031215-1
Activity:
0
Door shop drawings Approval
Project:
U031215-1
Activity:
Receipt of commented drawings
Project:
U031215-1
Activity:
0
Resubmission & final approval
Project:
U031215-1
Activity:
Resubmission & final approval
Project:
U031215-1
Activity:
Approval of shop drawings
Project:
U031215-1
Activity:
0
Preparation of shop drawings
Project:
U031215-1
Activity:
0
Submission of shop drawings
Project:
U031215-1
Activity:
0
Receipt of commented drawings
Project:
U031215-1
Activity:
0
Resubmission & final approval
Project:
U031215-1
Activity:
0
Preparation of shop drawings
Project:
U031215-1
Activity:

AZ1 - SD-1920
AZ1 - SD-1930
AZ1 - SD-2BV-167
AZ1 - SD-2BV-168
AZ1 - SD-2BV-202
AZ1 - SD-2BV-203
AZ1 - SD-2BV-204
AZ1 - SD-2BV-205
AZ1 - SD-2BV-208
AZ1 - SD-2BV-209
AZ1 - SD-2BV-210
AZ1 - SD-2BV-211
AZ1 - SD-2BV-220
AZ1 - SD-2BV-230
AZ1 - SD-2BV-240
AZ1 - SD-2BV-780
AZ1 - SD-3BV-160
AZ1 - SD-3BV-169
AZ1 - SD-3BV-170
AZ1 - SD-3BV-170
AZ1 - SD-3BV-180
AZ1 - SD-3BV-225
AZ1 - SD-3BV-760
AZ1 - SD-970
AZ1 - SD-HS1-295
AZ1 - SD-HS1-296
AZ1 - SD-HS1-297
AZ1 - SD-HS1-298
AZ1 - SD-HS1-306
AZ1 - SD-HS1-307

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Submission of shop drawings


Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
Preparation of shop drawings
Project:
U031215-1
Submission of shop drawings
Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
Submission of shop drawings
Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
Preparation of shop drawings
Project:
U031215-1
Submission of shop drawings
Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
Preparation of shop drawings
Project:
U031215-1
Submission of shop drawings
Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
Preparation of shop drawings
Project:
U031215-1
Submission of shop drawings
Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
Preparation of shop drawings
Project:
U031215-1
Submission of shop drawings
Project:
U031215-1

Activity:

AZ1 - SD-HS1-308

Activity:

AZ1 - SD-HS1-309

Activity:

AZ1 - SD-HS1-312

Activity:

AZ1 - SD-HS1-313

Activity:

AZ1 - SD-HS1-322

Activity:

AZ1 - SD-HS1-323

Activity:

AZ1 - SD-HS1-324

Activity:

AZ1 - SD-HS1-325

Activity:

AZ1 - SD-HS1-355

Activity:

AZ1 - SD-HS1-356

Activity:

AZ1 - SD-HS1-357

Activity:

AZ1 - SD-HS1-362

Activity:

AZ1 - SD-HS1-363

Activity:

AZ1 - SD-HS1-364

Activity:

AZ1 - SD-HS1-365

Activity:

AZ1 - SD-HS1-366

Activity:

AZ1 - SD-HS1-367

Activity:

AZ1 - SD-HS1-368

Activity:

AZ1 - SD-HS1-369

Activity:

AZ1 - SD-HS1-374

Activity:

AZ1 - SD-HS1-375

Activity:

AZ1 - SD-HS1-376

Activity:

AZ1 - SD-HS1-377

Activity:

AZ1 - SD-HS1-380

Activity:

AZ1 - SD-HS1-381

Activity:

AZ1 - SD-HS1-384

Activity:

AZ1 - SD-HS1-385

Activity:

AZ1 - SD-HS3-190

Activity:

AZ1 - SD-HS3-191

Activity:

AZ1 - SD-HS3-192

Receipt of commented drawings


Project:
U031215-1
0
Resubmission & final approval
Project:
U031215-1
0
Submission of shop drawings
Project:
U031215-1
0
Receipt of commented drawings
Project:
U031215-1
0
Resubmission & final approval
Project:
U031215-1
0
Preparation of shop drawings
Project:
U031215-1
0
Submission of shop drawings
Project:
U031215-1
0
Receipt of commented drawings
Project:
U031215-1
0
Resubmission & final approval
Project:
U031215-1
0
Preparation of shop drawings
Project:
U031215-1
0
Submission of shop drawings
Project:
U031215-1
0
Receipt of commented drawings
Project:
U031215-1
0
Resubmission & final approval
Project:
U031215-1
0
Preparation of shop drawings
Project:
U031215-1
0
Submission of shop drawings
Project:
U031215-1
0
Receipt of commented drawings
Project:
U031215-1
0
Resubmission & final approval
Project:
U031215-1
0
Receipt of commented drawings
Project:
U031215-1
0
Resubmission & final approval
Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Preparation of shop drawings
Project:
U031215-1
Submission of shop drawings
Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Preparation of shop drawings
Project:
U031215-1
Submission of shop drawings
Project:
U031215-1
Receipt of commented drawings
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
Resubmission & final approval
Project:
U031215-1
0
Vinyl Sheet
Project:
U031215-1

Activity:

AZ1 - SD-HS3-193

Activity:

AZ1 - SD-HS3-259

Activity:

AZ1 - SD-HS3-260

Activity:

AZ1 - SD-HS3-261

Activity:

AZ1 - SD-HS3-266

Activity:

AZ1 - SD-HS3-267

Activity:

AZ1 - SD-HS3-268

Activity:

AZ1 - SD-HS3-269

Activity:

AZ1 - SD-HS3-270

Activity:

AZ1 - SD-HS3-271

Activity:

AZ1 - SD-HS3-272

Activity:

AZ1 - SD-HS3-273

Activity:

AZ1 - SD-HS3-278

Activity:

AZ1 - SD-HS3-279

Activity:

AZ1 - SD-HS3-280

Activity:

AZ1 - SD-HS3-281

Activity:

AZ1 - SD-HS3-288

Activity:

AZ1 - SD-HS3-289

Activity:

AZ1 - SD-HS3-300

Activity:

AZ1 - SD-HS3-340

Activity:

AZ1 - SD-HS3-350

Activity:

AZ1 - SD-HS3-360

Activity:

AZ1 - SD-HS3-400

Activity:

AZ1 - SD-HS3-410

Activity:

AZ1 - SD-HS3-420

Activity:

AZ1 - SD-HS3-800

Activity:

AZ1 - SD-HS3-820

Activity:

AZ1 - SD-HS3-840

Activity:

AZ1- MAT-PROC-15

Activity:

AZ1- MAT-PROC-17

0
0
0
000
020
022N
023N
024N
030
100
120
140
170
180
190
210
240
260
280
300
360
370
380
390
400
410
430
440
closet
450
460

Rolling Shutter
Project:
U031215-1
Activity:
AZ1- MAT-PROC-19
Corner Guards
Project:
U031215-1
Activity:
AZ1- MAT-PROC-20
Sanitary wares
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV1-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
Headboard fixing
Project:
Cleaning & snagging

U031215-1

Activity:

AZ1-CONS -2BV1-1

U031215-1

Activity:

AZ1-CONS -2BV1-1

480
500
510
530
540
550
560
570
590
610
630
640
650
670
680
690
700
740
750
770
780
790
800
820
880
890
050
090
10
21N

Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Vanity counters fixing
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 2BR/V1
Project:
U031215-1
Activity:
Facade terrace ceiling cement board - 2BR/V1
Project:
U031215-1
Activity:
Facade terrace floor Decking - 2BR/V1
Project:
U031215-1
Activity:
Rafters - 2BR/V1
Project:
U031215-1
Activity:
2BV1 : Final snagging & De snagging
Project:
U031215-1
Activity:
Alum & Glass - Glass works - 2BR/V1
Project:
U031215-1
Activity:
WPC Panels Installation - 2BR/V1
Project:
U031215-1
Activity:
WPC Track installation - 2BR/V1
Project:
U031215-1
Activity:
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
Epoxy on Floor
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Access required for MEP Final Fix*

AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-1
AZ1-CONS -2BV1-3
AZ1-CONS -2BV1-3
AZ1-CONS -2BV1-5
AZ1-CONS -2BV1-5

30
30
40
50
60
90
00
10
00
21N
60
70
90
00
10
20
70
80
90
100
121N
160
170
190
200
210
220
270
280
300

Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Install Control Panels & DDC
Project:
U031215-1
Install Cable trays
Project:
U031215-1
Install LV Cables
Project:
U031215-1
Control Panel Cable termination
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Access required for MEP Final Fix*
Project:
U031215-1
Install LV Cable trays
Project:
U031215-1
Install LV Cables
Project:
U031215-1
Install SMDBs
Project:
U031215-1
Install DBs
Project:
U031215-1
SMDB Termination & testing
Project:
U031215-1
DB Termination & testing
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install Fire extinguishers
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Access required for MEP Final Fix*
Project:
U031215-1
Install LV Cable trays
Project:
U031215-1
Install LV Cables
Project:
U031215-1
Install SMDBs
Project:
U031215-1
Install DBs
Project:
U031215-1
SMDB Termination & testing
Project:
U031215-1
DB Termination & testing
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Inspection & Approvals

Activity:

AZ1-CONS -2BV1-5

Activity:

AZ1-CONS -2BV1-6

Activity:

AZ1-CONS -2BV1-6

Activity:

AZ1-CONS -2BV1-6

Activity:

AZ1-CONS -2BV1-6

Activity:

AZ1-CONS -2BV1-6

Activity:

AZ1-CONS -2BV1-7

Activity:

AZ1-CONS -2BV1-7

Activity:

AZ1-CONS -2BV1-8

Activity:

AZ1-CONS -2BV1-8

Activity:

AZ1-CONS -2BV1-8

Activity:

AZ1-CONS -2BV1-8

Activity:

AZ1-CONS -2BV1-8

Activity:

AZ1-CONS -2BV1-9

Activity:

AZ1-CONS -2BV1-9

Activity:

AZ1-CONS -2BV1-9

Activity:

AZ1-CONS -2BV1-9

Activity:

AZ1-CONS -2BV1-9

Activity:

AZ1-CONS -2BV1-9

Activity:

AZ1-CONS -2BV2-1

Activity:

AZ1-CONS -2BV2-1

Activity:

AZ1-CONS -2BV2-1

Activity:

AZ1-CONS -2BV2-1

Activity:

AZ1-CONS -2BV2-1

Activity:

AZ1-CONS -2BV2-1

Activity:

AZ1-CONS -2BV2-1

Activity:

AZ1-CONS -2BV2-1

Activity:

AZ1-CONS -2BV2-1

Activity:

AZ1-CONS -2BV2-1

Activity:

AZ1-CONS -2BV2-1

360
370
380
390
400
410
430
440
closet
450
460
480
500
510
540
550
560
570
590
630
640
650
670
680
690
700
740
750
770
780

Project:
U031215-1
Activity:
AZ1-CONS -2BV2-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -2BV2-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV2-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -2BV2-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV2-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV2-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV2-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV2-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
Headboard fixing
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 2BR/V2
Project:
U031215-1
Activity:
Facade terrace ceiling cement board - 2BR/V2
Project:
U031215-1
Activity:
Facade terrace floor Decking - 2BR/V2
Project:
U031215-1
Activity:

AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1
AZ1-CONS -2BV2-1

790
800
880
890
950
980
990
10
21N
30
90
00
10
60
70
80
90
30
32N
33N
34N
40
10
30
50
80
90
00
20
50

Rafters - 2BR/V2
Project:
U031215-1
Activity:
AZ1-CONS
2BV2 : Final snagging & De snagging
Project:
U031215-1
Activity:
AZ1-CONS
WPC Panels Installation - 2BR/V2
Project:
U031215-1
Activity:
AZ1-CONS
WPC Track installation - 2BR/V2
Project:
U031215-1
Activity:
AZ1-CONS
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
AZ1-CONS
Equipment fitout- 2BRV2
Project:
U031215-1
Activity:
AZ1-CONS
Epoxy on Floor
Project:
U031215-1
Activity:
AZ1-CONS
Wild air provisions
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Install Control Panels & DDC
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
AZ1-CONS

-2BV2-1
-2BV2-1
-2BV2-1
-2BV2-2
-2BV2-2
-2BV2-2
-2BV2-5
-2BV2-5
-2BV2-5
-2BV2-5
-2BV2-6
-2BV2-6
-2BV2-6
-2BV2-6
-2BV2-6
-2BV2-6
-2BV2-7
-2BV2-7
-2BV2-7
-2BV2-7
-2BV2-7
-2BV2-8
-2BV2-8
-2BV2-8
-2BV2-8
-2BV2-8
-2BV2-9
-2BV2-9
-2BV2-9
-2BV2-9

70
90
000
020
030
041N
042N
043N
100
120
140
170
180
190
210
240
250N
260
280
290
300
360
370
380
390
400
410
430
440
closet
450

Install FA+CB+PA devices


Project:
U031215-1
Activity:
AZ1-CONS -2BV2-9
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Install ELV devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV3-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
Headboard fixing

U031215-1

Activity:

AZ1-CONS -2BV3-1

460
480
500
510
530
540
550
560
570
590
630
640
650
670
680
690
700
740
750
770
780
790
800
880
890
850
880
10
20
41N

Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 2BR/V3
Project:
U031215-1
Activity:
Facade terrace ceiling cement board - 2BR/V3
Project:
U031215-1
Activity:
Facade terrace floor Decking - 2BR/V3
Project:
U031215-1
Activity:
Rafters - 2BR/V3
Project:
U031215-1
Activity:
2BV3: Final snagging & De snagging
Project:
U031215-1
Activity:
WPC Panels Installation - 2BR/V3
Project:
U031215-1
Activity:
WPC Track installation - 2BR/V3
Project:
U031215-1
Activity:
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
Equipment fitout- 2BRV3
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix*

AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-1
AZ1-CONS -2BV3-2
AZ1-CONS -2BV3-2
AZ1-CONS -2BV3-5
AZ1-CONS -2BV3-5
AZ1-CONS -2BV3-5

10
20
40
90
00
10
20
11N
20
20
30
40
50
80
90
020
030
040
060
130
160
180
200
220
360
370
380
390
400
410

Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Install Control Panels & DDC
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling

-2BV3-6
-2BV3-6
-2BV3-6
-2BV3-6
-2BV3-7
-2BV3-7
-2BV3-7
-2BV3-8
-2BV3-8
-2BV3-9
-2BV3-9
-2BV3-9
-2BV3-9
-2BV3-9
-2BV3-9
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1
-2BV4-1

420
430
440
closet
450
460
480
500
510
540
550
560
570
590
630
640
650
670
680
690
700
740
750
770
780
790
800
880
890
750

Project:
U031215-1
Activity:
AZ1-CONS -2BV4-1
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -2BV4-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV4-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
Headboard fixing
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 2BR/V4
Project:
U031215-1
Activity:
Facade terrace ceiling cement board - 2BR/V4
Project:
U031215-1
Activity:
Facade terrace floor Decking - 2BR/V4
Project:
U031215-1
Activity:
Rafters - 2BR/V4
Project:
U031215-1
Activity:
2BV4: Final snagging & De snagging
Project:
U031215-1
Activity:
WPC Panels Installation - 2BR/V4
Project:
U031215-1
Activity:
WPC Track installation - 2BR/V4
Project:
U031215-1
Activity:
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:

AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-1
AZ1-CONS -2BV4-2
AZ1-CONS -2BV4-2

780
10
20
41N
80
90
10
20
30
40
90
00
10
20
31N
40
00
10
20
70
80
90
00
40
50
61N
62N
63N
000
020

Equipment fitout- 2BRV4


Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install LV Cable trays
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
SMDB Termination & testing
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Control Panels & DDC
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Control Panel Cable termination
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:

AZ1-CONS -2BV4-5
AZ1-CONS -2BV4-5
AZ1-CONS -2BV4-5
AZ1-CONS -2BV4-5
AZ1-CONS -2BV4-5
AZ1-CONS -2BV4-6
AZ1-CONS -2BV4-6
AZ1-CONS -2BV4-6
AZ1-CONS -2BV4-6
AZ1-CONS -2BV4-6
AZ1-CONS -2BV4-7
AZ1-CONS -2BV4-7
AZ1-CONS -2BV4-7
AZ1-CONS -2BV4-7
AZ1-CONS -2BV4-7
AZ1-CONS -2BV4-8
AZ1-CONS -2BV4-8
AZ1-CONS -2BV4-8
AZ1-CONS -2BV4-8
AZ1-CONS -2BV4-8
AZ1-CONS -2BV4-8
AZ1-CONS -2BV4-9
AZ1-CONS -2BV4-9
AZ1-CONS -2BV4-9
AZ1-CONS -2BV4-9
AZ1-CONS -2BV4-9
AZ1-CONS -2BV4-9
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1

051N
052N
053N
054N
100
120
140
170
180
190
210
240
250
250N
260
280
290
300
360
370
380
390
400
410
420
430
440
closet
450
460
480

Access required for MEP First/Second Fix (Partition)*


Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Install ELV devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV5-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
Headboard fixing
Project:
Cleaning & snagging
Project:
Painting 1st coat

U031215-1

Activity:

AZ1-CONS -2BV5-1

U031215-1

Activity:

AZ1-CONS -2BV5-1

U031215-1

Activity:

AZ1-CONS -2BV5-1

500
530
540
550
560
570
590
630
640
650
670
680
690
700
740
750
770
780
790
800
880
890
650
10
01N
10
10
20
30
40

Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 2BR/V5
Project:
U031215-1
Activity:
Facade terrace ceiling cement board - 2BR/V5
Project:
U031215-1
Activity:
Facade terrace floor Decking - 2BR/V5
Project:
U031215-1
Activity:
Rafters - 2BR/V5
Project:
U031215-1
Activity:
2BV5 : Final snagging & De snagging
Project:
U031215-1
Activity:
WPC Panels Installation - 2BR/V5
Project:
U031215-1
Activity:
WPC Track installation - 2BR/V5
Project:
U031215-1
Activity:
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Install Control Panels & DDC
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Control Panel Cable termination

AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-1
AZ1-CONS -2BV5-2
AZ1-CONS -2BV5-5
AZ1-CONS -2BV5-6
AZ1-CONS -2BV5-6
AZ1-CONS -2BV5-7
AZ1-CONS -2BV5-7
AZ1-CONS -2BV5-7
AZ1-CONS -2BV5-7

70
80
90
00
21N
90
00
20
70
80
000
030
040
040N
050
070
080
090
100
121N
150
160
170
190
200
210
220
270
280
290

Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install ELV devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install LV Cable trays
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
SMDB Termination & testing
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Fire extinguishers

AZ1-CONS -2BV5-7
AZ1-CONS -2BV5-7
AZ1-CONS -2BV5-7
AZ1-CONS -2BV5-8
AZ1-CONS -2BV5-8
AZ1-CONS -2BV5-8
AZ1-CONS -2BV5-9
AZ1-CONS -2BV5-9
AZ1-CONS -2BV5-9
AZ1-CONS -2BV5-9
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1

300
360
370
380
390
400
410
420
430
440
closet
450
460
480
500
540
550
560
570
640
650
670
690
700
740
750
770
780
790
800

Project:
U031215-1
Activity:
AZ1-CONS -2BV6-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -2BV6-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -2BV6-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV6-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -2BV6-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV6-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV6-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV6-1
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -2BV6-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV6-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
Headboard fixing
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 2BR/V6
Project:
U031215-1
Activity:
Facade terrace ceiling cement board - 2BR/V6
Project:
U031215-1
Activity:
Facade terrace floor Decking - 2BR/V6
Project:
U031215-1
Activity:
Rafters - 2BR/V6
Project:
U031215-1
Activity:
2BV6 : Final snagging & De snagging
Project:
U031215-1
Activity:

AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1
AZ1-CONS -2BV6-1

880
890
550
590
10
01N
10
70
80
90
40
50
60
70
10
20
31N
32N
33N
90
10
30
60
040
050
060
070
100
111N
160

WPC Panels Installation - 2BR/V6


Project:
U031215-1
Activity:
AZ1-CONS
WPC Track installation - 2BR/V6
Project:
U031215-1
Activity:
AZ1-CONS
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
AZ1-CONS
Epoxy on Floor
Project:
U031215-1
Activity:
AZ1-CONS
Wild air provisions
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Install Control Panels & DDC
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Install Control Panels & DDC
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cable trays
Project:
U031215-1
Activity:
AZ1-CONS

-2BV6-1
-2BV6-2
-2BV6-2
-2BV6-5
-2BV6-6
-2BV6-6
-2BV6-6
-2BV6-6
-2BV6-6
-2BV6-7
-2BV6-7
-2BV6-7
-2BV6-7
-2BV6-8
-2BV6-8
-2BV6-8
-2BV6-8
-2BV6-8
-2BV6-8
-2BV6-9
-2BV6-9
-2BV6-9
-2BV7-1
-2BV7-1
-2BV7-1
-2BV7-1
-2BV7-1
-2BV7-1
-2BV7-1
-2BV7-1

170
190
200
210
220
270
280
290
300
360
370
380
390
400
410
420
430
440
closet
450
460
480
500
530
540
550
560
570
640
650
670

Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
SMDB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Headboard fixing
Project:
U031215-1
Cleaning & snagging
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Door frames installation
Project:
U031215-1
Wall plastering
Project:
U031215-1
Ceiling stud works
Project:
U031215-1
Floor tiles installation
Project:
U031215-1
Boarding, taping & jointing
Project:
U031215-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Cement board lining & Cistern Closing
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Door frames installation

Activity:

AZ1-CONS -2BV7-1

Activity:

AZ1-CONS -2BV7-1

Activity:

AZ1-CONS -2BV7-1

Activity:

AZ1-CONS -2BV7-1

Activity:

AZ1-CONS -2BV7-1

Activity:

AZ1-CONS -2BV7-1

Activity:

AZ1-CONS -2BV7-1

Activity:

AZ1-CONS -2BV7-1

Activity:

AZ1-CONS -2BV7-1

Activity:

AZ1-CONS -2BV7-1

Activity:

AZ1-CONS -2BV7-1

Activity:

AZ1-CONS -2BV7-1

700
720
740
750
770
780
790
800
880
890
450
10
30
40
51N
52N
53N
10
50
80
20
50
60
60N
70
90
00
10
10
21N

Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Installation of fire place
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 2BR/V7
Project:
U031215-1
Activity:
Facade terrace ceiling cement board - 2BR/7
Project:
U031215-1
Activity:
Facade terrace floor Decking - 2BR/V7
Project:
U031215-1
Activity:
Rafters - 2BR/V7
Project:
U031215-1
Activity:
2BV7 : Final snagging & De snagging
Project:
U031215-1
Activity:
WPC Panels Installation - 2BR/V7
Project:
U031215-1
Activity:
WPC Track installation - 2BR/V7
Project:
U031215-1
Activity:
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install ELV devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix*

AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-1
AZ1-CONS -2BV7-2
AZ1-CONS -2BV7-5
AZ1-CONS -2BV7-5
AZ1-CONS -2BV7-5
AZ1-CONS -2BV7-5
AZ1-CONS -2BV7-5
AZ1-CONS -2BV7-5
AZ1-CONS -2BV7-6
AZ1-CONS -2BV7-6
AZ1-CONS -2BV7-6
AZ1-CONS -2BV7-7
AZ1-CONS -2BV7-7
AZ1-CONS -2BV7-7
AZ1-CONS -2BV7-7
AZ1-CONS -2BV7-7
AZ1-CONS -2BV7-7
AZ1-CONS -2BV7-8
AZ1-CONS -2BV7-8
AZ1-CONS -2BV7-9
AZ1-CONS -2BV7-9

70
80
90
000
020
030
041N
042N
043N
100
120
140
170
210
240
250
250N
260
280
290
300
360
370
380
390
400
410
420
430
440

Project:
U031215-1
Activity:
AZ1-CONS -2BV7-9
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-9
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV7-9
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Install ELV devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -2BV8-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in

closet
450
460
480
500
540
550
560
570
640
650
670
700
740
750
770
780
790
800
880
890
350
390
10
30
41N
30
50
60
90

Project:
U031215-1
Activity:
Headboard fixing
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 2BR/V8
Project:
U031215-1
Activity:
Facade terrace ceiling cement board - 2BR/V8
Project:
U031215-1
Activity:
Facade terrace floor Decking - 2BR/V8
Project:
U031215-1
Activity:
Rafters - 2BR/V8
Project:
U031215-1
Activity:
2BV8 : Final snagging & De snagging
Project:
U031215-1
Activity:
WPC Panels Installation - 2BR/V8
Project:
U031215-1
Activity:
WPC Track installation - 2BR/V8
Project:
U031215-1
Activity:
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
Epoxy on Floor
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install Control Panels & DDC
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Control Panel Cable termination
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:

AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-1
AZ1-CONS -2BV8-2
AZ1-CONS -2BV8-2
AZ1-CONS -2BV8-5
AZ1-CONS -2BV8-5
AZ1-CONS -2BV8-5
AZ1-CONS -2BV8-6
AZ1-CONS -2BV8-6
AZ1-CONS -2BV8-6
AZ1-CONS -2BV8-6
AZ1-CONS -2BV8-7

00
10
20
31N
60
70
90
00
10
20
70
80
90
000
020
030
040
040N
050
070
080
090
100
121N
190
200
220
270
280
290

Install FA+CB+PA devices


Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install LV Cable trays
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
SMDB Termination & testing
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install ELV devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:

AZ1-CONS -2BV8-7
AZ1-CONS -2BV8-8
AZ1-CONS -2BV8-8
AZ1-CONS -2BV8-8
AZ1-CONS -2BV8-8
AZ1-CONS -2BV8-8
AZ1-CONS -2BV8-9
AZ1-CONS -2BV8-9
AZ1-CONS -2BV8-9
AZ1-CONS -2BV8-9
AZ1-CONS -2BV8-9
AZ1-CONS -2BV8-9
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1

300
360
370
380
390
400
410
420
430
440
closet
450
460
480
500
510
530
540
550
560
570
590
630
640
650
670
680
690
700
730
740

Inspection & Approvals


Project:
U031215-1
Activity:
AZ1-CONS -3BV1-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -3BV1-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV1-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -3BV1-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV1-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV1-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV1-1
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -3BV1-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV1-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
Headboard fixing
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 3BR/V1

AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1
AZ1-CONS -3BV1-1

790
810
870
880
150
180
10
21N
30
30
60
90
00
10
10
20
90
00
10
30
60
70
020
030
041N
042N
043N
100
120
140

Project:
U031215-1
Activity:
AZ1-CONS
3BV1 : Final snagging & De snagging
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glass - Glass works - 3BR/V1
Project:
U031215-1
Activity:
AZ1-CONS
WPC Panels Installation - 3BR/V1
Project:
U031215-1
Activity:
AZ1-CONS
WPC Track installation - 3BR/V1
Project:
U031215-1
Activity:
AZ1-CONS
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
AZ1-CONS
Equipment fitout- 3BRV1
Project:
U031215-1
Activity:
AZ1-CONS
Wild air provisions
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Install Control Panels & DDC
Project:
U031215-1
Activity:
AZ1-CONS
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)

-3BV1-1
-3BV1-1
-3BV1-1
-3BV1-1
-3BV1-2
-3BV1-2
-3BV1-5
-3BV1-5
-3BV1-5
-3BV1-6
-3BV1-6
-3BV1-6
-3BV1-7
-3BV1-7
-3BV1-8
-3BV1-8
-3BV1-8
-3BV1-9
-3BV1-9
-3BV1-9
-3BV1-9
-3BV1-9
-3BV2-1
-3BV2-1
-3BV2-1
-3BV2-1
-3BV2-1
-3BV2-1
-3BV2-1
-3BV2-1

170
200
210
230
240
250
250N
260
280
290
300
360
370
380
390
400
410
420
430
440
closet
450
460
480
500
510
540
550
560
570

Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Install PD pipes & test (wet area)
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Install ELV devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV2-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Headboard fixing
Project:
U031215-1
Cleaning & snagging
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Door frames installation
Project:
U031215-1
Door panels & ironmongary installation
Project:
U031215-1
Ceiling stud works
Project:
U031215-1
Floor tiles installation
Project:
U031215-1
Boarding, taping & jointing
Project:
U031215-1
Primers / stucco on walls & ceiling
Project:
U031215-1

Activity:

AZ1-CONS -3BV2-1

Activity:

AZ1-CONS -3BV2-1

Activity:

AZ1-CONS -3BV2-1

Activity:

AZ1-CONS -3BV2-1

Activity:

AZ1-CONS -3BV2-1

Activity:

AZ1-CONS -3BV2-1

Activity:

AZ1-CONS -3BV2-1

Activity:

AZ1-CONS -3BV2-1

Activity:

AZ1-CONS -3BV2-1

Activity:

AZ1-CONS -3BV2-1

590
630
640
650
670
680
690
700
730
740
790
810
870
880
050
080
10
20
42N
40
90
00
10
20
32N
40
40
50
70
00

Final Painting on walls & ceiling


Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 3BR/V2
Project:
U031215-1
Activity:
3BV2 : Final snagging & De snagging
Project:
U031215-1
Activity:
Alum & Glass - Glass works - 3BR/V2
Project:
U031215-1
Activity:
WPC Panels Installation - 3BR/V2
Project:
U031215-1
Activity:
WPC Track installation - 3BR/V2
Project:
U031215-1
Activity:
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
Equipment fitout- 3BRV2
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Install Control Panels & DDC
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Control Panel Cable termination
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:

AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-1
AZ1-CONS -3BV2-2
AZ1-CONS -3BV2-2
AZ1-CONS -3BV2-5
AZ1-CONS -3BV2-5
AZ1-CONS -3BV2-5
AZ1-CONS -3BV2-6
AZ1-CONS -3BV2-6
AZ1-CONS -3BV2-7
AZ1-CONS -3BV2-7
AZ1-CONS -3BV2-7
AZ1-CONS -3BV2-7
AZ1-CONS -3BV2-7
AZ1-CONS -3BV2-8
AZ1-CONS -3BV2-8
AZ1-CONS -3BV2-8
AZ1-CONS -3BV2-9
AZ1-CONS -3BV2-9

10
20
000
020
120
131N
220
240
250
280
290
300
360
370
380
390
400
410
420
430
440
closet
450
460
480
500
510
530
540
550
560

Install FA+CB+PA devices


Project:
U031215-1
Activity:
AZ1-CONS -3BV2-9
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Access required for MEP Final Fix
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Install Control Panels & DDC
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV3-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Headboard fixing
Project:
U031215-1
Cleaning & snagging
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Door frames installation
Project:
U031215-1
Door panels & ironmongary installation
Project:
U031215-1
Wall plastering
Project:
U031215-1
Ceiling stud works
Project:
U031215-1
Floor tiles installation
Project:
U031215-1
Boarding, taping & jointing

Activity:

AZ1-CONS -3BV3-1

Activity:

AZ1-CONS -3BV3-1

Activity:

AZ1-CONS -3BV3-1

Activity:

AZ1-CONS -3BV3-1

Activity:

AZ1-CONS -3BV3-1

Activity:

AZ1-CONS -3BV3-1

Activity:

AZ1-CONS -3BV3-1

Activity:

AZ1-CONS -3BV3-1

Activity:

AZ1-CONS -3BV3-1

570
630
640
650
670
680
690
700
730
740
790
810
870
880
10
30
40
52N
53N
0
10
30
50
80
90
10
20
40
50
60

Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace floor Waterproofing & Screed - 3BR/V3
Project:
U031215-1
Activity:
AZ1-CONS
3BV3 : Final snagging & De snagging
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glass - Glass works - 3BR/V3
Project:
U031215-1
Activity:
AZ1-CONS
WPC Panels Installation - 3BR/V3
Project:
U031215-1
Activity:
AZ1-CONS
WPC Track installation - 3BR/V3
Project:
U031215-1
Activity:
AZ1-CONS
Wild air provisions
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test (wet area)
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices

-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-1
-3BV3-5
-3BV3-5
-3BV3-5
-3BV3-5
-3BV3-5
-3BV3-6
-3BV3-6
-3BV3-6
-3BV3-6
-3BV3-6
-3BV3-6
-3BV3-7
-3BV3-7
-3BV3-7
-3BV3-7
-3BV3-7

60N
70
90
00
10
20
31N
0
10
20
40
90
020
040
060
090
130
160
170
170N
180
200
210
220
360
370
380
390
400
410

Project:
U031215-1
Activity:
AZ1-CONS
Install ELV devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix
Project:
U031215-1
Activity:
AZ1-CONS
Equipment fitout- 3BRV3
Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS
Install Conduits/Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling

-3BV3-7
-3BV3-7
-3BV3-7
-3BV3-8
-3BV3-8
-3BV3-8
-3BV3-8
-3BV3-9
-3BV3-9
-3BV3-9
-3BV3-9
-3BV3-9
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1
-3BV4-1

420
430
440
closet
450
480
500
510
530
540
550
560
570
580
630
640
650
670
680
690
700
730
740
790
810
85
870
88
880
10

Project:
U031215-1
Activity:
AZ1-CONS -3BV4-1
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -3BV4-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV4-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
Headboard fixing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 3BR/V4
Project:
U031215-1
Activity:
3BV4 : Final snagging & De snagging
Project:
U031215-1
Activity:
Alum & Glass - Glass works - 3BR/V4
Project:
U031215-1
Activity:
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
WPC Panels Installation - 3BR/V4
Project:
U031215-1
Activity:
Equipment fitout- 3BRV4
Project:
U031215-1
Activity:
WPC Track installation - 3BR/V4
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:

AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-1
AZ1-CONS -3BV4-5
AZ1-CONS -3BV4-5

30
41N
30
60
90
00
10
20
31N
10
20
40
90
00
10
20
40
50
61N
62N
63N
000
010
040
050
060
070N
080
090
100

Clearance - Final Civil works


Project:
U031215-1
Activity:
Access required for MEP Final Fix
Project:
U031215-1
Activity:
Install Control Panels & DDC
Project:
U031215-1
Activity:
Control Panel Cable termination
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Install PD pipes & test (wet area)
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install ELV devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:

AZ1-CONS -3BV4-5
AZ1-CONS -3BV4-6
AZ1-CONS -3BV4-6
AZ1-CONS -3BV4-6
AZ1-CONS -3BV4-7
AZ1-CONS -3BV4-7
AZ1-CONS -3BV4-7
AZ1-CONS -3BV4-7
AZ1-CONS -3BV4-8
AZ1-CONS -3BV4-8
AZ1-CONS -3BV4-8
AZ1-CONS -3BV4-8
AZ1-CONS -3BV4-9
AZ1-CONS -3BV4-9
AZ1-CONS -3BV4-9
AZ1-CONS -3BV4-9
AZ1-CONS -3BV4-9
AZ1-CONS -3BV4-9
AZ1-CONS -3BV4-9
AZ1-CONS -3BV4-9
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1

120
131N
220
250
280
290
300
360
370
380
390
400
410
420
430
440
closet
450
480
500
540
550
560
570
640
650
670
690
700
730
740

Clearance - Final Civil works


Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Install Control Panels & DDC
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV5-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
Headboard fixing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 3BR/V5

AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1
AZ1-CONS -3BV5-1

810
870
880
80
00
10
00
11N
00
20
70
80
90
00
20
21N
22N
60
00
20
40
70
80
000
020
040
060
120
130
140

Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glass - Glass works - 3BR/V5
Project:
U031215-1
Activity:
AZ1-CONS
WPC Panels Installation - 3BR/V5
Project:
U031215-1
Activity:
AZ1-CONS
WPC Track installation - 3BR/V5
Project:
U031215-1
Activity:
AZ1-CONS
Equipment fitout- 3BRV5
Project:
U031215-1
Activity:
AZ1-CONS
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
AZ1-CONS
Wild air provisions
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS
Install Conduits/Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test (wet area)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure

-3BV5-1
-3BV5-1
-3BV5-1
-3BV5-3
-3BV5-5
-3BV5-5
-3BV5-6
-3BV5-6
-3BV5-7
-3BV5-7
-3BV5-7
-3BV5-7
-3BV5-7
-3BV5-8
-3BV5-8
-3BV5-8
-3BV5-8
-3BV5-8
-3BV5-9
-3BV5-9
-3BV5-9
-3BV5-9
-3BV5-9
-3BV6-1
-3BV6-1
-3BV6-1
-3BV6-1
-3BV6-1
-3BV6-1
-3BV6-1

140N
160
170
170N
180
200
210
220
330
340
350
360
370
380
390
400
410
closet
420
450
470
480
510
520
530
540
610
620
630
640

Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Install ELV devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Install FA+CB devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Headboard fixing
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Door frames installation
Project:
U031215-1
Door panels & ironmongary installation
Project:
U031215-1
Ceiling stud works
Project:
U031215-1
Floor tiles installation
Project:
U031215-1
Boarding, taping & jointing
Project:
U031215-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Cement board lining & Cistern Closing
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Floor screed
Project:
U031215-1
Door frames installation
Project:
U031215-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

Activity:

AZ1-CONS -3BV6-1

660
670
700
710
780
840
850
860
80
00
10
30
41N
30
60
90
00
10
20
31N
40
00
20
40
90
00
10
20
30
61N

Wall plastering
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - 3BR/V6
Project:
U031215-1
Activity:
Alum & Glass - Glass works - 3BR/V6
Project:
U031215-1
Activity:
WPC Panels Installation - 3BR/V6
Project:
U031215-1
Activity:
WPC Track installation - 3BR/V6
Project:
U031215-1
Activity:
EIFS (Without Final Coat) after Framing - 3BR/V6
Project:
U031215-1
Activity:
Equipment fitout- 3BRV6
Project:
U031215-1
Activity:
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix
Project:
U031215-1
Activity:
Install Control Panels & DDC
Project:
U031215-1
Activity:
Control Panel Cable termination
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB devices
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:

AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-1
AZ1-CONS -3BV6-3
AZ1-CONS -3BV6-5
AZ1-CONS -3BV6-5
AZ1-CONS -3BV6-5
AZ1-CONS -3BV6-5
AZ1-CONS -3BV6-6
AZ1-CONS -3BV6-6
AZ1-CONS -3BV6-6
AZ1-CONS -3BV6-7
AZ1-CONS -3BV6-7
AZ1-CONS -3BV6-7
AZ1-CONS -3BV6-7
AZ1-CONS -3BV6-7
AZ1-CONS -3BV6-8
AZ1-CONS -3BV6-8
AZ1-CONS -3BV6-8
AZ1-CONS -3BV6-8
AZ1-CONS -3BV6-9
AZ1-CONS -3BV6-9
AZ1-CONS -3BV6-9
AZ1-CONS -3BV6-9
AZ1-CONS -3BV6-9
AZ1-CONS -3BV6-9

62N
64N
72N
73N
74N
80
000
020
031N
040
140
150
160
170
200
210
220
350
360
370
380
390
400
410
430
440
closet
450
460
480
500

Access required for MEP Final Fix: Wet Area*


Project:
U031215-1
Activity:
AZ1-CONS -3BV6-9
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-9
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-9
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-9
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS -3BV6-9
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Install Control Panels & DDC
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Water proofing works
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-1
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Headboard fixing
Project:
U031215-1
Cleaning & snagging
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Door frames installation

Activity:

AZ1-CONS -3BV7-1

Activity:

AZ1-CONS -3BV7-1

Activity:

AZ1-CONS -3BV7-1

Activity:

AZ1-CONS -3BV7-1

510
530
540
550
560
570
590
630
640
650
660
670
680
690
700
730
740
790
810
870
880
250
280
10
30
40
10
30
50
80

Project:
U031215-1
Activity:
AZ1-CONS
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace floor Waterproofing & Screed - 3BR/V7
Project:
U031215-1
Activity:
AZ1-CONS
3BV7 : Final snagging & De snagging
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glass - Glass works - 3BR/V7
Project:
U031215-1
Activity:
AZ1-CONS
WPC Panels Installation - 3BR/V7
Project:
U031215-1
Activity:
AZ1-CONS
WPC Track installation - 3BR/V7
Project:
U031215-1
Activity:
AZ1-CONS
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
AZ1-CONS
Equipment fitout- 3BRV7
Project:
U031215-1
Activity:
AZ1-CONS
Wild air provisions
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition

-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-1
-3BV7-2
-3BV7-2
-3BV7-5
-3BV7-5
-3BV7-5
-3BV7-6
-3BV7-6
-3BV7-6
-3BV7-6

90
00
10
20
50
70
90
10
20
41N
10
20
40
73N
74N
90
0
0
N
0
N
N
N
0
0
0
0
0
0
0

Project:
U031215-1
Activity:
AZ1-CONS -3BV7-6
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-7
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-7
Install PD pipes & test (wet area)
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-7
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-7
Inspection & Approvals (Ceiling closure)
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-7
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-7
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-8
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-8
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-8
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-9
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-9
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-9
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-9
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-9
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS -3BV7-9
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -BR-100
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS -BR-101
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS -BR-101
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS -BR-102
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS -BR-102
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS -BR-103
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS -BR-104
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -BR-105
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS -BR-106
Alum & Glass - Glass works - - Beach Restaurant
Project:
U031215-1
Activity:
AZ1-CONS -BR-107
Ceramic / stone wall cladding
Project:
U031215-1
Activity:
AZ1-CONS -BR-108
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS -BR-109
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS -BR-110
Concrete wall tiles
Project:
U031215-1
Activity:
AZ1-CONS -BR-111
EIFS (Without Final Coat) including all brackets - Beach Restaurant

0
0
0
0
0
0
0
N
N
0
N
0
N
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Project:
U031215-1
Activity:
Facade terrace ceiling cement board - Beach Restaurant
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Concrete tile flooring
Project:
U031215-1
Activity:
WPC Track installation - Beach Restaurant
Project:
U031215-1
Activity:
Wooden flooring
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Plastered wall finish
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Install Sanitary wares
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install FA+CB+PA devices

AZ1-CONS -BR-112
AZ1-CONS -BR-114
AZ1-CONS -BR-116
AZ1-CONS -BR-117
AZ1-CONS -BR-118
AZ1-CONS -BR-119
AZ1-CONS -BR-121
AZ1-CONS -BR-121
AZ1-CONS -BR-122
AZ1-CONS -BR-123
AZ1-CONS -BR-123
AZ1-CONS -BR-124
AZ1-CONS -BR-124
AZ1-CONS -BR-128
AZ1-CONS -BR-129
AZ1-CONS -BR-130
AZ1-CONS -BR-131
AZ1-CONS -BR-132
AZ1-CONS -BR-134
AZ1-CONS -BR-136
AZ1-CONS -BR-137
AZ1-CONS -BR-138
AZ1-CONS -BR-141
AZ1-CONS -BR-142
AZ1-CONS -BR-144
AZ1-CONS -BR-147
AZ1-CONS -BR-148
AZ1-CONS -BR-149
AZ1-CONS -BR-150
AZ1-CONS -BR-151

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N
Install
Install
Install
Install
Install
Install
Plaster
Install
Install

Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install ELV devices (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
Install LPG final devices
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Facade terrace floor Decking - Beach Restaurant
Project:
U031215-1
Activity:
Pergola -Day Care
Project:
U031215-1
Activity:
Rafters -Beach resort
Project:
U031215-1
Activity:
BR : Final snagging & De snagging
Project:
U031215-1
Activity:
WPC Panels Installation - Beach Restaurant
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Concealed WC cistern
Project:
U031215-1
Activity:
Lighting & Small power point wiring
Project:
U031215-1
Activity:
FA+CB+PA point wiring
Project:
U031215-1
Activity:
FA+CB point wiring
Project:
U031215-1
Activity:
PD pipes & test
Project:
U031215-1
Activity:
CHW Pipes+valves
Project:
U031215-1
Activity:
work
Project:
U031215-1
Activity:
FCU+Valve package
Project:
U031215-1
Activity:
FA+CB+PA point wiring

AZ1-CONS -BR-152
AZ1-CONS -BR-153
AZ1-CONS -BR-154
AZ1-CONS -BR-155
AZ1-CONS -BR-156
AZ1-CONS -BR-158
AZ1-CONS -BR-159
AZ1-CONS -BR-160
AZ1-CONS -BR-161
AZ1-CONS -BR-165
AZ1-CONS -BR-170
AZ1-CONS -BR-174
AZ1-CONS -BR-176
AZ1-CONS -BR-179
AZ1-CONS -BR-180
AZ1-CONS -BR-183
AZ1-CONS -BR-191
AZ1-CONS -BR-194
AZ1-CONS -BR-195
AZ1-CONS -BR-196
AZ1-CONS -BR-201
AZ1-CONS -BR-230
AZ1-CONS -BR-260
AZ1-CONS -BR-290
AZ1-CONS -BR-350
AZ1-CONS -BR-360
AZ1-CONS -BR-380
AZ1-CONS -BR-390
AZ1-CONS -BR-400
AZ1-CONS -BR-410

Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
Install PD pipes & test
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
Install FCU+Valve package
Project:
U031215-1
Activity:
Install LPG pipes & test
Project:
U031215-1
Activity:
Install CHW Pipes+valves
Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Install CHW Pipes+valves
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Install Ecology Units (TBA)
Project:
U031215-1
Activity:
Install Extract Ducts/dampers
Project:
U031215-1
Activity:
Install Kitchen Extract Fans (TBC)
Project:
U031215-1
Activity:
Install FCU+Valve packages
Project:
U031215-1
Activity:
Install Control Panels (TBC)
Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install Ducts (site measurement pieces)
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
N
Access required for MEP Final Fix*

AZ1-CONS -BR-420
AZ1-CONS -BR-430
AZ1-CONS -BR-440
AZ1-CONS -BR-450
AZ1-CONS -BR-470
AZ1-CONS -BR-490
AZ1-CONS -BR-500
AZ1-CONS -BR-510
AZ1-CONS -BR-520
AZ1-CONS -BR-530
AZ1-CONS -BR-550
AZ1-CONS -BR-560
AZ1-CONS -BR-580
AZ1-CONS -BR-590
AZ1-CONS -BR-600
AZ1-CONS -BR-610
AZ1-CONS -BR-620
AZ1-CONS -BR-630
AZ1-CONS -BR-650
AZ1-CONS -BR-660
AZ1-CONS -BR-680
AZ1-CONS -BR-690
AZ1-CONS -BR-700
AZ1-CONS -BR-720
AZ1-CONS -BR-740
AZ1-CONS -BR-750
AZ1-CONS -BR-770
AZ1-CONS -BR-780
AZ1-CONS -BR-790
AZ1-CONS -BR-802

Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
N
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Access to area
Project:
U031215-1
Activity:
Alum & Glazing - Frame - - Beach Restaurant
Project:
U031215-1
Activity:
Marking layout and approval
Project:
U031215-1
Activity:
Marking layout and approval
Project:
U031215-1
Activity:
Facade terrace floor Waterproofing & Screed - Beach Restaurant
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
1880
Equipment fitout- 3BRV6
Project:
U031215-1
Activity:
1910
Access required for MEP Second Fix
Project:
U031215-1
Activity:
1950
Epoxy on Floor
Project:
U031215-1
Activity:
1960
Pool Equipment MEP 1st & 2nd Fix
Project:
U031215-1
Activity:
910N
Access required for MEP Final Fix
Project:
U031215-1
Activity:
911N
Clearance - Final Civil works
Project:
U031215-1
Activity:
951N
Install New AHU x 1 Nos
Project:
U031215-1
Activity:
952N
Install Fan New IFC
Project:
U031215-1
Activity:
953N
Install CHW header pipes+valves/test
Project:
U031215-1
Activity:
954N
Install CHW header pipes Insulation
Project:
U031215-1
Activity:
955N
Install Cable trays**
Project:
U031215-1
Activity:
956N
Install Ducts/dampers
Project:
U031215-1
Activity:
957N
Install LV Cables
Project:
U031215-1
Activity:
958N
Install Attenuators/Ducts

AZ1-CONS -BR-803

AZ1-CONS -BR-804
AZ1-CONS -BR-820
AZ1-CONS -BR-840
AZ1-CONS -BR-850
AZ1-CONS -BR-860
AZ1-CONS -BR-900
AZ1-CONS -BR-910
AZ1-CONS -BR-920
AZ1-CONS -BR-930
AZ1-CONS -BR-940
AZ1-CONS -BR-950
AZ1-CONS -BR-960
AZ1-CONS -BR-970
AZ1-CONS -BR-980
AZ1-CONS -BR-990
AZ1-CONS -DAY- AZ1-CONS -DAY- AZ1-CONS -DAY- AZ1-CONS -DAY- AZ1-CONS -DAY- 1
AZ1-CONS -DAY- 1
AZ1-CONS -DAY- 1
AZ1-CONS -DAY- 1
AZ1-CONS -DAY- 1
AZ1-CONS -DAY- 1
AZ1-CONS -DAY- 1
AZ1-CONS -DAY- 1
AZ1-CONS -DAY- 1
AZ1-CONS -DAY- 1

959N
961N
00
10
20
30
40
50
60
70
80
90
10
20
30
40
50
60
70
80
90
10
30
40
50
60
70
90
00
10

Project:
U031215-1
Activity:
Install Control Panels
Project:
U031215-1
Activity:
Control Panel Cable termination
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
SMDB Termination & testing
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Alum & Glass - Glass works-DAY CARE

AZ1-CONS -DAY- 1
AZ1-CONS -DAY- 1
AZ1-CONS -DAY-10
AZ1-CONS -DAY-10
AZ1-CONS -DAY-10
AZ1-CONS -DAY-10
AZ1-CONS -DAY-10
AZ1-CONS -DAY-10
AZ1-CONS -DAY-10
AZ1-CONS -DAY-10
AZ1-CONS -DAY-10
AZ1-CONS -DAY-10
AZ1-CONS -DAY-11
AZ1-CONS -DAY-11
AZ1-CONS -DAY-11
AZ1-CONS -DAY-11
AZ1-CONS -DAY-11
AZ1-CONS -DAY-11
AZ1-CONS -DAY-11
AZ1-CONS -DAY-11
AZ1-CONS -DAY-11
AZ1-CONS -DAY-12
AZ1-CONS -DAY-12
AZ1-CONS -DAY-12
AZ1-CONS -DAY-12
AZ1-CONS -DAY-12
AZ1-CONS -DAY-12
AZ1-CONS -DAY-12
AZ1-CONS -DAY-13
AZ1-CONS -DAY-13

20
40
70
80
00
10
20
30
40
50
80
90
00
60
90
00
10
20
30
40
50
60
70
80
90
00
10
20
30N
40

Project:
U031215-1
Activity:
AZ1-CONS -DAY-13
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -DAY-13
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS -DAY-13
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS -DAY-13
EIFS (Without Final Coat) - including all brackets -Day Care
Project:
U031215-1
Activity:
AZ1-CONS -DAY-14
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -DAY-14
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -DAY-14
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS -DAY-14
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -DAY-14
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS -DAY-14
Wild air provisions
Project:
U031215-1
Activity:
AZ1-CONS -DAY-14
Stone flooring
Project:
U031215-1
Activity:
AZ1-CONS -DAY-14
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -DAY-15
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -DAY-15
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS -DAY-15
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -DAY-16
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -DAY-16
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -DAY-16
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -DAY-16
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -DAY-16
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -DAY-16
Install Sanitary wares
Project:
U031215-1
Activity:
AZ1-CONS -DAY-16
Install Sanitary wares
Project:
U031215-1
Activity:
AZ1-CONS -DAY-16
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -DAY-16
Install FA+CB devices
Project:
U031215-1
Activity:
AZ1-CONS -DAY-16
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -DAY-17
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -DAY-17
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -DAY-17
WPC Track installation - Day Care
Project:
U031215-1
Activity:
AZ1-CONS -DAY-17
Install ELV devices
Project:
U031215-1
Activity:
AZ1-CONS -DAY-17
Inspection & Approvals

50
60N
70
80
90
00
10
20
30
40
80
90
20
30
40
50
60
80
90
00
30
0
0N
0N10
1N
2N
3N
3N10
0
0N

Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Install ELV devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Mirror installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Cleaning/ snagging / inspection
Project:
U031215-1
Activity:
Handover of the area
Project:
U031215-1
Activity:
Pergola -Day Care
Project:
U031215-1
Activity:
Rafters -Day Care
Project:
U031215-1
Activity:
WPC Panels Installation - Day Care
Project:
U031215-1
Activity:
Day Care : Final snagging & De snagging
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix(high level)*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix(high level)*

AZ1-CONS -DAY-17
AZ1-CONS -DAY-17
AZ1-CONS -DAY-17
AZ1-CONS -DAY-17
AZ1-CONS -DAY-17
AZ1-CONS -DAY-18
AZ1-CONS -DAY-18
AZ1-CONS -DAY-18
AZ1-CONS -DAY-18
AZ1-CONS -DAY-18
AZ1-CONS -DAY-18
AZ1-CONS -DAY-18
AZ1-CONS -DAY-19
AZ1-CONS -DAY-19
AZ1-CONS -DAY-19
AZ1-CONS -DAY-19
AZ1-CONS -DAY-19
AZ1-CONS -DAY-19
AZ1-CONS -DAY-19
AZ1-CONS -DAY-20
AZ1-CONS -DAY-20
AZ1-CONS -DAY-22
AZ1-CONS -DAY-22
AZ1-CONS -DAY-22
AZ1-CONS -DAY-22
AZ1-CONS -DAY-22
AZ1-CONS -DAY-22
AZ1-CONS -DAY-22
AZ1-CONS -DAY-23
AZ1-CONS -DAY-23

1N
0
0
0
0
0N
1N
0
0
0N
1N
0
0
0N
1N
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install Concealed P&D Pipes
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Install Concealed P&D Pipes
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install Concealed WC cistern
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix(high level)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix(high level)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
Install Concealed WC cistern
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
Install Concealed Piping
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
Install Concealed Piping
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Marking layout and approval
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring

AZ1-CONS -DAY-23
AZ1-CONS -DAY-24
AZ1-CONS -DAY-25
AZ1-CONS -DAY-26
AZ1-CONS -DAY-27
AZ1-CONS -DAY-27
AZ1-CONS -DAY-27
AZ1-CONS -DAY-29
AZ1-CONS -DAY-31
AZ1-CONS -DAY-31
AZ1-CONS -DAY-31
AZ1-CONS -DAY-32
AZ1-CONS -DAY-34
AZ1-CONS -DAY-34
AZ1-CONS -DAY-34
AZ1-CONS -DAY-35
AZ1-CONS -DAY-36
AZ1-CONS -DAY-37
AZ1-CONS -DAY-38
AZ1-CONS -DAY-39
AZ1-CONS -DAY-40
AZ1-CONS -DAY-41
AZ1-CONS -DAY-42
AZ1-CONS -DAY-43
AZ1-CONS -DAY-47
AZ1-CONS -DAY-48
AZ1-CONS -DAY-49
AZ1-CONS -DAY-50
AZ1-CONS -DAY-51
AZ1-CONS -DAY-52

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package

-DAY-53
-DAY-54
-DAY-55
-DAY-56
-DAY-57
-DAY-58
-DAY-59
-DAY-60
-DAY-61
-DAY-62
-DAY-63
-DAY-64
-DAY-65
-DAY-66
-DAY-67
-DAY-68
-DAY-69
-DAY-70
-DAY-71
-DAY-72
-DAY-73
-DAY-74
-DAY-75
-DAY-76
-DAY-77
-DAY-78
-DAY-79
-DAY-82
-DAY-83
-DAY-84

Project:
U031215-1
Install Ducts/dampers
Project:
U031215-1
0
Install CHW Pipes+valves
Project:
U031215-1
0
Install CHW Pipes+valves
Project:
U031215-1
0
Install CHW Pipes+valves
Project:
U031215-1
0
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
0
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
0
Install CHW Pipes test & insulation
Project:
U031215-1
0
Install CHW Pipes test & insulation
Project:
U031215-1
0
Install CHW Pipes test & insulation
Project:
U031215-1
0
Install SMDBs
Project:
U031215-1
0
Install Ducts/dampers
Project:
U031215-1
0
Install Ducts/dampers
Project:
U031215-1
0
Install Ducts/dampers
Project:
U031215-1
0
Alum & Glazing - Frame -DAY CARE
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
0
Install Mechanical Plant
Project:
U031215-1
0
Install FA+CB point wiring
Project:
U031215-1
0
Install ELV point wiring (BMS)
Project:
U031215-1
0
Install FF pipes+valves/test
Project:
U031215-1
0
Install FA+CB devices
Project:
U031215-1
0
Install FCU+Valve package
Project:
U031215-1
0
Install Sprinklers
Project:
U031215-1
0
Install FA+CB devices
Project:
U031215-1
0
Install Lighting & Wiring devices
Project:
U031215-1
0
Install Lighting & Wiring devices
Project:
U031215-1
0
Install LV Cables
Project:
U031215-1
0
Install FA+CB devices
Project:
U031215-1
0
Clearance - Final Civil works
Project:
U031215-1
0
Inspection & Approvals
Project:
U031215-1
0
Clearance - Final Civil works

Activity:

AZ1-CONS -DAY-85

Activity:

AZ1-CONS -DAY-86

Activity:

AZ1-CONS -DAY-87

Activity:

AZ1-CONS -DAY-88

Activity:

AZ1-CONS -DAY-89

Activity:

AZ1-CONS -DAY-90

Activity:

AZ1-CONS -DAY-91

Activity:

AZ1-CONS -DAY-92

Activity:

AZ1-CONS -DAY-93

Activity:

AZ1-CONS -DAY-95

Activity:

AZ1-CONS -DAY-96

Activity:

AZ1-CONS -DAY-97

Activity:

AZ1-CONS -DAY-98

Activity:

AZ1-CONS -DAY-99

Activity:

AZ1-CONS -ER-100

Activity:

AZ1-CONS -ER-101

Activity:

AZ1-CONS -ER-107

Activity:

AZ1-CONS -ER-108

Activity:

AZ1-CONS -ER-110

Activity:

AZ1-CONS -ER-114

Activity:

AZ1-CONS -ER-116

Activity:

AZ1-CONS -ER-119

Activity:

AZ1-CONS -ER-120

Activity:

AZ1-CONS -ER-125

Activity:

AZ1-CONS -ER-126

Activity:

AZ1-CONS -ER-127

Activity:

AZ1-CONS -ER-128

Activity:

AZ1-CONS -ER-129

Activity:

AZ1-CONS -ER-130

Activity:

AZ1-CONS -ER-131

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
CT+Isolator Cable termination
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install FA+CB devices
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install FA+CB devices
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install FA+CB devices
Project:
U031215-1
Install ELV devices (BMS)
Project:
U031215-1
Install ELV devices (BMS)
Project:
U031215-1
Install ELV devices (BMS)
Project:
U031215-1
Install ELV devices (BMS)
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Inspection & Approvals

Activity:

AZ1-CONS -ER-132

Activity:

AZ1-CONS -ER-133

Activity:

AZ1-CONS -ER-135

Activity:

AZ1-CONS -ER-136

Activity:

AZ1-CONS -ER-142

Activity:

AZ1-CONS -ER-143

Activity:

AZ1-CONS -ER-146

Activity:

AZ1-CONS -ER-147

Activity:

AZ1-CONS -ER-149

Activity:

AZ1-CONS -ER-151

Activity:

AZ1-CONS -ER-153

Activity:

AZ1-CONS -ER-155

Activity:

AZ1-CONS -ER-156

Activity:

AZ1-CONS -ER-157

Activity:

AZ1-CONS -ER-158

Activity:

AZ1-CONS -ER-159

Activity:

AZ1-CONS -ER-163

Activity:

AZ1-CONS -ER-165

Activity:

AZ1-CONS -ER-166

Activity:

AZ1-CONS -ER-167

Activity:

AZ1-CONS -ER-168

Activity:

AZ1-CONS -ER-169

Activity:

AZ1-CONS -ER-170

Activity:

AZ1-CONS -ER-171

Activity:

AZ1-CONS -ER-172

Activity:

AZ1-CONS -ER-173

Activity:

AZ1-CONS -ER-174

Activity:

AZ1-CONS -ER-175

Activity:

AZ1-CONS -ER-176

Activity:

AZ1-CONS -ER-177

Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
0
Inspection & Approvals
Project:
U031215-1
Activity:
N
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
0
Clearance - Final Civil works
Project:
U031215-1
Activity:
N
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
0
Install CHW Pipes cladding
Project:
U031215-1
Activity:
0
LPG Chamber Signange
Project:
U031215-1
Activity:
0
Clearance - Final Civil works
Project:
U031215-1
Activity:
0
Inspection & Approvals
Project:
U031215-1
Activity:
N
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
N
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
N
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
N
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
N
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
N10
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
N
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
N
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
Install Fire syppression system pipes+valves/test
Project:
U031215-1
Activity:
N
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
N
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install PD pipes & test
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install FCU+Valve package

AZ1-CONS -ER-178

AZ1-CONS -ER-179
AZ1-CONS -ER-180
AZ1-CONS -ER-181
AZ1-CONS -ER-181
AZ1-CONS -ER-182
AZ1-CONS -ER-183
AZ1-CONS -ER-184
AZ1-CONS -ER-185
AZ1-CONS -ER-191
AZ1-CONS -ER-220
AZ1-CONS -ER-221
AZ1-CONS -ER-240
AZ1-CONS -ER-241
AZ1-CONS -ER-241
AZ1-CONS -ER-290
AZ1-CONS -ER-290
AZ1-CONS -ER-291
AZ1-CONS -ER-320
AZ1-CONS -ER-380
AZ1-CONS -ER-390
AZ1-CONS -ER-430
AZ1-CONS -ER-470
AZ1-CONS -ER-490
AZ1-CONS -ER-500
AZ1-CONS -ER-520
AZ1-CONS -ER-530
AZ1-CONS -ER-570
AZ1-CONS -ER-620
AZ1-CONS -ER-630

Project:
U031215-1
Activity:
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
N
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
N
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install LPG Control Station
Project:
U031215-1
Activity:
20
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
2N
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
30
Install LV Cables
Project:
U031215-1
Activity:
3N
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
40
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
60
Ceiling stud works
Project:
U031215-1
Activity:
70
SMDB Termination & testing
Project:
U031215-1
Activity:
80
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
10
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
1N
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
20
DB Termination & testing
Project:
U031215-1
Activity:
40
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
60
Install FA+CB+PA devices
Project:
U031215-1
Activity:
70
Install FA+CB+PA devices
Project:
U031215-1
Activity:
80
Install Fire extinguishers
Project:
U031215-1
Activity:
90
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
00
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
10
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
20
Install FA+CB+PA devices
Project:
U031215-1
Activity:
2N
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
30
Inspection & Approvals
Project:
U031215-1
Activity:
40
Clearance - Final Civil works
Project:
U031215-1
Activity:
50
Clearance - Final Civil works

AZ1-CONS -ER-640
AZ1-CONS -ER-650
AZ1-CONS -ER-650
AZ1-CONS -ER-660
AZ1-CONS -ER-690
AZ1-CONS -ER-780
AZ1-CONS -ER-930
AZ1-CONS -GYM-10
AZ1-CONS -GYM-10
AZ1-CONS -GYM-10
AZ1-CONS -GYM-10
AZ1-CONS -GYM-10
AZ1-CONS -GYM-10
AZ1-CONS -GYM-10
AZ1-CONS -GYM-10
AZ1-CONS -GYM-11
AZ1-CONS -GYM-11
AZ1-CONS -GYM-11
AZ1-CONS -GYM-11
AZ1-CONS -GYM-11
AZ1-CONS -GYM-11
AZ1-CONS -GYM-11
AZ1-CONS -GYM-11
AZ1-CONS -GYM-12
AZ1-CONS -GYM-12
AZ1-CONS -GYM-12
AZ1-CONS -GYM-12
AZ1-CONS -GYM-12
AZ1-CONS -GYM-12
AZ1-CONS -GYM-12

60
70
80
90
10
30
40
60
70
10
1N
1N10
30
40
40N
50
50N
51N
60
70
80
90
00
10
20
2N
30
30N
3N
40

Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
WPC Track installation - Gym
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Wood flooring
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install ELV devices*
Project:
U031215-1
Activity:
Install Sanitary Wares*
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install ELV devices
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install Lighting & Wiring devices

AZ1-CONS -GYM-12
AZ1-CONS -GYM-12
AZ1-CONS -GYM-12
AZ1-CONS -GYM-12
AZ1-CONS -GYM-13
AZ1-CONS -GYM-13
AZ1-CONS -GYM-13
AZ1-CONS -GYM-13
AZ1-CONS -GYM-13
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-14
AZ1-CONS -GYM-15
AZ1-CONS -GYM-15
AZ1-CONS -GYM-15
AZ1-CONS -GYM-15
AZ1-CONS -GYM-15
AZ1-CONS -GYM-15
AZ1-CONS -GYM-15
AZ1-CONS -GYM-15

50
50N
70
80
10
30
80
90
10
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV devices
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace floor Decking - Gym
Project:
U031215-1
Activity:
AZ1-CONS
WPC Panels Installation - Gym
Project:
U031215-1
Activity:
AZ1-CONS
Gym : Final snagging & De snagging
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glazing - Frame -Gym
Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace floor Waterproofing & Screed - Gym
Project:
U031215-1
Activity:
AZ1-CONS
Marking layout and approval
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glass - Glass works -Gym
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace ceiling cement board - Gym
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)

-GYM-15
-GYM-15
-GYM-15
-GYM-15
-GYM-16
-GYM-16
-GYM-16
-GYM-16
-GYM-17
-GYM-28
-GYM-29
-GYM-31
-GYM-33
-GYM-43
-GYM-46
-GYM-47
-GYM-48
-GYM-49
-GYM-53
-GYM-54
-GYM-55
-GYM-57
-GYM-58
-GYM-59
-GYM-60
-GYM-61
-GYM-62
-GYM-63
-GYM-64
-GYM-65

Project:
U031215-1
Activity:
AZ1-CONS -GYM-66
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS -GYM-67
0
Install ELV point wiring (SCS+BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS -GYM-71
0
Stone wall cladding
Project:
U031215-1
Activity:
AZ1-CONS -GYM-82
0
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS -GYM-85
0
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS -GYM-87
0
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS -GYM-89
0
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS -GYM-92
0
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS -GYM-93
0
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS -GYM-94
0
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS -GYM-97
0
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -GYM-98
0
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS -GYM-99
0
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
00
Access to Hotel Operator (as per cleint instruction without civil defenc
e and cause & affect)
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
10
Training
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
20
Final Integration and Snagging, As-Built Dwgs, O & M manuals Submission
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
30
Demobilization, Project Closeout & Completion
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
40
Milestone 4 : Substantial Completion of Main Hotel Buildings
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
50
Project Completion
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
60
MEP Works Completion
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
70
MEP Training, As-Built Dwgs, O & M manuals Submission
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
010
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
030
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
040
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
050
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
060
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
070
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
080
SMDB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
10
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
0

110
120
140
160
170
180
200
220
240
250
260
270
300
310
31N
32N
340
350
370
380
40
420
440
460
470
480
490
500
510
530

Install FF droppers + test


Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
SMDB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
EIFS (Without Final Coat) including all brackets - Sec 1;GF
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
SMDB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
SMDB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-10

560
570
580
60
610
620
650
660
670
680
70
700
710
720
730
740
750
760
770
790
800
810
810N
820
830
850
860
870
890
90

Install FA+CB+PA devices


Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Alum & Glass - Glass works - S1;Ground Floor
Project:
U031215-1
Activity:
LV Cables arrange+dressing (to be tied with riser)
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Install PD pipes & test
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:

AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10
AZ1-CONS -HS1-10

900
910
920
930
950
960
970
980
990
990N
991N
992N
000
010
020
021N
022N
030
040
050
060
070
080
090
10
100
110
120
130
140

Install Lighting & Wiring devices


Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Ceiling stud works
Project:
U031215-1
Boarding, taping & jointing
Project:
U031215-1
Boarding, taping & jointing - ceiling
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Access required for MEP First Fix*
Project:
U031215-1
Access required for MEP Second Fix*
Project:
U031215-1
Access required for MEP Final Fix*
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Access required for MEP Second Fix*
Project:
U031215-1
Access required for MEP Final Fix*
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Concealed Pipes - Block wall
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Wild air provisions
Project:
U031215-1
Wild air provisions
Project:
U031215-1
Wild air provisions
Project:
U031215-1

Activity:

AZ1-CONS -HS1-10

Activity:

AZ1-CONS -HS1-10

Activity:

AZ1-CONS -HS1-10

Activity:

AZ1-CONS -HS1-10

Activity:

AZ1-CONS -HS1-10

Activity:

AZ1-CONS -HS1-10

Activity:

AZ1-CONS -HS1-10

Activity:

AZ1-CONS -HS1-10

Activity:

AZ1-CONS -HS1-10

Activity:

AZ1-CONS -HS1-10

Activity:

AZ1-CONS -HS1-10

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

Activity:

AZ1-CONS -HS1-11

150
160
170
180
190
200
210
220
230
240
250
260
270
280
290
2N
300
310
330
350
370
380
390
410
430
440
450
460
470
470N

Wild air provisions


Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:

AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11

471N
472N
480
490
4N
500
510
520
540
550
560
570
580
590
5N
600
610
620
630
640
650
660
670
680
690
6N
70
700
710
720

Access required for MEP Second Fix*


Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:

AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11
AZ1-CONS -HS1-11

730
740
750
760
770
780
790
800
840
850
860
870
880
900
910
920
020
030
040
050
060
070
080
090
100
110
120
130
140
150

Primers / stucco on walls & ceiling


Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Busbar Site Measurement & Delivery
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
EIFS (Without Final Coat) - including all brackets - Sec 1;1st F
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Install Sump/Water Pumps
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Install Busbar final connections(to be tied with busriser)
Project:
U031215-1
Activity:
AZ1-CONS
Vanity counters fixing
Project:
U031215-1
Activity:
AZ1-CONS
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS
Vanity counters fixing
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS

-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-11
-HS1-12
-HS1-12
-HS1-12
-HS1-12
-HS1-12
-HS1-12
-HS1-12
-HS1-12
-HS1-12
-HS1-12
-HS1-12
-HS1-12
-HS1-12
-HS1-12
-HS1-12

160
170
180
190
200
210
220
230
240
250
260
280
290
2N
300
310
320
330
340
350
360
370
380
390
400
410
420
440
450
460

Door frames installation


Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Install Fire Pumps
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Shower marble benches fixing
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Shower marble benches fixing
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:

AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12

470
480
490
4N
500
510
520
530
540
550
560
570
580
590
5N
600
610
620
630
650
660
670
680
6N
700
710
720
730
740
750

Painting 1st coat


Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Sanitary wares
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install ELV devices (BMS+Security+Lighting Control+CO
Project:
U031215-1
Activity:

AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
Sensors)
AZ1-CONS -HS1-12

760
770
790
7N
800
810
830
840
850
860
870
880
890
90
900
910
930
940
950
960
980
000
010
020
030
040
050
060
070
080

Install ELV devices (BMS+Security+Lighting Control)


Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Carpet installation
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:

AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-12
AZ1-CONS -HS1-13
AZ1-CONS -HS1-13
AZ1-CONS -HS1-13
AZ1-CONS -HS1-13
AZ1-CONS -HS1-13
AZ1-CONS -HS1-13
AZ1-CONS -HS1-13
AZ1-CONS -HS1-13
AZ1-CONS -HS1-13
AZ1-CONS -HS1-13

090
100
110
130
140
150
160
170
180
190
200
210
220
230
240
250
260
270
280
290
310
320
330
330N
331N
340
350
370
380
390

Painting 1st coat


Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
LV Panels Cable termination
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
EIFS (Without Final Coat) including all brackets - Sec 1;2nd F
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Shower marble benches fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Carpet installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sanitary wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-13

400
410
420
430
440
460
470
480
500
510
520
530
540
550
560
570
60
600
610
620
630
640
650
660
670
680
690
700
710
720

Floor tiles installation


Project:
U031215-1
Shower marble benches fixing
Project:
U031215-1
Fixing skirting
Project:
U031215-1
Fixing skirting
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Fixing skirting
Project:
U031215-1
Shower glass partitions
Project:
U031215-1
Shower glass partitions
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install Sanitary Wares
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install FF pipes+valves/test
Project:
U031215-1
Door frames installation
Project:
U031215-1
Floor tiles installation
Project:
U031215-1
Shower marble benches fixing
Project:
U031215-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Fixing skirting
Project:
U031215-1
Fixing skirting
Project:
U031215-1
Carpet installation
Project:
U031215-1
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Install Room Management/ELV Devices
Project:
U031215-1

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

730
740
750
760
770
780
790
80
800
810
821N
840
850
860
870
880
890
920
930
950
960
980
000
010
020
030
040
050
060
070

Install Lighting & Wiring devices


Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Fixing skirting
Project:
U031215-1
Headboard fixing
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install Ducts/dampers
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Install FA+CB point wiring
Project:
U031215-1
Floor tiles installation
Project:
U031215-1
Wooden cladding in the walk-in
Project:
U031215-1
Fixing skirting
Project:
U031215-1
Install Sanitary Wares
Project:
U031215-1
Install Sanitary wares
Project:
U031215-1
Install & Earthing system
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Fixing skirting
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Sanitary Wares
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Wooden cladding in the walk-in
Project:
U031215-1

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-13

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

080
090
100
110
120
130
140
150
160
170
180
190
20
200
210
230
250
270
280
30
300
310
320
330
340
350
370
380
390
closet
40

Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Carpet installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Shower marble benches fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Install PD pipes & test

Activity:

AZ1-CONS -HS1-14

410
420
440
450
460
470
480
490
500
510
520
530
540
550
560
570
580
590
60
600
620
630
650
660
closet
670
690
700
720
730

Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Shower marble benches fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Cleaning & snagging
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install Room Management/ELV Devices
Project:
U031215-1
Headboard fixing
Project:
U031215-1

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

740
750
760
770
780
closet
790
80
800
830
840
850
860
870
890
910
920
940
950
960
closet
970
980
990
000
020
040
050
060
080
090

Install DB/Termination
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
EIFS (Without Final Coat) - including all brackets - Sec 1;3rd F
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
LV Cable testing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-14
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install DB/Termination
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Headboard fixing
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Room Management/ELV Devices
Project:
U031215-1
Cleaning & snagging
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Wall covering installation
Project:
U031215-1

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-14

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

100
110
120
closet
130
140
150
160
170
180
190
220
230
240
250
270
280
290
300
310
320
340
350
361
370
380
390
400
410
420
430

Wall covering installation


Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install FA+CB devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install DB/Termination
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install ELV devices (BMS)
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install RO System
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in

closet
440
450
470
480
500
510
520
550
closet
560
570
580
590
600
620
630
640
650
660
670
690
700
710
closet
720
730
740
750
760
770

Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Carpet installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install DB/Termination
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Final Painting on walls & ceiling
Project:
U031215-1
Final Painting on walls & ceiling
Project:
U031215-1
Final Painting on walls & ceiling
Project:
U031215-1
Door panels & ironmongary installation
Project:
U031215-1
Door panels & ironmongary installation
Project:
U031215-1
Door panels & ironmongary installation
Project:
U031215-1

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

Activity:

AZ1-CONS -HS1-15

790
810
820
830
850
860
870
880
890
900
910
920
930
940
950
960
970
980
990
00
000
010
020
030
050
060
closet
070
080
090
100

Install Room Management/ELV Devices


Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
WPC Panels Installation - Sec 1;3rd F
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Roof WaterProofing (Final Coat)-Sec 1
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-15
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Install FA+CB devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Facade terrace floor Decking -S1;3rd floor
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
Final Painting on walls
Project:
Cleaning & snagging
Project:
Cleaning & snagging
Project:
Cleaning & snagging

U031215-1
& ceiling
U031215-1

Activity:

AZ1-CONS -HS1-16

Activity:

AZ1-CONS -HS1-16

U031215-1

Activity:

AZ1-CONS -HS1-16

U031215-1

Activity:

AZ1-CONS -HS1-16

110
130
140
closet
150
160
170
180
190
210
220
240
closet
250
260
270
280
290
300
310
320
330
340
350
360
370
380
390
400
410
420

Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Install ELV devices (BMS)
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS1-16
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
WPC Panels Installation - Sec 1;2nd F
Project:
U031215-1
Activity:
Facade terrace floor Decking -S1;2nd floor
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation

AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16

430
440
450
460
470
480
490
500
510
520
52N
530
550
560
570
580
590
60
600
610
620
630
640
650
660
670
680
690
700
710

Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Generator Installation -phase 1
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Facade terrace floor Decking -S1;1st floor
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Install Fire syppression system cylinders
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
WPC Panels Installation - Sec 1;1st F

AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16

720
730
740
750
760
770
780
790
800
810
820
830
840
870
900
020
10
20
50N
60
70
80
10
2N
4N
5N
6N
90
00
1N

Project:
U031215-1
Activity:
Install FA+CB devices
Project:
U031215-1
Activity:
Install ELV devices (BMS)
Project:
U031215-1
Activity:
Facade terrace floor Decking -S1;Ground Floor
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
WPC Panels Installation - Sec 1 GF
Project:
U031215-1
Activity:
EIFS (Final Coat) - Sec 1 GF
Project:
U031215-1
Activity:
EIFS (Final Coat)- Sec 1;1st F
Project:
U031215-1
Activity:
Hotel Sector 1 : Final snagging & De snagging
Project:
U031215-1
Activity:
EIFS (Final Coat) - Sec 1;2nd F
Project:
U031215-1
Activity:
EIFS (Final Coat) - Sec 1;3rd F
Project:
U031215-1
Activity:
Louvers Installation
Project:
U031215-1
Activity:
Louvers Installation
Project:
U031215-1
Activity:
Corner Guards & Wheel Stopper Installation
Project:
U031215-1
Activity:
Louvers Installation
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Install Smoke Duct
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Access required for MEP Final Fix*

AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-16
AZ1-CONS -HS1-17
AZ1-CONS -HS1-17
AZ1-CONS -HS1-17
AZ1-CONS -HS1-17
AZ1-CONS -HS1-17
AZ1-CONS -HS1-17
AZ1-CONS -HS1-17
AZ1-CONS -HS1-18
AZ1-CONS -HS1-18
AZ1-CONS -HS1-18
AZ1-CONS -HS1-18
AZ1-CONS -HS1-18
AZ1-CONS -HS1-18
AZ1-CONS -HS1-19
AZ1-CONS -HS1-19

Project:
U031215-1
Activity:
AZ1-CONS -HS1-19
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-19
60
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS -HS1-19
80
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
1N
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
20
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
300
Generator Installation -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
30N
Install Smoke Duct
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
31N
Install Smoke Duct
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
32N
Install Smoke Duct
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
33N
Install Smoke Duct
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
340N
Install Smoke Duct risers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
341N
Install Fan @Plant Room (Required duration is 15 days, Cleint instructi
on is 10 days)
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
350
Pantry equipments installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
360
Pantry equipments installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
370
Pantry equipments installation
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
380
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
390
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
40
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
400
Access required for MEP First Fix (Block wall)*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
410
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
420
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
430
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
440
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
450
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
460
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
470
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
480
Install Sanitary wares
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
490
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
500
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS1-20
31N

510
51N
520
530
550
560
570
590
610
620
630
640
650
660
670
70
720
740
40N
41N
71N
10N
11N
30
60
1N
2N
70
1N
2N

Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed WC cistern
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed P&D Pipes
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed conduits
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install Control Panels
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS

-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-20
-HS1-21
-HS1-21
-HS1-21
-HS1-23
-HS1-23
-HS1-23
-HS1-23
-HS1-24
-HS1-24
-HS1-24
-HS1-25
-HS1-25
-HS1-25

40
50
60
80
50
90
41N
60
80
50
70
00
80
90
00
10
60
80
20
90
00
2N
40
4N
5N
60
6N
6N10
7N
7N10

Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire syppression system pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable ladder in trench
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Water proofing works
Project:
U031215-1
Activity:
AZ1-CONS
Water proofing works
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS

-HS1-25
-HS1-25
-HS1-25
-HS1-27
-HS1-27
-HS1-28
-HS1-28
-HS1-28
-HS1-29
-HS1-29
-HS1-30
-HS1-31
-HS1-31
-HS1-32
-HS1-33
-HS1-33
-HS1-33
-HS1-35
-HS1-35
-HS1-36
-HS1-36
-HS1-36
-HS1-36
-HS1-36
-HS1-36
-HS1-36
-HS1-36
-HS1-36
-HS1-36
-HS1-36

90
00
10
20
90
50
60
70
70N
71N
90
20
30
40
50
01M
11N
30
50
90
00
21N
40
80
90
00
30
50
60
90

MEP Clearance - Ceiling Stud/Grid*


Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Pantry equipments installation
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test (wet area)
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS

-HS1-37
-HS1-37
-HS1-37
-HS1-37
-HS1-38
-HS1-38
-HS1-38
-HS1-38
-HS1-38
-HS1-38
-HS1-39
-HS1-39
-HS1-39
-HS1-39
-HS1-40
-HS1-40
-HS1-40
-HS1-40
-HS1-40
-HS1-41
-HS1-41
-HS1-41
-HS1-41
-HS1-41
-HS1-42
-HS1-42
-HS1-42
-HS1-42
-HS1-42
-HS1-43

00
00N
10
30
90
1N
20
3N
4N
50
5N
60
1N
2N
50
60
31N
50N
51N
10
30
50
40
50
60
70
0
10
20
30

MEP Clearance - Ceiling Closure*


Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - Block wall
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Framework & one side boarding
Project:
U031215-1
Activity:
AZ1-CONS

-HS1-43
-HS1-43
-HS1-43
-HS1-43
-HS1-44
-HS1-44
-HS1-44
-HS1-44
-HS1-44
-HS1-44
-HS1-44
-HS1-45
-HS1-45
-HS1-45
-HS1-45
-HS1-46
-HS1-46
-HS1-46
-HS1-47
-HS1-47
-HS1-48
-HS1-49
-HS1-49
-HS1-49
-HS1-49
-HS1-50
-HS1-50
-HS1-50
-HS1-50
-HS1-50

40
60
61N
90N
00
20
60
90
20
90
00
10
20
40
50
80
90
20
40
50
70
80
90
00
30
50
60
80
00
10

Cement board lining & Cistern Closing


Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access to Corridor
Project:
U031215-1
Activity:
AZ1-CONS
Access to Corridor
Project:
U031215-1
Activity:
AZ1-CONS
Access to Corridor
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS

-HS1-50
-HS1-50
-HS1-50
-HS1-51
-HS1-51
-HS1-51
-HS1-51
-HS1-52
-HS1-52
-HS1-53
-HS1-53
-HS1-53
-HS1-53
-HS1-53
-HS1-53
-HS1-53
-HS1-54
-HS1-54
-HS1-54
-HS1-54
-HS1-54
-HS1-54
-HS1-55
-HS1-55
-HS1-55
-HS1-55
-HS1-55
-HS1-56
-HS1-56
-HS1-56

20
90
0
50
60
70
20
30
40
60
70
76N
77N
90
00
10
30
40
50
70
50
70
00
20
30
70
80
90
2N
4N

MEP Clearance - Ceiling Closure*


Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glazing - Frame - S1;3rd Floor
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Marking layout and approval
Project:
U031215-1
Activity:
AZ1-CONS
Marking layout and approval
Project:
U031215-1
Activity:
AZ1-CONS
Marking layout and approval
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling Grid Supports & Grid Installation
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling Boarding & Painting works
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS

-HS1-56
-HS1-57
-HS1-57
-HS1-57
-HS1-57
-HS1-58
-HS1-58
-HS1-58
-HS1-58
-HS1-58
-HS1-58
-HS1-58
-HS1-58
-HS1-59
-HS1-59
-HS1-59
-HS1-59
-HS1-59
-HS1-59
-HS1-60
-HS1-60
-HS1-61
-HS1-61
-HS1-61
-HS1-61
-HS1-61
-HS1-61
-HS1-62
-HS1-62
-HS1-62

5N
66N
67N
6N
70
20
30
90
0
00
10
00
10
50
60
80
0
50
90
40
90
20
40
50
80
2N
30
4N
5N
5N10

Access required for MEP Final Fix: Wet Area*


Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
Install FHC
Project:
U031215-1
Activity:
Install Concealed Pipes - Block wall
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Install FHC
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:

AZ1-CONS -HS1-62
AZ1-CONS -HS1-62
AZ1-CONS -HS1-62
AZ1-CONS -HS1-62
AZ1-CONS -HS1-63
AZ1-CONS -HS1-63
AZ1-CONS -HS1-63
AZ1-CONS -HS1-64
AZ1-CONS -HS1-64
AZ1-CONS -HS1-64
AZ1-CONS -HS1-65
AZ1-CONS -HS1-65
AZ1-CONS -HS1-65
AZ1-CONS -HS1-65
AZ1-CONS -HS1-65
AZ1-CONS -HS1-66
AZ1-CONS -HS1-66
AZ1-CONS -HS1-66
AZ1-CONS -HS1-67
AZ1-CONS -HS1-67
AZ1-CONS -HS1-68
AZ1-CONS -HS1-68
AZ1-CONS -HS1-68
AZ1-CONS -HS1-68
AZ1-CONS -HS1-69
AZ1-CONS -HS1-69
AZ1-CONS -HS1-69
AZ1-CONS -HS1-69
AZ1-CONS -HS1-69
AZ1-CONS -HS1-69

5N20
60
6N
00
20
30
70
0
00
20
50
60
90
50
50N
60
0
10
20
20N
50
80
10
70
80
0
00
30
50
60

Access required for MEP Final Fix*


Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Install Control Panels
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS

-HS1-69
-HS1-69
-HS1-70
-HS1-70
-HS1-70
-HS1-70
-HS1-71
-HS1-71
-HS1-71
-HS1-71
-HS1-71
-HS1-71
-HS1-72
-HS1-72
-HS1-72
-HS1-73
-HS1-73
-HS1-73
-HS1-73
-HS1-73
-HS1-73
-HS1-74
-HS1-74
-HS1-74
-HS1-75
-HS1-75
-HS1-75
-HS1-75
-HS1-75
-HS1-75

80
0
10
20
30
70
90
30
33N
35N
36N
37N
00
00N
10
50
70
10
20
40
50
80
90
30
40
80
10
30
40
70

Inspection & Approvals (Ceiling closure)*


Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Alum & Glass - Glass works - S1;3rd Floor
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:

AZ1-CONS -HS1-76
AZ1-CONS -HS1-76
AZ1-CONS -HS1-76
AZ1-CONS -HS1-76
AZ1-CONS -HS1-76
AZ1-CONS -HS1-76
AZ1-CONS -HS1-77
AZ1-CONS -HS1-77
AZ1-CONS -HS1-77
AZ1-CONS -HS1-77
AZ1-CONS -HS1-77
AZ1-CONS -HS1-78
AZ1-CONS -HS1-78
AZ1-CONS -HS1-78
AZ1-CONS -HS1-78
AZ1-CONS -HS1-78
AZ1-CONS -HS1-79
AZ1-CONS -HS1-79
AZ1-CONS -HS1-79
AZ1-CONS -HS1-79
AZ1-CONS -HS1-79
AZ1-CONS -HS1-79
AZ1-CONS -HS1-80
AZ1-CONS -HS1-80
AZ1-CONS -HS1-80
AZ1-CONS -HS1-81
AZ1-CONS -HS1-81
AZ1-CONS -HS1-81
AZ1-CONS -HS1-81
AZ1-CONS -HS1-82

10
20
30
40
70
80
30
50
90
40
70
10
20
30
50
60
80
30
60
70
80
0
30
40
80
90
00
10
90
00

Install Lighting & Small power point wiring


Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Install MV (Primary Cables)
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Install LV (Secondary) + Control Cables
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
QRM Termination & Testing
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS

-HS1-82
-HS1-82
-HS1-82
-HS1-82
-HS1-82
-HS1-83
-HS1-83
-HS1-83
-HS1-84
-HS1-84
-HS1-85
-HS1-85
-HS1-85
-HS1-85
-HS1-85
-HS1-85
-HS1-86
-HS1-86
-HS1-86
-HS1-86
-HS1-87
-HS1-87
-HS1-87
-HS1-87
-HS1-87
-HS1-88
-HS1-88
-HS1-88
-HS1-89
-HS1-89

10
50
60
70
80
90
10
70
80
90
60
90
20
10
60
70
50
0
00
30
70
80
00
60
80
90
0
20
40
60

Install Lighting & Small power point wiring


Project:
U031215-1
Activity:
AZ1-CONS
WPC Track Installation - Sec 1;3rd F
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glass - Glass works - S1;2nd Floor
Project:
U031215-1
Activity:
AZ1-CONS
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
TRF Termination & Testing
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS
WPC Track Installation - Sec 1;2nd F
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Panels
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
WPC Track Installation - Sec 1;1st F
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test (wet area)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS

-HS1-89
-HS1-89
-HS1-89
-HS1-89
-HS1-89
-HS1-90
-HS1-90
-HS1-90
-HS1-90
-HS1-91
-HS1-91
-HS1-92
-HS1-93
-HS1-93
-HS1-93
-HS1-94
-HS1-95
-HS1-95
-HS1-95
-HS1-95
-HS1-95
-HS1-96
-HS1-96
-HS1-96
-HS1-96
-HS1-97
-HS1-97
-HS1-97
-HS1-97
-HS1-97

70
80
90
0
20
30
40
60
90
00
20
30
40
80
90
40
40N
41N
50
90
00
11N
40
00
20
40
40N
41N
42N
60

Install DBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Alum & Glass - Glass works- S1;1st Floor
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install Cable trays high level
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install PD pipes & test
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install Fire suppression system pipes+valves/test
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
Access to area
Project:
U031215-1
Activity:
Access required for MEP First Fix (Block wall)*
Project:
U031215-1
Activity:
Access required for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:

AZ1-CONS -HS1-97
AZ1-CONS -HS1-97
AZ1-CONS -HS1-98
AZ1-CONS -HS1-98
AZ1-CONS -HS1-98
AZ1-CONS -HS1-98
AZ1-CONS -HS1-98
AZ1-CONS -HS1-98
AZ1-CONS -HS1-99
AZ1-CONS -HS1-99
AZ1-CONS -HS1-99
AZ1-CONS -HS1-99
AZ1-CONS -HS1-99
AZ1-CONS -HS1-99
AZ1-CONS -HS2-10
AZ1-CONS -HS2-10
AZ1-CONS -HS2-10
AZ1-CONS -HS2-10
AZ1-CONS -HS2-10
AZ1-CONS -HS2-11
AZ1-CONS -HS2-11
AZ1-CONS -HS2-11
AZ1-CONS -HS2-12
AZ1-CONS -HS2-12
AZ1-CONS -HS2-12
AZ1-CONS -HS2-12
AZ1-CONS -HS2-12
AZ1-CONS -HS2-12
AZ1-CONS -HS2-12
AZ1-CONS -HS2-13

10
30
40
70
80
90
20
50
60
70
91N
20
30
30N
31N
32N
33N
40
50
60
70
80
00
10
20
60
70
80
10
20

Marking layout and approval


Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - Block wall
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Piping
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First Fix (Block wall)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Wooden paneling @ Reception backwall
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Ceramic / stone wall cladding
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Ceramic / stone wall cladding
Project:
U031215-1
Activity:
AZ1-CONS

-HS2-13
-HS2-14
-HS2-14
-HS2-14
-HS2-14
-HS2-15
-HS2-15
-HS2-15
-HS2-15
-HS2-15
-HS2-16
-HS2-16
-HS2-16
-HS2-16
-HS2-16
-HS2-16
-HS2-16
-HS2-16
-HS2-16
-HS2-16
-HS2-16
-HS2-17
-HS2-17
-HS2-17
-HS2-17
-HS2-17
-HS2-17
-HS2-18
-HS2-18
-HS2-18

30
50
60
90
00
20
30
40
50
70
00
20
30
50
70
90
00
10
20
40
50
60
70
90
00
40
80
00
10
20

Install ELV point wiring (BMS+Security+Lighting Control)


Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install Trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glazing - Frame (afterS3 Ground Floor) -S2
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Underground CHW Pipes+test+insulate
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install Trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace floor Waterproofing & Screed -S2
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install Control Panels
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS

-HS2-18
-HS2-18
-HS2-18
-HS2-19
-HS2-19
-HS2-19
-HS2-19
-HS2-19
-HS2-19
-HS2-20
-HS2-20
-HS2-20
-HS2-20
-HS2-20
-HS2-20
-HS2-21
-HS2-21
-HS2-21
-HS2-21
-HS2-21
-HS2-21
-HS2-21
-HS2-21
-HS2-22
-HS2-22
-HS2-22
-HS2-23
-HS2-23
-HS2-23
-HS2-23

50
60
70
80
90
00
30
40
60
70
90
00
10
20
30
50
70
00
30
40
50
60
70
80
00
10
20
50
60
90

Alum & Glass - Glass Works -S2


Project:
U031215-1
Activity:
AZ1-CONS -HS2-23
Access to area
Project:
U031215-1
Activity:
AZ1-CONS -HS2-23
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -HS2-23
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS -HS2-23
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS -HS2-24
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS -HS2-24
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -HS2-24
EIFS (Without Final Coat) including all brackets - Sec 2
Project:
U031215-1
Activity:
AZ1-CONS -HS2-24
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -HS2-24
Marking layout and approval
Project:
U031215-1
Activity:
AZ1-CONS -HS2-24
BMS Installation
Project:
U031215-1
Activity:
AZ1-CONS -HS2-25
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS -HS2-25
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS -HS2-25
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
AZ1-CONS -HS2-25
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS -HS2-25
Supports for chandeliers
Project:
U031215-1
Activity:
AZ1-CONS -HS2-25
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS -HS2-26
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS -HS2-26
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS2-26
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS -HS2-26
FCC Installation
Project:
U031215-1
Activity:
AZ1-CONS -HS2-26
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -HS2-26
Install Fire syppression system cylinders
Project:
U031215-1
Activity:
AZ1-CONS -HS2-26
WPC Track Installation - Sec 2
Project:
U031215-1
Activity:
AZ1-CONS -HS2-27
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS2-27
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS2-27
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS -HS2-27
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS -HS2-27
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS2-27
Install FA+CB devices
Project:
U031215-1
Activity:
AZ1-CONS -HS2-28

10
20
40
60
90
00
10
30
40
50
60
70
80
00
10
20
30
40
50
60
00
10
40
50
80
10
20
30
40
50

Install Grills +Diffusers


Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Fire syppression system cylinders
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install FA+CB devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Stone flooring
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Veneer wall paneling
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Fire syppression system cylinders
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Modular open wooden ceiling
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:

AZ1-CONS -HS2-28
AZ1-CONS -HS2-28
AZ1-CONS -HS2-28
AZ1-CONS -HS2-28
AZ1-CONS -HS2-29
AZ1-CONS -HS2-29
AZ1-CONS -HS2-29
AZ1-CONS -HS2-29
AZ1-CONS -HS2-29
AZ1-CONS -HS2-29
AZ1-CONS -HS2-29
AZ1-CONS -HS2-29
AZ1-CONS -HS2-30
AZ1-CONS -HS2-30
AZ1-CONS -HS2-30
AZ1-CONS -HS2-30
AZ1-CONS -HS2-30
AZ1-CONS -HS2-30
AZ1-CONS -HS2-30
AZ1-CONS -HS2-31
AZ1-CONS -HS2-31
AZ1-CONS -HS2-31
AZ1-CONS -HS2-31
AZ1-CONS -HS2-31
AZ1-CONS -HS2-32
AZ1-CONS -HS2-32
AZ1-CONS -HS2-32
AZ1-CONS -HS2-32
AZ1-CONS -HS2-32
AZ1-CONS -HS2-32

60
70
80
90
00
10
20
30
40
50
60
70
90
00
10
20
30
40
50
60
70
90
20
60
70
80
90
00
20
30

Install FA+CB devices


Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Desks, cabinets & shelvings installation
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Glass boxes installation
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install ELV devices (BMS+Security+Lighting Control+CO
Project:
U031215-1
Activity:
Install ELV devices (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
Install ELV devices (BMS)
Project:
U031215-1
Activity:
Install ELV devices (BMS)
Project:
U031215-1
Activity:
Install ELV devices (BMS)
Project:
U031215-1
Activity:
Terrazzo / Stone flooring
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Glass partitions
Project:
U031215-1
Activity:
Stone wall cladding
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Fixing skirting (Wooden & Metal)
Project:
U031215-1
Activity:
Install Control Panels
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:

AZ1-CONS -HS2-32
AZ1-CONS -HS2-32
AZ1-CONS -HS2-32
AZ1-CONS -HS2-33
AZ1-CONS -HS2-33
AZ1-CONS -HS2-33
AZ1-CONS -HS2-33
AZ1-CONS -HS2-33
AZ1-CONS -HS2-33
AZ1-CONS -HS2-33
AZ1-CONS -HS2-33
AZ1-CONS -HS2-33
AZ1-CONS -HS2-34
Sensors)
AZ1-CONS -HS2-34
AZ1-CONS -HS2-34
AZ1-CONS -HS2-34
AZ1-CONS -HS2-34
AZ1-CONS -HS2-34
AZ1-CONS -HS2-34
AZ1-CONS -HS2-34
AZ1-CONS -HS2-34
AZ1-CONS -HS2-35
AZ1-CONS -HS2-35
AZ1-CONS -HS2-35
AZ1-CONS -HS2-35
AZ1-CONS -HS2-35
AZ1-CONS -HS2-36
AZ1-CONS -HS2-36
AZ1-CONS -HS2-36
AZ1-CONS -HS2-36

40
50
60
70
90
10
20
30
40
50
60
70
80
90
00
10
20
30
40
50
70
80
00
10
40
50
60
70
80
90

Inspection & Approvals


Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Plastered wall finish installation
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Carpet installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Vanity counters / Reception counter installation
Project:
U031215-1
Activity:
Wooden deck flooring to Vestibule
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Cleaning/ snagging / inspection
Project:
U031215-1
Activity:
Handover of the area
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Facade terrace floor Decking --S2
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Control Panel Cable termination
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Fixing mirrors
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Carpet flooring
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:

AZ1-CONS -HS2-36
AZ1-CONS -HS2-36
AZ1-CONS -HS2-36
AZ1-CONS -HS2-36
AZ1-CONS -HS2-37
AZ1-CONS -HS2-37
AZ1-CONS -HS2-37
AZ1-CONS -HS2-37
AZ1-CONS -HS2-37
AZ1-CONS -HS2-37
AZ1-CONS -HS2-37
AZ1-CONS -HS2-37
AZ1-CONS -HS2-37
AZ1-CONS -HS2-38
AZ1-CONS -HS2-38
AZ1-CONS -HS2-38
AZ1-CONS -HS2-38
AZ1-CONS -HS2-38
AZ1-CONS -HS2-38
AZ1-CONS -HS2-38
AZ1-CONS -HS2-38
AZ1-CONS -HS2-39
AZ1-CONS -HS2-39
AZ1-CONS -HS2-39
AZ1-CONS -HS2-39
AZ1-CONS -HS2-39
AZ1-CONS -HS2-39
AZ1-CONS -HS2-39
AZ1-CONS -HS2-39
AZ1-CONS -HS2-40

0
00
10
20
30
40
50
60
70
80
90
40
50
60
70
80
00
10
20
30
50
60
70
80
90
00
10
20
30
40

Install FA+CB point wiring


Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS
Fixing chandeliers
Project:
U031215-1
Activity:
AZ1-CONS
Cleaning/ snagging / inspection
Project:
U031215-1
Activity:
AZ1-CONS
Handover of the area
Project:
U031215-1
Activity:
AZ1-CONS
Pergola - S2
Project:
U031215-1
Activity:
AZ1-CONS
WPC Panels Installation - Sec 2
Project:
U031215-1
Activity:
AZ1-CONS
Roof WaterProofing (Final Coat) -Sec 2
Project:
U031215-1
Activity:
AZ1-CONS
EIFS (Final Coat) - Sec 2
Project:
U031215-1
Activity:
AZ1-CONS
Hotel Sector 2 : Final snagging & De snagging
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV devices (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS

-HS2-40
-HS2-40
-HS2-40
-HS2-40
-HS2-40
-HS2-40
-HS2-40
-HS2-40
-HS2-40
-HS2-40
-HS2-41
-HS2-41
-HS2-41
-HS2-41
-HS2-41
-HS2-42
-HS2-42
-HS2-42
-HS2-42
-HS2-42
-HS2-42
-HS2-42
-HS2-42
-HS2-42
-HS2-43
-HS2-43
-HS2-43
-HS2-43
-HS2-43
-HS2-43

50
60
70
00
10
20
30
40
50
60
70
80
90
0
00
10
20
30
40
50
60
70
80
90
00
10
20
30
0
0

Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV devices (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed conduits
Project:
U031215-1
Activity:
AZ1-CONS

-HS2-43
-HS2-43
-HS2-44
-HS2-44
-HS2-44
-HS2-44
-HS2-44
-HS2-44
-HS2-44
-HS2-44
-HS2-44
-HS2-44
-HS2-45
-HS2-45
-HS2-45
-HS2-45
-HS2-45
-HS2-45
-HS2-45
-HS2-45
-HS2-45
-HS2-45
-HS2-45
-HS2-46
-HS2-46
-HS2-46
-HS2-46
-HS2-49
-HS2-53
-HS2-58

0
0
0N
1N
2N
0
0N
1N
0N10
0N20
1N
1N10
1N20
2N
2N10
2N20
0
0N
1N
0
0
0
0N
1N
0
0
0
0N
1N
0

Install Fire syppression system pipes+valves/test


Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
Access required for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Access required for MEP First Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:

AZ1-CONS -HS2-63
AZ1-CONS -HS2-68
AZ1-CONS -HS2-68
AZ1-CONS -HS2-68
AZ1-CONS -HS2-77
AZ1-CONS -HS2-77
AZ1-CONS -HS2-77
AZ1-CONS -HS2-78
AZ1-CONS -HS2-78
AZ1-CONS -HS2-78
AZ1-CONS -HS2-78
AZ1-CONS -HS2-78
AZ1-CONS -HS2-78
AZ1-CONS -HS2-78
AZ1-CONS -HS2-78
AZ1-CONS -HS2-79
AZ1-CONS -HS2-80
AZ1-CONS -HS2-80
AZ1-CONS -HS2-83
AZ1-CONS -HS2-86
AZ1-CONS -HS2-87
AZ1-CONS -HS2-87
AZ1-CONS -HS2-87
AZ1-CONS -HS2-93
AZ1-CONS -HS2-94
AZ1-CONS -HS2-95
AZ1-CONS -HS2-95
AZ1-CONS -HS2-95
AZ1-CONS -HS2-96
AZ1-CONS -HS2-97

0
0
040
070
130
200
210
220
250
260
280
290
300
320
330
340
340N
350
380
40
420
450
50N
550
560
580
60
600
640
650

Install Fire suppression system pipes+valves/test


Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
WPC Track Installation - Sec.3 3rd floor
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install P&D header pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Extract Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glazing - Frame -S3;Basement
Project:
U031215-1
Activity:
AZ1-CONS

-HS2-99
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10
-HS3-10

670
70
720
740
750
770
790
830
860
900
920
930
950
960
980
000
040
040N
041N
042N
043N
044N
070
10
110
160
170
180
1N
200

Alum & Glass - Glass works -S3;Ground floor


Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
Install Kitchen Extract Fans (TBC)
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
WPC Track Installation - Sec.3 2nd floor
Project:
U031215-1
Activity:
Install Control Panels
Project:
U031215-1
Activity:
Install CHW header pipes+valves/test
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Chiller+Isolator Cable termination
Project:
U031215-1
Activity:
Chiller Plant Manager (CPM) Installation+Connections
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Wet Area)*
Project:
U031215-1
Activity:
Floor screed
Project:
U031215-1
Activity:

AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-10
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11
AZ1-CONS -HS3-11

210
220
250
270
280
290
2N
300
330
360
3N
410
420
440
4N
500
510
520
570
5N
610
620
630
650
660
670
680
690
6N
700

Ceramic / stone wall cladding


Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
WPC Track Installation - Sec.3 1st floor
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB devices
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glass - Glass works-S3;Basement
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS

-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11

710
740
750
760
770
780
800
830
840
850
870
880
930
960
000
010
020
030
060
070
080
100
110
120
130
140
160
162N
164N
165N

WPC Track Installation - Sec.3 GF


Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS
Install DBs
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install DB
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts (site measurement pieces)
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays high level
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
SMDB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
AZ1-CONS
SMDB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS
SMDB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS

-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-11
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12
-HS3-12

180
190
200
220
240
260
270
280
290
300
320
330
340
350
360
370
390
400
410
440N
490
4N
500
510
520
530
540
550
560
580

Install flexible ducts+plenums


Project:
U031215-1
Activity:
SMDB Termination & testing
Project:
U031215-1
Activity:
SMDB Termination & testing
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
WPC Track Installation - Sec.3 Basement
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Boarding, taping & jointing
Project:
U031215-1
Activity:
Trenches & Manhole Covering
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Stone works @ Ablution
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:

AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12

590
5N
600
620
630
650
660
690
6N
700
710
730
740
750
760
770
780
790
800
820
830
840
860
870
880
890
930
940
960
970

Install FA+CB+PA devices


Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
LV Cables arrange+dressing (to be tied with riser)
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:

AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12
AZ1-CONS -HS3-12

980
990
000
010
011N
012N
013N
014N
020
030
050
060
070
080
090
100
110
120
130
140
150
160
170
180
190
200
210
220
230
240

Clearance - Final Civil works


Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:
Wild air provisions
Project:
U031215-1
Activity:

AZ1-CONS -HS3-12
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13
AZ1-CONS -HS3-13

250
260
270
280
290
300
310
320
330
350
360
370
40
400
410
430
440
460
470
480
490
500
510
520
540
550
560
570
580
590

Wild air provisions


Project:
U031215-1
Activity:
AZ1-CONS
Wild air provisions
Project:
U031215-1
Activity:
AZ1-CONS
Wild air provisions
Project:
U031215-1
Activity:
AZ1-CONS
Wild air provisions
Project:
U031215-1
Activity:
AZ1-CONS
Wild air provisions
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Acoustic gypsum ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation - wet area
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS

-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13

5N
600
610
620
630
640
650
660
670
680
690
6N
700
710
720
730
740
750
760
770
780
790
810
820
830
850
860
870
980
990

Access required for MEP Final Fix: Wet Area*


Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling - wet area
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling - Corridore
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB devices
Project:
U031215-1
Activity:
AZ1-CONS
Busbar Site Measurement & Delivery
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Tracks for operable partitions
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Install Busbar final connections(to be tied with busriser)
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Vanity counters fixing
Project:
U031215-1
Activity:
AZ1-CONS
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS

-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-13
-HS3-14

010
020
040
050
060
080
090
10
100
110
120
130
140
150
160
170
180
190
200
210
220
230
240
250
260
270
280
290
2N
300

Stone flooring
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Install FHC
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation - wet area
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation - Corridore
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Cold Room Works & Consultant Inspection -phase 1
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:

AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14

310
320
330
340
350
360
370
380
390
3N
40
400
410
430
440
450
460
470
480
490
500
520
530
540
550
560
570
580
590
60

Install FF droppers + test


Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Shower marble benches fixing
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Shower marble benches fixing
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Dominico mori wall tiles installation
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Floor tiles installation - wet area
Project:
U031215-1
Activity:
Wall cladding installation - wood finish - Corridore
Project:
U031215-1
Activity:
Wall cladding installation - wood finish
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:

AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14

600
610
620
630
640
650
660
670
680
690
700
720
730
740
760
770
780
790
800
830
840
850
860
860N
861N
862N
870
880
890
900

Painting 1st coat


Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Painting 1st coat - wet area
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Wooden cladding in the walk-in
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Painting 1st coat - Corridore
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Floor tiles installation
Project:
U031215-1
Door frames installation
Project:
U031215-1
Floor tiles installation
Project:
U031215-1
Wall covering installation
Project:
U031215-1
Wall covering installation
Project:
U031215-1
Install Sanitary Wares
Project:
U031215-1
Install Sanitary Wares
Project:
U031215-1
Install Sanitary wares
Project:
U031215-1
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Install flexible ducts+plenums
Project:
U031215-1
Install flexible ducts+plenums
Project:
U031215-1
MEP Clearance - Ceiling Closure
Project:
U031215-1
Access required for MEP First Fix*
Project:
U031215-1
Access required for MEP Second Fix*
Project:
U031215-1
Access required for MEP Final Fix*
Project:
U031215-1
Wooden cladding in the walk-in
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Install Sprinklers
Project:
U031215-1

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

Activity:

AZ1-CONS -HS3-14

910
920
930
940
950
960
970
990
000
010
020
030
040
050
060
080
090
100
110
120
130
140
150
160
170
190
200
210
220
240

Install Sprinklers
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Veneer wall paneling
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install ELV devices (BMS)
Project:
U031215-1
Activity:
Install ELV devices (BMS)
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
LV Panels Cable termination
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
WPC Panels Installation - Sec.3 3rd floor
Project:
U031215-1
Activity:

AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-14
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15

280
290
2N
30
300
310
320
330
350
360
380
390
40
400
410
420
430
440
450
460
470
480
490
4N
50
500
510
520
540
560

Install Lighting & Wiring devices


Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Door frames installation
Project:
U031215-1
Activity:
AZ1-CONS
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS
Fixing skirting - wet area
Project:
U031215-1
Activity:
AZ1-CONS
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS
Carpet installation
Project:
U031215-1
Activity:
AZ1-CONS
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
QRM Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS

-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15
-HS3-15

570
590
5N
600
610
620
630
640
650
660
670
680
690
6N
70
700
710
720
730
740
750
760
780
790
800
810
820
830
860
870

Inspection & Approvals


Project:
U031215-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Access required for MEP Final Fix: Wet
Project:
U031215-1
Floor tiles installation
Project:
U031215-1
Door frames installation
Project:
U031215-1
Floor tiles installation
Project:
U031215-1
Shower marble benches fixing
Project:
U031215-1
Wall covering installation
Project:
U031215-1
Fixing skirting
Project:
U031215-1
Install Sanitary Wares
Project:
U031215-1
Install Sanitary Wares
Project:
U031215-1
Install Sanitary wares
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Access required for MEP Final Fix: Dry
Project:
U031215-1
Install FCU+Valve package
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Install ELV devices (BMS)
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Resin flooring
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Fixing skirting
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install Sanitary Wares
Project:
U031215-1
Install Ceiling roses+flexible wires
Project:
U031215-1
Install Ceiling roses+flexible wires
Project:
U031215-1
Counters installation
Project:
U031215-1
Install Ceiling roses+flexible wires
Project:
U031215-1

Activity:

AZ1-CONS -HS3-15

Activity:
Area*
Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:
Area*
Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

Activity:

AZ1-CONS -HS3-15

AZ1-CONS -HS3-15

AZ1-CONS -HS3-15

880
890
890N
90
900
910
920
930
940
950
960
970
980
990
00
000
010
020
050
060
070
090
0N
100
110
120
140
170
180
190

Install Lighting & Wiring devices


Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Shower marble benches fixing
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Carpet instalaltion
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:

AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-15
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16

1N
20
200
210
220
230
240
270
280
290
300
310
320
330
340
350
360
370
390
40
400
410
430
440
460
470
480
490
500
510

Access required for MEP Final Fix*


Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Shower glass partitions - wet area
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Shower glass partitions
Project:
U031215-1
Activity:
Shower glass partitions
Project:
U031215-1
Activity:
Install & Earthing system
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
WPC Panels Installation - Sec.3 2nd floor
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Shower glass partitions
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Sanitary wares
Project:
U031215-1
Activity:
Testing of systems (locally)
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Shower marble benches fixing
Project:
U031215-1
Activity:

AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16

520
530
540
560
570
580
590
60
600
610
620
630
650
660
670
690
70
710
720
730
740
750
760
770
780
790
80
800
810
822N

Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS
Carpet installation - Corridore
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS
Install Sanitary wares
Project:
U031215-1
Activity:
AZ1-CONS
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
AZ1-CONS
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Sanitary Wares
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS

-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16
-HS3-16

823N
824N
840
860
870
880
890
90
900
910
920
930
940
950
960
970
980
990
000
020
030
040
050
060
070
080
090
10
100
120

Access required for MEP Final Fix*


Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Fabric padded panels on walls
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Hoods Installation
Project:
U031215-1
Activity:
WPC Panels Installation - Sec.3 1st floor
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Shower marble benches fixing
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Shower glass partitions
Project:
U031215-1
Activity:
Headboard fixing
Project:
U031215-1
Activity:
Carpet installation
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Facade terrace floor Decking -S3;3rd floor
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Wooden cladding in the walk-in
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:

AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-16
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17

130
140
150
170
180
190
1N
20
200
220
230
240
250
260
270
280
300
310
320
330
340
350
360
380
390
400
410
420
430
440

Fixing skirting
Project:
U031215-1
Activity:
Shower glass partitions
Project:
U031215-1
Activity:
Headboard fixing
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Operable partitions installation
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Carpet installation
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
LV Cable testing
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Wall covering installation
Project:
U031215-1
Activity:
Floor tiles installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Headboard fixing
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install ELV devices (BMS)/ Test locally
Project:
U031215-1
Activity:
Consultant Inspection for hoods installation
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:

AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17

450
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
closet
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
460
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
490
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
510
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
520
H-S3 : Kitchen & Laundry equipments installation works
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
530
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
540
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
560
WPC Panels Installation - Sec.3 GF
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
570
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
580
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
590
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
600
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
610
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
620
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
630
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
640
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
650
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
660
Facade terrace floor Decking -S3;2nd floor
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
670
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
closet
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
690
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
710
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
720
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
730
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
740
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
750
Install Sanitary wares
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
760
Wall covering installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
770
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
790
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
800
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17

810
820
830
840
850
860
870
closet
880
890
900
90N
920
930
940
960
970
980
990
000
00N
010
020
030
040
050
060
070
080
090
100

Install Lighting & Wiring devices


Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
Install Sanitary wares
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
Painting 1st coat
Project:
U031215-1
Activity:
AZ1-CONS -HS3-17
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
TRF Termination & testing
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Install FA+CB devices
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Shower glass partitions
Project:
U031215-1
Activity:
Headboard fixing
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Cleaning/ snagging / inspection
Project:
U031215-1
Activity:
Handover of the area
Project:
U031215-1
Activity:
Installation of Custom Fabricated Equipments -phase 1

AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-17
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18

110
tem
120
140
closet
160
180
190
1N
200
210
220
230
240
250
260
270
280
290
300
310
320
330
340
360
370
closet
380
390
400
410

Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Installation & Consultant Inspection of Kitchen Hood Fire Supression sys
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install ELV devices (BMS)
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Sanitary wares
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install FA+CB devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Facade terrace floor Decking -S3;1st floor
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Cleaning & snagging
Project:
U031215-1
Cleaning & snagging
Project:
U031215-1
Door panels & ironmongary installation
Project:
U031215-1
Door panels & ironmongary installation
Project:
U031215-1

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-18

Activity:

AZ1-CONS -HS3-18

420
430
440
450
460
470
480
490
500
510
520
530
550
560
570
590
600
610
620
closet
630
640
680
700
710
720
730
740
750
770
780

Install Lighting & Wiring devices


Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install ELV devices (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Floor tiles installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Shower marble benches fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install ELV devices (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
WPC Panels Installation - Sec.3 Basement
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling - wet area
Project:
U031215-1
Activity:
Install ELV devices (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install ELV devices (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
Install ELV devices (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Room Management/ELV Devices

AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18
AZ1-CONS -HS3-18

800
810
820
830
840
850
860
870
880
890
910
920
940
950
960
970
980
closet
990
00
000
020
030
050
060
070
080
090
110
120

Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Door panels & ironmongary installation - wet area
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS -HS3-18
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install Sanitary Wares
Project:
U031215-1
Activity:
Install Sanitary wares
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling - Corridore
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:

AZ1-CONS -HS3-18
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19

130
140
150
160
170
closet
180
190
1N
200
closet
210
220
230
240
260
270
280
2N
30
310
340
350
closet
360
370
380
390
400
410
420
430

Clearance - Final Civil works


Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Install LPG final devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Facade terrace floor Decking -S3;Ground floor
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Headboard fixing
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Fixing skirting
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Door panels & ironmongary installation - Corridore
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Testing & Commissioning for Kitchen & Laundry works
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Install FA+CB+PA devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Final Painting on walls & ceiling
Project:
U031215-1
Final Painting on walls & ceiling
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Final Painting on walls & ceiling
Project:
U031215-1
Final Painting on walls & ceiling
Project:
U031215-1
Door panels & ironmongary installation
Project:
U031215-1
Door panels & ironmongary installation
Project:
U031215-1
Cleaning & snagging

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

440
450
460
470
480
490
50
500
510
520
530
540
550
560
570
580
590
60
600
closet
610
620
630
650
670
690
70
700
710
740

Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Cleaning & snagging - wet area
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Shower glass partitions
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Cleaning & snagging - Corridore
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Install Room Management/ELV Devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Cleaning & snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS -HS3-19
TV wall units, Wall cabinets, Glass shelving, minibar cabinets, walk in
Project:
U031215-1
Cleaning & snagging
Project:
U031215-1
Cleaning & snagging
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Room Management/ELV Devices
Project:
U031215-1
Final Painting on walls & ceiling
Project:
U031215-1
Install FF droppers + test
Project:
U031215-1
Final Painting on walls & ceiling
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Door panels & ironmongary installation
Project:
U031215-1

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

Activity:

AZ1-CONS -HS3-19

750
760
770
780
790
800
810
830
840
850
860
870
880
890
920
930
940
960
970
980
990
000
010
020
050
060
070
080
090
100

Door panels & ironmongary installation


Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Install CHW Pipes Cladding
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Door panels & ironmongary installation
Project:
U031215-1
Activity:
Generator Installation -phase 1
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Fire syppression system cylinders
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:

AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-19
AZ1-CONS -HS3-20
AZ1-CONS -HS3-20
AZ1-CONS -HS3-20
AZ1-CONS -HS3-20
AZ1-CONS -HS3-20
AZ1-CONS -HS3-20
AZ1-CONS -HS3-20
AZ1-CONS -HS3-20
AZ1-CONS -HS3-20
AZ1-CONS -HS3-20

110

Install FA+CB devices


Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
120
Install ELV devices (BMS)
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
130
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
140
Inspection & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
150
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
160
Hotel Sector 3 : Final snagging & De snagging
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
270
Generator Installation -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
280
Cold Room Works & Consultant Inspection -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
290
Installation of Custom Fabricated Equipments -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
30
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
320
Install Smoke Duct
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
320N
Install Smoke Duct risers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
32N
Install Smoke Duct
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
330N
Install Smoke Duct
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
331N
Install Smoke Duct
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
332N
Install Smoke Duct
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
334N
Install Fan @ Plant Room (Required duration is 15 days, Cleint instruct
ion is 10 days)
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
36N
Install Grills +Diffusers
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
380
Pantry equipments installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
390
Pantry equipments installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
400
Pantry equipments installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
410
Pantry equipments installation
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
420N
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
421N
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
430
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
440
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
440N
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
450
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
450N
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS -HS3-20
460N
MEP Clearance - Ceiling Closure

490
5N
6N
30
5N
6N
70
00
0N
10
1N
10
1N
20
20N
30
50
60
00
1N
30
70
00
30
60
80
00
20
1N
20

Project:
U031215-1
Activity:
AZ1-CONS
Louvers Installation
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers

-HS3-20
-HS3-20
-HS3-20
-HS3-21
-HS3-21
-HS3-21
-HS3-21
-HS3-22
-HS3-22
-HS3-22
-HS3-22
-HS3-23
-HS3-23
-HS3-23
-HS3-23
-HS3-23
-HS3-23
-HS3-23
-HS3-24
-HS3-24
-HS3-24
-HS3-24
-HS3-25
-HS3-25
-HS3-25
-HS3-25
-HS3-26
-HS3-26
-HS3-27
-HS3-27

41N
1N
2N
70
00
20
40
50
0N
1N
30
60
70N
71N
1N
2N
3N
4N
4N10
5N
5N10
6N
1N
20
30
40
70
80
80N
90

Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install IDF- Terminations
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
Access required for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Wet Area)*
Project:
U031215-1
Activity:
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
Access required for MEP Final Fix *
Project:
U031215-1
Activity:
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
Access required for MEP Final Fix *
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install PD pipes & test
Project:
U031215-1
Activity:
Install Concealed Piping
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring

AZ1-CONS -HS3-27
AZ1-CONS -HS3-28
AZ1-CONS -HS3-28
AZ1-CONS -HS3-28
AZ1-CONS -HS3-29
AZ1-CONS -HS3-29
AZ1-CONS -HS3-29
AZ1-CONS -HS3-29
AZ1-CONS -HS3-30
AZ1-CONS -HS3-30
AZ1-CONS -HS3-30
AZ1-CONS -HS3-30
AZ1-CONS -HS3-30
AZ1-CONS -HS3-30
AZ1-CONS -HS3-31
AZ1-CONS -HS3-31
AZ1-CONS -HS3-31
AZ1-CONS -HS3-31
AZ1-CONS -HS3-31
AZ1-CONS -HS3-31
AZ1-CONS -HS3-31
AZ1-CONS -HS3-31
AZ1-CONS -HS3-32
AZ1-CONS -HS3-32
AZ1-CONS -HS3-32
AZ1-CONS -HS3-32
AZ1-CONS -HS3-32
AZ1-CONS -HS3-32
AZ1-CONS -HS3-32
AZ1-CONS -HS3-32

10
30
40
60
00
30
40
50
30
1N
20
30
42N
43N
72N
73N
80
90
00
20
20N
30
50
60
20
30
40
50
70
80

Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Install Control Panels
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install PD pipes & test
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Access to Corridor
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Water proofing works
Project:
U031215-1
Activity:
Wall plastering
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*

AZ1-CONS -HS3-33
AZ1-CONS -HS3-33
AZ1-CONS -HS3-33
AZ1-CONS -HS3-33
AZ1-CONS -HS3-34
AZ1-CONS -HS3-34
AZ1-CONS -HS3-34
AZ1-CONS -HS3-34
AZ1-CONS -HS3-35
AZ1-CONS -HS3-36
AZ1-CONS -HS3-37
AZ1-CONS -HS3-37
AZ1-CONS -HS3-37
AZ1-CONS -HS3-37
AZ1-CONS -HS3-37
AZ1-CONS -HS3-37
AZ1-CONS -HS3-37
AZ1-CONS -HS3-37
AZ1-CONS -HS3-38
AZ1-CONS -HS3-38
AZ1-CONS -HS3-38
AZ1-CONS -HS3-38
AZ1-CONS -HS3-38
AZ1-CONS -HS3-38
AZ1-CONS -HS3-39
AZ1-CONS -HS3-39
AZ1-CONS -HS3-39
AZ1-CONS -HS3-39
AZ1-CONS -HS3-39
AZ1-CONS -HS3-39

20
40
20
30
0N
0N10
0N20
0N30
1N
50
70
60
70
80
90
00
10
60
70
80
90
00
10
40
50
10
20
30
70
80

Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install PICV
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers

-HS3-40
-HS3-40
-HS3-41
-HS3-41
-HS3-42
-HS3-42
-HS3-42
-HS3-42
-HS3-42
-HS3-42
-HS3-42
-HS3-43
-HS3-43
-HS3-43
-HS3-43
-HS3-44
-HS3-44
-HS3-44
-HS3-44
-HS3-44
-HS3-44
-HS3-45
-HS3-45
-HS3-45
-HS3-45
-HS3-46
-HS3-46
-HS3-46
-HS3-46
-HS3-46

10
20
40
30
52N
61N
62N
70
80
10
40
50
70
80
90
00
10
12N
13N
14N
15N
16N
17N
18N
20
30
40
60
80
90

Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install DB
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Framework & one side boarding
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First/Second Fix (Partition)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid (Wet Area)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid (Dry Area)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring

-HS3-47
-HS3-47
-HS3-47
-HS3-48
-HS3-48
-HS3-48
-HS3-48
-HS3-48
-HS3-48
-HS3-49
-HS3-49
-HS3-49
-HS3-49
-HS3-49
-HS3-49
-HS3-50
-HS3-50
-HS3-50
-HS3-50
-HS3-50
-HS3-50
-HS3-50
-HS3-50
-HS3-50
-HS3-50
-HS3-50
-HS3-50
-HS3-50
-HS3-50
-HS3-50

00
10
20
30
50
80
90
00
10
20
30
40
50
10
40
60
70
90
00
40
80
00
10
50
60
80
20
00
60
30

Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test (wet area)
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace floor Waterproofing & Screed -S3;3rd floor
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Framework & one side boarding
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test (wet area)
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install IDF Panels
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test

-HS3-51
-HS3-51
-HS3-51
-HS3-51
-HS3-51
-HS3-51
-HS3-51
-HS3-52
-HS3-52
-HS3-52
-HS3-52
-HS3-52
-HS3-52
-HS3-53
-HS3-53
-HS3-53
-HS3-53
-HS3-53
-HS3-54
-HS3-54
-HS3-54
-HS3-55
-HS3-55
-HS3-55
-HS3-55
-HS3-55
-HS3-56
-HS3-57
-HS3-57
-HS3-58

50
60
80
82N
83N
84N
90
00
20
30
20
30
30N
40
60
70
80
92N
40
80
90
00
10
40
80
26N
27N
70
90
00

Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
DB Termination & testing
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable tray/truking
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Structural Access
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring

-HS3-58
-HS3-58
-HS3-58
-HS3-58
-HS3-58
-HS3-58
-HS3-58
-HS3-59
-HS3-59
-HS3-59
-HS3-60
-HS3-60
-HS3-60
-HS3-60
-HS3-60
-HS3-60
-HS3-60
-HS3-60
-HS3-61
-HS3-61
-HS3-61
-HS3-62
-HS3-62
-HS3-62
-HS3-62
-HS3-63
-HS3-63
-HS3-63
-HS3-63
-HS3-64

00
20
30
50
60
70
80
2N
3N
50
80
20
30
10
40
10
50
70
0
02N
03N
0N
60
90
00
20
50
60
70
20

Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Cement board lining & Cistern Closing
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works - Corridore
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glass - Glass works -S3;3rd Floor
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Clearance - Final Civil works
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Access to Corridor
Project:
U031215-1
Activity:
AZ1-CONS
Access to Corridor
Project:
U031215-1
Activity:
AZ1-CONS
Access to Corridor
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace floor Waterproofing & Screed -S3;2nd floor
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - ceiling - Corridore
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring

-HS3-65
-HS3-65
-HS3-65
-HS3-65
-HS3-65
-HS3-65
-HS3-65
-HS3-66
-HS3-66
-HS3-66
-HS3-66
-HS3-67
-HS3-67
-HS3-68
-HS3-68
-HS3-69
-HS3-69
-HS3-69
-HS3-70
-HS3-70
-HS3-70
-HS3-70
-HS3-70
-HS3-70
-HS3-71
-HS3-71
-HS3-71
-HS3-71
-HS3-72
-HS3-73

1N
40
50
70
0
0N
27N
28N
60
70
80
80
90
00
10
70
00
10
50
60
0
00
30
40
70
80
40
70
00
40

Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Wet Area*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix: Dry Area*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Facade terrace ceiling cement board - S3;3rd floor
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Marking layout and approval
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring

-HS3-74
-HS3-74
-HS3-74
-HS3-74
-HS3-75
-HS3-75
-HS3-75
-HS3-75
-HS3-75
-HS3-75
-HS3-75
-HS3-76
-HS3-76
-HS3-77
-HS3-77
-HS3-77
-HS3-78
-HS3-78
-HS3-78
-HS3-78
-HS3-79
-HS3-79
-HS3-79
-HS3-79
-HS3-79
-HS3-79
-HS3-80
-HS3-80
-HS3-81
-HS3-81

50
10
60
30
50
60
60N
70
30
10
40
60
00
30
50
00
30
70
00
10
50
60
70
00
40
70
80
80N
90
91N

Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Alum & Glass - Glass works-S3;2ndFloor
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Install PD pipes & test
Project:
U031215-1
Activity:
Install Concealed Piping
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Install PD pipes & test
Project:
U031215-1
Activity:
Inspection & Approvals (Dry Area Ceiling grid)*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install Concealed Pipes - G.B Partition
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Marking layout and approval
Project:
U031215-1
Activity:
Install FCU+Valve packages
Project:
U031215-1
Activity:
Install Cable trays/trunking
Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Wall boards closing
Project:
U031215-1
Activity:
Alum & Glazing - Frame -S3;Ground floor
Project:
U031215-1
Activity:
Install LPG pipes & test
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Facade terrace ceiling cement board - S3;2nd floor
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
Access required for MEP Final Fix*

AZ1-CONS -HS3-81
AZ1-CONS -HS3-82
AZ1-CONS -HS3-82
AZ1-CONS -HS3-83
AZ1-CONS -HS3-83
AZ1-CONS -HS3-83
AZ1-CONS -HS3-83
AZ1-CONS -HS3-83
AZ1-CONS -HS3-84
AZ1-CONS -HS3-85
AZ1-CONS -HS3-85
AZ1-CONS -HS3-85
AZ1-CONS -HS3-86
AZ1-CONS -HS3-86
AZ1-CONS -HS3-86
AZ1-CONS -HS3-87
AZ1-CONS -HS3-87
AZ1-CONS -HS3-87
AZ1-CONS -HS3-88
AZ1-CONS -HS3-88
AZ1-CONS -HS3-88
AZ1-CONS -HS3-88
AZ1-CONS -HS3-88
AZ1-CONS -HS3-89
AZ1-CONS -HS3-89
AZ1-CONS -HS3-89
AZ1-CONS -HS3-89
AZ1-CONS -HS3-89
AZ1-CONS -HS3-89
AZ1-CONS -HS3-89

00
01N
70
90
00
10
30
50
70
00
20
30
40
80
10
30
50
70
80
00
20
50
70
10
20
30
40
80
00
10

Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Access to area
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Wall boards closing
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Alum & Glass - Glass works -S3;First Floor
Project:
U031215-1
Activity:
AZ1-CONS
Install DB
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Install SC Cables
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Marking layout and approval
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid *

-HS3-90
-HS3-90
-HS3-90
-HS3-90
-HS3-91
-HS3-91
-HS3-91
-HS3-91
-HS3-91
-HS3-92
-HS3-92
-HS3-92
-HS3-92
-HS3-92
-HS3-93
-HS3-93
-HS3-93
-HS3-93
-HS3-93
-HS3-94
-HS3-94
-HS3-94
-HS3-94
-HS3-95
-HS3-95
-HS3-95
-HS3-95
-HS3-95
-HS3-96
-HS3-96

10N
20
40
50
90
00
20
20N
40
50
60
70
80
00
10
80
00
10
30
40
60
80
10
20
30
40
41N
50
51N
60

Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire syppression system pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install Novec system pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Ceiling stud works
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing - wet area
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Sump Pumps
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install IDF- Terminations
Project:
U031215-1
Activity:
AZ1-CONS
Boarding, taping & jointing
Project:
U031215-1
Activity:
AZ1-CONS
Access to area
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
1st Coat Painting
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First Fix (Block wall)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First Fix (Block wall)*

-HS3-96
-HS3-96
-HS3-96
-HS3-96
-HS3-96
-HS3-97
-HS3-97
-HS3-97
-HS3-97
-HS3-97
-HS3-97
-HS3-97
-HS3-97
-HS3-98
-HS3-98
-HS3-98
-HS3-99
-HS3-99
-HS3-99
-HS3-99
-HS3-99
-HS3-99
-HS4-10
-HS4-10
-HS4-10
-HS4-10
-HS4-10
-HS4-10
-HS4-10
-HS4-10

61N
70
80
81N
00
10
40
50
60
70
90
00
30
50
60
80
90
91N
00
20
50
70
80
90
00
30
40
50
60
70

Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First Fix (Block wall)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed conduits
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed conduits
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed P&D Pipes
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Piping
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed P&D Pipes & Conduits
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts (site measurement pieces)
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed WC cistern
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed WC cistern
Project:
U031215-1
Activity:
AZ1-CONS
Marking layout and approval
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Control Panels
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Floor Drains - By JLW
Project:
U031215-1
Activity:
AZ1-CONS
Install SC Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable trays/trunking
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Sprinklers

-HS4-10
-HS4-10
-HS4-10
-HS4-10
-HS4-11
-HS4-11
-HS4-11
-HS4-11
-HS4-11
-HS4-11
-HS4-11
-HS4-12
-HS4-12
-HS4-12
-HS4-12
-HS4-12
-HS4-12
-HS4-12
-HS4-13
-HS4-13
-HS4-13
-HS4-13
-HS4-13
-HS4-13
-HS4-14
-HS4-14
-HS4-14
-HS4-14
-HS4-14
-HS4-14

80
90
00
10
20
30
50
60
70
80
00
40
60
90
10
20
30
50
80
00
10
20
30
50
60
70
90
00
10
40

Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install IDF- Terminations
Project:
U031215-1
Activity:
AZ1-CONS
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS
Doors & Shutter Installation
Project:
U031215-1
Activity:
AZ1-CONS
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes+valves

-HS4-14
-HS4-14
-HS4-15
-HS4-15
-HS4-15
-HS4-15
-HS4-15
-HS4-15
-HS4-15
-HS4-15
-HS4-16
-HS4-16
-HS4-16
-HS4-16
-HS4-17
-HS4-17
-HS4-17
-HS4-17
-HS4-17
-HS4-18
-HS4-18
-HS4-18
-HS4-18
-HS4-18
-HS4-18
-HS4-18
-HS4-18
-HS4-19
-HS4-19
-HS4-19

60
70
10
20
40
50
60
80
90
00
10
20
30
40
50
60
70
80
90
0
00
10
20
30
50
60
70
80
90
00

Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Install FHC
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Stone wall cladding
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Trenches & Manhole Covering
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Control Panels
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Install FA+CB devices
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Cable trays**
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Concrete wall & Ceiling Surface Preparation
Project:
U031215-1
Activity:
Alum & Glazing - Frame -S4
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Suspended False Ceiling Grid
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install DBs

AZ1-CONS -HS4-19
AZ1-CONS -HS4-19
AZ1-CONS -HS4-20
AZ1-CONS -HS4-20
AZ1-CONS -HS4-20
AZ1-CONS -HS4-20
AZ1-CONS -HS4-20
AZ1-CONS -HS4-20
AZ1-CONS -HS4-20
AZ1-CONS -HS4-21
AZ1-CONS -HS4-21
AZ1-CONS -HS4-21
AZ1-CONS -HS4-21
AZ1-CONS -HS4-21
AZ1-CONS -HS4-21
AZ1-CONS -HS4-21
AZ1-CONS -HS4-21
AZ1-CONS -HS4-21
AZ1-CONS -HS4-21
AZ1-CONS -HS4-22
AZ1-CONS -HS4-22
AZ1-CONS -HS4-22
AZ1-CONS -HS4-22
AZ1-CONS -HS4-22
AZ1-CONS -HS4-22
AZ1-CONS -HS4-22
AZ1-CONS -HS4-22
AZ1-CONS -HS4-22
AZ1-CONS -HS4-22
AZ1-CONS -HS4-23

10
20
30
40
50
60
70
80
90
90N
00
10
30
40
50
60
80
90
00
10
20
30
30N
40
50
60
80
90
00
10

Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install FF droppers + test
Project:
U031215-1
Activity:
Control Panel Cable termination
Project:
U031215-1
Activity:
Install Panels
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
SMDB Termination & testing
Project:
U031215-1
Activity:
SMDB Termination & testing
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install Cable trays high level
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Suspended False Ceiling Board
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install Lighting & Wiring devices

AZ1-CONS -HS4-23
AZ1-CONS -HS4-23
AZ1-CONS -HS4-23
AZ1-CONS -HS4-23
AZ1-CONS -HS4-23
AZ1-CONS -HS4-23
AZ1-CONS -HS4-23
AZ1-CONS -HS4-23
AZ1-CONS -HS4-23
AZ1-CONS -HS4-23
AZ1-CONS -HS4-24
AZ1-CONS -HS4-24
AZ1-CONS -HS4-24
AZ1-CONS -HS4-24
AZ1-CONS -HS4-24
AZ1-CONS -HS4-24
AZ1-CONS -HS4-24
AZ1-CONS -HS4-24
AZ1-CONS -HS4-25
AZ1-CONS -HS4-25
AZ1-CONS -HS4-25
AZ1-CONS -HS4-25
AZ1-CONS -HS4-25
AZ1-CONS -HS4-25
AZ1-CONS -HS4-25
AZ1-CONS -HS4-25
AZ1-CONS -HS4-25
AZ1-CONS -HS4-25
AZ1-CONS -HS4-26
AZ1-CONS -HS4-26

30
40
00
10
20
30
40
50
60
70
80
00
10
20
30
40
50
60
70
80
90
0
0N
10
1N
20
50
60
70
80

Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Alum & Glass - Glass works -S4
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Access to area
Project:
U031215-1
Install Fire extinguishers
Project:
U031215-1
Install Fire extinguishers
Project:
U031215-1
Boarding, taping & jointing
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Wild air provisions
Project:
U031215-1
Wild air provisions
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
LV Cables arrange+dressing (to be tied
Project:
U031215-1
Access required for MEP First Fix*
Project:
U031215-1
Access required for MEP Second Fix*
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Access required for MEP Final Fix*
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Marking layout and approval
Project:
U031215-1
Clearance - Final Civil works
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Clearance - Final Civil works

Activity:

AZ1-CONS -HS4-26

Activity:

AZ1-CONS -HS4-26

Activity:

AZ1-CONS -HS4-27

Activity:

AZ1-CONS -HS4-27

Activity:

AZ1-CONS -HS4-27

Activity:

AZ1-CONS -HS4-27

Activity:

AZ1-CONS -HS4-27

Activity:

AZ1-CONS -HS4-27

Activity:

AZ1-CONS -HS4-27

Activity:

AZ1-CONS -HS4-27

Activity:

AZ1-CONS -HS4-27

Activity:

AZ1-CONS -HS4-28

Activity:

AZ1-CONS -HS4-28

Activity:

AZ1-CONS -HS4-28

Activity:

AZ1-CONS -HS4-28

Activity:

AZ1-CONS -HS4-28

Activity:

AZ1-CONS -HS4-28

Activity:

AZ1-CONS -HS4-28

Activity:

AZ1-CONS -HS4-28

Activity:

AZ1-CONS -HS4-28

Activity:
with riser)
Activity:

AZ1-CONS -HS4-28

Activity:

AZ1-CONS -HS4-29

Activity:

AZ1-CONS -HS4-29

Activity:

AZ1-CONS -HS4-29

Activity:

AZ1-CONS -HS4-29

Activity:

AZ1-CONS -HS4-29

Activity:

AZ1-CONS -HS4-29

Activity:

AZ1-CONS -HS4-29

Activity:

AZ1-CONS -HS4-29

AZ1-CONS -HS4-29

90
0
00
10
20
30
40
50
70
80
90
00
10
20
30
40
70
80
90
0
00
0N
10
1N
30
40
50
60
80
90

Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Concealed conduits
Project:
U031215-1
Primers / stucco on walls & ceiling
Project:
U031215-1
Stone flooring
Project:
U031215-1
Fixing skirting
Project:
U031215-1
Rubber / Linoleum flooring
Project:
U031215-1
Deck flooring
Project:
U031215-1
Plain plastered wall finish
Project:
U031215-1
Shower glass partitions
Project:
U031215-1
Floor screed
Project:
U031215-1
Floor Tiling / Finishes
Project:
U031215-1
Joinery installation
Project:
U031215-1
Painting 1st coat
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install Sanitary wares
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install Sanitary wares
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Access required for MEP First Fix*
Project:
U031215-1
Install Sprinklers
Project:
U031215-1
Access required for MEP Second Fix*
Project:
U031215-1
Ceramic / stone wall cladding
Project:
U031215-1
Access required for MEP Final Fix*
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install Lighting & Wiring devices
Project:
U031215-1
Install FA+CB+PA devices
Project:
U031215-1
Install Grills +Diffusers
Project:
U031215-1
Inspection & Approvals
Project:
U031215-1
Install Grills +Diffusers

Activity:

AZ1-CONS -HS4-29

Activity:

AZ1-CONS -HS4-30

Activity:

AZ1-CONS -HS4-30

Activity:

AZ1-CONS -HS4-30

Activity:

AZ1-CONS -HS4-30

Activity:

AZ1-CONS -HS4-30

Activity:

AZ1-CONS -HS4-30

Activity:

AZ1-CONS -HS4-30

Activity:

AZ1-CONS -HS4-30

Activity:

AZ1-CONS -HS4-30

Activity:

AZ1-CONS -HS4-30

Activity:

AZ1-CONS -HS4-31

Activity:

AZ1-CONS -HS4-31

Activity:

AZ1-CONS -HS4-31

Activity:

AZ1-CONS -HS4-31

Activity:

AZ1-CONS -HS4-31

Activity:

AZ1-CONS -HS4-31

Activity:

AZ1-CONS -HS4-31

Activity:

AZ1-CONS -HS4-31

Activity:

AZ1-CONS -HS4-32

Activity:

AZ1-CONS -HS4-32

Activity:

AZ1-CONS -HS4-32

Activity:

AZ1-CONS -HS4-32

Activity:

AZ1-CONS -HS4-32

Activity:

AZ1-CONS -HS4-32

Activity:

AZ1-CONS -HS4-32

Activity:

AZ1-CONS -HS4-32

Activity:

AZ1-CONS -HS4-32

Activity:

AZ1-CONS -HS4-32

Activity:

AZ1-CONS -HS4-32

0
00
10
20
40
60
90
0N
10
30
40
50
60
70
80
90
0
00
0N
10
1N
20
2N
30
3N
40
4N
50
60
70

Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install ELV devices (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Concealed conduits
Project:
U031215-1
Activity:
Final Painting works
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Mirror installation
Project:
U031215-1
Activity:
Install & Earthing system
Project:
U031215-1
Activity:
WC doors installation
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Access required for MEP First Fix (Block wall)*
Project:
U031215-1
Activity:
Cleaning/ snagging / inspection
Project:
U031215-1
Activity:
Access required for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
Handover of the area
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
Tile / stone / concrete flooring
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Plastered wall finish installation
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
H-S4 : Kitchen & Laundry equipments installation works
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
LV Cable testing
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Hand made tiles on walls / Ceiling

AZ1-CONS -HS4-33
AZ1-CONS -HS4-33
AZ1-CONS -HS4-33
AZ1-CONS -HS4-33
AZ1-CONS -HS4-33
AZ1-CONS -HS4-33
AZ1-CONS -HS4-33
AZ1-CONS -HS4-34
AZ1-CONS -HS4-34
AZ1-CONS -HS4-34
AZ1-CONS -HS4-34
AZ1-CONS -HS4-34
AZ1-CONS -HS4-34
AZ1-CONS -HS4-34
AZ1-CONS -HS4-34
AZ1-CONS -HS4-34
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35
AZ1-CONS -HS4-35

90
0
00
tem
0N
10
1N
20
2N
30
3N
40
4N
50
60
70
80
90
0
00
10
20
40
50
60
70
90
0
10
30

Project:
U031215-1
Activity:
AZ1-CONS -HS4-35
Installation of Custom Fabricated Equipments -phase 1
Project:
U031215-1
Activity:
AZ1-CONS -HS4-36
Access required for MEP First Fix (Block wall)*
Project:
U031215-1
Activity:
AZ1-CONS -HS4-36
Installation & Consultant Inspection of Kitchen Hood Fire Supression sys
Project:
U031215-1
Activity:
Access required for MEP Second Fix (High Level)*
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Stud/Grid*
Project:
U031215-1
Activity:
Glass partition @ Show kitchen / courtyard
Project:
U031215-1
Activity:
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
Install FA+CB devices
Project:
U031215-1
Activity:
MEP Clearance - Ceiling Closure*
Project:
U031215-1
Activity:
Facade terrace floor Decking -S4
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install ELV devices (BMS)
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Testing & Commissioning for Kitchen & Laundry works
Project:
U031215-1
Activity:
Concrete wall & Ceiling Primer, Stuco & Paint
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Bar counters installation
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install ELV devices (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
MEP Marking By JLW
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Final Painting on walls & ceiling
Project:
U031215-1
Activity:

AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-36
AZ1-CONS -HS4-37
AZ1-CONS -HS4-37
AZ1-CONS -HS4-37
AZ1-CONS -HS4-37
AZ1-CONS -HS4-37
AZ1-CONS -HS4-37
AZ1-CONS -HS4-37
AZ1-CONS -HS4-37
AZ1-CONS -HS4-37
AZ1-CONS -HS4-38
AZ1-CONS -HS4-38
AZ1-CONS -HS4-38
AZ1-CONS -HS4-38

40
50
60
70
00
0
20
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0N
1N
0
1N
0
0
0

Cleaning/ snagging / inspection


Project:
U031215-1
Activity:
AZ1-CONS
Handover of the area
Project:
U031215-1
Activity:
AZ1-CONS
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS
Hotel Sector 4 : Final snagging & De snagging
Project:
U031215-1
Activity:
AZ1-CONS
Installation of Custom Fabricated Equipments -phase 2
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
MEP Marking By JLW
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Concrete wall & Ceiling Surface Preparation
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install IDF Panels
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable tray/truking
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Concrete wall & Ceiling Primer, Stuco & Paint
Project:
U031215-1
Activity:
AZ1-CONS

-HS4-38
-HS4-38
-HS4-38
-HS4-39
-HS4-40
-HS4-40
-HS4-42
-HS4-43
-HS4-44
-HS4-45
-HS4-46
-HS4-47
-HS4-48
-HS4-49
-HS4-50
-HS4-53
-HS4-54
-HS4-59
-HS4-60
-HS4-61
-HS4-62
-HS4-64
-HS4-64
-HS4-64
-HS4-65
-HS4-65
-HS4-66
-HS4-68
-HS4-69
-HS4-70

0
0
0
0
0
0
0
0
0N
0
0
0
0
0N
0
0
0
0N
1N
0
0
0
1010
1020
1030
1050
1060
1080
1090
1100

Plaster works (Inc. Dining area)


Project:
U031215-1
Activity:
AZ1-CONS -HS4-71
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS -HS4-72
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS -HS4-75
Install ELV point wiring (BMS)
Project:
U031215-1
Activity:
AZ1-CONS -HS4-79
Block Wall Primer, stuco
Project:
U031215-1
Activity:
AZ1-CONS -HS4-81
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS -HS4-82
Install Extinguisher
Project:
U031215-1
Activity:
AZ1-CONS -HS4-83
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS -HS4-83
Install Concealed conduits
Project:
U031215-1
Activity:
AZ1-CONS -HS4-86
Doors & Shutter Installation
Project:
U031215-1
Activity:
AZ1-CONS -HS4-87
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS -HS4-88
MEP First FIx - By JLW
Project:
U031215-1
Activity:
AZ1-CONS -HS4-89
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS -HS4-89
Install Concealed conduits
Project:
U031215-1
Activity:
AZ1-CONS -HS4-90
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS -HS4-92
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS -HS4-94
Plaster works
Project:
U031215-1
Activity:
AZ1-CONS -HS4-95
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS -HS4-95
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -HS4-96
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS -HS4-97
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS -HS4-98
Install Concealed conduits
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal LV Cabling Works (2)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal LV Cabling Works (2) -phase 1
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-6 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-9 : Concrete Encasement for Electrical services / Trench Backfilling
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal ELV Ducts Works (2)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Etisalate Ducts Works (2)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Telco Ducts Works (2)
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-9 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRA-

1110
1120
1130
1160
1170
1180
1190
1210
1220
1230
1240
1250
1260
1270
1300
1310
1320
1350
1360
1370
1380
1390
140N
1470
1480
1490
1510
1540
1550
1590

External ELV Main Cable Installation(2)


Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal ELV Ducts Works (2)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal ELV Main Cable Installation(2)
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-4 : Concrete Encasement for Electrical services / Trench Backfilling
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-8 : Concrete Encasement for Electrical services / Trench Backfilling
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-7 : Concrete Encasement for Electrical services / Trench Backfilling
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal ELV Main Cable Installation(2)
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-4 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-8 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-7 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-2 : Concrete Encasement for Electrical services / Trench Backfilling
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Concrete Encasement for Electrical services / Trench Backfilling
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-2 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6) -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6) -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6) -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6)-phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6)-phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6)-phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal LV Cabling Works (2) -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal LV Cabling Works (2) -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRAInstallation of New Electrical Works for landscaping
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-2 : Construction of Manholes - Electrical Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Construction of Manholes - Fire Fighting Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Construction of Manholes - Plumbing & Drainage Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Construction of Manholes - Electrical Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-4 : Construction of Manholes - LPG Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-4 : Construction of Manholes - Electrical Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-5 : Construction of Manholes - Electrical Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRA-

160
1630
1670
1710
1750
1760
1770
180
250
300
330
340
380
390
450
470
490
510
550
640
670
690
710
720
730
750
760
780
790
800

RD-8 : Construction of Trenches - for MEP Services


Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-6 : Construction of Manholes - Electrical Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-7 : Construction of Manholes - Electrical Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-8 : Construction of Manholes - Electrical Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-9 : Construction of Manholes - Electrical Works
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal ELV Ducts Works (2)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal ELV Main Cable Installation(2)
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-5 : Construction of Trenches - for MEP Services
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-6 : Construction of Trenches - for MEP Services
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Backfilling up to Formation level - Stage 1
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-4 : Construction of Trenches - for MEP Services
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-7 : Construction of Trenches - for MEP Services
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Water Supply Piping Works (3)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Water Supply Piping Works (3)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal MV Cabling Works (2)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Drainage Supply Piping Works (4)
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Backfilling up to Formation level - Stage 2
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-3 : Construction of Trenches - for MEP Services
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-9 : Construction of Trenches - for MEP Services
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6) -phase 1
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Water Supply Piping Works (3)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Drainage Supply Piping Works (4)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Water Supply Piping Works (3)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Water Supply Piping Works (3)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Water Supply Piping Works (3)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Water Supply Piping Works (3)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6)-phase 1
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-5 : Concrete Encasement for Electrical services / Trench Backfilling
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Drainage Supply Piping Works (4)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Drainage Supply Piping Works (4)
Project:
U031215-1
Activity:
AZ1-CONS -INFRA-

810
820
870
880
900
920
930
950
960
970
980
990
01
02
03
04
05
06
07
08
09
11
12
15
420
430
440
450
460
470

External Drainage Supply Piping Works (4)


Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal LV Cabling Works (2) -phase 1
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal CHW Piping Works (8)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal CHW Piping Works (9)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6)-phase 1
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-6 : Concrete Encasement for Electrical services / Trench Backfilling
Project:
U031215-1
Activity:
AZ1-CONS -INFRARD-5 : Backfilling to formation level
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6)-phase 1
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal LPG Piping Works (6)
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6) -phase 1
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal FF Piping Works (6) -phase 1
Project:
U031215-1
Activity:
AZ1-CONS -INFRAExternal Telco Ducts Works (2)
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Excavation & Levelling up to formation level - Wall 08
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Road Base & Blinding - Wall 08
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Vapour Barrier & Water proofing (Bottom of Footing) - Wall 08
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Screed - Wall 08
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Footing Reinforcement - Wall 08
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Footing Shuttering - Wall 08
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Footing Concreting - Wall 08
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
R.Wall Reinforcement - Wall 08
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
R.Wall Shuttering - Wall 08
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
R.Wall Casting - Wall 08
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Footing & Wall Water proofing
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Backfilling
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Road Base & Blinding
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Vapour Barrier & Water proofing (Bottom of Footing)
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Screed
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Footing Reinforcement
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Footing Shuttering - Wall 2B
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
Footing Concreting - Wall 2B
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1

480
490
500
510
540
550
690
700
710
720
730
740
750
760
770
780
790
820
830
840
850
860
870
880
890
900
910
920
930
960

R.Wall Reinforcement
Project:
U031215-1
Activity:
R.Wall Shuttering - Wall 2B
Project:
U031215-1
Activity:
R.Wall Casting - Wall 2B
Project:
U031215-1
Activity:
Footing & Wall Water proofing
Project:
U031215-1
Activity:
Backfilling
Project:
U031215-1
Activity:
Excavation & Levelling up to formation level
Project:
U031215-1
Activity:
Excavation & Levelling up to formation level
Project:
U031215-1
Activity:
Road Base & Blinding
Project:
U031215-1
Activity:
Vapour Barrier & Water proofing (Bottom of Footing)
Project:
U031215-1
Activity:
Screed
Project:
U031215-1
Activity:
Footing Reinforcement
Project:
U031215-1
Activity:
Footing Shuttering - Wall 07
Project:
U031215-1
Activity:
Footing Concreting - Wall 07
Project:
U031215-1
Activity:
R.Wall Reinforcement
Project:
U031215-1
Activity:
R.Wall Shuttering - Wall 7
Project:
U031215-1
Activity:
R.Wall Casting - Wall 7
Project:
U031215-1
Activity:
Footing & Wall Water proofing
Project:
U031215-1
Activity:
Backfilling
Project:
U031215-1
Activity:
Excavation & Levelling up to formation level
Project:
U031215-1
Activity:
Road Base & Blinding
Project:
U031215-1
Activity:
Vapour Barrier & Water proofing (Bottom of Footing)
Project:
U031215-1
Activity:
Screed
Project:
U031215-1
Activity:
Footing Reinforcement
Project:
U031215-1
Activity:
Footing Shuttering - Wall 06
Project:
U031215-1
Activity:
Footing Concreting - Wall 06
Project:
U031215-1
Activity:
R.Wall Reinforcement
Project:
U031215-1
Activity:
R.Wall Shuttering - Wall 6
Project:
U031215-1
Activity:
R.Wall Casting - Wall 6
Project:
U031215-1
Activity:
Footing & Wall Water proofing
Project:
U031215-1
Activity:
Backfilling
Project:
U031215-1
Activity:

AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1
AZ1-CONS -LAND-1

970
250
260
270
280
290
300
310
320
330
340
350
380
490
520
50
80
10
40
70
50
90
00
40
60
80
90
00
20
30

Excavation & Levelling up to formation level


Project:
U031215-1
Activity:
Excavation & Levelling up to formation level
Project:
U031215-1
Activity:
Road Base & Blinding
Project:
U031215-1
Activity:
Vapour Barrier & Water proofing (Bottom of Footing)
Project:
U031215-1
Activity:
Screed
Project:
U031215-1
Activity:
Footing Reinforcement
Project:
U031215-1
Activity:
Footing Shuttering - Wall 3B
Project:
U031215-1
Activity:
Footing Concreting - Wall 3B
Project:
U031215-1
Activity:
R.Wall Reinforcement
Project:
U031215-1
Activity:
R.Wall Shuttering - Wall 3B
Project:
U031215-1
Activity:
R.Wall Casting - Wall 3B
Project:
U031215-1
Activity:
Footing & Wall Water proofing
Project:
U031215-1
Activity:
Backfilling
Project:
U031215-1
Activity:
Wall Water proofing
Project:
U031215-1
Activity:
Backfilling
Project:
U031215-1
Activity:
Footing & Wall Water proofing
Project:
U031215-1
Activity:
Backfilling
Project:
U031215-1
Activity:
Brackes & Rails Installation
Project:
U031215-1
Activity:
Landing doors Installation
Project:
U031215-1
Activity:
Fixing of Machines
Project:
U031215-1
Activity:
CWT & CAR Assembly
Project:
U031215-1
Activity:
STM
Project:
U031215-1
Activity:
STM
Project:
U031215-1
Activity:
Shaft Wiring
Project:
U031215-1
Activity:
Commissioning - 1st stage
Project:
U031215-1
Activity:
Commissioning - 1st stage
Project:
U031215-1
Activity:
Bond Cabin Fitout
Project:
U031215-1
Activity:
Quality Inspection
Project:
U031215-1
Activity:
Quality Inspection
Project:
U031215-1
Activity:
Commissionig 2nd stage
Project:
U031215-1
Activity:

AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-2
AZ1-CONS -LAND-9
AZ1-CONS -LAND-9
AZ1-CONS -LIFT-1
AZ1-CONS -LIFT-1
AZ1-CONS -LIFT-1
AZ1-CONS -LIFT-2
AZ1-CONS -LIFT-2
AZ1-CONS -LIFT-3
AZ1-CONS -LIFT-3
AZ1-CONS -LIFT-3
AZ1-CONS -LIFT-3
AZ1-CONS -LIFT-3
AZ1-CONS -LIFT-4
AZ1-CONS -LIFT-4
AZ1-CONS -LIFT-4
AZ1-CONS -LIFT-4

40
60
80
00
20
60
70
90
10
20
00
10
30
40
50
60
70
70N
71N
80N
81N
90
00
20
30
40
50
60
70
80

3rd Party Inspection


Project:
U031215-1
Activity:
AZ1-CONS -LIFT-4
3rd Party Inspection
Project:
U031215-1
Activity:
AZ1-CONS -LIFT-4
Client Inspection
Project:
U031215-1
Activity:
AZ1-CONS -LIFT-5
Client Inspection
Project:
U031215-1
Activity:
AZ1-CONS -LIFT-5
Client Handover
Project:
U031215-1
Activity:
AZ1-CONS -LIFT-6
Bond Cabin Fitout
Project:
U031215-1
Activity:
AZ1-CONS -LIFT-6
Commissionig 2nd stage
Project:
U031215-1
Activity:
AZ1-CONS -LIFT-6
Templete Fixing by lift contractor - PL 01 to 04
Project:
U031215-1
Activity:
AZ1-CONS -MISC-1
Sauna Equipments Installation & Fitout Completion (Gym & SPA) -phase 1
Project:
U031215-1
Activity:
AZ1-CONS -MISC-1
Sauna Equipments Installation & Fitout Completion (Gym & SPA) -phase 2
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Install IDF- Terminations
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Install Fire extinguishers
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Access to area
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Access required for MEP First Fix*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-10
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS -SPA-11
Install Concealed conduits
Project:
U031215-1
Activity:
AZ1-CONS -SPA-11
Marking layout and approval
Project:
U031215-1
Activity:
AZ1-CONS -SPA-11
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS -SPA-11
Control Panel Cable termination
Project:
U031215-1
Activity:
AZ1-CONS -SPA-11
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS -SPA-11
Floor screed
Project:
U031215-1
Activity:
AZ1-CONS -SPA-11
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS -SPA-11
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS -SPA-12

0
10
20
30
40
50
60
70
80
90
0
00
10
40
50
60
70
80
0
00
10
20
30
40
50
70
80
0
00
30

Install Lighting & Small power point wiring


Project:
U031215-1
Activity:
Alum & Glazing - Frame -SPA
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
Install CHW Pipes+valves
Project:
U031215-1
Activity:
Install Ducts/dampers
Project:
U031215-1
Activity:
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Alum & Glass - Glass works -SPA
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Install SMDBs
Project:
U031215-1
Activity:
Install IDF Panels
Project:
U031215-1
Activity:
Ceiling stud works
Project:
U031215-1
Activity:
Install DBs
Project:
U031215-1
Activity:
Install Cable tray/truking
Project:
U031215-1
Activity:
Install Cable trays
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Install LV Cables
Project:
U031215-1
Activity:
SMDB Termination & testing
Project:
U031215-1
Activity:

AZ1-CONS -SPA-12
AZ1-CONS -SPA-12
AZ1-CONS -SPA-12
AZ1-CONS -SPA-12
AZ1-CONS -SPA-12
AZ1-CONS -SPA-12
AZ1-CONS -SPA-12
AZ1-CONS -SPA-12
AZ1-CONS -SPA-12
AZ1-CONS -SPA-13
AZ1-CONS -SPA-13
AZ1-CONS -SPA-13
AZ1-CONS -SPA-13
AZ1-CONS -SPA-13
AZ1-CONS -SPA-13
AZ1-CONS -SPA-13
AZ1-CONS -SPA-13
AZ1-CONS -SPA-14
AZ1-CONS -SPA-14
AZ1-CONS -SPA-14
AZ1-CONS -SPA-14
AZ1-CONS -SPA-14
AZ1-CONS -SPA-14
AZ1-CONS -SPA-14
AZ1-CONS -SPA-14
AZ1-CONS -SPA-14
AZ1-CONS -SPA-15
AZ1-CONS -SPA-15
AZ1-CONS -SPA-15
AZ1-CONS -SPA-15

40
50
60
70
80
00
10
20
30
40
50
60
70
70N
80
0
00
10
20
40
40N
50
50N
60
60N
70
80
90
90N
0

Install Lighting & Small power point wiring


Project:
U031215-1
Activity:
Install FF droppers + Test
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
DB Termination & testing
Project:
U031215-1
Activity:
Install flexible ducts+plenums
Project:
U031215-1
Activity:
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Mechanical Plant
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install FF pipes+valves/test
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Sprinklers*
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Sprinklers*
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Sprinklers*
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install ELV devices
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:

AZ1-CONS -SPA-15
AZ1-CONS -SPA-15
AZ1-CONS -SPA-15
AZ1-CONS -SPA-15
AZ1-CONS -SPA-16
AZ1-CONS -SPA-16
AZ1-CONS -SPA-16
AZ1-CONS -SPA-16
AZ1-CONS -SPA-16
AZ1-CONS -SPA-16
AZ1-CONS -SPA-16
AZ1-CONS -SPA-16
AZ1-CONS -SPA-16
AZ1-CONS -SPA-16
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-17
AZ1-CONS -SPA-18
AZ1-CONS -SPA-18

00
10
20
30
40
50
60
70
80
90
0
00
10
20
30
40
40N
50
60
70
70N
80
90
0
00
10
30
40
50
60

Install FA+CB+PA devices


Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Install FA+CB point wiring
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install ELV devices
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:

AZ1-CONS -SPA-18
AZ1-CONS -SPA-18
AZ1-CONS -SPA-18
AZ1-CONS -SPA-18
AZ1-CONS -SPA-18
AZ1-CONS -SPA-18
AZ1-CONS -SPA-18
AZ1-CONS -SPA-18
AZ1-CONS -SPA-18
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-19
AZ1-CONS -SPA-20
AZ1-CONS -SPA-20
AZ1-CONS -SPA-20
AZ1-CONS -SPA-20
AZ1-CONS -SPA-20
AZ1-CONS -SPA-20
AZ1-CONS -SPA-20
AZ1-CONS -SPA-20

70
80
00
10
1N
20
30
40
60
70
80
90
00
10
20
30
40
50
60
70
80
90
00
10
1N
20
30
40
40N
50

Wild air provisions


Project:
U031215-1
Activity:
Boarding, taping & jointing - ceiling
Project:
U031215-1
Activity:
Primers / stucco on walls & ceiling
Project:
U031215-1
Activity:
Install SC Cables
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Wood flooring to Sauna
Project:
U031215-1
Activity:
Install IDF- Terminations
Project:
U031215-1
Activity:
Fixing skirting
Project:
U031215-1
Activity:
Joinery installation
Project:
U031215-1
Activity:
Door frames installation
Project:
U031215-1
Activity:
Plastered wall finish
Project:
U031215-1
Activity:
Stone flooring
Project:
U031215-1
Activity:
Wooden wall paneling
Project:
U031215-1
Activity:
Install Fire extinguishers
Project:
U031215-1
Activity:
Decorative niche installation
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Painting 1st coat
Project:
U031215-1
Activity:
Glass partitions & Glass doors instalaltion
Project:
U031215-1
Activity:
WPC Track installation - SPA
Project:
U031215-1
Activity:
Clearance - Final Civil works
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:
Install Sprinklers
Project:
U031215-1
Activity:
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
Install FA+CB+PA devices
Project:
U031215-1
Activity:
Install Grills +Diffusers
Project:
U031215-1
Activity:
Install Lighting & Wiring devices
Project:
U031215-1
Activity:
Install ELV devices
Project:
U031215-1
Activity:
Inspection & Approvals
Project:
U031215-1
Activity:

AZ1-CONS -SPA-20
AZ1-CONS -SPA-21
AZ1-CONS -SPA-21
AZ1-CONS -SPA-21
AZ1-CONS -SPA-21
AZ1-CONS -SPA-21
AZ1-CONS -SPA-21
AZ1-CONS -SPA-21
AZ1-CONS -SPA-21
AZ1-CONS -SPA-21
AZ1-CONS -SPA-21
AZ1-CONS -SPA-22
AZ1-CONS -SPA-22
AZ1-CONS -SPA-22
AZ1-CONS -SPA-22
AZ1-CONS -SPA-22
AZ1-CONS -SPA-22
AZ1-CONS -SPA-22
AZ1-CONS -SPA-22
AZ1-CONS -SPA-22
AZ1-CONS -SPA-22
AZ1-CONS -SPA-23
AZ1-CONS -SPA-23
AZ1-CONS -SPA-23
AZ1-CONS -SPA-23
AZ1-CONS -SPA-23
AZ1-CONS -SPA-23
AZ1-CONS -SPA-23
AZ1-CONS -SPA-23
AZ1-CONS -SPA-23

60
70
90
00
10
1N
20
30
50
60
90
1N
50
60
70
80
90
00
1N
1N10
0
1N
2N
3N
4N
0
0
0N
1N
2N

Inspection & Approvals


Project:
U031215-1
Activity:
AZ1-CONS
Final Painting on walls & ceiling
Project:
U031215-1
Activity:
AZ1-CONS
Fabric padded panels
Project:
U031215-1
Activity:
AZ1-CONS
Mirrors installation
Project:
U031215-1
Activity:
AZ1-CONS
Door panels & ironmongary installation
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Cleaning/ snagging / inspection
Project:
U031215-1
Activity:
AZ1-CONS
Handover of the area
Project:
U031215-1
Activity:
AZ1-CONS
Rafters -SPA
Project:
U031215-1
Activity:
AZ1-CONS
WPC Panels Installation - SPA
Project:
U031215-1
Activity:
AZ1-CONS
SPA : Final snagging & De snagging
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Inspection & Approvals (Ceiling closure)*
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install Concealed Piping
Project:
U031215-1
Activity:
AZ1-CONS
Block works
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Grid *
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP First Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS

-SPA-23
-SPA-23
-SPA-24
-SPA-24
-SPA-24
-SPA-24
-SPA-24
-SPA-24
-SPA-24
-SPA-24
-SPA-25
-SPA-25
-SPA-25
-SPA-25
-SPA-25
-SPA-25
-SPA-26
-SPA-26
-SPA-26
-SPA-28
-SPA-30
-SPA-30
-SPA-30
-SPA-30
-SPA-38
-SPA-39
-SPA-39
-SPA-39
-SPA-39
-SPA-39

3N
4N
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

MEP Clearance - Ceiling Closure


Project:
U031215-1
Activity:
AZ1-CONS
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install Lighting & Small power point wiring
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS
Install PD pipes & test
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install IDF Panels
Project:
U031215-1
Activity:
AZ1-CONS
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS
Install Cable tray/truking
Project:
U031215-1
Activity:
AZ1-CONS
Install FCU+Valve package
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS
Install CHW Pipes test & insulation
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS
Install Ducts/dampers
Project:
U031215-1
Activity:
AZ1-CONS

-SPA-39
-SPA-41
-SPA-42
-SPA-43
-SPA-44
-SPA-46
-SPA-47
-SPA-48
-SPA-49
-SPA-50
-SPA-51
-SPA-52
-SPA-54
-SPA-55
-SPA-56
-SPA-57
-SPA-58
-SPA-59
-SPA-60
-SPA-61
-SPA-62
-SPA-63
-SPA-64
-SPA-66
-SPA-67
-SPA-68
-SPA-69
-SPA-70
-SPA-71
-SPA-72

0
0
0
0
0N
1N
2N
3N
4N
0N
1N
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
00
10

Install PD pipes & test


Project:
U031215-1
Activity:
AZ1-CONS -SPA-73
Inspection & Approvals (Ceiling grid)*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-75
Install FF pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS -SPA-76
Access required for MEP First Fix*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-76
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-76
MEP Clearance - Ceiling Stud/Grid *
Project:
U031215-1
Activity:
AZ1-CONS -SPA-76
Access required for MEP droppers (Ceiling Grid)*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-76
MEP Clearance - Ceiling Closure
Project:
U031215-1
Activity:
AZ1-CONS -SPA-76
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-77
Access required for MEP Second Fix*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-77
Access required for MEP Final Fix*
Project:
U031215-1
Activity:
AZ1-CONS -SPA-83
Install CHW Pipes+valves
Project:
U031215-1
Activity:
AZ1-CONS -SPA-84
Install CHW header pipes+valves/test
Project:
U031215-1
Activity:
AZ1-CONS -SPA-85
Wall plastering
Project:
U031215-1
Activity:
AZ1-CONS -SPA-86
Install CHW header pipes+Insulation
Project:
U031215-1
Activity:
AZ1-CONS -SPA-87
Install Control Panels
Project:
U031215-1
Activity:
AZ1-CONS -SPA-89
Install SMDBs
Project:
U031215-1
Activity:
AZ1-CONS -SPA-90
Install Cable trays
Project:
U031215-1
Activity:
AZ1-CONS -SPA-91
Install FF droppers + test
Project:
U031215-1
Activity:
AZ1-CONS -SPA-92
Install LV Cables
Project:
U031215-1
Activity:
AZ1-CONS -SPA-93
Install flexible ducts+plenums
Project:
U031215-1
Activity:
AZ1-CONS -SPA-94
Install FA+CB+PA point wiring
Project:
U031215-1
Activity:
AZ1-CONS -SPA-95
Install SC Cables
Project:
U031215-1
Activity:
AZ1-CONS -SPA-96
Install ELV point wiring (BMS+Security+Lighting Control)
Project:
U031215-1
Activity:
AZ1-CONS -SPA-97
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -SPA-98
Stone wall cladding
Project:
U031215-1
Activity:
AZ1-CONS -SPA-99
Install Ceiling roses+flexible wires
Project:
U031215-1
Activity:
AZ1-CONS -T&C-10
Beach Rest: LV Panel - Commissioning with Temporary power (By Sixco)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-10
Etisalat/DU/ GSM Installation Works
Project:
U031215-1
Activity:
AZ1-CONS -T&C-10
Water Meter & FCU Valves Installation
Project:
U031215-1
Activity:
AZ1-CONS -T&C-10

20
30
40
0
90
0
00
10
20
30
40
50
60
70
80
90
0
70
90
0
60
70
80
90
0
0
0
0
0
60

Hotel Sector 4 :Wild Air on


Project:
U031215-1
Activity:
AZ1-CONS -T&C-10
Hotel Sector 2 :Wild Air on
Project:
U031215-1
Activity:
AZ1-CONS -T&C-10
Shop Drawing Submission to CD
Project:
U031215-1
Activity:
AZ1-CONS -T&C-11
Sector 3: CHW Piping Completed
Project:
U031215-1
Activity:
AZ1-CONS -T&C-11
Shop Drawing Approved by CD
Project:
U031215-1
Activity:
AZ1-CONS -T&C-12
Beach Rest: CHW Piping Completed
Project:
U031215-1
Activity:
AZ1-CONS -T&C-12
Shop Drawing Submission to CD
Project:
U031215-1
Activity:
AZ1-CONS -T&C-12
Shop Drawing Approved by CD
Project:
U031215-1
Activity:
AZ1-CONS -T&C-12
Shop Drawing Submission to CD
Project:
U031215-1
Activity:
AZ1-CONS -T&C-12
Shop Drawing Approved by CD
Project:
U031215-1
Activity:
AZ1-CONS -T&C-12
Shop Drawing Submission to CD
Project:
U031215-1
Activity:
AZ1-CONS -T&C-12
Shop Drawing Approved by CD
Project:
U031215-1
Activity:
AZ1-CONS -T&C-12
Shop Drawing Submission to CD
Project:
U031215-1
Activity:
AZ1-CONS -T&C-12
Shop Drawing Approved by CD
Project:
U031215-1
Activity:
AZ1-CONS -T&C-12
Shop Drawing Submission to Authorites
Project:
U031215-1
Activity:
AZ1-CONS -T&C-12
Shop Drawing Approved by Authorities
Project:
U031215-1
Activity:
AZ1-CONS -T&C-13
Sector 2: CHW Piping Completed
Project:
U031215-1
Activity:
AZ1-CONS -T&C-13
Payment of Fees
Project:
U031215-1
Activity:
AZ1-CONS -T&C-13
Obtain Building Completion Certificate
Project:
U031215-1
Activity:
AZ1-CONS -T&C-14
MCC Panels (CHW Pumps) Commissioning with Temporary power (By Sixco)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-14
NORR - IFC Shop Drawing Submission
Project:
U031215-1
Activity:
AZ1-CONS -T&C-14
NORR - IFC Shop Drawing Approved
Project:
U031215-1
Activity:
AZ1-CONS -T&C-14
NORR - IFC Shop Drawing Submission
Project:
U031215-1
Activity:
AZ1-CONS -T&C-14
NORR - IFC Shop Drawing Approved
Project:
U031215-1
Activity:
AZ1-CONS -T&C-15
Chilled water pumps+ Pressurisation system - Commissioning/Startup
Project:
U031215-1
Activity:
AZ1-CONS -T&C-16
Sector 1: CHW Piping Completed
Project:
U031215-1
Activity:
AZ1-CONS -T&C-17
Spa: CHW Piping Completed
Project:
U031215-1
Activity:
AZ1-CONS -T&C-18
Sector 4: CHW Piping Completed
Project:
U031215-1
Activity:
AZ1-CONS -T&C-19
Gym: CHW Piping Completed
Project:
U031215-1
Activity:
AZ1-CONS -T&C-19
Permanent Power ON
Project:
U031215-1
Activity:
AZ1-CONS -T&C-20

0
40
50
60
70
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Day Care: CHW Piping Completed


Project:
U031215-1
Activity:
AZ1-CONS -T&C-20
BR:Wild Air on
Project:
U031215-1
Activity:
AZ1-CONS -T&C-20
Spa:Wild Air on
Project:
U031215-1
Activity:
AZ1-CONS -T&C-20
Villa:Wild Air on
Project:
U031215-1
Activity:
AZ1-CONS -T&C-20
DC:Wild Air on
Project:
U031215-1
Activity:
AZ1-CONS -T&C-21
Villa: CHW System Ready
Project:
U031215-1
Activity:
AZ1-CONS -T&C-23
External Chilled Water Line (ABS) C.T to Chiller -Flushing
Project:
U031215-1
Activity:
AZ1-CONS -T&C-24
Gym: LV Panel- Commissioning with Temporary power (By Sixco)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-25
Cooling Tower Testing/Start up (with out RO)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-26
Sector 2: LV Panel - Commissioning with Temporary power (By Sixco)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-27
Day Care: LV Panel - Commissioning with Temporary power (By Sixco)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-28
Spa: LV Panel - Commissioning with Temporary power (By Sixco)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-29
Sector 1: LV Panel - Commissioning with Temporary power (By Sixco)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-30
Sector 4: LV Panel - Commissioning with Temporary power (By Sixco)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-31
Villa: LV Panel - Commissioning with Temporary power (By Sixco)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-32
Sector 3: LV Panel - Commissioning with Temporary power (By Sixco)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-33
Chiller - Testing/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-34
Hotel: Chilled Water -Flushing & Chemical cleaning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-35
Hotel:Chilled Water - Ready
Project:
U031215-1
Activity:
AZ1-CONS -T&C-36
External : Chilled Water -Flushing & Chemical cleaning complete
Project:
U031215-1
Activity:
AZ1-CONS -T&C-37
External :Chilled Water - Ready
Project:
U031215-1
Activity:
AZ1-CONS -T&C-39
Sector 2: AHUs Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-40
Sector 4:AHUs Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-41
Sector 3: AHUs Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-42
Sector 3: FCUs - Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-43
Hotel Sector 1 & 3 :Wild Air on
Project:
U031215-1
Activity:
AZ1-CONS -T&C-44
Sector 2:FCUs - Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-45
Sector 1:AHUs Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-46
Sector 1:FCUs - Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-47
Sector 4:FCUs - Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-48

Spa: AHUs Precommissioning/Start up


Project:
U031215-1
Activity:
AZ1-CONS -T&C-48
0N
Day Care : AHUs Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-49
0
Day Care:FCUs - Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-50
0
Gym:FCUs - Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-51
0
Spa: FCUs - Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-52
0
Beach Rest:FCUs - Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-53
0
Villa:AHUs Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-54
0
Villa:FCUs - Precommissioning/Start up
Project:
U031215-1
Activity:
AZ1-CONS -T&C-55
0
Gym:Wild Air on
Project:
U031215-1
Activity:
AZ1-CONS -T&C-56
0
Water Tank Filled up and Ready (By Sixco)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-57
0N
Fan - Testing & Commissioning (Life safety) (Required duration is 21 day
s for smoke fan , Cleint instruction is 14 days)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-58
0
Low voltage wires & cables - Cold tests
Project:
U031215-1
Activity:
AZ1-CONS -T&C-60
0
Low voltage wires & cables - Cold tests Witness & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -T&C-62
0
LV Panel - Cold tests
Project:
U031215-1
Activity:
AZ1-CONS -T&C-63
0
LV Panels - Panel Cold tests -Witness & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -T&C-65
0
Testing & Commissioning of Spa Area
Project:
U031215-1
Activity:
AZ1-CONS -T&C-67
0
FEWA: LV Inspection
Project:
U031215-1
Activity:
AZ1-CONS -T&C-68
0
FEWA : Receive Power (temporary power)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-69
0
Sump Pumps - Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-70
0
Domestic water Pumps - Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-71
0
Fire Fighting Pumps - Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-72
0
LV Panels - Energisation & Functional tests
Project:
U031215-1
Activity:
AZ1-CONS -T&C-73
0
LV Panels -Functional tests Witness & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -T&C-74
0
Special Fire Protection Systems- Testing & Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-76
0
Structural Cabling System - Testing & Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-77
0
Emergency generator - Load test /Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-78
0
BMS- Testing & Commissioning ( Life Safety)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-79
0
Fire Hose Reel Tests
Project:
U031215-1
Activity:
AZ1-CONS -T&C-80
0
Sanitary Fixture - Tests
Project:
U031215-1
Activity:
AZ1-CONS -T&C-81
0
Fire Alarm System - Testing & Commissioning

Project:
U031215-1
Activity:
AZ1-CONS -T&C-82
Voice Evacuation System - Testing & Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-83
0
Central Battery System - Testing & Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-84
0
Access Control System - Testing & Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-85
0
Sprinkler Tests
Project:
U031215-1
Activity:
AZ1-CONS -T&C-86
0
Genaerator+ATS -Functional tests Witness & Approvals
Project:
U031215-1
Activity:
AZ1-CONS -T&C-87
0
Security System - Testing & Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-88
0
ELV Systems - Testing & Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-89
0
Etisalat/DU installation Inspection
Project:
U031215-1
Activity:
AZ1-CONS -T&C-90
0
Etisalat/DU Certificate
Project:
U031215-1
Activity:
AZ1-CONS -T&C-91
0
Domestic water system cleaning and disinfection
Project:
U031215-1
Activity:
AZ1-CONS -T&C-92
0
Air Balance at Grills ( (Building to be enclosed by SIXCO)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-93
0
BMS- Testing & Commissioning (Complete)
Project:
U031215-1
Activity:
AZ1-CONS -T&C-94
0
LPG System - Testing and Commissioning
Project:
U031215-1
Activity:
AZ1-CONS -T&C-95
0
Water Inspection
Project:
U031215-1
Activity:
AZ1-CONS -T&C-96
0
Cause and Effect Tests
Project:
U031215-1
Activity:
AZ1-CONS -T&C-97
0
Water Meter installation
Project:
U031215-1
Activity:
AZ1-CONS -T&C-98
0
Water Connection
Project:
U031215-1
Activity:
AZ1-CONS -T&C-99
0
Civil Defence Inspection and Approvals
Project:
U031215-1
Activity:
AZO1-POOL-1945
Install SBS water proofing - Hotel Water feature
Project:
U031215-1
Activity:
AZO1-POOL-2000
IR - Clearance for Pool Works - Hotel Water feature
Project:
U031215-1
Activity:
AZO1-POOL-2085
Flood Test - Hotel Water feature
Project:
U031215-1
Activity:
AZO1-POOL-2355
IR - Clearance for Pool Works - Hotel Water feature
Project:
U031215-1
Activity:
AZO1-POOL-2510
Reinforcement installation - Hotel Water feature
Project:
U031215-1
Activity:
AZO1-POOL-2640
IR - Clearance for Pool Works - Hotel Water feature
Project:
U031215-1
Activity:
AZO1-POOL-2655
Spray Gunite - Hotel Water feature
Project:
U031215-1
Activity:
AZO1-POOL-2790
IR - Clearance for Pool Works - Hotel Water feature
Project:
U031215-1
Activity:
AZO1-POOL-2860
Curing - Hotel Water feature
Project:
U031215-1
Activity:
AZO1-POOL-2900
Plaster - Hotel Water feature
Project:
U031215-1
Activity:
AZO1-POOL-2905
Cold Test - Hotel Water feature
Project:
U031215-1
Activity:
AZO1-POOL-2980
Energization of Panel - Hotel Water feature
0

Project:
U031215-1
Activity:
Live Test - Hotel Water feature
Project:
U031215-1
Activity:
Coping Stone - Hotel Water feature
Project:
U031215-1
Activity:
IR - Clearance for Pool Works - Hotel Water feature
Project:
U031215-1
Activity:
Water Proofing - Hotel Water feature
Project:
U031215-1
Activity:
Tiling - Hotel Water feature
Project:
U031215-1
Activity:
MEP Final Fix - Hotel Water feature
Project:
U031215-1
Activity:
Fill water - Hotel Water feature
Project:
U031215-1
Activity:
Area handover - Hotel Water feature
Project:
U031215-1
Activity:
Bond package-02 - Prelims
Project:
U031215-1
Activity:
liminaries - BOH
Project:
U031215-1
Activity:
rks
Project:
U031215-1
Activity:
ofing to pantry & toilet area
Project:
U031215-1
Activity:
Wall painting (SIXCO)
Project:
U031215-1
Activity:
Metal door installation
Project:
U031215-1
Activity:
wooden door installation
Project:
U031215-1
Activity:
Wooden skirting
Project:
U031215-1
Activity:
ofing to pantry & toilet area
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Cement sand screed (SIXCO)
Project:
U031215-1
Activity:
ofing to pantry & toilet area
Project:
U031215-1
Activity:
Wall painting (SIXCO)
Project:
U031215-1
Activity:
Metal door installation
Project:
U031215-1
Activity:
ofing to pantry & toilet area
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Metal door installation
Project:
U031215-1
Activity:
ofing to pantry & toilet area
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Metal door installation
Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
ofing to pantry & toilet area

AZO1-POOL-2985
AZO1-POOL-2990
AZO1-POOL-3045
AZO1-POOL-3105
AZO1-POOL-3160
AZO1-POOL-3235
AZO1-POOL-3240
AZO1-POOL-3245
BND-PRLM-0100
BOH-S

Bond Pri

BOH100 Block wo
BOH1000 Waterpro
BOH10005
BOH10025
BOH10035
BOH10055
BOH1010 Waterpro
BOH10105
BOH10185
BOH1020 Waterpro
BOH10225
BOH10245
BOH1030 Waterpro
BOH10325
BOH10395
BOH1040 Waterpro
BOH10405
BOH10475
BOH10485
BOH1050 Waterpro

Project:
Metal door installation
Project:
Cleaning & snagging
Project:
Metal door installation
Project:
Cleaning & snagging
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on

U031215-1

Activity:

BOH10555

U031215-1

Activity:

BOH10565

U031215-1

Activity:

BOH10635

U031215-1

Activity:

BOH10645

Activity:

BOH10655

Activity:

BOH10665

Activity:

BOH10685

Activity:

BOH10705

Activity:

BOH10725

Activity:

BOH10735

Activity:

BOH10745

Activity:

BOH10765

Activity:

BOH10785

Activity:

BOH10805

Activity:

BOH10815

Activity:

BOH10825

Activity:

BOH10835

Activity:

BOH10845

Activity:

BOH10855

Activity:

BOH10865

Activity:

BOH10885

Activity:

BOH10905

Activity:

BOH10925

Activity:

BOH10945

Activity:

BOH10965

Activity:

BOH10975

Activity:

BOH10985

Activity:

BOH10995

Activity:

BOH11005

Activity:

BOH11015

U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &

Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor

Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on

U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &

Activity:

BOH11025

Activity:

BOH11045

Activity:

BOH11065

Activity:

BOH11085

Activity:

BOH11095

Activity:

BOH11105

Activity:

BOH11115

Activity:

BOH11125

Activity:

BOH11135

Activity:

BOH11145

Activity:

BOH11175

Activity:

BOH11195

Activity:

BOH11215

Activity:

BOH11225

Activity:

BOH11235

Activity:

BOH11245

Activity:

BOH11255

Activity:

BOH11265

Activity:

BOH11275

Activity:

BOH11285

Activity:

BOH11295

Activity:

BOH11305

Activity:

BOH11315

Activity:

BOH11325

Activity:

BOH11335

Activity:

BOH11345

Activity:

BOH11355

Activity:

BOH11365

Activity:

BOH11375

Activity:

BOH11385

Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor

Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on

U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &

Activity:

BOH11395

Activity:

BOH11405

Activity:

BOH11415

Activity:

BOH11425

Activity:

BOH11435

Activity:

BOH11445

Activity:

BOH11455

Activity:

BOH11465

Activity:

BOH11475

Activity:

BOH11485

Activity:

BOH11495

Activity:

BOH11505

Activity:

BOH11515

Activity:

BOH11525

Activity:

BOH11535

Activity:

BOH11545

Activity:

BOH11555

Activity:

BOH11565

Activity:

BOH11575

Activity:

BOH11585

Activity:

BOH11595

Activity:

BOH11605

Activity:

BOH11615

Activity:

BOH11625

Activity:

BOH11635

Activity:

BOH11645

Activity:

BOH11655

Activity:

BOH11665

Activity:

BOH11675

Activity:

BOH11685

Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor

Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on

U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &

Activity:

BOH11695

Activity:

BOH11715

Activity:

BOH11725

Activity:

BOH11745

Activity:

BOH11755

Activity:

BOH11765

Activity:

BOH11775

Activity:

BOH11785

Activity:

BOH11795

Activity:

BOH11805

Activity:

BOH11815

Activity:

BOH11825

Activity:

BOH11835

Activity:

BOH11845

Activity:

BOH11855

Activity:

BOH11865

Activity:

BOH11875

Activity:

BOH11885

Activity:

BOH11895

Activity:

BOH11905

Activity:

BOH11915

Activity:

BOH11925

Activity:

BOH11935

Activity:

BOH11945

Activity:

BOH11955

Activity:

BOH11965

Activity:

BOH11975

Activity:

BOH11985

Activity:

BOH11995

Activity:

BOH12005

Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor

Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
Final Coat of painting on
Project:
stering (SIXCO)
Project:
stering (SIXCO)
Project:
stering (SIXCO)
Project:
stering (SIXCO)
Project:
stering (SIXCO)
Project:
rks
Project:
e & Flooring layout
Project:
ishes layout
Project:
d ceiling layout
Project:
e & Flooring layout
Project:
ishes layout
Project:
d ceiling layout
Project:
ery
Project:
ooring @ Hotel
Project:
or
Project:
and screed (SIXCO)
Project:
and screed (SIXCO)
Project:
and screed (SIXCO)

U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1
walls, Ceiling &
U031215-1

Activity:

BOH12015

Activity:

BOH12025

Activity:

BOH12035

Activity:

BOH12045

Activity:

BOH12055

Activity:

BOH12065

Activity:

BOH12075

Activity:

BOH12085

Activity:

BOH12095

Activity:

BOH12105

Activity:

BOH12115

Activity:

BOH12125

Activity:

BOH1250 Wall pla

U031215-1

Activity:

BOH1255 Wall pla

U031215-1

Activity:

BOH1260 Wall pla

U031215-1

Activity:

BOH1265 Wall pla

U031215-1

Activity:

BOH1345 Wall pla

U031215-1

Activity:

BOH135 Block wo

U031215-1

Activity:

BOH1370 Referenc

U031215-1

Activity:

BOH1375 Wall fin

U031215-1

Activity:

BOH1380 Reflecte

U031215-1

Activity:

BOH1385 Referenc

U031215-1

Activity:

BOH1390 Wall fin

U031215-1

Activity:

BOH1395 Reflecte

U031215-1

Activity:

BOH1420 Ironmong

U031215-1

Activity:

BOH1430 Vinyl fl

U031215-1

Activity:

BOH1455 Metal do

U031215-1

Activity:

BOH1660 Cement s

U031215-1

Activity:

BOH1680 Cement s

U031215-1

Activity:

BOH1685 Cement s

Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor
Floor

Project:
and screed (SIXCO)
Project:
and screed (SIXCO)
Project:
and screed (SIXCO)
Project:
and screed (SIXCO)
Project:
and wall plastering (SIXCO)
Project:
and screed (SIXCO)
Project:
oor
Project:
es
Project:
es
Project:
es
Project:
es
Project:
es
Project:
es
Project:
es
Project:
es
Project:
MEP Final Fix (BY JLW)
Project:
MEP Final Fix (BY JLW)
Project:
MEP Final Fix (BY JLW)
Project:
MEP Final Fix (BY JLW)
Project:
MEP Final Fix (BY JLW)
Project:
MEP Final Fix (BY JLW)
Project:
MEP Final Fix (BY JLW)
Project:
MEP Final Fix (BY JLW)
Project:
MEP Final Fix (BY JLW)
Project:
Gypsum Ceiling Boarding
Project:
Gypsum Ceiling Board Painting
Project:
Suspended ceiling
Project:
Vinyl flooring & skirting
Project:
Metal door installation
Project:
ceiling grid / Support

U031215-1

Activity:

BOH1695 Cement s

U031215-1

Activity:

BOH1700 Cement s

U031215-1

Activity:

BOH1705 Cement s

U031215-1

Activity:

BOH1710 Cement s

U031215-1

Activity:

BOH1755 Cement s

U031215-1

Activity:

BOH1760 Cement s

U031215-1

Activity:

BOH180 Wooden d

U031215-1

Activity:

BOH1855 Wall til

U031215-1

Activity:

BOH1860 Wall til

U031215-1

Activity:

BOH1865 Wall til

U031215-1

Activity:

BOH1870 Wall til

U031215-1

Activity:

BOH1875 Wall til

U031215-1

Activity:

BOH1880 Wall til

U031215-1

Activity:

BOH1885 Wall til

U031215-1

Activity:

BOH1890 Wall til

U031215-1

Activity:

Boh189070

U031215-1

Activity:

Boh189090

U031215-1

Activity:

Boh189110

U031215-1

Activity:

Boh189120

U031215-1

Activity:

Boh189150

U031215-1

Activity:

Boh189160

U031215-1

Activity:

Boh189180

U031215-1

Activity:

Boh189190

U031215-1

Activity:

Boh189210

U031215-1

Activity:

BOH189220

U031215-1

Activity:

BOH189230

U031215-1

Activity:

BOH189240

U031215-1

Activity:

BOH189260

U031215-1

Activity:

BOH189280

U031215-1

Activity:

BOH189290

Project:
U031215-1
Activity:
Cleaning & snagging
Project:
U031215-1
Activity:
Final Coat of painting on walls, Ceiling & Floor
Project:
U031215-1
Activity:
Suspended ceiling (Inc. grid / Support)
Project:
U031215-1
Activity:
Suspended ceiling
Project:
U031215-1
Activity:
grid
Project:
U031215-1
Activity:
nting (SIXCO)
Project:
U031215-1
Activity:
nting (SIXCO)
Project:
U031215-1
Activity:
nting (SIXCO)
Project:
U031215-1
Activity:
k for ceiling
Project:
U031215-1
Activity:
k for ceiling
Project:
U031215-1
Activity:
k for ceiling
Project:
U031215-1
Activity:
k for ceiling
Project:
U031215-1
Activity:
k for ceiling
Project:
U031215-1
Activity:
k for ceiling
Project:
U031215-1
Activity:
k for ceiling
Project:
U031215-1
Activity:
k for ceiling
Project:
U031215-1
Activity:
and wall plastering (SIXCO)
Project:
U031215-1
Activity:
ofing
Project:
U031215-1
Activity:
nting (SIXCO)
Project:
U031215-1
Activity:
d Ceiling
Project:
U031215-1
Activity:
nting (SIXCO)
Project:
U031215-1
Activity:
ofing
Project:
U031215-1
Activity:
CPT-1
Project:
U031215-1
Activity:
d ceiling
Project:
U031215-1
Activity:
d Ceiling
Project:
U031215-1
Activity:
painting (SIXCO)
Project:
U031215-1
Activity:
painting (SIXCO)
Project:
U031215-1
Activity:
d ceiling
Project:
U031215-1
Activity:
d ceiling
Project:
U031215-1
Activity:
d ceiling

BOH189310
BOH189320
BOH189330
BOH189340
BOH2115 Ceiling
BOH2280 Wall pai
BOH2285 Wall pai
BOH2310 Wall pai
BOH2340 Framewor
BOH2345 Framewor
BOH2350 Framewor
BOH2355 Framewor
BOH2360 Framewor
BOH2365 Framewor
BOH2370 Framewor
BOH2375 Framewor
BOH2380 Cement s
BOH2390 Waterpro
BOH2425 Wall pai
BOH2430 Suspende
BOH2435 Wall pai
BOH2480 Waterpro
BOH250 Carpet BOH2510 Suspende
BOH2525 Suspende
BOH2540 Ceiling
BOH2545 Ceiling
BOH2585 Suspende
BOH2590 Suspende
BOH2595 Suspende

Project:

U031215-1

Activity:

BOH2600 Suspende

Project:

U031215-1

Activity:

BOH2605 Suspende

Project:

U031215-1

Activity:

BOH2610 Suspende

Project:

U031215-1

Activity:

BOH2615 Suspende

Project:

U031215-1

Activity:

BOH2620 Suspende

Project:
U031215-1
ooring and skirting (SIXCO)
Project:
U031215-1
ooring & skirting (SIXCO)
Project:
U031215-1
and screed (SIXCO)
Project:
U031215-1
ooring & skirting (SIXCO)
Project:
U031215-1
and wall plastering (SIXCO)
Project:
U031215-1
ooring & skirting (SIXCO)
Project:
U031215-1
ofing
Project:
U031215-1
and screed (SIXCO)
Project:
U031215-1
by JLW
Project:
U031215-1
ooring & skirting (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
es - BOH (HSKP / Pantry / Toilet)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
& snagging
Project:
U031215-1
ooring & skirting (SIXCO)
Project:
U031215-1
ooring & skirting (SIXCO)
Project:
U031215-1
and screed (SIXCO)
Project:
U031215-1
Grid Installation (Corridore)
Project:
U031215-1
Boarding Installation (Corridore)
Project:
U031215-1
and screed (SIXCO)
Project:
U031215-1
ofing
Project:
U031215-1
oard Ceiling painting (Sixco)

Activity:

BOH2685 Epoxy fl

Activity:

BOH2755 Epoxy fl

Activity:

BOH2810 Cement s

Activity:

BOH2850 Epoxy fl

Activity:

BOH2855 Cement s

Activity:

BOH2860 Epoxy fl

Activity:

BOH2865 Waterpro

Activity:

BOH2905 Cement s

Activity:

BOH300 Marking

Activity:

BOH3045 Epoxy fl

Activity:

BOH3070 Wall pai

Activity:

BOH3085 Wall pai

Activity:

BOH3115 Wall pai

Activity:

BOH3130 Wall til

Activity:

BOH3145 Wall pai

Activity:

BOH3160 Wall pai

Activity:

BOH3170 Cleaning

Activity:

BOH3220 Epoxy fl

Activity:

BOH3235 Epoxy fl

Activity:

BOH3240 Cement s

Activity:

BOH3255 Ceiling

Activity:

BOH3265 Ceiling

Activity:

BOH3270 Cement s

Activity:

BOH3285 Waterpro

Activity:

BOH3305 Gypsum b

d ceiling
d ceiling
d ceiling
d ceiling
d ceiling

Project:
and wall plastering (SIXCO)
Project:
by JLW
Project:
looring
Project:
and wall plastering (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
and screed (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
and screed (SIXCO)
Project:
oor
Project:
nting (SIXCO)
Project:
nting (SIXCO)
Project:
painting (SIXCO)
Project:
CPT-2
Project:
and wall plastering (SIXCO)
Project:
and wall plastering (SIXCO)
Project:
CPT-1
Project:
ofing to wet areas
Project:
ooring & skirting (SIXCO)
Project:
and screed (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
nting (SIXCO)
Project:
painting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
painting (SIXCO)
Project:
ooring & skirting SIXCO)
Project:
and screed (SIXCO)
Project:
ooring & skirting SIXCO)
Project:
and wall plastering (SIXCO)

U031215-1

Activity:

BOH3360 Cement s

U031215-1

Activity:

BOH340 Marking

U031215-1

Activity:

BOH3400 Raised f

U031215-1

Activity:

BOH3455 Cement s

U031215-1

Activity:

BOH3460 Epoxy fl

U031215-1

Activity:

BOH3465 Epoxy fl

U031215-1

Activity:

BOH3500 Cement s

U031215-1

Activity:

BOH3515 Epoxy fl

U031215-1

Activity:

BOH3525 Cement s

U031215-1

Activity:

BOH3560 Wooden d

U031215-1

Activity:

BOH3565 Wall pai

U031215-1

Activity:

BOH3575 Wall pai

U031215-1

Activity:

BOH3580 Ceiling

U031215-1

Activity:

BOH3600 Carpet -

U031215-1

Activity:

BOH3665 Cement s

U031215-1

Activity:

BOH3670 Cement s

U031215-1

Activity:

BOH3680 Carpet -

U031215-1

Activity:

BOH3695 Waterpro

U031215-1

Activity:

BOH3740 Epoxy fl

U031215-1

Activity:

BOH3770 Cement s

U031215-1

Activity:

BOH3775 Epoxy fl

U031215-1

Activity:

BOH3785 Epoxy fl

U031215-1

Activity:

BOH3830 Wall pai

U031215-1

Activity:

BOH3845 Ceiling

U031215-1

Activity:

BOH3865 Epoxy fl

U031215-1

Activity:

BOH3895 Ceiling

U031215-1

Activity:

BOH3925 Epoxy fl

U031215-1

Activity:

BOH3955 Cement s

U031215-1

Activity:

BOH3960 Epoxy fl

U031215-1

Activity:

BOH3965 Cement s

Project:
ooring & skirting (SIXCO)
Project:
and screed (SIXCO)
Project:
and screed (SIXCO)
Project:
nting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
& chasing (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting SIXCO)
Project:
nting (SIXCO)
Project:
painting (SIXCO)
Project:
nting (SIXCO)
Project:
nting (SIXCO)
Project:
ofing
Project:
painting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
& chasing (SIXCO)
Project:
nting (SIXCO)
Project:
painting (SIXCO)
Project:
& chasing (SIXCO)
Project:
ooring and skirting (SIXCO)
Project:
painting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
and screed (SIXCO)
Project:
ooring & skirting SIXCO)
Project:
ooring & skirting SIXCO)
Project:
ooring & skirting (SIXCO)

U031215-1

Activity:

BOH3990 Epoxy fl

U031215-1

Activity:

BOH4005 Cement s

U031215-1

Activity:

BOH4020 Cement s

U031215-1

Activity:

BOH4085 Wall pai

U031215-1

Activity:

BOH4090 Epoxy fl

U031215-1

Activity:

BOH410 Cutting

U031215-1

Activity:

BOH4125 Epoxy fl

U031215-1

Activity:

BOH4140 Epoxy fl

U031215-1

Activity:

BOH4185 Epoxy fl

U031215-1

Activity:

BOH4195 Wall pai

U031215-1

Activity:

BOH4200 Ceiling

U031215-1

Activity:

BOH4250 Wall pai

U031215-1

Activity:

BOH4315 Wall pai

U031215-1

Activity:

BOH4360 Waterpro

U031215-1

Activity:

BOH4375 Ceiling

U031215-1

Activity:

BOH4385 Epoxy fl

U031215-1

Activity:

BOH4390 Epoxy fl

U031215-1

Activity:

BOH4395 Epoxy fl

U031215-1

Activity:

BOH4440 Epoxy fl

U031215-1

Activity:

BOH445 Cutting

U031215-1

Activity:

BOH4465 Wall pai

U031215-1

Activity:

BOH4470 Ceiling

U031215-1

Activity:

BOH450 Cutting

U031215-1

Activity:

BOH4530 Epoxy fl

U031215-1

Activity:

BOH4545 Ceiling

U031215-1

Activity:

BOH4555 Epoxy fl

U031215-1

Activity:

BOH4590 Cement s

U031215-1

Activity:

BOH4630 Epoxy fl

U031215-1

Activity:

BOH4675 Epoxy fl

U031215-1

Activity:

BOH4680 Epoxy fl

Project:
painting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
nting (SIXCO)
Project:
& snagging
Project:
& snagging
Project:
ofing to pantry & toilet area
Project:
nting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
oor installation
Project:
oor installation
Project:
oor installation
Project:
oor installation
Project:
ooring & skirting SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
& snagging
Project:
and screed (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
nting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
ooring & skirting (SIXCO)

U031215-1

Activity:

BOH4695 Ceiling

U031215-1

Activity:

BOH4735 Epoxy fl

U031215-1

Activity:

BOH4750 Epoxy fl

U031215-1

Activity:

BOH4760 Epoxy fl

U031215-1

Activity:

BOH4775 Epoxy fl

U031215-1

Activity:

BOH4785 Wall pai

U031215-1

Activity:

BOH4795 Cleaning

U031215-1

Activity:

BOH4800 Cleaning

U031215-1

Activity:

BOH4820 Waterpro

U031215-1

Activity:

BOH4840 Wall pai

U031215-1

Activity:

BOH4895 Epoxy fl

U031215-1

Activity:

BOH4920 Epoxy fl

U031215-1

Activity:

BOH4925 Epoxy fl

U031215-1

Activity:

BOH4975 Epoxy fl

U031215-1

Activity:

BOH4980 Epoxy fl

U031215-1

Activity:

BOH5000 Epoxy fl

U031215-1

Activity:

BOH5025 Wooden d

U031215-1

Activity:

BOH5030 wooden d

U031215-1

Activity:

BOH5035 wooden d

U031215-1

Activity:

BOH5045 wooden d

U031215-1

Activity:

BOH5055 Epoxy fl

U031215-1

Activity:

BOH5105 Epoxy fl

U031215-1

Activity:

BOH5120 Epoxy fl

U031215-1

Activity:

BOH5145 Epoxy fl

U031215-1

Activity:

BOH5155 Cleaning

U031215-1

Activity:

BOH5165 Cement s

U031215-1

Activity:

BOH5170 Epoxy fl

U031215-1

Activity:

BOH5175 Wall pai

U031215-1

Activity:

BOH5210 Epoxy fl

U031215-1

Activity:

BOH5225 Epoxy fl

Project:

U031215-1

Activity:

BOH5235 Wall pai

U031215-1

Activity:

BOH5270 Epoxy fl

U031215-1

Activity:

BOH5305 Ceramic

U031215-1

Activity:

BOH5310 Ceramic

U031215-1

Activity:

BOH5315 Ceramic

U031215-1

Activity:

BOH5320 Ceramic

U031215-1

Activity:

BOH5325 Ceramic

U031215-1

Activity:

BOH5335 Ceiling

U031215-1

Activity:

BOH5340 Ceramic

U031215-1

Activity:

BOH5350 Ceramic

U031215-1

Activity:

BOH5360 Ceramic

U031215-1

Activity:

BOH5390 Ceramic

U031215-1

Activity:

BOH5395 Metal do

U031215-1

Activity:

BOH540 Installa

U031215-1

Activity:

BOH5400 Metal do

U031215-1

Activity:

BOH5405 Metal do

U031215-1

Activity:

BOH5410 Metal do

U031215-1

Activity:

BOH5415 Metal do

U031215-1

Activity:

BOH5420 Metal do

U031215-1

Activity:

BOH5425 Metal do

U031215-1

Activity:

BOH5430 Metal do

U031215-1

Activity:

BOH5435 Metal do

U031215-1

Activity:

BOH5440 Metal do

U031215-1

Activity:

BOH5445 Metal do

U031215-1

Activity:

BOH5450 Metal do

U031215-1

Activity:

BOH5455 Metal do

U031215-1

Activity:

BOH5460 Metal do

U031215-1

Activity:

BOH5465 Metal do

U031215-1

Activity:

BOH5470 Metal do

U031215-1

Activity:

BOH5475 Metal do

nting (SIXCO)
Project:
ooring & skirting (SIXCO)
Project:
wall tiles
Project:
wall tiles
Project:
wall tiles
Project:
wall tiles
Project:
wall tiles
Project:
grid / Supports
Project:
wall tiles
Project:
wall tiles
Project:
wall tiles
Project:
wall tiles
Project:
or installation
Project:
tion of conduits by JLW
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation

Project:

U031215-1

Activity:

BOH5480 Metal do

Project:

U031215-1

Activity:

BOH5485 Metal do

Project:

U031215-1

Activity:

BOH5490 Metal do

Project:

U031215-1

Activity:

BOH5495 Metal do

Project:

U031215-1

Activity:

BOH5500 Metal do

Project:

U031215-1

Activity:

BOH5505 Metal do

Project:

U031215-1

Activity:

BOH5510 Metal do

Project:

U031215-1

Activity:

BOH5515 Metal do

Project:

U031215-1

Activity:

BOH5520 Metal do

Project:

U031215-1

Activity:

BOH5525 Metal do

Project:

U031215-1

Activity:

BOH5530 Metal do

Project:

U031215-1

Activity:

BOH5535 Metal do

Project:

U031215-1

Activity:

BOH5540 Metal do

Project:

U031215-1

Activity:

BOH5545 Metal do

Project:

U031215-1

Activity:

BOH5550 Metal do

Project:

U031215-1

Activity:

BOH5555 Metal do

Project:

U031215-1

Activity:

BOH5560 Metal do

Project:

U031215-1

Activity:

BOH5565 Metal do

Project:

U031215-1

Activity:

BOH5570 Metal do

Project:

U031215-1

Activity:

BOH5575 Metal do

Project:

U031215-1

Activity:

BOH5580 Metal do

Project:

U031215-1

Activity:

BOH5585 Metal do

Project:

U031215-1

Activity:

BOH5590 Metal do

Project:

U031215-1

Activity:

BOH5595 Metal do

Project:

U031215-1

Activity:

BOH5600 Metal do

Project:

U031215-1

Activity:

BOH5605 Metal do

Project:

U031215-1

Activity:

BOH5610 Metal do

Project:

U031215-1

Activity:

BOH5615 Metal do

Project:

U031215-1

Activity:

BOH5620 Metal do

Project:

U031215-1

Activity:

BOH5625 Metal do

or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation

Project:

U031215-1

Activity:

BOH5630 Metal do

Project:

U031215-1

Activity:

BOH5635 Metal do

Project:

U031215-1

Activity:

BOH5640 Metal do

Project:

U031215-1

Activity:

BOH5645 Metal do

Project:

U031215-1

Activity:

BOH5650 Metal do

Project:

U031215-1

Activity:

BOH5655 Metal do

Project:

U031215-1

Activity:

BOH5660 Metal do

Project:

U031215-1

Activity:

BOH5665 Metal do

Project:

U031215-1

Activity:

BOH5670 Metal do

Project:

U031215-1

Activity:

BOH5675 Metal do

Project:

U031215-1

Activity:

BOH5680 Metal do

Project:

U031215-1

Activity:

BOH5685 Metal do

Project:

U031215-1

Activity:

BOH5690 Metal do

Project:

U031215-1

Activity:

BOH5695 Metal do

Project:

U031215-1

Activity:

BOH5700 Metal do

Project:

U031215-1

Activity:

BOH5705 Metal do

Project:

U031215-1

Activity:

BOH5710 Metal do

Project:

U031215-1

Activity:

BOH5715 Metal do

Project:

U031215-1

Activity:

BOH5720 Metal do

Project:

U031215-1

Activity:

BOH5725 Metal do

Project:

U031215-1

Activity:

BOH5730 Metal do

Project:

U031215-1

Activity:

BOH5735 Metal do

Project:

U031215-1

Activity:

BOH5740 Metal do

Project:

U031215-1

Activity:

BOH5745 Metal do

Project:
tion of conduits by JLW
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation

U031215-1

Activity:

BOH575 Installa

U031215-1

Activity:

BOH5750 Metal do

U031215-1

Activity:

BOH5755 Metal do

U031215-1

Activity:

BOH5760 Metal do

U031215-1

Activity:

BOH5765 Metal do

U031215-1

Activity:

BOH5770 Metal do

or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation
or installation

Project:

U031215-1

Activity:

BOH5775 Metal do

Project:

U031215-1

Activity:

BOH5780 Metal do

Project:

U031215-1

Activity:

BOH5785 Metal do

Project:

U031215-1

Activity:

BOH5790 Metal do

Project:

U031215-1

Activity:

BOH5795 Metal do

U031215-1

Activity:

BOH580 Installa

U031215-1

Activity:

BOH5800 Metal do

U031215-1

Activity:

BOH5805 Ceramic

U031215-1

Activity:

BOH5810 Metal do

U031215-1

Activity:

BOH5815 Metal do

U031215-1

Activity:

BOH5820 Metal do

U031215-1

Activity:

BOH5825 Metal do

U031215-1

Activity:

BOH5830 Metal do

U031215-1

Activity:

BOH5835 Metal do

U031215-1

Activity:

BOH5840 Metal do

U031215-1

Activity:

BOH5845 Metal do

U031215-1

Activity:

BOH5850 Metal do

U031215-1

Activity:

BOH5855 Ceramic

U031215-1

Activity:

BOH5860 Metal do

U031215-1

Activity:

BOH5865 Ceramic

U031215-1

Activity:

BOH5870 Metal do

U031215-1

Activity:

BOH5875 Ceramic

U031215-1

Activity:

BOH5880 Metal do

U031215-1

Activity:

BOH5885 Ceramic

U031215-1

Activity:

BOH5890 Metal do

U031215-1

Activity:

BOH5895 Ceramic

U031215-1

Activity:

BOH590 Cement s

U031215-1

Activity:

BOH5900 Metal do

U031215-1

Activity:

BOH5905 Ceramic

U031215-1

Activity:

BOH5910 Metal do

or installation
or installation
or installation
or installation
or installation
Project:
tion of conduits by JLW
Project:
or installation
Project:
tiles flooring
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
or installation
Project:
tiles flooring
Project:
or installation
Project:
tiles flooring
Project:
or installation
Project:
tiles flooring
Project:
or installation
Project:
tiles flooring
Project:
or installation
Project:
tiles flooring
Project:
and wall plastering (SIXCO)
Project:
or installation
Project:
tiles flooring
Project:
or installation

Project:

U031215-1

Activity:

BOH5915 Ceramic

Project:

U031215-1

Activity:

BOH5920 Metal do

Project:

U031215-1

Activity:

BOH5925 Metal do

Project:

U031215-1

Activity:

BOH5930 Metal do

Project:

U031215-1

Activity:

BOH5935 Metal do

Project:

U031215-1

Activity:

BOH5940 Metal do

Project:

U031215-1

Activity:

BOH5945 Metal do

Project:
U031215-1
and wall plastering (SIXCO)
Project:
U031215-1
or installation
Project:
U031215-1
or installation
Project:
U031215-1
or installation
Project:
U031215-1
or installation
Project:
U031215-1
or installation
Project:
U031215-1
or installation
Project:
U031215-1
or installation
Project:
U031215-1
or installation
Project:
U031215-1
or installation
Project:
U031215-1
or installation
Project:
U031215-1
and screed (SIXCO)
Project:
U031215-1
at of painting on walls, Ceiling & Floor
Project:
U031215-1
d ceiling
Project:
U031215-1
d ceiling
Project:
U031215-1
& snagging
Project:
U031215-1
& snagging
Project:
U031215-1
d ceiling
Project:
U031215-1
& snagging
Project:
U031215-1
& snagging
Project:
U031215-1
and screed (SIXCO)
Project:
U031215-1
& snagging
Project:
U031215-1
& snagging

Activity:

BOH595 Cement s

Activity:

BOH5950 Metal do

Activity:

BOH5955 Metal do

Activity:

BOH5960 Metal do

Activity:

BOH5965 Metal do

Activity:

BOH5970 Metal do

Activity:

BOH5975 Metal do

Activity:

BOH5980 Metal do

Activity:

BOH5985 Metal do

Activity:

BOH5990 Metal do

Activity:

BOH5995 Metal do

Activity:

BOH600 Cement s

Activity:

BOH6000 Final Co

Activity:

BOH6005 Suspende

Activity:

BOH6010 Suspende

Activity:

BOH6020 Cleaning

Activity:

BOH6030 Cleaning

Activity:

BOH6035 Suspende

Activity:

BOH6040 Cleaning

Activity:

BOH6045 Cleaning

Activity:

BOH605 Cement s

Activity:

BOH6055 Cleaning

Activity:

BOH6060 Cleaning

tiles flooring
or installation
or installation
or installation
or installation
or installation
or installation

Project:

U031215-1

Activity:

BOH6065 Cleaning

Project:

U031215-1

Activity:

BOH6075 Cleaning

Project:

U031215-1

Activity:

BOH6085 Cleaning

Project:

U031215-1

Activity:

BOH6090 Cleaning

Project:

U031215-1

Activity:

BOH6095 Cleaning

Project:
and screed (SIXCO)
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
d ceiling layout

U031215-1

Activity:

BOH610 Cement s

U031215-1

Activity:

BOH6100 Cleaning

U031215-1

Activity:

BOH6105 Cleaning

U031215-1

Activity:

BOH6115 Cleaning

U031215-1

Activity:

BOH6120 Cleaning

U031215-1

Activity:

BOH6125 Cleaning

U031215-1

Activity:

BOH6135 Cleaning

U031215-1

Activity:

BOH6145 Cleaning

U031215-1

Activity:

BOH6150 Cleaning

U031215-1

Activity:

BOH6155 Cleaning

U031215-1

Activity:

BOH6160 Cleaning

U031215-1

Activity:

BOH6165 Cleaning

U031215-1

Activity:

BOH6175 Cleaning

U031215-1

Activity:

BOH6180 Cleaning

U031215-1

Activity:

BOH6185 Cleaning

U031215-1

Activity:

BOH6190 Cleaning

U031215-1

Activity:

BOH6195 Cleaning

U031215-1

Activity:

BOH6200 Cleaning

U031215-1

Activity:

BOH6205 Cleaning

U031215-1

Activity:

BOH6215 Cleaning

U031215-1

Activity:

BOH6220 Cleaning

U031215-1

Activity:

BOH6225 Cleaning

U031215-1

Activity:

BOH6235 Cleaning

U031215-1

Activity:

BOH6245 Cleaning

U031215-1

Activity:

BOH625 Reflecte

& snagging
& snagging
& snagging
& snagging
& snagging

Project:

U031215-1

Activity:

BOH6255 Cleaning

Project:

U031215-1

Activity:

BOH6260 Cleaning

Project:

U031215-1

Activity:

BOH6265 Cleaning

Project:

U031215-1

Activity:

BOH6275 Cleaning

Project:

U031215-1

Activity:

BOH6285 Cleaning

Project:

U031215-1

Activity:

BOH6295 Cleaning

Project:

U031215-1

Activity:

BOH6300 Cleaning

Project:

U031215-1

Activity:

BOH6305 Cleaning

Project:

U031215-1

Activity:

BOH6315 Cleaning

Project:

U031215-1

Activity:

BOH6325 Cleaning

Project:

U031215-1

Activity:

BOH6335 Suspende

Project:

U031215-1

Activity:

BOH6340 Framewor

U031215-1

Activity:

BOH6355 Epoxy fl

U031215-1

Activity:

BOH6365 Epoxy fl

U031215-1

Activity:

BOH6375 Epoxy fl

U031215-1

Activity:

BOH6380 Ceramic

U031215-1

Activity:

BOH6385 Epoxy fl

U031215-1

Activity:

BOH6395 Epoxy fl

U031215-1

Activity:

BOH6405 Epoxy fl

U031215-1

Activity:

BOH6415 Epoxy fl

U031215-1

Activity:

BOH6420 Ceramic

U031215-1

Activity:

BOH6500 Ceiling

U031215-1

Activity:

BOH6505 Suspende

U031215-1

Activity:

BOH6510 Cleaning

U031215-1

Activity:

BOH6520 Cleaning

U031215-1

Activity:

BOH6525 Cleaning

U031215-1

Activity:

BOH6530 Cleaning

U031215-1

Activity:

BOH6535 Cleaning

U031215-1

Activity:

BOH6540 Cleaning

U031215-1

Activity:

BOH6545 Cleaning

& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
d ceiling
k for ceiling
Project:
ooring and skirting (SIXCO)
Project:
ooring and skirting (SIXCO)
Project:
ooring and skirting (SIXCO)
Project:
skirting
Project:
ooring and skirting (SIXCO)
Project:
ooring and skirting (SIXCO)
Project:
ooring and skirting (SIXCO)
Project:
ooring and skirting (SIXCO)
Project:
skirting
Project:
Grid Installation
Project:
d ceiling
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging

Project:

U031215-1

Activity:

BOH6550 Cleaning

Project:

U031215-1

Activity:

BOH6555 Cleaning

Project:

U031215-1

Activity:

BOH6560 Cleaning

Project:

U031215-1

Activity:

BOH6565 Cleaning

Project:

U031215-1

Activity:

BOH6570 Cleaning

Project:

U031215-1

Activity:

BOH6575 Cleaning

Project:

U031215-1

Activity:

BOH6580 Cleaning

Project:

U031215-1

Activity:

BOH6585 Cleaning

Project:

U031215-1

Activity:

BOH6590 Cleaning

Project:

U031215-1

Activity:

BOH6595 Cleaning

Project:

U031215-1

Activity:

BOH6600 Cleaning

Project:

U031215-1

Activity:

BOH6605 Cleaning

Project:

U031215-1

Activity:

BOH6610 Cleaning

Project:

U031215-1

Activity:

BOH6615 Cleaning

Project:

U031215-1

Activity:

BOH6620 Cleaning

Project:

U031215-1

Activity:

BOH6625 Cleaning

Project:

U031215-1

Activity:

BOH6630 Cleaning

Project:

U031215-1

Activity:

BOH6635 Cleaning

Project:

U031215-1

Activity:

BOH6640 Cleaning

Project:

U031215-1

Activity:

BOH6645 Cleaning

Project:

U031215-1

Activity:

BOH6650 Cleaning

Project:

U031215-1

Activity:

BOH6655 Cleaning

Project:

U031215-1

Activity:

BOH6660 Ceramic

Project:

U031215-1

Activity:

BOH6675 Ceramic

Project:

U031215-1

Activity:

BOH6680 Suspende

Project:

U031215-1

Activity:

BOH6685 Suspende

Project:

U031215-1

Activity:

BOH6695 Cleaning

Project:

U031215-1

Activity:

BOH6700 Cleaning

Project:

U031215-1

Activity:

BOH6705 Suspende

Project:

U031215-1

Activity:

BOH6710 Cleaning

& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
tiles flooring
tiles flooring
d ceiling
d ceiling
& snagging
& snagging
d ceiling
& snagging

Project:

U031215-1

Activity:

BOH6715 Cleaning

Project:

U031215-1

Activity:

BOH6720 Cleaning

Project:

U031215-1

Activity:

BOH6725 Wall pai

Project:

U031215-1

Activity:

BOH6735 Cleaning

Project:

U031215-1

Activity:

BOH6740 Cleaning

Project:

U031215-1

Activity:

BOH6745 Cleaning

Project:

U031215-1

Activity:

BOH6750 Cleaning

Project:

U031215-1

Activity:

BOH6755 Cleaning

Project:

U031215-1

Activity:

BOH6760 Cleaning

Project:

U031215-1

Activity:

BOH6765 Cleaning

Project:

U031215-1

Activity:

BOH6770 Cleaning

Project:

U031215-1

Activity:

BOH6785 Suspende

Project:

U031215-1

Activity:

BOH6790 Ceramic

Project:

U031215-1

Activity:

BOH6795 Ceramic

Project:

U031215-1

Activity:

BOH6800 Metal do

Project:

U031215-1

Activity:

BOH6805 Ceramic

Project:

U031215-1

Activity:

BOH6810 Ceramic

Project:

U031215-1

Activity:

BOH6815 Ceramic

Project:

U031215-1

Activity:

BOH6820 Metal do

Project:

U031215-1

Activity:

BOH6835 Ceramic

Project:

U031215-1

Activity:

BOH6840 Wall pai

Project:

U031215-1

Activity:

BOH6845 Cleaning

Project:

U031215-1

Activity:

BOH6850 Cleaning

Project:

U031215-1

Activity:

BOH6855 Cleaning

Project:

U031215-1

Activity:

BOH6860 Cleaning

Project:

U031215-1

Activity:

BOH6870 Ceramic

Project:

U031215-1

Activity:

BOH6880 Ceramic

Project:
d ceiling layout
Project:
skirting
Project:
skirting

U031215-1

Activity:

BOH690 Reflecte

U031215-1

Activity:

BOH6900 Ceramic

U031215-1

Activity:

BOH6905 Ceramic

& snagging
& snagging
nting (SIXCO)
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
d ceiling
skirting
tiles flooring
or installation
tiles flooring
tiles flooring
tiles flooring
or installation
tiles flooring
nting (SIXCO)
& snagging
& snagging
& snagging
& snagging
tiles flooring
tiles flooring

Project:

U031215-1

Activity:

BOH6910 Ceramic

U031215-1

Activity:

BOH6915 Vinyl fl

U031215-1

Activity:

BOH6930 Metal do

U031215-1

Activity:

BOH6935 Cleaning

U031215-1

Activity:

BOH6940 Ceramic

U031215-1

Activity:

BOH6950 Metal do

U031215-1

Activity:

BOH6965 Metal do

U031215-1

Activity:

BOH6975 Cleaning

U031215-1

Activity:

BOH6980 Ceramic

U031215-1

Activity:

BOH6985 Metal do

U031215-1

Activity:

BOH6990 Cleaning

U031215-1

Activity:

BOH6995 Ceiling

U031215-1

Activity:

BOH7000 Cleaning

U031215-1

Activity:

BOH7030 Ceramic

U031215-1

Activity:

BOH7045 Ceramic

U031215-1

Activity:

BOH7055 Metal do

U031215-1

Activity:

BOH7060 Metal do

U031215-1

Activity:

BOH7065 Metal do

U031215-1

Activity:

BOH7070 Cleaning

U031215-1

Activity:

BOH7075 Cleaning

U031215-1

Activity:

BOH7095 Cleaning

U031215-1

Activity:

BOH7135 Cleaning

U031215-1

Activity:

BOH7160 Cleaning

U031215-1

Activity:

BOH7170 Wall pai

U031215-1

Activity:

BOH7175 Ceiling

U031215-1

Activity:

BOH7205 Epoxy fl

U031215-1

Activity:

BOH7210 Vinyl sh

U031215-1

Activity:

BOH7215 Ceramic

U031215-1

Activity:

BOH7420 Wooden d

U031215-1

Activity:

BOH7425 Wooden d

skirting
Project:
ooring & skirting
Project:
or installation
Project:
& snagging
Project:
skirting
Project:
or installation
Project:
or installation
Project:
& snagging
Project:
skirting
Project:
or installation
Project:
& snagging
Project:
painting (SIXCO)
Project:
& snagging
Project:
skirting
Project:
tiles flooring
Project:
or installation
Project:
or installation
Project:
or installation
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
& snagging
Project:
nting (SIXCO)
Project:
painting (SIXCO)
Project:
ooring and skirting (SIXCO)
Project:
eet flooring & skirting
Project:
skirting
Project:
oor installation
Project:
oor installation

Project:
U031215-1
oor installation
Project:
U031215-1
oor installation
Project:
U031215-1
oor installation
Project:
U031215-1
oor installation
Project:
U031215-1
oor installation
Project:
U031215-1
oor installation
Project:
U031215-1
& snagging
Project:
U031215-1
& snagging
Project:
U031215-1
& snagging
Project:
U031215-1
& snagging
Project:
U031215-1
& snagging
Project:
U031215-1
& snagging
Project:
U031215-1
& snagging
Project:
U031215-1
& snagging
Project:
U031215-1
e & Flooring layout
Project:
U031215-1
ofing to wet areas
Project:
U031215-1
tiles - Walls
Project:
U031215-1
k for ceiling
Project:
U031215-1
d ceiling
Project:
U031215-1
ishes layout
Project:
U031215-1
tiles flooring
Project:
U031215-1
or installation
Project:
U031215-1
oor installation
Project:
U031215-1
ooring and skirting (SIXCO)
Project:
U031215-1
d ceiling layout
Project:
U031215-1
skirting
Project:
U031215-1
eet flooring & skirting
Project:
U031215-1
installation to support ceiling
Project:
U031215-1
& snagging
Project:
U031215-1
ofing to wet areas

Activity:

BOH7460 wooden d

Activity:

BOH7465 wooden d

Activity:

BOH7470 wooden d

Activity:

BOH7475 wooden d

Activity:

BOH7480 wooden d

Activity:

BOH7485 wooden d

Activity:

BOH7490 Cleaning

Activity:

BOH7505 Cleaning

Activity:

BOH7515 Cleaning

Activity:

BOH7540 Cleaning

Activity:

BOH7550 Cleaning

Activity:

BOH7555 Cleaning

Activity:

BOH7560 Cleaning

Activity:

BOH7565 Cleaning

Activity:

BOH780 Referenc

Activity:

BOH7805 Waterpro

Activity:

BOH7825 Ceramic

Activity:

BOH7835 Framewor

Activity:

BOH7845 Suspende

Activity:

BOH785 Wall fin

Activity:

BOH7865 Ceramic

Activity:

BOH7875 Metal do

Activity:

BOH7885 wooden d

Activity:

BOH7895 Epoxy fl

Activity:

BOH790 Reflecte

Activity:

BOH7905 Ceramic

Activity:

BOH7925 Vinyl sh

Activity:

BOH7935 Perlings

Activity:

BOH7955 Cleaning

Activity:

BOH8025 Waterpro

Project:

U031215-1

Activity:

BOH8045 Ceramic

Project:

U031215-1

Activity:

BOH8055 Framewor

Project:

U031215-1

Activity:

BOH8065 Suspende

Project:

U031215-1

Activity:

BOH8085 Ceramic

Project:

U031215-1

Activity:

BOH8095 Metal do

U031215-1

Activity:

BOH810 Referenc

U031215-1

Activity:

BOH8105 wooden d

U031215-1

Activity:

BOH8125 Ceramic

U031215-1

Activity:

BOH815 Wall fin

U031215-1

Activity:

BOH8175 Cleaning

U031215-1

Activity:

BOH820 Reflecte

U031215-1

Activity:

BOH8265 Ceramic

U031215-1

Activity:

BOH8275 Framewor

U031215-1

Activity:

BOH8285 Suspende

U031215-1

Activity:

BOH830 Wall fin

U031215-1

Activity:

BOH8305 Ceramic

U031215-1

Activity:

BOH8315 Metal do

U031215-1

Activity:

BOH8325 wooden d

U031215-1

Activity:

BOH8335 Epoxy fl

U031215-1

Activity:

BOH8345 Ceramic

U031215-1

Activity:

BOH835 Reflecte

U031215-1

Activity:

BOH8365 Vinyl sh

U031215-1

Activity:

BOH8395 Cleaning

U031215-1

Activity:

BOH840 Carpet -

U031215-1

Activity:

BOH860 Referenc

U031215-1

Activity:

BOH865 Wall fin

U031215-1

Activity:

BOH870 Reflecte

U031215-1

Activity:

BOH8715 Framewor

U031215-1

Activity:

BOH8725 Suspende

U031215-1

Activity:

BOH8735 Wall pai

tiles - Walls
k for ceiling
d ceiling
tiles flooring
or installation
Project:
e & Flooring layout
Project:
oor installation
Project:
skirting
Project:
ishes layout
Project:
& snagging
Project:
d ceiling layout
Project:
tiles - Walls
Project:
k for ceiling
Project:
d ceiling
Project:
ishes layout
Project:
tiles flooring
Project:
or installation
Project:
oor installation
Project:
ooring and skirting (SIXCO)
Project:
skirting
Project:
d ceiling layout
Project:
eet flooring & skirting
Project:
& snagging
Project:
CPT-1
Project:
e & Flooring layout
Project:
ishes layout
Project:
d ceiling layout
Project:
k for ceiling
Project:
d ceiling
Project:
nting (SIXCO)

Project:

U031215-1

Activity:

BOH8745 Ceramic

Project:

U031215-1

Activity:

BOH8755 Metal do

U031215-1

Activity:

BOH8765 wooden d

U031215-1

Activity:

BOH8785 Ceramic

U031215-1

Activity:

BOH880 Wall fin

U031215-1

Activity:

BOH8835 Cleaning

U031215-1

Activity:

BOH885 Reflecte

U031215-1

Activity:

BOH8875 Suspende

U031215-1

Activity:

BOH8895 Epoxy fl

U031215-1

Activity:

BOH8905 Metal do

U031215-1

Activity:

BOH8915 Cleaning

U031215-1

Activity:

BOH8985 Metal do

U031215-1

Activity:

BOH8995 Cleaning

U031215-1

Activity:

BOH9025 Cement s

U031215-1

Activity:

BOH9065 Metal do

U031215-1

Activity:

BOH9075 Cleaning

U031215-1

Activity:

BOH9165 Framewor

U031215-1

Activity:

BOH9175 Suspende

U031215-1

Activity:

BOH9185 Ceramic

U031215-1

Activity:

BOH9195 Ceramic

U031215-1

Activity:

BOH9215 Metal do

U031215-1

Activity:

BOH9235 Ceramic

U031215-1

Activity:

BOH9255 Ceiling

U031215-1

Activity:

BOH9265 Wall pai

U031215-1

Activity:

BOH9285 Cleaning

U031215-1

Activity:

BOH9325 Suspende

U031215-1

Activity:

BOH9345 Vinyl fl

U031215-1

Activity:

BOH9355 Metal do

U031215-1

Activity:

BOH9365 Cleaning

U031215-1

Activity:

BOH940 Waterpro

tiles flooring
or installation
Project:
oor installation
Project:
skirting
Project:
ishes layout
Project:
& snagging
Project:
d ceiling layout
Project:
d ceiling
Project:
ooring and skirting (SIXCO)
Project:
or installation
Project:
& snagging
Project:
or installation
Project:
& snagging
Project:
and screed (SIXCO)
Project:
or installation
Project:
& snagging
Project:
k for ceiling
Project:
d ceiling
Project:
wall tiles
Project:
tile flooring
Project:
or installation
Project:
skirting
Project:
painting (SIXCO)
Project:
nting (SIXCO)
Project:
& snagging
Project:
d ceiling
Project:
ooring & skirting
Project:
or installation
Project:
& snagging
Project:
ofing to pantry & toilet area

Project:
U031215-1
ofing to wet areas
Project:
U031215-1
tiles - Walls
Project:
U031215-1
k for ceiling
Project:
U031215-1
d ceiling
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
tiles flooring
Project:
U031215-1
or installation
Project:
U031215-1
oor installation
Project:
U031215-1
skirting
Project:
U031215-1
& snagging
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
d ceiling
Project:
U031215-1
ooring and skirting (SIXCO)
Project:
U031215-1
or installation
Project:
U031215-1
& snagging
Project:
U031215-1
tiles - Walls
Project:
U031215-1
k for ceiling
Project:
U031215-1
d ceiling
Project:
U031215-1
nting (SIXCO)
Project:
U031215-1
tiles flooring
Project:
U031215-1
or installation
Project:
U031215-1
oor installation
Project:
U031215-1
skirting
Project:
U031215-1
& snagging
Project:
U031215-1
ofing to pantry & toilet area
Project:
U031215-1
k for ceiling
Project:
U031215-1
d ceiling
Project:
U031215-1
Installation (Excavation,Incoming cable,Pocket
Project:
U031215-1
FEWA Inspection
Project:
U031215-1
BOH Light Fittings Delivery

Activity:

BOH9435 Waterpro

Activity:

BOH9455 Ceramic

Activity:

BOH9465 Framewor

Activity:

BOH9475 Suspende

Activity:

BOH9485 Wall pai

Activity:

BOH9495 Ceramic

Activity:

BOH9505 Metal do

Activity:

BOH9515 wooden d

Activity:

BOH9535 Ceramic

Activity:

BOH9585 Cleaning

Activity:

BOH9625 Wall pai

Activity:

BOH9635 Suspende

Activity:

BOH9645 Epoxy fl

Activity:

BOH9655 Metal do

Activity:

BOH9665 Cleaning

Activity:

BOH9755 Ceramic

Activity:

BOH9765 Framewor

Activity:

BOH9775 Suspende

Activity:

BOH9785 Wall pai

Activity:

BOH9795 Ceramic

Activity:

BOH9805 Metal do

Activity:

BOH9815 wooden d

Activity:

BOH9835 Ceramic

Activity:

BOH9885 Cleaning

Activity:

BOH990 Waterpro

Activity:

BOH9985 Framewor

Activity:

BOH9995 Suspende

Activity:
FEWA-1700
Sub station,SWGR)
Activity:
FEWA-1710
Activity:

V0 - 18780

Project:
U031215-1
Activity:
V0 - 18790
Aluminum louver doors
Project:
U031215-1
Activity:
V0 - 18830
New AHU Material Order / Manufacturing & Delivery on site
Project:
U031215-1
Activity:
V0 - 18860
New Fans Material Order / Manufacturing & Delivery on site
Project:
U031215-1
Activity:
V0 - 18890
New FCU Material Order / Manufacturing & Delivery on site
Project:
U031215-1
Activity:
VO - 18610
Install RO System
Project:
U031215-1
Activity:
VO - 18620
Install RO System
Project:
U031215-1
Activity:
VO - 18630
Install RO System
Project:
U031215-1
Activity:
VO - 18640
Install RO System
Project:
U031215-1
Activity:
VO - 18770
Pool MEP Shop Drawings Submission & Approval for Daycare Basement area
Project:
U031215-1
Activity:
VO - MAT-PROC-17
80
Technical Subittal Approval
Project:
U031215-1
Activity:
VO - MAT-PROC-18
00
Material Order Placing
Project:
U031215-1
Activity:
VO - MAT-PROC-18
10
Material Delivery to site
Project:
U031215-1
Activity:
VO - MAT-PROC-26
30
Material Delivery to site
Project:
U031215-1
Activity:
Z1-ELEC-010
Allow Provisional Sum for Electrical Works -phase 1
Project:
U031215-1
Activity:
Z1-ELEC-10
Allow Provisional Sum for Electrical Works -phase 2
Project:
U031215-1
Activity:
Z1-ELEC-20
Allow Provisional Sum for Electrical Works -phase 3
Project:
U031215-1
Activity:
Z1-HL-GRV-010
Supply & Lay of Gravel above Geotextile Membrane
Project:
U031215-1
Activity:
Z1-HL-GRV-020
Supply & Install of Stepping Block in Gravel Area
Project:
U031215-1
Activity:
Z1-HL-INST-010
Fill & Compacting of Sub Base Layer
Project:
U031215-1
Activity:
Z1-HL-INST-020
Supply & Install of In-Situ Concrete Paving
Project:
U031215-1
Activity:
Z1-HL-INST-030
Finishing & Preparation of of In-Situ Paving with Grooves
Project:
U031215-1
Activity:
Z1-HL-MOW-010
Supply & Install of Mowing Edge with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z1-HL-NOD-010
Fill & Compacting of Sub Base Layer for Pedestrain Paving
Project:
U031215-1
Activity:
Z1-HL-NOD-020
Supply & Placing of Concrete Base for Vehicular Paving
Project:
U031215-1
Activity:
Z1-HL-NOD-030
Supply & Install of Granite Paving with Color Matched Grout
Project:
U031215-1
Activity:
Z1-HL-PAV1-010
Supply & Placing of Concrete Base for Paving Band
Project:
U031215-1
Activity:
Z1-HL-PAV1-020
Supply & Install of Paving Band with Mortar Bed
Project:
U031215-1
Activity:
Z1-HL-PAV1-030
Supply & Install of Precast Concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z1-HL-PAV5-010
Supply & Placing of Concrete Base for Paving Blocks
Project:
U031215-1
Activity:
Z1-HL-PAV5-020
Supply & Install of Granite Paving Blocks with Mortar Bed & Grout

Project:
U031215-1
Activity:
Z1-HL-PEB-010
Supply & Lay of Pebbles above Geotextile Membrane
Project:
U031215-1
Activity:
Z1-HL-SHD-010
Excavation, Leveling & Preparation of Shade area
Project:
U031215-1
Activity:
Z1-HL-SHD-020
Supply & Placing of Concrete Foundation
Project:
U031215-1
Activity:
Z1-HL-SHD-030
Supply & Install of Shade Structure
Project:
U031215-1
Activity:
Z1-HL-SHD-040
Supply & Install of Towel Bar's Paving
Project:
U031215-1
Activity:
Z1-HL-SHD-050
Supply & Install of Towel Bar's Coping
Project:
U031215-1
Activity:
Z1-HL-SHD-060
Supply & Apply of Towel Bar's Stucco Finish
Project:
U031215-1
Activity:
Z1-HL-SHD-070
Supply & Install of Towel Bar's Aluminium Access Door
Project:
U031215-1
Activity:
Z1-HL-STP2-010
Supply & Placing of Reinforced Concrete Structure
Project:
U031215-1
Activity:
Z1-HL-STP2-020
Supply & Install of Steps Timber Treads & Risers with Steel Spacers
Project:
U031215-1
Activity:
Z1-HL-TD-010
Preparation & Compaction of Decking area
Project:
U031215-1
Activity:
Z1-HL-TD-020
Supply & Placing of Concrete Base for Decking area
Project:
U031215-1
Activity:
Z1-HL-TD-030
Supply & Install of Timber Deck
Project:
U031215-1
Activity:
Z1-IR-010
Handing Over and Access to Zone 1
Project:
U031215-1
Activity:
Z2A-ELEC-010
Allow Provisional Sum for Electrical Works -phase 1
Project:
U031215-1
Activity:
Z2A-ELEC-10
Allow Provisional Sum for Electrical Works -phase 2
Project:
U031215-1
Activity:
Z2A-ELEC-20
Allow Provisional Sum for Electrical Works -phase 3
Project:
U031215-1
Activity:
Z2A-HL-GRV-010
Supply & Lay of Gravel above Geotextile Membrane
Project:
U031215-1
Activity:
Z2A-HL-INST-010
Fill & Compacting of Sub Base Layer
Project:
U031215-1
Activity:
Z2A-HL-INST-020
Supply & Install of In-Situ Concrete Paving
Project:
U031215-1
Activity:
Z2A-HL-INST-030
Finishing & Preparation of of In-Situ Paving with Grooves
Project:
U031215-1
Activity:
Z2A-HL-MOW-010
Supply & Install of Mowing Edge with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z2A-HL-NOD-010
Fill & Compacting of Sub Base Layer for Pedestrain Paving
Project:
U031215-1
Activity:
Z2A-HL-NOD-020
Supply & Placing of Concrete Base for Vehicular Paving
Project:
U031215-1
Activity:
Z2A-HL-NOD-030
Supply & Install of Granite Paving
Project:
U031215-1
Activity:
Z2A-HL-NOD-040
Supply & Fill all Joints with Color Matched Grout
Project:
U031215-1
Activity:
Z2A-HL-PAV1-010
Supply & Placing of Concrete Base for Paving Band
Project:
U031215-1
Activity:
Z2A-HL-PAV1-020
Supply & Install of Paving Band with Mortar Bed
Project:
U031215-1
Activity:
Z2A-HL-PAV1-030
Supply & Install of Precast concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z2A-HL-PAV3-010
Supply & Placing of Concrete Base for Paving Bands

Project:
U031215-1
Activity:
Z2A-HL-PAV3-020
Supply & Install of Paving Band with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z2A-HL-PAV3-030
Supply & Install of Precast Concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z2A-HL-PAV5-010
Supply & Placing of Concrete Base for Paving Blocks
Project:
U031215-1
Activity:
Z2A-HL-PAV5-020
Supply & Install of Granite Paving Blocks with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z2A-HL-PAV6-010
Supply & Placing of Concrete Base for Paving
Project:
U031215-1
Activity:
Z2A-HL-PAV6-020
Supply & Install of Precast Concrete Paving on Mortar Bed
Project:
U031215-1
Activity:
Z2A-HL-PEB-010
Supply & Lay of Pebble above Geotextile Membrane
Project:
U031215-1
Activity:
Z2A-HL-RG-010
Supply & Lay of Gravel
Project:
U031215-1
Activity:
Z2A-HL-RG-020
Supply & Lay of Sand Bed
Project:
U031215-1
Activity:
Z2A-HL-RG-030
Supply & Install of Interlocking Plastic Grass
Project:
U031215-1
Activity:
Z2A-HL-SS-010
Supply & Placing of Concrete Base for Paving
Project:
U031215-1
Activity:
Z2A-HL-SS-020
Supply & Install of Stepping Stone with Mortar Bed
Project:
U031215-1
Activity:
Z2A-HL-STP1-010
Supply & Placing of Reinforced Concrete Structure
Project:
U031215-1
Activity:
Z2A-HL-STP1-020
Supply & Install of Granite Steps Treads & Risers with Grout
Project:
U031215-1
Activity:
Z2A-HL-TD-010
Supply & Placing of Concrete Base for Timber Deck
Project:
U031215-1
Activity:
Z2A-HL-TD-020
Supply & Install of Timber Deck
Project:
U031215-1
Activity:
Z2A-HL-WT-010
Supply & Install of Wire Trellis
Project:
U031215-1
Activity:
Z2A-IR-010
Handing Over and Access to Zone 2A
Project:
U031215-1
Activity:
Z2A-IR-020
Setting Out of Irrigation Mainline
Project:
U031215-1
Activity:
Z2A-IR-030
Excavation of Irrigation Mainline Trench
Project:
U031215-1
Activity:
Z2A-IR-040
Supply & Laying of Irrigation Mainline Pipes
Project:
U031215-1
Activity:
Z2A-IR-050
Pressure Test for Irrigation Mainline
Project:
U031215-1
Activity:
Z2A-IR-060
Excavation of Irrigation Lateral line Trench
Project:
U031215-1
Activity:
Z2A-IR-070
Supply & Laying of Lateral Lines Pipes
Project:
U031215-1
Activity:
Z2A-IR-080
Supply, Laying/Install of Drip, Sprinkler, Valves, Boxes
Project:
U031215-1
Activity:
Z2A-SL-010
Excavation of Palm & Tree Pits
Project:
U031215-1
Activity:
Z2A-SL-020
Supply & Fill of Planting Medium
Project:
U031215-1
Activity:
Z2A-SL-030
upply & Install of Palms, Trees, Shrubs, G.C, Grass, ...
Project:
U031215-1
Activity:
Z2B-ELEC-010
Allow Provisional Sum for Electrical Works -phase 1
Project:
U031215-1
Activity:
Z2B-ELEC-10
Allow Provisional Sum for Electrical Works -phase 2

Project:
U031215-1
Activity:
Z2B-ELEC-20
Allow Provisional Sum for Electrical Works -phase 3
Project:
U031215-1
Activity:
Z2B-HL-GRV-010
Supply & Lay of Gravel above Geotextile Membrane
Project:
U031215-1
Activity:
Z2B-HL-INST-010
Fill & Compacting of Sub Base Layer
Project:
U031215-1
Activity:
Z2B-HL-INST-020
Supply & Install of In-Situ Concrete Paving
Project:
U031215-1
Activity:
Z2B-HL-INST-030
Finishing & Preparation of of In-Situ Paving with Grooves
Project:
U031215-1
Activity:
Z2B-HL-LW-010
Excavation, Leveling & Preparation of Landscape Wall areas
Project:
U031215-1
Activity:
Z2B-HL-LW-020
Fill & Compacting of Sub Base Layer
Project:
U031215-1
Activity:
Z2B-HL-LW-030
Supply & Placing of Reinforced Concrete Foundation
Project:
U031215-1
Activity:
Z2B-HL-LW-040
Supply & Placing of Reinforced Concrete Wall
Project:
U031215-1
Activity:
Z2B-HL-LW-050
Supply & Install of Drainage Matt
Project:
U031215-1
Activity:
Z2B-HL-LW-060
Supply & Lay of Geotextile Membrane
Project:
U031215-1
Activity:
Z2B-HL-LW-070
Supply & Lay of Drain Pipe
Project:
U031215-1
Activity:
Z2B-HL-LW-080
Supply & Lay of Gravel Drainage Layer
Project:
U031215-1
Activity:
Z2B-HL-LW-090
Supply & Install of Wall Coping with Color Matched Grout
Project:
U031215-1
Activity:
Z2B-HL-MOW-010
Supply & Install of Mowing Edge with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z2B-HL-NOD-010
Fill & Compacting of Sub Base Layer for Pedestrain Paving
Project:
U031215-1
Activity:
Z2B-HL-NOD-020
Supply & Placing of Concrete Base for Vehicular Paving
Project:
U031215-1
Activity:
Z2B-HL-NOD-030
Supply & Install of Granite Paving
Project:
U031215-1
Activity:
Z2B-HL-NOD-040
Supply & Fill all Joints with Color Matched Grout
Project:
U031215-1
Activity:
Z2B-HL-PAV1-010
Supply & Placing of Concrete Base for Paving Band
Project:
U031215-1
Activity:
Z2B-HL-PAV1-020
Supply & Install of Paving Band with Mortar Bed
Project:
U031215-1
Activity:
Z2B-HL-PAV1-030
Supply & Install of Precast Concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z2B-HL-PAV3-010
Supply & Placing of Concrete Base for Paving Bands
Project:
U031215-1
Activity:
Z2B-HL-PAV3-020
Supply & Install of Paving Band with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z2B-HL-PAV3-030
Supply & Install of Precast Concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z2B-HL-PAV5-010
Supply & Placing of Concrete Base for Paving Blocks
Project:
U031215-1
Activity:
Z2B-HL-PAV5-020
Supply & Install of Granite Paving Blocks with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z2B-HL-PAV6-010
Supply & Placing of Concrete Base for Paving
Project:
U031215-1
Activity:
Z2B-HL-PAV6-020
Supply & Install of Precast Concrete Paving on Mortar Bed
Project:
U031215-1
Activity:
Z2B-HL-PEB-010
Supply & Lay of Pebble above Geotextile Membrane

Project:
U031215-1
Activity:
Supply & Lay of Gravel
Project:
U031215-1
Activity:
Supply & Lay of Sand Bed
Project:
U031215-1
Activity:
Supply & Install of Interlocking Plastic Grass
Project:
U031215-1
Activity:
Supply & Placing of Concrete Base for Paving
Project:
U031215-1
Activity:
Supply & Install of Stepping Stone with Mortar Bed
Project:
U031215-1
Activity:
Supply & Placing of Reinforced Concrete Structure
Project:
U031215-1
Activity:
Supply & Install of Granite Steps Treads & Risers with Grout
Project:
U031215-1
Activity:
Supply & Placing of Concrete Base for Timber Deck
Project:
U031215-1
Activity:
Supply & Install of Timber Deck
Project:
U031215-1
Activity:
Supply & Install of Wire Trellis
Project:
U031215-1
Activity:
Handing Over and Access to Zone 2B
Project:
U031215-1
Activity:
Setting Out of Irrigation Mainline
Project:
U031215-1
Activity:
Excavation of Irrigation Mainline Trench
Project:
U031215-1
Activity:
Supply & Laying of Irrigation Mainline Pipes
Project:
U031215-1
Activity:
Pressure Test for Irrigation Mainline
Project:
U031215-1
Activity:
Excavation of Irrigation Lateral line Trench
Project:
U031215-1
Activity:
Supply & Laying of Lateral Lines Pipes
Project:
U031215-1
Activity:
Supply, Laying/Install of Drip, Sprinkler, Valves, Boxes
Project:
U031215-1
Activity:
Excavation of Palm & Tree Pits
Project:
U031215-1
Activity:
Supply & Fill of Planting Medium
Project:
U031215-1
Activity:
upply & Install of Palms, Trees, Shrubs, G.C, Grass, ...
Project:
U031215-1
Activity:
Allow Provisional Sum for Electrical Works -phase 1
Project:
U031215-1
Activity:
Allow Provisional Sum for Electrical Works -phase 2
Project:
U031215-1
Activity:
Allow Provisional Sum for Electrical Works -phase 3
Project:
U031215-1
Activity:
Supply & Lay of Gravel above Geotextile Membrane
Project:
U031215-1
Activity:
Fill & Compacting of Sub Base Layer
Project:
U031215-1
Activity:
Supply & Install of In-Situ Concrete Paving
Project:
U031215-1
Activity:
Finishing & Preparation of of In-Situ Paving with Grooves
Project:
U031215-1
Activity:
Supply & Install of Mowing Edge with Mortar Bed & Grout
Project:
U031215-1
Activity:
Fill & Compacting of Sub Base Layer for Pedestrain Paving

Z2B-HL-RG-010
Z2B-HL-RG-020
Z2B-HL-RG-030
Z2B-HL-SS-010
Z2B-HL-SS-020
Z2B-HL-STP1-010
Z2B-HL-STP1-020
Z2B-HL-TD-010
Z2B-HL-TD-020
Z2B-HL-WT-010
Z2B-IR-010
Z2B-IR-020
Z2B-IR-030
Z2B-IR-040
Z2B-IR-050
Z2B-IR-060
Z2B-IR-070
Z2B-IR-080
Z2B-SL-010
Z2B-SL-020
Z2B-SL-030
Z3-ELEC-010
Z3-ELEC-10
Z3-ELEC-20
Z3-HL-GRV-010
Z3-HL-INST-010
Z3-HL-INST-020
Z3-HL-INST-030
Z3-HL-MOW-010
Z3-HL-NOD-010

Project:
U031215-1
Activity:
Z3-HL-NOD-020
Supply & Placing of Concrete Base for Vehicular Paving
Project:
U031215-1
Activity:
Z3-HL-NOD-030
Supply & Install of Granite Paving
Project:
U031215-1
Activity:
Z3-HL-NOD-040
Supply & Fill all Joints with Color Matched Grout
Project:
U031215-1
Activity:
Z3-HL-PAV1-010
Supply & Placing of Concrete Base for Paving Band
Project:
U031215-1
Activity:
Z3-HL-PAV1-020
Supply & Install of Paving Band with Mortar Bed
Project:
U031215-1
Activity:
Z3-HL-PAV1-030
Supply & Install of Precast Concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z3-HL-PAV2-010
Supply & Placing of Concrete Base for Paving
Project:
U031215-1
Activity:
Z3-HL-PAV2-020
Supply & Install of Granite Paving on Mortar Bed
Project:
U031215-1
Activity:
Z3-HL-PAV5-010
Supply & Placing of Concrete Base for Paving Blocks
Project:
U031215-1
Activity:
Z3-HL-PAV5-020
Supply & Install of Granite Paving Blocks with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z3-HL-PAV6-010
Supply & Placing of Concrete Base for Paving
Project:
U031215-1
Activity:
Z3-HL-PAV6-020
Supply & Install of Precast Concrete Paving on Mortar Bed
Project:
U031215-1
Activity:
Z3-HL-PAV7-010
Fill & Compacting of Sub Base Layer
Project:
U031215-1
Activity:
Z3-HL-PAV7-020
Supply, Install & Finishing of In-Situ Concrete Paving, Beige Color
Project:
U031215-1
Activity:
Z3-HL-PAV7-030
Supply, Install & Finishing of In-Situ Concrete Paving, Brown Color
Project:
U031215-1
Activity:
Z3-HL-PAV8-010
Supply & Placing of Concrete Base for Paving
Project:
U031215-1
Activity:
Z3-HL-PAV8-020
Supply & Install of Granite Paving with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z3-HL-PEB-010
Supply & Lay of Pebbles above Geotextile Membrane
Project:
U031215-1
Activity:
Z3-HL-RG-010
Supply & Lay of Gravel
Project:
U031215-1
Activity:
Z3-HL-RG-020
Supply & Lay of Sand Bed
Project:
U031215-1
Activity:
Z3-HL-RG-030
Supply & Install of Interlocking Plastic Grass
Project:
U031215-1
Activity:
Z3-HL-SHW1-010
Supply & Placing of Concrete Structure
Project:
U031215-1
Activity:
Z3-HL-SHW1-020
Supply & Install of Shower's Granite Cladding & Coping with Grout
Project:
U031215-1
Activity:
Z3-HL-SHW1-030
Supply & Install of Shower's Timber Deck
Project:
U031215-1
Activity:
Z3-HL-SHW1-040
Supply & Install of Shower's Accessories
Project:
U031215-1
Activity:
Z3-HL-STP1-010
Supply & Placing of Reinforced Concrete Structure
Project:
U031215-1
Activity:
Z3-HL-STP1-020
Supply & Install of Granite Steps Treads & Risers with Grout
Project:
U031215-1
Activity:
Z3-HL-WT-010
Supply & Install of Wire Trellis
Project:
U031215-1
Activity:
Z3-IR-010
Handing Over and Access to Zone 3
Project:
U031215-1
Activity:
Z4-ELEC-010
Allow Provisional Sum for Electrical Works-phase 1

Project:
U031215-1
Activity:
Z4-ELEC-10
Allow Provisional Sum for Electrical Works-phase 2
Project:
U031215-1
Activity:
Z4-ELEC-20
Allow Provisional Sum for Electrical Works-phase 3
Project:
U031215-1
Activity:
Z4-HL-GRV-010
Supply & Lay of Gravel above Geotextile Membrane
Project:
U031215-1
Activity:
Z4-HL-INST-010
Fill & Compacting of Sub Base Layer
Project:
U031215-1
Activity:
Z4-HL-INST-020
Supply & Install of In-Situ Concrete Paving
Project:
U031215-1
Activity:
Z4-HL-INST-030
Finishing & Preparation of of In-Situ Paving with Grooves
Project:
U031215-1
Activity:
Z4-HL-MOW-010
Supply & Install of Mowing Edge with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z4-HL-NOD-010
Fill & Compacting of Sub Base Layer for Pedestrain Paving
Project:
U031215-1
Activity:
Z4-HL-NOD-020
Supply & Placing of Concrete Base for Vehicular Paving
Project:
U031215-1
Activity:
Z4-HL-NOD-030
Supply & Install of Granite Paving
Project:
U031215-1
Activity:
Z4-HL-NOD-040
Supply & Fill all Joints with Color Matched Grout
Project:
U031215-1
Activity:
Z4-HL-PAV1-010
Supply & Placing of Concrete Base for Paving Band
Project:
U031215-1
Activity:
Z4-HL-PAV1-020
Supply & Install of Paving Band with Mortar Bed
Project:
U031215-1
Activity:
Z4-HL-PAV1-030
Supply & Install of Precast Concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z4-HL-PAV3-010
Supply & Placing of Concrete Base for Paving Bands
Project:
U031215-1
Activity:
Z4-HL-PAV3-020
Supply & Install of Paving Band with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z4-HL-PAV3-030
Supply & Install of Precast Concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z4-HL-PAV4-010
Supply & Placing of Concrete Base for Paving Bands
Project:
U031215-1
Activity:
Z4-HL-PAV4-020
Supply & Install of Granite Paving Band with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z4-HL-PAV5-010
Supply & Placing of Concrete Base for Paving Blocks
Project:
U031215-1
Activity:
Z4-HL-PAV5-020
Supply & Install of Granite Paving Blocks with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z4-HL-PAV6-010
Supply & Placing of Concrete Base for Paving
Project:
U031215-1
Activity:
Z4-HL-PAV6-020
Supply & Install of Precast Concrete Paving on Mortar Bed
Project:
U031215-1
Activity:
Z4-HL-PER-020
Supply & Install of Timber Pergola (Post, Beam, Rafter)
Project:
U031215-1
Activity:
Z4-HL-PER-030
Supply & Install of Pergola's Coping
Project:
U031215-1
Activity:
Z4-HL-PER-040
Supply & Apply of Pergola's Render Finish
Project:
U031215-1
Activity:
Z4-HL-RG-010
Supply & Lay of Gravel
Project:
U031215-1
Activity:
Z4-HL-RG-020
Supply & Lay of Sand Bed
Project:
U031215-1
Activity:
Z4-HL-RG-030
Supply & Install of Interlocking Plastic Grass
Project:
U031215-1
Activity:
Z4-HL-SHD-010
Excavation, Leveling & Preparation of Shade area

Project:
U031215-1
Activity:
Supply & Placing of Concrete Foundation
Project:
U031215-1
Activity:
Supply & Install of Shade Structure
Project:
U031215-1
Activity:
Supply & Install of Towel Bar's Paving
Project:
U031215-1
Activity:
Supply & Install of Towel Bar's Coping
Project:
U031215-1
Activity:
Supply & Apply of Towel Bar's Stucco Finish
Project:
U031215-1
Activity:
Supply & Install of Towel Bar's Aluminium Access Door
Project:
U031215-1
Activity:
Supply & Placing of Concrete Foundation & Base
Project:
U031215-1
Activity:
Supply & Install of Masonry Wall
Project:
U031215-1
Activity:
Supply & Install of Shower's Granite Coping
Project:
U031215-1
Activity:
Supply & Install of Shower's Timber Deck
Project:
U031215-1
Activity:
Supply & Apply of Shower Stucco Finish
Project:
U031215-1
Activity:
Supply & Install of Shower's Accessories
Project:
U031215-1
Activity:
Supply & Placing of Concrete Base for Paving
Project:
U031215-1
Activity:
Supply & Install of Stepping Stone with Mortar Bed
Project:
U031215-1
Activity:
Supply & Placing of Reinforced Concrete Structure
Project:
U031215-1
Activity:
Supply & Install of Granite Steps Treads & Risers with Grout
Project:
U031215-1
Activity:
Supply & Placing of Concrete Base for Timber Deck
Project:
U031215-1
Activity:
Supply & Install of Timber Deck
Project:
U031215-1
Activity:
Supply & Install of Wire Trellis
Project:
U031215-1
Activity:
Handing Over and Access to Zone 4
Project:
U031215-1
Activity:
Allow Provisional Sum for Electrical Works -phase 1
Project:
U031215-1
Activity:
Allow Provisional Sum for Electrical Works -phase 2
Project:
U031215-1
Activity:
Allow Provisional Sum for Electrical Works -phase 3
Project:
U031215-1
Activity:
Supply & Lay of Gravel above Geotextile Membrane
Project:
U031215-1
Activity:
Fill & Compacting of Sub Base Layer
Project:
U031215-1
Activity:
Supply & Install of In-Situ Concrete Paving
Project:
U031215-1
Activity:
Finishing & Preparation of of In-Situ Paving with Grooves
Project:
U031215-1
Activity:
Supply & Install of Wall Coping with Color Matched Grout
Project:
U031215-1
Activity:
Supply & Install of Mowing Edge with Mortar Bed & Grout
Project:
U031215-1
Activity:
Fill & Compacting of Sub Base Layer for Pedestrain Paving

Z4-HL-SHD-020
Z4-HL-SHD-030
Z4-HL-SHD-040
Z4-HL-SHD-050
Z4-HL-SHD-060
Z4-HL-SHD-070
Z4-HL-SHW2-010
Z4-HL-SHW2-020
Z4-HL-SHW2-030
Z4-HL-SHW2-040
Z4-HL-SHW2-050
Z4-HL-SHW2-060
Z4-HL-SS-010
Z4-HL-SS-020
Z4-HL-STP1-010
Z4-HL-STP1-020
Z4-HL-TD-010
Z4-HL-TD-020
Z4-HL-WT-010
Z4-IR-010
Z5-ELEC-010
Z5-ELEC-10
Z5-ELEC-20
Z5-HL-GRV-010
Z5-HL-INST-010
Z5-HL-INST-020
Z5-HL-INST-030
Z5-HL-LW-090
Z5-HL-MOW-010
Z5-HL-NOD-010

Project:
U031215-1
Activity:
Z5-HL-NOD-020
Supply & Placing of Concrete Base for Vehicular Paving
Project:
U031215-1
Activity:
Z5-HL-NOD-030
Supply & Install of Granite Paving with Color Matched Grout
Project:
U031215-1
Activity:
Z5-HL-PAV1-010
Supply & Placing of Concrete Base for Paving Band
Project:
U031215-1
Activity:
Z5-HL-PAV1-020
Supply & Install of Paving Band with Mortar Bed
Project:
U031215-1
Activity:
Z5-HL-PAV1-030
Supply & Install of Precast Concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z5-HL-PAV2-010
Supply & Placing of Concrete Base for Paving
Project:
U031215-1
Activity:
Z5-HL-PAV2-020
Supply & Install of Granite Paving on Mortar Bed
Project:
U031215-1
Activity:
Z5-HL-PAV3-010
Supply & Placing of Concrete Base for Paving Bands
Project:
U031215-1
Activity:
Z5-HL-PAV3-020
Supply & Install of Paving Band with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z5-HL-PAV3-030
Supply & Install of Precast Concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z5-HL-PAV4-010
Supply & Placing of Concrete Base for Paving Bands
Project:
U031215-1
Activity:
Z5-HL-PAV4-020
Supply & Install of Granite Paving Band with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z5-HL-PAV5-010
Supply & Placing of Concrete Base for Paving Blocks
Project:
U031215-1
Activity:
Z5-HL-PAV5-020
Supply & Install of Granite Paving Blocks with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z5-HL-SS-010
Supply & Placing of Concrete Base for Paving
Project:
U031215-1
Activity:
Z5-HL-SS-020
Supply & Install of Stepping Stone with Mortar Bed
Project:
U031215-1
Activity:
Z5-HL-STP1-010
Supply & Placing of Reinforced Concrete Structure
Project:
U031215-1
Activity:
Z5-HL-STP1-020
Supply & Install of Granite Steps Treads & Risers with Grout
Project:
U031215-1
Activity:
Z5-HL-WT-010
Supply & Install of Wire Trellis
Project:
U031215-1
Activity:
Z5-IR-010
Handing Over and Access to Zone 5
Project:
U031215-1
Activity:
Z6-ELEC-010
Allow Provisional Sum for Electrical Works -phase 1
Project:
U031215-1
Activity:
Z6-ELEC-10
Allow Provisional Sum for Electrical Works -phase 2
Project:
U031215-1
Activity:
Z6-ELEC-20
Allow Provisional Sum for Electrical Works -phase 3
Project:
U031215-1
Activity:
Z6-HL-GRV-010
Supply & Lay of Gravel above Geotextile Membrane
Project:
U031215-1
Activity:
Z6-HL-GRV-020
Supply & Install of Stepping Block in Gravel Area
Project:
U031215-1
Activity:
Z6-HL-INST-010
Fill & Compacting of Sub Base Layer
Project:
U031215-1
Activity:
Z6-HL-INST-020
Supply & Install of In-Situ Concrete Paving
Project:
U031215-1
Activity:
Z6-HL-INST-030
Finishing & Preparation of of In-Situ Paving with Grooves
Project:
U031215-1
Activity:
Z6-HL-MOW-010
Supply & Install of Mowing Edge with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z6-HL-NOD-010
Supply & Placing of Concrete Base for Vehicular Paving

Project:
U031215-1
Activity:
Z6-HL-NOD-020
Supply & Install of Granite Paving with Color Matched Grout
Project:
U031215-1
Activity:
Z6-HL-NOD-030
Fill & Compacting of Sub Base Layer for Pedestrain Paving
Project:
U031215-1
Activity:
Z6-HL-PAV1-010
Supply & Placing of Concrete Base for Paving Band
Project:
U031215-1
Activity:
Z6-HL-PAV1-020
Supply & Install of Paving Band with Mortar Bed
Project:
U031215-1
Activity:
Z6-HL-PAV1-030
Supply & Install of Precast Concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z6-HL-PAV3-010
Supply & Placing of Concrete Base for Paving Bands
Project:
U031215-1
Activity:
Z6-HL-PAV3-020
Supply & Install of Paving Band with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z6-HL-PAV3-030
Supply & Install of Precast Concrete Paving on Sand Bed
Project:
U031215-1
Activity:
Z6-HL-PAV4-010
Supply & Placing of Concrete Base for Paving Bands
Project:
U031215-1
Activity:
Z6-HL-PAV4-020
Supply & Install of Granite Paving Band with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z6-HL-PAV5-010
Supply & Placing of Concrete Base for Paving Blocks
Project:
U031215-1
Activity:
Z6-HL-PAV5-020
Supply & Install of Granite Paving Blocks with Mortar Bed & Grout
Project:
U031215-1
Activity:
Z6-HL-PER-010
Supply & Install of Timber Pergola (Post, Beam, Rafter)
Project:
U031215-1
Activity:
Z6-HL-PER-020
Supply & Install of Pergola's Coping
Project:
U031215-1
Activity:
Z6-HL-PER-030
Supply & Apply of Pergola's Render Finish
Project:
U031215-1
Activity:
Z6-HL-STP1-010
Supply & Placing of Reinforced Concrete Structure
Project:
U031215-1
Activity:
Z6-HL-STP1-020
Supply & Install of Granite Steps Treads & Risers with Grout
Project:
U031215-1
Activity:
Z6-HL-TD-010
Supply & Placing of Concrete Base for Timber Deck
Project:
U031215-1
Activity:
Z6-HL-TD-020
Supply & Install of Timber Deck
Project:
U031215-1
Activity:
Z6-HL-WT-010
Supply & Install of Wire Trellis
Project:
U031215-1
Activity:
ZOR-ENG-010
Material Submittals
Project:
U031215-1
Activity:
ZOR-ENG-020
Material Approvals
Project:
U031215-1
Activity:
ZOR-FUR-010
Supply & Placing of Pots, Benches, Litter Bin
Project:
U031215-1
Activity:
ZOR-FUR-020
Supply & Install of Handrail
Project:
U031215-1
Activity:
ZOR-FUR-030
Supply & Apply of Wall Render Finish
Project:
U031215-1
Activity:
ZOR-FUR-040
Tree Pit Paving Band
Project:
U031215-1
Activity:
ZOR-PRE.MOB-030
Landscapping works - Prelims
Project:
U031215-1
Activity:
ZOR-PRO-030
Hard Landscape Material Procurements
Project:
U031215-1
Activity:
ZOR-PRO-040
Lighting Material Procurements - By Client
Project:
U031215-1
Activity:
ZOR-SN-010
Snaging Works

Project:
U031215-1
Activity:
ZOR-TC-010
Testing & Commissioning & Authority Inspection- Landscapping works
Activities with unsatisfied constraints..........................11
Project:
U031215-1
Activity:
A17740 Mileston
e 1 : Temporary water, sewage and power connections to permit start-up of wild-a
ir
Project:
U031215-1
Activity:
A17750 Mileston
e 2 : Building fully enclosed, Temporary Water & Power Connections and commencem
ent of Testing & Commissioning
Project:
U031215-1
Activity:
A17760 Mileston
e 3 : Substantial Completion of Back of House of Hotel Basement Areas (as per cl
ient ins without CD and cause &
Project:
U031215-1
Activity:
A18030 Hotel Op
erator on board to start snagging works
Project:
U031215-1
Activity:
AZ1 - MOCK-1310
Final Cleaning, Snagging & Desnagging
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
40
Milestone 4 : Substantial Completion of Main Hotel Buildings
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
50
Project Completion
Project:
U031215-1
Activity:
AZ1-CONS -HOVR-1
60
MEP Works Completion
Project:
U031215-1
Activity:
BOH7805 Waterpro
ofing to wet areas
Project:
U031215-1
Activity:
BOH8025 Waterpro
ofing to wet areas
Project:
U031215-1
Activity:
BOH840 Carpet CPT-1
Activities with unsatisfied relationships........................0
Activities with external dates...................................124
Project:
U031215-1
Activity:
AZ1-CONS -INFRA300
RD-3 : Backfilling up to Formation level - Stage 1
Project:
U031215-1
Activity:
AZ1-CONS -LAND-1
970
Excavation & Levelling up to formation level
Project:
U031215-1
Activity:
AZ1-CONS -LAND-2
250
Excavation & Levelling up to formation level
Project:
U031215-1
Activity:
BOH3170 Cleaning
& snagging
Project:
U031215-1
Activity:
BOH4795 Cleaning
& snagging
Project:
U031215-1
Activity:
BOH4800 Cleaning
& snagging
Project:
U031215-1
Activity:
BOH5155 Cleaning
& snagging
Project:
U031215-1
Activity:
BOH6015 Cleaning
& snagging
Project:
U031215-1
Activity:
BOH6020 Cleaning
& snagging
Project:
U031215-1
Activity:
BOH6025 Cleaning
& snagging
Project:
U031215-1
Activity:
BOH6030 Cleaning
& snagging
Project:
U031215-1
Activity:
BOH6040 Cleaning
& snagging
Project:
U031215-1
Activity:
BOH6045 Cleaning
& snagging
Project:
U031215-1
Activity:
BOH6050 Cleaning

& snagging
Project:

U031215-1

Activity:

BOH6055 Cleaning

Project:

U031215-1

Activity:

BOH6060 Cleaning

Project:

U031215-1

Activity:

BOH6065 Cleaning

Project:

U031215-1

Activity:

BOH6070 Cleaning

Project:

U031215-1

Activity:

BOH6075 Cleaning

Project:

U031215-1

Activity:

BOH6080 Cleaning

Project:

U031215-1

Activity:

BOH6085 Cleaning

Project:

U031215-1

Activity:

BOH6090 Cleaning

Project:

U031215-1

Activity:

BOH6095 Cleaning

Project:

U031215-1

Activity:

BOH6100 Cleaning

Project:

U031215-1

Activity:

BOH6105 Cleaning

Project:

U031215-1

Activity:

BOH6110 Cleaning

Project:

U031215-1

Activity:

BOH6115 Cleaning

Project:

U031215-1

Activity:

BOH6120 Cleaning

Project:

U031215-1

Activity:

BOH6125 Cleaning

Project:

U031215-1

Activity:

BOH6130 Cleaning

Project:

U031215-1

Activity:

BOH6135 Cleaning

Project:

U031215-1

Activity:

BOH6140 Cleaning

Project:

U031215-1

Activity:

BOH6145 Cleaning

Project:

U031215-1

Activity:

BOH6150 Cleaning

Project:

U031215-1

Activity:

BOH6155 Cleaning

Project:

U031215-1

Activity:

BOH6160 Cleaning

Project:

U031215-1

Activity:

BOH6165 Cleaning

Project:

U031215-1

Activity:

BOH6170 Cleaning

Project:

U031215-1

Activity:

BOH6175 Cleaning

Project:

U031215-1

Activity:

BOH6180 Cleaning

Project:

U031215-1

Activity:

BOH6185 Cleaning

Project:

U031215-1

Activity:

BOH6190 Cleaning

Project:

U031215-1

Activity:

BOH6195 Cleaning

Project:

U031215-1

Activity:

BOH6200 Cleaning

& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging

& snagging
Project:

U031215-1

Activity:

BOH6205 Cleaning

Project:

U031215-1

Activity:

BOH6210 Cleaning

Project:

U031215-1

Activity:

BOH6215 Cleaning

Project:

U031215-1

Activity:

BOH6220 Cleaning

Project:

U031215-1

Activity:

BOH6225 Cleaning

Project:

U031215-1

Activity:

BOH6230 Cleaning

Project:

U031215-1

Activity:

BOH6235 Cleaning

Project:

U031215-1

Activity:

BOH6240 Cleaning

Project:

U031215-1

Activity:

BOH6245 Cleaning

Project:

U031215-1

Activity:

BOH6250 Cleaning

Project:

U031215-1

Activity:

BOH6255 Cleaning

Project:

U031215-1

Activity:

BOH6260 Cleaning

Project:

U031215-1

Activity:

BOH6265 Cleaning

Project:

U031215-1

Activity:

BOH6270 Cleaning

Project:

U031215-1

Activity:

BOH6275 Cleaning

Project:

U031215-1

Activity:

BOH6280 Cleaning

Project:

U031215-1

Activity:

BOH6285 Cleaning

Project:

U031215-1

Activity:

BOH6290 Cleaning

Project:

U031215-1

Activity:

BOH6295 Cleaning

Project:

U031215-1

Activity:

BOH6300 Cleaning

Project:

U031215-1

Activity:

BOH6305 Cleaning

Project:

U031215-1

Activity:

BOH6310 Cleaning

Project:

U031215-1

Activity:

BOH6315 Cleaning

Project:

U031215-1

Activity:

BOH6320 Cleaning

Project:

U031215-1

Activity:

BOH6325 Cleaning

Project:

U031215-1

Activity:

BOH6520 Cleaning

Project:

U031215-1

Activity:

BOH6525 Cleaning

Project:

U031215-1

Activity:

BOH6530 Cleaning

Project:

U031215-1

Activity:

BOH6535 Cleaning

Project:

U031215-1

Activity:

BOH6540 Cleaning

& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging

& snagging
Project:

U031215-1

Activity:

BOH6545 Cleaning

Project:

U031215-1

Activity:

BOH6550 Cleaning

Project:

U031215-1

Activity:

BOH6555 Cleaning

Project:

U031215-1

Activity:

BOH6560 Cleaning

Project:

U031215-1

Activity:

BOH6565 Cleaning

Project:

U031215-1

Activity:

BOH6570 Cleaning

Project:

U031215-1

Activity:

BOH6575 Cleaning

Project:

U031215-1

Activity:

BOH6580 Cleaning

Project:

U031215-1

Activity:

BOH6585 Cleaning

Project:

U031215-1

Activity:

BOH6590 Cleaning

Project:

U031215-1

Activity:

BOH6595 Cleaning

Project:

U031215-1

Activity:

BOH6600 Cleaning

Project:

U031215-1

Activity:

BOH6605 Cleaning

Project:

U031215-1

Activity:

BOH6610 Cleaning

Project:

U031215-1

Activity:

BOH6615 Cleaning

Project:

U031215-1

Activity:

BOH6620 Cleaning

Project:

U031215-1

Activity:

BOH6625 Cleaning

Project:

U031215-1

Activity:

BOH6630 Cleaning

Project:

U031215-1

Activity:

BOH6635 Cleaning

Project:

U031215-1

Activity:

BOH6640 Cleaning

Project:

U031215-1

Activity:

BOH6645 Cleaning

Project:

U031215-1

Activity:

BOH6650 Cleaning

Project:

U031215-1

Activity:

BOH6655 Cleaning

Project:

U031215-1

Activity:

BOH6710 Cleaning

Project:

U031215-1

Activity:

BOH6715 Cleaning

Project:

U031215-1

Activity:

BOH6735 Cleaning

Project:

U031215-1

Activity:

BOH6740 Cleaning

Project:

U031215-1

Activity:

BOH6745 Cleaning

Project:

U031215-1

Activity:

BOH6750 Cleaning

Project:

U031215-1

Activity:

BOH6755 Cleaning

& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging

& snagging
Project:

U031215-1

Activity:

BOH6760 Cleaning

Project:

U031215-1

Activity:

BOH6765 Cleaning

Project:

U031215-1

Activity:

BOH6770 Cleaning

Project:

U031215-1

Activity:

BOH6845 Cleaning

Project:

U031215-1

Activity:

BOH6850 Cleaning

Project:

U031215-1

Activity:

BOH6855 Cleaning

Project:

U031215-1

Activity:

BOH6860 Cleaning

Project:

U031215-1

Activity:

BOH6935 Cleaning

Project:

U031215-1

Activity:

BOH6975 Cleaning

Project:

U031215-1

Activity:

BOH7000 Cleaning

Project:

U031215-1

Activity:

BOH7095 Cleaning

Project:

U031215-1

Activity:

BOH7160 Cleaning

Project:

U031215-1

Activity:

BOH7490 Cleaning

Project:

U031215-1

Activity:

BOH7505 Cleaning

Project:

U031215-1

Activity:

BOH7515 Cleaning

Project:

U031215-1

Activity:

BOH7540 Cleaning

Project:

U031215-1

Activity:

BOH7550 Cleaning

Project:

U031215-1

Activity:

BOH7555 Cleaning

Project:

U031215-1

Activity:

BOH7560 Cleaning

Project:

U031215-1

Activity:

BOH7565 Cleaning

& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging
& snagging

You might also like