Daily Progress Report: Activity Break Down (Hours Decimalized) Mobilization Sail To Site
Daily Progress Report: Activity Break Down (Hours Decimalized) Mobilization Sail To Site
CLIENT:
ADMA-OPCO
CONTRACT NO.:
167168
FIELD :
ZAKUM FIELD
LOCATION :
PL 13
OPERATION MODE:
CLIENT REPRESENTATIVES
BESHAY HOSSAM
ADMA REP.
DEVENDER SUTRAVE
ADMA HSE
AHMED ASHRAF
ADMA HSE
INSPECTO
DEWAKAR PANDEY
SRINIVAS
PERSONNEL MOVEMENT
CO.
DEPARTURE
CO.
NAME
SEA CONQUEST
GRAND TOTAL
HEALTH, SAFETY AND ENVIRONMENT STATISTICS
DESCRIPTION
NPCC
CLIENT
S/CONT. VESSELS TODAY
FATALITY (FA)
0
0
0
0
0
LOST TIME INJURY/INCIDENT (LTI)
0
0
0
0
0
MANHOURS
336
60
0
288
684
NO. OF MANHOURS SINCE LAST LTI (NPCC)
3648
636
0
2832
7116
MARINE INCIDENT
0
0
0
0
0
PROPERTY DAMAGE (PD)
0
0
0
0
0
BEHAVIORAL SAFETY AUDIT
0
0
0
0
0
SAFETY TRAINING
0
0
0
0
0
RESTRICTED WORKDAY CASE (RWDC)
0
0
0
0
0
MEDICAL TREATMENT CASE (MTC)
0
0
0
0
0
FIRST AID CASE (FAC)
0
0
0
0
0
NEAR MISS
0
0
0
0
0
UNSAFE / SUBSTANDARD ACT
0
0
0
0
0
UNSAFE / SUBSTANDARD CONDITION
0
0
0
0
0
OCCUPATIONAL ILLNESS
0
0
0
0
0
HIP MEETING (DAILY)
2
0
0
4
6
HSE COMM. MEETING
0
0
0
0
0
GENERAL HSE MEETING
0
0
0
0
0
DRILLS (ABANDON/FIRE/MOB/H2S/MED/DIVI
0
0
0
0
0
RISK ASSESSMENT (RA) MEETING / JSA
0
1
0
0
1
PERMIT TO WORK (PTW) MEETING /AUDITS
0
0
0
0
0
HSE TRAINING / INDUCTIONS
0
0
0
2
2
HSE INSPECTION (MONTHLY) / AUDITS
0
0
0
0
0
OCCUPATIONAL HEALTH / HYGIENE INSP.
0
0
0
0
0
DCM
0
0
0
0
0
TODATE
0
0
24528
615976
0
3
187
8
0
0
1
1
67
141
0
4858
0
25
123
18
8
255
98
81
169
TIME
MOBILIZATIO
SAIL TO SITE
IN FIELD MOV
BUNKERING&
TRANSFER PA
PREPARTORY
BALANCE WO
J-TUBE REPLAC
F/S C, SLEEPE
F/SPAN CORR
F/SPAN CORR
CABLE STABIL
BUOY CONNEC
SUBSEA RECO
F/SPAN CORR
F/SPAN CORR
CLEAR COMPO
AME/EUR
T.C.N
BARGE SUPD'T
HOOK-UP SUPD'T
FIELD ENGINEER
F/SPAN CORR
ARAB
AME/EUR
T.C.N
F/SPAN CORR
H. D CRANE OPTR
F/SPAN CORR
L. D CRANE OPTR
F/SPAN CORR
E&I
F/SPAN CORR
BARGE FOREMAN
PAITNING SUPV.
SLEEPERS SH
QC INSPECTOR
PAINTING C/H
NDT TECH
PAINTER/BLASTER
DIVE MONITO
CHIEF CLERK
SURVEY .
SURVEY ENGINEER
F/SPAN CORR
CH.WAREHOUSEMAN
CHIEF MECHANIC
DIVING WOR
WAREHOUSEMAN
MECHANIC
MEDIC
MASTER. ELECT
DEMOBILIZAT
LPO
C/H ELECTRICIAN
VESSEL CHAN
ELECTRICIAN
INSTALLATION
OILER
INSTALLATION
SAFETY OFFICER
MARINE RIGGER
F/SPAN CORR
F/SPAN CORR
FABRICATION F/M.
PLANT CLERK
SURVEY FIELD
FABRICATION C/H
MACHINIST
ASSIST M/V S
FABRICATOR
ELECTRONIC TECH.
DEMOBILIZAT
FITTER
CHIEF ELECTRICIAN
CO-ORDINATOR
DIVING SUPDT
DIVING SUPV
GROUT RIGGER
DIVER
DIVER - DMT
DELAYS
LEAD DIVER
COMPANY CAU
WAITING ON P
WELDING FOREMAN
WAITING ON W
WELDING C/H
WAITING ON D
WELDER STR.
WAITING FOR
WELDER TIG
WAITING FOR
RIGGING F/M
RIGGING C/H
RIGGER
WAITING ON Z
WAITING ON
SCAFFOLDING FM
OTHER DELAY
MECHANICAL
SCAFFOLDER
OTHER DELAY
WAITING ON W
WAITING ON D
SUB-TOTAL
11
14
MECHANICAL
DOWNTIME O
TOTAL NPCC
28
DISTRIBUTION
ORIG.
COPY
COPY
PMT
CLIENT
VESSEL
NO.
5
28
VESSEL CREW
NO.
HEAVY FUEL
FUEL
REC'D
STOCK
18
CON'D
CON'D
OIS
GLOBAL MARITIME
DEL'D
DEL'D
MUTAWA
REC'D
REC'D
TOTAL POB :
SIGNATURE
NAME
COMPANY
COMPANY
VESSEL CATERING
SEA CONQUEST
CONSUMABLES
(USG)
57
BAL
BAL
DPR NO.
190
VESSEL
SEA CONQUEST
DATE
24-Jun-2016
SHEET
INSPECTORS
ADMA QC
ADMA QC
NAME
WEATHER
BARO
WIND SPEED (kts)
SEA SWELL (ft)
DIRECTION
TYPE
DP
GRAND TOTAL
REV. 0
MARINE SPREAD
POB
57
1 of 2
1200
5-12
2-5
NW-NE
2400
5-12
2-5
NW-NE
LOCATION
57
MARINE SPREAD & HELICOPTER MOVEMENT
DESCRIPTION
NIL
ACTIVITY BREAK DOWN (HOURS DECIMALIZED)
MOBILIZATION
SAIL TO SITE
IN FIELD MOVEMENT AND SETTING UP ON LOCATIONS
BUNKERING&TRANSFER PROVISION/MATERIAL OUTSIDE FIELD
TRANSFER PASSENGER
PREPARTORY WORKS FOR GROUTING ACTIVITIES
BALANCE WORK ON ZK-276
J-TUBE REPLACEMENT AND INSTALLATION AT ZWSC-BST-S1
PL1 FJC RECTIFICATION
BELL MOUTH SEAL RECTIFICATION AT ZK-2
F/SPAN CORRECTION, CR GB AND SLEEPER TIE DOWN AT PL35
F/SPAN CORRECTION AND GROUT BAG INSTALLATION AT PL23
F/SPAN CORRECTION AND GROUT BAG INSTALLATION AT PL22
F/SPAN CORRECTION AND GROUT BAG INSTALLATION AT PL41
F/S C, SLEEPER TIE DOWN AND GB INSTALLATION AT PL42
F/SPAN CORRECTION AND GROUT BAG INSTALLATION AT PL12
F/SPAN CORRECTION AND GROUT BAG INSTALLATION AT PL11
CABLE STABILIZATION
BUOY CONNECTION AT ZWSC LOCATION
SUBSEA RECOVERY OF DAMAGED CABLE ZWSC TO ZK-19A
F/SPAN CORRECTION, CR GB AND SLEEPER TIE DOWN AT PL14
F/SPAN CORRECTION, CR GB AT PL15
CLEAR COMPOSITE CABLE LAYING PUNCH LIST
F/SPAN CORRECTION AND GROUT BAG INSTALLATION AT PL09
F/SPAN CORRECTION AND GROUT BAG INSTALLATION AT PL08
F/SPAN CORRECTION AND GROUT BAG INSTALLATION AT PL10
F/SPAN CORRECTION AND GROUT BAG INSTALLATION AT PL13
F/SPAN CORRECTION AND GROUT BAG INSTALLATION AT PL19
TODAY
TODATE
1.50
9.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
165.50
93.05
116.67
156.55
3.00
9.50
14.50
0.00
8.00
2.50
34.50
93.50
17.00
35.00
83.50
5.50
95.11
81.25
8.25
125.75
102.75
16.25
35.87
42.25
57.25
22.47
277.50
111.30
0.00
0.00
0.00
0.00
0.00
7.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
152.80
7.30
10.00
42.35
150.50
10.50
8.00
65.00
46.00
169.00
100.50
3.00
11.50
17.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
5.80
0.00
1487.15
99.50
6.50
0.00
233.08
6.00
43.50
3.00
9.00
2.50
0.00
13.50
0.00
36.75
0.00
6.00
24.00
4560.00
DELAYS
COMPANY CAUSED DELAY (ADMA)
WAITING ON PERMIT
WAITING ON WEATHER/CURRENT/STRONG CURRENT
WAITING ON DAY LIGHT
WAITING FOR NIGHT WORK DISPENSATION
WAITING FOR NEXT SHIFT (BURNT ALL DIVERS)
WAITING ON ZAKHER MARINE (MECHANICAL BREAK DOWN)
WAITING ON ZAKHER MARINE (UNAVAILABILITY OF OPTIMA/OTHERS )
OTHER DELAY (SUPPLY BOAT, MATERIAL & PERSONNEL)
MECHANICAL BREAK DOWN (GROUTING PUMP)
OTHER DELAY (TRAFFIC BOAT AT ZK22)
TOTAL
STORES (DHS)
FUEL
FRESH WATER
LUB. OIL
37,776
STOCK
83,742
STOCK
1,321
CON'D
4,227
CON'D
36,455
MICO
DEL'D
REC'D
REC'D
BAL
79,515
BAL
BESHAY HOSSAM
ADMA-REP
TODAY
TODATE
0.00
ZAKUM FIELD
LOCATION :
PL 13
OPERATION MODE:
TIME
LOG OF EVENTS
0000-0130
0130-0915
0915-1030
1030-1200
1200-1300
1300-1600
DIVER RECOVERED THE HALF SHELL PIPELINE PROTECTION FROM SEA BED AT KUDETA LO
1600-1700
1700-1800
DIVING TEAM AT SEP 450 FOR SAFETY MEETING FOR INSTALLING HALF SHELL PIPELINE P
1800-2400
1800-1900
1900-2400
HSE ACTIVITIES
1. ATTENDED HIP MEETING WITH THE WORKFORCE.
2. MONITORED LIFTING ACTIVITIES ON DECK.
AREA OF CONCERN
NIL
CORRECTIVE ACTION REQUIRED
NIL
CLIENT COMMENTS
26-Jun-2016
27-Jun-2016
SIGNATURE
NAME
COMPANY
S REPORT
DPR NO.
VESSEL
DE ZAKUM FIELD
OR
DATE
SHEET
190
REV. : 0
SEA CONQUEST
24-Jun-2016
2 of2
A OF CONCERN
VE ACTION REQUIRED
NT COMMENTS
BESHAY HOSSAM
ADMA-REP