The document calculates the materials required to make concrete beams for an experiment with 6 specimens. It determines that 142.5kg of cement is needed without phosphogypsum replacement and that adding 10% phosphogypsum would use 22.5kg of cement and 7.5kg of phosphogypsum per beam. In total, 668.64kg of cement and 49.5kg of phosphogypsum would be required.
The document calculates the materials required to make concrete beams for an experiment with 6 specimens. It determines that 142.5kg of cement is needed without phosphogypsum replacement and that adding 10% phosphogypsum would use 22.5kg of cement and 7.5kg of phosphogypsum per beam. In total, 668.64kg of cement and 49.5kg of phosphogypsum would be required.
The document calculates the materials required to make concrete beams for an experiment with 6 specimens. It determines that 142.5kg of cement is needed without phosphogypsum replacement and that adding 10% phosphogypsum would use 22.5kg of cement and 7.5kg of phosphogypsum per beam. In total, 668.64kg of cement and 49.5kg of phosphogypsum would be required.
Volume of concrete obtained per z gram=(1/3.14)+(1.5/2.65)+(3/2.65)+(0.5/1)=2.52
Weight of cement required for 1 concrete beam=63000/2.52=25kg Weight of cement required for 1 concrete beam with 10% phosphogypsum=25-.1x25 =22.5kg Total weight of cement required for 6 specimens=142.5kg Weight of phosphogypsum required for 10% cement replacement=10% x25=2.5kg Weight of phosphogypsum required for 6 specimens=7.5kg Result Total weight of cement required=668.64kg Total weight of phosphogypsum % cement