O & M Manual - Volume 6 - Kotri Barrage PDF

You might also like

Download as pdf
Download as pdf
You are on page 1of 84
-_— = wt [= om s = a & o KOTRIBARRAGE ‘OPERATION AND MAINTENANCE MANUAL VOLUME 6 OPERATION AND MAINTENANCE OF PONTOON, BULKHEAD GATES AND TUG Irrigation and Power Department Government of Sindh APRIL 1999 = a = = see eae eS Se Se SS See ee KOTRI BARRAGE ‘OPERATION AND MAINTENANCE. MANUAL VOLUME 6 OPERATION AND MAINTENANCE OF PONTOON, BULKHEAD GATES AND TUG APRIL, 1999 Prepared by: WSP International ist Pint, Buckingham Gate, Gatwick Aieport, West Sete, RING ONT United Kingdom Tele +4440)1293 aaa Fay: +444()1298 602699 Mip/ nw. ap n.com == See eS Irrigation and Power Department Government of Sindh OPERATION AND MAINTENANCE MANUAL Kotri Barrage Rehabilitation Project ctste SP cnt Ira peed hi mln he cau an igen forthe UX, Rernove caps fn Ht Cte lst water vent pipe an tore aly ekose mater wink ropes which are nigga sprints nd cone thn a he Pt 1 Gite a contol ins 31 the Hud Gate is rtd ete the vert postion by progressive fing. and ‘tng of falls ter conparinnts The requited sequences shown in Table 2510. dhe atin ote Mulksnd Gate at avons sags showin Fig 25, 410 TULRHEAD GATE FILLING SCHEDULE 62° - 68° WITIL 2 NORMAL ARMS TO TURN GATE. FROM HORIZONTAL TO VERTICAL, AND FNTER INTO SLUICEWAY Tos ACTION TANK Ro) TON T | eae Tae Fi Us pol pump aut foi | cu TTP Move Trg. Avs a mopar str, TSP Oper Bs ase aes a sonmlscomec oa reqs en wa CL pug er Tak Tal Us? Pope ai [ite Pape at rit Stan —_| rr peta aw] few Pini se Pump it 7D tied Pgs BU 2 ssreinaien ae oe = =a See eT ee eee eee ACTION "TANK Nor. is Fraps: Soars | tr er ta Noe 1 | Att cu . Fali- Set Au, ou Toi TP ang flog Rips Pave Far |__| keine Pes Note 2 927 Came ere tthe Ui ato Balt gan ase teach rane landed 7 SecFigue 21 TTF to tow an op Tater Beam w jt LPT oF touring nater_1 Pump prtank Noe} TT Secret ate a Dolan Ams 102 —[ Trier Sheena oni top of Catioe W ja touching LTE Fito Tom wa Gs aro Ward | ETT oF np pe Tak Note 3 [FTC imps Rates 234 om ll: Silay wat Gr | rauppee ta Notes 3.48 1S PRI Sietneous aw aw 1 Pung per Tank Notes 3.4.5.6 il Us 2 Punge Nowe 3.4586 BI Fl” Sirus ait ci _ 1 Pan per Ta Nous 34.586 [Ef raUee Pomps os Te] il Sentaneoush aL a Bong Ta Till Us? Fampe Bi Lock on Sie Seal when BG veal Comect restates to Latice Arms to cotet teu Over HLTH LTS See Figo TE | Close Begs Vas 141] Closets Pipe Wark Vales og Vet Cape THT | Mentor Console Gangs readings while BG sn Shiconay Use Hand Pump if esa NOTES 1 Fits 28% of tak efne concent fA tank emyng. This aloe to em the it hee sn ae td » senate SESE SS Se SS eee ews Zs = = 7 a to of the tt pipes are attache o LTH 4 LT3tvouphout the ballstng wisedne fram poston 1 nnd TNS alls for immediate tammng of thes tanks whan eer ‘Cams dems be applied fiom postion 92 util sel is in cota with Scosay lek dae ob LT F's 1 Cranes are ler fer each stage fom position 11 to maintain fad of 7 ¢ on cach rae ‘sm svngs ten 250 mn upto o barrage gate, wok ot at what dat teil sea wl tee to etc with thei eonrte At this post he ide ese ps ut i oat st mad ith the per wall (make se Bg ss ean Shcenay al Lattice Amis ate in contac with LT F's) MAU oir tino amit vrai, 2) WETT ad 13a lt, pop soe water into LTE Gay 25%) Ths il ive I sabe ig eve SS Resant re txpe ales 50 page 32 ASME RNG a Drawdown rao (nthe caal ar honed and all Barrage Gates are open andthe pond reduced ois teal eel of 50.00 f approx be BH already installed in ante bays res spc tert ease 1 rte the psc alo marth oul become etl and it upteam 2 IF fal of alata they’ cauld pose igh ine loads on the conerete of the the BIG are made stable by connecting te topes fom the rear ofthe gate restraint seacture to the ups sonarat spp Beam and are pretension by toque ‘won ost the psa iver lel he ime of Hthead Gate fsa ine Sine the water fos cnt ty ppg at Wate rom ballast tanks whe they are steve the pot ss (tee ha ty be a any patclr te) athe pod gs hs mel pp welt romave te allot water Silay ha the [nurs ne lw al he po eh ae is pp ino the ast aks 9 ital open poe 3 a 3319 : a sn st SuSE a on a GORA SAMA a aaa fe aac ceases i A412 Hulead Gite Eaptving Shed On Fling River Level 62-4 oir RIG TAN Nor oN Gee ee ‘BHC wr Pein AU oy Emp AIL Fees cw Eng BIL cu. Pr Atl a I fms pa. se P ae ou gt aww Be BL Gt Ege BL 7 [ene ma cH | ep Ba Tie wa cH fags au | HG snow apart from LT LT [GE Tite ciane te postion ‘oe: chases operation which should only occur at drawdown, only 1 dsl scr pny ame wl be avaible to cmpty each Bulkhead Gate Pumping shuld omens either eve! races the required positon (lose ton equi with 1 PD Controt Root ensue that he ive eve isnot low oll more than 2 ia advance ofthe BHG bast water PD shuld be vad wel a sane ofthis eguienent asE Se SES SSS ee SS o ose sno — = = SSE Stet Ss SE SSB SS SSeS See 2S oonernvan sar os ata TANK Nes, Enpiy erent OTT Lit co ca eww ry ry a wit Ga. Ba aL om e. aie cw Alt aw ce alt Bue cw cu ove: dr ths peation hil shoul only acne afer desdbu, only dst Proctad pump will be avaiable o fl each Bulead Gate Pumping sould omens in advance ofthe rng rer eel oder to nse hat ll aks ited in ch action are fl by he tne he eer Kev Bas reached he Beg shown the Paste Colin ‘Clos sn is requ with LP D- Control Roor to ena tht he river vei not alle 16 Hse foot of HGH ballast water aterwse a dangerous svation wil scour TP shall he ward welt advance ofthis require PLEASE ReHE 10 FIG 21 Closing» Shiemay with a Maen Gate ‘lesa tthe Geo potion Tale 2310 cones the Ponoon Knuckle ‘oo Cram tht Hoo in st te ope an othe cen hold of he Pond te gags, sing att athe Kick Hon Crane ib a the eontet a tonne cletnce postion etc ere i gat man_ Soe Fig 32 a sass | Swe poos naa oe aa SHALE UE OMT TAN AL {12 Ms ont hotee ow cranes an pe on tRger nck ropes pre scat ‘crane fh Patan to Bulkhead Gate to swing cut Postaon Sponsor Arms ant «ste Dulf Norton jacks ten of sponson bs 300mm. See Fig 22 S48 Slove Poteontulkead Gate wit ito siceway by paying ost anchor topes and ‘stn m moon ropes etl docking ams egaze the Lead Trane Fenders and he Hud Gate etal theses S44 Poet trom Postion i Table 31D vt Bed gate is fly tllasted inthe 18 Hthtc Operation of Siting PLEASE REFER 10 FIGS 2) These operations ar conoled Fem the hydauie console onthe Buihead Gate ‘shich 5 spolied with ndravhe power bv Reeble hoses from quick rlese ‘upg tthe outboard en ofthe Pontoon Starboard Sponson. See Fig S ‘essunseconsle up 19290 har Confirm prestre on console inet pressure we Gl ‘heck he tales 9a ae of poston (12.00 ook) Pil sale fans 2 ad 3 wo ewend seas rams (600 ofeach, pus to retract (12 mone) Check ta gouges G2 and G3 ae charged to 27 bar Rekase ale handle 2 ar ttl 1) Tom sabe hae 5 to 20 oeock, ol fo a minute this wil oc the lock emmove handles tom valves 2 and 3 npeven any tithe operation a i i i I I 0 I I I I I I I i] 1 Fe the passe he acer, a Son om any ofthe pres gauges 2 > lls shoals teow th eating presi of 27 tar, when the ponion| ‘oss moved he pn ma eed to estore psu Remove fckng cap om ae I. hale o 9.0 oeack and operate pump Foleo ase pressive Ths wil ake substatleffor to pm through the Pressure rcing shee To icease press in all etn, by pasing the Presse reduing slbe. tum ai Hold salve 6 clockise (20 o'clock) and yap haa rkese Ine on competion 1) When side ss ve Ben retract pra to movement oath ga, remove oi ‘ark ate anit plo to pesent any wae entering Wt sso that th head Gates satiety seating the suceway remove all ‘nets ten Pontos al Bulkad Gate nds the Ponto Ress wits shook be pretenses tthe torque Figures shonin the abe below “hye mr kel at tie of teionig, See Fig 28 for deta of system TORQUE REQUIRED ry we 2364 268 ms 17 ant uss ae ns dia 2102) “so wt a seers esas = aS SS eS eS See ee ee oe ee a 186 Haw VF NCEA, PLEASE. REFEK 10 F1G 28 Renoing Balk lend Gate From a Shiceway (hes al work on Breage Gate i complete nsue Barage Gateson cer ae aeclsed "hn Potaon to Shvcevay wit tg, manoeuvring a scribed in 234 nse al Poston rating stems a intionl ‘po blthead Gate bs ws salves to oo inerapce with Davaye Gate Neg Poon faa te ngnge docking ams on LF and comme K BC, balls ser es. tage Wie eps and eile hyd pipes rac ding salt eof lr masonry as fk (Ref Fig 59 ay eles ack ras by ting YabeS atlockwise at 1000 o'dlock, ei ine presse is re by Posh vaies 2 and 3 raat ain rams tl side eal ae jst clear of pie Fp tanks im reverse ender fom condition 13 in Table 2310 en the Bullhead ‘oe tats approximate ln above the el, scien for lice docking ams to eae TF hooks Wher tend Gates ear of el once lyric sing seals ‘Welsh bic Cine Fram seuss Bs wncing acho ropes and paying ot com oes Hated Gat proms 28m cee ofthe slucenay anwar weee eee eee -— os ae LOW EWREAGE RMI MENU S11 Mone Hua tater Sirs 2) Costin desing to Coton & " Sore fone fo net SHucenas, checking thal rier depths adoqat Wo eer IG nts codon ter wine ops as Spang Ines and aach hand Ines to latices, leave KO comected Rekase Pontoon Mecring ies an aches and move to nest Slucevay wing the Returning Hlthead Gatto Landing Ate 9) Come detalsting reverse ore to Bat shown Table? 310 t0 Coiion 1 Survex rt eee spsay a8 Paragraph 231 1) Rete wm ep 8 ing nes, tach Ran int aie A Rekeas Ponto mooring tsa anchors andr to slipway with "1 Prop Pvtoon anchor off spss and rum Bulkhead Gate to slipway by versng manocwres ia Pa 2 1 6 ifems 20 € 21 1S ‘Who cng tanks of alt wate i esemil tat al the water i emoved in vi to ave this the filling prosdures must be followed 1 Wher empnga Single Tank a) Use two pps in tandem 1) When low fom at pipe i ees to smal trike rack open river water 1 abet te prae2tnallonto mon in thi condion fr 3 fe ints he shot of ier water inet valve Repel thi proces a numberof tenes This is 2 So operaion BE PATIENT (ae wens eee SS SS ee eo tae tga 29 Commerce aon the“ compartment Fst the bulkead Gate adopes 8 ihe ea nnd the A ie S51 Ste puny ang these copa 1 Whe the am beth tks i edo! to rele shut of bath pugs 41) Reset sahes to operate in tandem to fist one compart aed then te other in the same mame a ese in 1) above st Recovery om tthe Slirmay + Protandn leche + Fog. Roles Gate norma water eves (64 9 1968 RL) + Lange Poot + Leming he Ta A“ Pre anting checks | Check. th posers cto the spay winch, beck the winch il eel (heck he ple. a wl brated ad un ey, (ho the gi wher sy Entre that const erce with al ae Fat Fea tan dit 41 Check the ope protein ensure safety bars rein place 5 Char the ails of bs and obstructions Ensure that conn surfaces with ails ve ie fom al ton i Lower the sipaay tlt the waters elge 7 Chuck the wil a eae Chuck csi sic dasligh to compete the operation © Complete chest of operations eared out and offer to ERUMaspector for stp S72 Lamingand Recovers of Main Gate 1 Aachen ete gm a olkead te . x snistinsanie os Sewreewoo™ = =a wee Sie and le mmr bead Gate ‘one Blea Gate ase lle anchor posts with measured wie ropes 1 Sioul wet spay Walley ensuing that cenaising quis engage tly ‘lc moms before wimcing completly cer af the iver Witt cat of water an emove dan pls to dain love tanks ‘Winco pasn above storage plinth and jack of oly. or TKS ont gcse to jack of on BHG2 pit, ception tlley ‘uk BIKS an yack on ners shown a Fig 33 then ch ove pith for i and ick off PLEASE REFER TO FIG 33 1 cr Poon ase sh: by eserning managers Paragraph 216 item 20, soa 1a secure 2 np cal let ater in bal tanks "over a aoe role erent Prtoon Comes Pntaon to nnch rly anchor posts with measured we ops 5 Cntraise penton in sin 1 Wine ite postin above storage pits and jack ff {antng the Top using a Crane to Lift directly fom te Water 1 sth uy tothe pers ad ly alongside Aa iting sing tthe tg ing points 1 Phaeethe eae eter oth pit th ta i to emai thee) ora fow loader iit sstobe moved 4117 fo fonder it be wed sci the ral othe ar Place the low loader cut sewing distance ofthe crane With a eran apable of iting 30 at $ Sm ‘es i the tg fromthe water above the pe surface and above the ow leader td She the erame wi aa plas th tg it the ctl 1 Scome the tg to the era ater 7 Rome the Mss Sn 1 teamyoot station ai ig sgt tag and unload weng 30 a 5S aes rae "Lot ns rae the i on to timers ee! grou loos eqpment rom th tg to str at lock ll doors an hatches 1 Rn we vss asgnca Sse esese Se eS ST eee ee eee eee eee eS VOLUME 6 SECTION 4 Maintenance Arie ARR GE OR MEAN Hp, Contents 4 Romtine Chests 42 ikea Gates 43 the top 44 Tealley Ries 45 Sinem ae Pe eS Se eee PP ee PS Ss aS os A. HARRAGE RST ANENL Rostin ecks Uh chs are atonal to regula servicing of the ems of equipment sn accndane wth omnes sre yas Nate See pagraph43 for Consumables dts Ponto on Land Assine th mal msiatance procadies ave Ben flowed the flowing checks snl he ard nt Before ae 1 Fda plgs we bon: pes (Check ame work nd poet ey tnd frie © Cho colton tte Check evel of nr iin deste per pc tank ehh attr esting vat eel up i evn pears 1 Check ie evel mtr 7 om pears to checkoprstion of al gts, he compressor andthe pumps nd Indaite per pack Weoolng water not seiable fr the hyaulic power ck take ore met to orth the hada © Movie temporary water supply to ballast pumps, operate pugs, check all ‘shes ae retaking when dosed * "Provide temporary wat supply to hae power pack cooling pimp, operate the power pack and the ning pnp * Wath she power yack rig patel toms hyavically power equipment in turn These tems aft e apa anlnded Check fr leaks Retum equipment tothe stowed potion Inspet th tie felch edn tank sory 12 Chee the tek of ops shale 1 Check all aces corse plac an fastening ae sete 14 Chechen sink te ate et a pe 15 Che all in peste rest and reas 1s Che al ala ter at eset ad undanag 17 Check he seh bord dco sk teenaged u srs a re Be ee Ss See Hawe.Gr ORE MANUAL 1S. Cesk he hte ns fie aid ht amy oto safety eqipcnt presen and severable 1 geet dhs sacra cos el ensue oustanding mancnance and reps fave hoon comet ont 20 Chek thee for al ks are able 21 The extingusers eharged and red or ae 22 Fr hoses ar nore present and sec * tra tempos spp et eooing water comet be mage avaiable thes tasks maybe ‘sete ular th ptoon ha ben hunch. This wil however mean tha here sullbe aca betes amen al tig the pomtoon and BHC to work ‘tes Moon fla the falls cache should be cated out as flows - Dai 1 chek mings 2 Check eetatr fi els and eterno 1 Check ange oe and ad ter in og (ad aught mark at comers) 4 Check forgnsral tinssand Kept onto “shisha” Chua eeaeaterint fr fom dria Weekly 1 Dypaltoutsstonk dp pipes, ot bie water in wel and record nog ‘Ck gator ator cooing water eves and top up if eessary,reord any topping ip nog 1 Cheek gmerater sump ol ees tp ip iFmeesay and rece in og, 41 Check eo evel in powerpack reservar and emer eve in ep oly tp ‘pat thes mor capac than as teen anfred to Bulla Gates, Inset fr damage an ee epee lg nla a “pe danas” report if there no) eck thi aed that ck an sie the amon se in te lag 7 Cc hewn geeratr btn large Chch saage tank a 1 Check anor wie mem gol oer s vonnsnessniew = a oe BS SS eS 2 Se Ss ee eee ee oni RAGE RMT 42 Malkhea Gator AAT Ontant efor ching the fllosng chek 1 Check blast pips fr kaksdamage 2 Chek hae pipes an valves Inspect dai ines 41 Inspect nal ait wor and report epi required Feo nd pgs 6 Inspect eter pit wok an rt gs 2 nsec uber ele and report dang Check hall shocks nd fo opera are ited "Check hat dhe conse are ae itl a the ols ae tight 422 When Anat me atioming Checks Should he Carrind Ou ALS AtMeorings Weekly 1 Chex. eps dans lange rom preins spection 2 Check the mooring cables ate scares have nat en tampered with 3 Examine or lp fit, of any bu op 4d Whe Pace Between Barrage Piers Dri 1 spt el eae ander ep inthe fog eco psteam water elo the BHG an which ballet compartment fil, (heck fram damage and enter ny in the eg (thereon ate one") Check but op oft an gest Chk am sco presse ads enone + Chwc ad cid am gates ap of gate - esterase = 2 EEE BERR ED DBE BS BD 0 q I 1 J orange gee RSE MANUAL ASL On band Asem menace procedures Have buen carted out the fllwing should be are ut bef auching and the est ered inthe ships og. 1 Cluck forester conten and chick pope and ae for damage ‘Check pa work and port any ped ep 4 Check ves of ot baa dre to winch 5 Check enge can tr kts, check tet stamer is ceaned Check eas yen prior unc (Check eel engi and garb. an wine Chock res, shackled ater stores ae stoved Chuck ahr re an ator able is in good eondtion 10 Check a cgi toned ee ore 12 Check eg onan ees 4.11 Whew Afot the Following Checks Should be Carried Out Dri 1 Cst moines 2 Clk engin fit evs an te in ag Check for gue tidins a hep th tg "sipshap 4 Check sty appara isin goad coon and available for use ‘Chk or presen of water in the bles and lg result pp ota eure Aer warm up and before shut down log geabox ol presi, engine al pressure, ns ate emperor che 7 Chol echo Ta et eq 5 Chan ge png nt sein z eset anen @ ase SET I ESBS SP eBeapaea S YAR AARRAGE RAE MANN Weeks 1 Rothe capes 30 mates ofthe tag as et worked ring the eck 2 After ensuring the propels are fee fom obstructions (cluding ropes) rn gat oe rts then ege “send” and "astern aerate totum the ropes 2103 wsoiton each 3 to celte the gear bos Isreal "Note: a nnn cond poses eticen aad ad aster thats forward And reves, ston 4s Conswnabes = iocation Te Ene ‘Sh ita X CF Te sth Sata te Cll Fran te tenes Sil Tels 46 atom Gere Sil RimulaX CF 4 non Uae Pouce Pack | Shs Tele 46 noon Fae Coking Pump | SAE 40 noon Compresicr ‘Sh Crena H68 Pontoon Came Genres SSAC 0-90 EP oon Cane Brake Gear | SAE RD-90 EP Foner tsdaie Coorg Famp_| SAE 40 Peto Wines Geatboe Sil Vite a0 Sigwae Win Sil Tel 6 ies OF fot] Ar Tog Engin arn8s3 sais Pontoon Gscrators | 15793 user | rast (0) ions Peetaon Compete | WD 184 17 ‘Atosoon6 (pees) neas Winch _| WD 1134-17 (eur) Toe Part mer ote hae of nl Tacation | Grease wate Below) ota Cra S| Shel Superga R2 Re Rope Shanes ania EP? Shyway Wonch Rope_| Sh Cardy EP ld owe. Whte pamelor manufac s reels ae wat avaiable, det equivalent outs fom athe rputable spi are equals acceptable 44 Telly ages AS Mer eas meson et 1) Rene al ace ofa and dt 2) Groot a whee AS Stipmay SL Atel pad 1) Charl it and dts ro wan te pert 2) Ads a i lp fF the spay which may interface wih uncreconen syeeione Remove wns at et opts SS ee ee VOLUME 6 SECT! INS Mlustrations ‘mn am —_ 2 Gh an J ORL TIVRRAGE_ DI SENNA ist of Mtrati et Tag Mosoonihend Ga he? Pan Yi on Panton ig Ponon Conta Desk ayost Fie ul Gite ip Sus Gt Side Seal Cont! Console het tas Bot ie Dar of Sina Launching and Recovery Equipment ies! Toc! Recovers Water Levels re 1 Lame & Recovery of Pntan on Say ie IM\ Lavo Saeko Tyn Lt or acing Ponto and Bullead Gates ie 11 onic Recover of tent Cts om Spas oe 1 Shy As fe 1 aang of Shp Fernand Bods og 1S To Late Stns al Cradle ap I fag Ponto Hast Tanks 9 17 Dagens ot Pontoon ln Sater ip 18 Vahe Fons to Fi Balat Tanks ye 1 Nake foetus to Erp Diss Tanks ye 20 Halse GttPomtonn oe oesd GtesPemaan Teg fer Upeing uted Gate ening essen Pes Utiing Pontoon & Top Bost ig 6 Gabe Contd Panel Last oe 38 Hkh Ge Upon Senne oe 28 so Gite Resta Stctre Manseicrng HG frm Shp ito Ree Uti Potaon and Tug Bost Ag 82 Raekle Boom Crane Aine to Cla Gs Main og 8 Bulead Gate 3 Re-Postioning Tolley i : S BLV9_QV3HING/NOOLNOd/ONL a = = oe op, oe, oe, eC: A: Gs Ge: Gs se sa \ t NOOLNOd NO M3IA NWid. wo et 3010" HiON3T wosnous SHOISNING. NWT 4 SCIOSINVIN sv oNh000 vv svrve saHonim waoni-2 i S3HONMA SNRIOOR-Z Taos Suo1vy3N39 vA OO1-<——— | ug wey ee ee ee ee ee ee . - LNOAV] AS30 TOYXLNOD NOOLNOd \ SLV9. GVBHINE ¥ SWUY INBRLNGY ONY TWHYON HUM. Nie musan aA PeSpeHERRE SH PSS S28 S228 8 883 SB SSB eB wee = = = = panen aangs3ee oa | N3QAH - ONL 3HL BEI Se BP USP RP wee eas se me ee ee es = = \ |? IN3WdINOS AYSAOISY GNV. ONIHONMWT AVMENS 40 wwxovid YO YOULL pee ee eee eee ee es ee 4 ST3A31 U3LVM A¥3A0034/9NIHONNWT a ee eo ee ee eee eee ee ‘ AVMdIIS NO NOOLNOd 4O AY3AOO3Y ONY HONNW. Nouvannos 72 HONIM = = 6 oe. eh, ee . . . , 2: ss é ! PUMP UNIT | | | | \ aes | — SACK /CHUNDER | : G | g © ie | LAYOUT i - PONTOON 4 No JACKS/CYLINDERS, JACK /CYUMBERS 12009 LAYOUT 2 - BULKHEAD GATES 6 No JACKS /CYLINDERS LAYOUT OF JACKS/PUMP UNIT FOR JACKING PONTOON AND BULKHEAD GATES Fig 104 \ NO AYMSS NO S3LVO Q¥3HINE 40 AY3A0038 ONY HONAYT MASSON Paeeeaay ij | 4] Be SSeS a2 Sse we we mM em = me = = m= = evo | LNANSONVEYY AVMs be SHINN 39¥U01: NOOINOd \ "194 SauVTIOS ONY ONISION34 AWMdMS 40 INSW3ONVEaY AVMclIIS JO GNA NO NOWLWART3 JNO _Su3ta SSOUDY SITIO TAAL ae we eS. w. ©: SS: SS ss 2 stow J1GvVY9 ANV SONNS ONILIN ONL meee Se RB eRe DP SB Se Se2eese2se veo) ; SANVL ISYTIVE NOOLNOd YO LNOAWT auvasoy = — om =< = oo oo am a oo on oe on on on 2 ol oe a a | \ crvonwvss. = 2 ae oe oe ow Oe we eee eee ee \ Boy «eee SUNVL LSwnve Td OL SNOLWSOd AWA ‘038019 38 01 Sanwa ONINWHGY THY |. 4» N3d0 38 OL NMOHS SAYA THY ‘s 81 “ON INV 9. | LON NVI SL “ON YINYL EL ON YNWL a BeEBe eee me ae Se we ee eS 2 eS 61 oy ~ | SXINVL ISVTVE ALdNg OL SNOLISOd NIWA eo 9M/NOOLNOS/31V9 avaH Ma = : = = eae @Seeeanmwe ewer es 2 2 = f aa ra ; ONIGN3dN Y3L4V 9NL/NOOLNOd/3Lv9 Gv3HING mi 5) @ == | ICr i THOT Sea @eBee i 11 St3ld NS3AL38 YENREING 31V0 OvapDning 4" IVOB ONL NY NOOINOd ONIZMIL me = a LOOAW] TANYd: TOMINOD YOMwaNaS s == meee ewePee ss eS ReSsePBPeesese sz ou FON3NOZS ONIGNFEN avo avaH nina ead Tm 8 am | St3QNNN YNVL ISVTIVE ONIKORS IVS GHIA NO WIA OL3NOS) sa'oom ams i & ON NOILIONOD LON Ni w'913 ‘ (w3411SWMOG ONDIOOT NOUWARTIA) + | AYNLONLS INIVYLSIY alv9 dv3H Ing v9) 3d0y vid wuz a —— i feu |v NL ONY NOOLNOd SNIZIIINA YAR GIN AVKANS HOSS 3iVv9 OVSH)NING_OHIUANSONYH | sse0y vomwy youg ¥3ld AVMs tee SUJON33 Y3ISNVYL GVOT HLIM LOWINOD NI SW8Y ONIMODG NOOLNOd HIIM S3ONZYVIIO GNV dN 13S aNveo WOO JIMONNY (aa ore avo ovatiring ‘OL ~—~__1938H0, Nouganno3 7 — BE ESE we ee eS ST eee eee ee TROLLEY = SP _— aurxneao Oy ae re GATE OM / cocks © TELIA a TS ee ee BULKHEAD |/ See TROLLEY REPOSITIONING BULKHEAD SATE No.3 ON TROLLEY FIG.33 Beam a ke eae eee ee eee eee VOLUME 6 SECTION 6 Supplements to the Volume uae me ee ee ee oe ee el = = OFP RRR GE DRS FA SuaE SUPPLEMENTS 10 VOLUME 6 "4 1-angcoppemens oth slum consiing manufacturer's wformation on operation, 5 puts ai mowtesance fave bean sued single copy ofeach supplement hs been 1 pc a su ome 1 mdi supplements ld he ode for patcular information on ima of Contents 17 PPemtosn Tie aerator Fontoon Wines. Spansoa Tals, Submersible Pampa, Buows, Fenders Ropes. Cas and Shackles Tone Vik, Swatches Antes and Nrarliancos Pts | Peiteon Gane aes rowan Trae Power Pack ~[ Blips Winch and iene Tacks for Nav dstning Spas Del Oo Tontoon A Conpiesor and Pontoon Motor Conal Cre ‘Tog Namiance ‘Spate Pap snd BVIG Th dais, Seals and Wahes ie trains Gan iy 7 “Tig Engine ipa) him da et acer loels INSPECTION NO: 9 ‘sheet of3 SUD-REGULATORS (OLD PULELD GATES Gate Nos Tatistct [Unsatis- | Irunsalisfactory, nature and location of cory [factory | defect (See sheets 2 and 3 for location reference) PRINTED SURFACES - UPPERLEAF ‘Upateam Face of Skinpate ‘Downieam Face ‘Stanpate oraontal Gide ‘Verieal Gees ‘Ailaiarsaraces ROLLERS UPPER LEAF ‘ila Ralls Rote Freely “Aid Ralls Fee of ‘ior wae ROLLER TRACK - LOWER LEAF Tat Free of Wear Tight Free of Wear ‘This inspection i to be cried out in cordance with guidance notes in Seton I and 2 of Volume 3 nd elauses 33, 3,5 and 3.7 of Volume Signature of Lnpector Countrsignes \P meRATIONAL (a = = saa Bs ee 2 = = = = = INSPECTION NO: 9 Sheet | of3 SUB-REGULATORS (OLD FULELI) GATES Gate Not ‘Sata | Uasat sory | factory “Tunsatntactory, nature and Weston of ‘defect (See phosts 2 and 3 for location reference) PRINTED SURFACES- UPPER LEAF Tpateam Face of Skinpate Downstream Face of ‘Stanpate lorena Gide Verial Gide “Ailetar oars ROLLERS UPPER LEAF ‘Ala Rolie Roe Freely ‘ila Relies Fes of Wear ‘FAINTED SURFACES - LOWER LEAF Upaveam Face of Skingate Dowaateam Face of Stinplate oszaatal Gade Vertical Oia ‘Aoi sarees ‘ROLLER TRACK- LOWER LEAF Tai Fee of War Tight, Free of Wear “This inspection ito be aed out in accordance with guidance nots in Seton I and 2 of Volume 3 snd elasee 3.3, 3,5 2083.7 of Volume Signature of lspector faa Countersignet $s a Sg Sn gS SER SSE SR TS INSPECTION NO: $ Sheet of3 HEAD REGULATOR GATES Gate Ne Tasted] Unsats | Mrunsatifactory, natore and leat Se | factory __| (See Shest for reference location) PAINTED SURFACES Upsteam Fase of Shinpate Downeveam Face of Slenplate Guter UE Gir Grae Te Gader a Guar 5 End Gre End Cader CE. “i oar wares SEATS ae Sa Tide Sad HL Bot Seal ‘Top Sead BOLT IN PARTS i ‘ating Angi fr Side Seale ROLLERS “Aig Roliew Rote Freely ‘Al 8 Raliew Fee of ‘Wear “This ingpection eto be eared usin cordance wih guidance notes in Seton | and of Vane 3 tod elaees 3,35, 36,3.7 nd 8 of Volume & Signature of Inspector a Dit nnn CCountssigned| saves Date oe ee, eee, eee = = om oannage oa MAA INSPECTION NO: 5 Sheet of3 HEAD REGULATOR GATES cae Ne Satta | Oneate= ry | face (See Shest for reference lation Tiumeatisaetory, satare and lesion of deft a) PAINTED SURFACES ‘Dpaeam Feo? Skinlate ‘Bownsteam Fase of ‘Slinaate ‘Gade UT Gade Gere Gaara Geer Te Fad Gadar Ri End Gader DH, ‘Ate arces SEALS Side Seal LE Tide Seal CT Bot Sal ‘Top Sad ‘BUILTIN FARTS ail ‘Mang Anal or Side Seals ‘ROLLERS “Rie Roliew Rowe Feely Al Rolls Fee of West “This inepecion is tobe cad out in acordance with guidance note in Section and 2 of Volume 3 tnd eauoes 93,35, 36,37 and 3.8 of Volume 6 Signature of lopector i ‘Countersigned| estes

You might also like