PURCHASE DIVISION

DEPARTMENT QUALITY MANUAL


Revision No. :
02
Dt of Revision : 12.9.2012

Section
Topic

Issue No:
Issue Dt.
Page No.
Issued by
Document

: 0
: FORMAT 6 OF PROCUREMENT PROCEDURE OF CPRI (NON-WORKS)

: 2
: 30.06.2003
: 10 OF 19
: QA
: DQM-01

FORMAT NO.:PUR/TENDDOC/P10/06
CPRI
www.tenderwizard.com/CPRI
Section II -Technical Specification
Tender Enquery No : PUR/DMD-09/15-16
Name of the Equipment: Automatic Electric Strength (BDV) measuring equipment.
Note :The Offers should be submitted only in this format otherwise the offer will be liable for rejection. A detailed technical
catalogue/literature/phamplet and any other technical details shall be sent in hard copy in a sealed cover superscribing enquiry number and due date
so as to reach the following address within the due date and time. This is very much essential to evaluate your offer.

Sl.No.

Parameters

Name of the Vendor


Offer Number and Date
CPRI Specification/Requirements

Quantity

1 Place where
1. DMD, CPRI, Bengaluru
equipment to be 2. RTL, CPRI, Noida
supplied
3. STDS, CPRI, Bhopal
4. UHVRL, CPRI, Hyderabad
5. RTL, CPRI, Kolkatta
6. RTL, CPRI, Guwahati
2 Scope
Supply, Installation and Training

3 Nos
2 Nos
1 No
1 No
1 No
1 No

MTEKPRO TECHNOLOGIES PVT LTD


ET1601036
To be completed by the Bidder
Guaranteed Technical
Deviation/Remark
Particulars
s Specify if any
(GTP)

COMPLIED

COMPLIED

Page 1 of 7

Name of the Vendor


Offer Number and Date
Sl.No. Parameters CPRI Specification/Requirements
Quantity
3 Scope of Supply The equipment supplied should be capable of determining the
breakdown voltage at power frequency for insulating liquids as
per IEC 60156, IS 6792 and other relevant applicable standards.
The equipment should have a) Voltage regulator b) step-up
transformer c) Switching system d) Energy limiting devices for
measuring breakdown voltage at power frequency for insulating
liquids . The test cell supplied with the equipment shall strickly
conform to IEC 60156 / IS 6792 standard specifications.
4 Voltage
regulator and
Application
Voltage

MTEKPRO TECHNOLOGIES PVT LTD


ET1601036
To be completed by the Bidder
COMPLIED

COMPLIED

Output voltage is
regulated and
controlled overvoltage dividerat
the output

The test voltage should be obtained by using a step-up


transformer supplied from an AC voltage source ( 48 Hz to 62
Hz).

COMPLIED

47 Hz - 63 Hz

The variable low- voltage source shall be capable of varying the


test voltage smoothly uniformly and without overshoots or
transients. Incremental increase by the variable auto
transformer shall not exceed 2% of the expected breakdown
voltage.

COMPLIED

The voltage applied to the electrodes of the liquid filled cell shall
have an approximately sinusoidal waveform, with peak factor of
1.41 0.07 . The waveform shall be demonstrated at the time
of installation and commissioning using necessary display
devices.

COMPLIED

Output Voltage : 0 - 100 kV or more ,


Resolution: 0.1 kV over full range.
The voltage increase rate should range from 0.5 kV/s to 6
kV/sec or more with provision for user selection of rate in the
above range, until breakdown occurs

COMPLIED

Page 2 of 7

i) If it is needed to
display the
waveform at the
commissioning of
the unit we need
to use VT 100
100 kV
0.5 kV/s - 10 kV/s

Sl.No. Parameters
5 Short circuit
current
requirement

Name of the Vendor


Offer Number and Date
CPRI Specification/Requirements
The short -circuit current of the transformer and associated
circuits shall be within the range of 10mA to 25 mA for all
voltage higher than 15 kV. This is required to protect the
equipment and to avoid excessive decomposition of the
insulating liquid at the instant of breakdown.

6 Switching
System
requirements

The primary circuit of the step-up transformer shall be fitted


with a circuit breaker operated by the current resulting from
the breakdown of the sample, and shall, break the voltage
within 10ms.

7 Automation

a) Shall have provision to select different test methods such as


IEC, ASTM, IS, ISO
b) Shall automatically conduct the test as per selected test
method, record six breakdown readings, mean and the standard
deviation
c) shall have provision to set the stirr time and stand by time
between two breakdown measurements
d) shall have the provision to enter the i) Sample ID; ii) Date of
Test; iii) Operators name ; iv) Ambient temperature and
Humidity
e) Shall have the provision to export the result to LIMS and any
other data transfer modes
f) Test should be carried out automatically and the test
readings should be displayed in LCD display.
g) Inbuilt printer should be provided for printing test results.
h)The equipment should have sturdy and reliable stirror for
homogenizing the sample.

Page 3 of 7

Quantity

MTEKPRO TECHNOLOGIES PVT LTD


ET1601036
To be completed by the Bidder

COMPLIED

COMPLIED

COMPLIED

<5 us

Sl.No. Parameters
8 Selectable
programs

9 Quantity of
sample

10 Electrode
requirements

Name of the Vendor


Offer Number and Date
CPRI Specification/Requirements
Quantity
Equipment should have inbuilt programs for conducting tests
as per pre-programmed standards ( IEC 60156, ASTM D 1816,
ASTM D 877, AS 1767.2.1 VDE-0370,CSSR RVHA,IRAM 2341, JIS
C2101 ) and should also have the provision for creating custom
made programs.
The volume of test cell should be between 300 ml to 600 ml.
The cell should be made of materials that is electrically
insulating, transparent and chemically inert, e.g. glass, resistant
to all types of insulating liquid ( such as mineral oil, synthetic
ester, natural esters, silicone oils) and the cleaning agents
which may be used.
a) The electrodes shall be made either of brass, or austenitic
stainless steel (316 or 304 grade). They shall be polished and in
shape either spherical 12.5 mm to 13 mm dia as shown in figure
1 of Annexure B.
b) Gap setting gauges of 1/2/2.5/2.54/4/5 mm shall be
supplied along with the equipment for precise setting of the
electrode gap with calibration certificate from an ISO/IEC
17025 accredited laboratory

11 Repeatability
Repeatability and Reproducibility clause to meet the
and
requirements of all applicable national and international
reproducibility standards

Page 4 of 7

MTEKPRO TECHNOLOGIES PVT LTD


ET1601036
To be completed by the Bidder

COMPLIED

COMPLIED

COMPLIED

COMPLIED

Gauges for gap


besides 2.5 mm
are optional

Sl.No. Parameters
12 Calibrator

Name of the Vendor


Offer Number and Date
CPRI Specification/Requirements
Suitable calibrated reference cell as per the above standards/
test methods with calibration certificate from ISO 17025
accredited calibration laboratory shall be supplied with
equipment for carrying out internal calibration

13 Mandatory
Spares

All required mandatory spars for trouble free operation for a


period of 3 years shall be quoted and supplied with the
equipment

14 Optional
Requirements

a) Shall have Reliable and heavy duty door closure for the cell
compartment
b) Shall have Provision for Automatic draining and loading of
the sample to test cell
c) Shall have provision for increasing the current limiting value
using user selection modes during specific works like
calibration and testing of samples with higher leakage current

15 Power supply
16 Environmental
conditions
17 Scope of
purchase
18 Warranty

Extended
Warranty

GENERAL REQUIREMENTS
Power supply requirement: 230 10 % V AC , 50 5 % Hz
The equipment should effectively function from ambient
temperature to 50C & RH between 10 - 90 %
Supply, Installation and Commissioning at CPRI- Bangalore and
at other identified units of CPRI
Warranty for 1 year from the date of Successful installation,
commissioning and performation demonstration of equipment
at CPRI
Extended warranty for a period of 3 years after completion of
the Initial warranty period

Page 5 of 7

Quantity

MTEKPRO TECHNOLOGIES PVT LTD


ET1601036
To be completed by the Bidder

COMPLIED

Included

COMPLIED

COMPLIED

COMPLIED
COMPLIED
COMPLIED
COMPLIED
COMPLIED
COMPLIED

a) Complied
b) Cell is filled
manually
ii) Changing of
current threshold
is not needed for
calibration

Sl.No. Parameters
19 Instruction
Manual
20 Personnel
Training

Name of the Vendor


Offer Number and Date
CPRI Specification/Requirements
2 Nos of Detailed Operation and Maintenance Instruction
manual sahll be provided with each equipment
Training for 2 Officers of CPRI on operation & maintenance of
equipment at CPRI, Bengaluru and its Units

21 Installation
infrastructure
22 Documentary
evidence

Pre-installation requirements have to be mentioned with the


offer.
Compliance of the specification should be supported by
documentary evidence such as product catalogues /
application notes.
23 Deviations
Deviations if any from the specifications given above which
provides improvement in the functioning of the above
item/equipment shall be clearly brought out with their
advantages.
24 Additional
Any additional features other than the above may be brought
features
out clearly.
25 Earlier Supply A list of customers ( with details like name of contact person,
details
address, phone No.) to whom similar systems were supplied
may be furnished.
26 Demonstration The vendor shall make detailed demonstration of the system
offered at CPRI Bangalore, during tender evaluation, if
required.
27 Working
Vendor shall arrange for demonstration of the system offered
Demonstration prior to technical evaluation.
28 Spares

Should ensure supply of spares for at least 7 years.


ANNEXURE B

Page 6 of 7

Quantity

MTEKPRO TECHNOLOGIES PVT LTD


ET1601036
To be completed by the Bidder
COMPLIED

COMPLIED
COMPLIED
COMPLIED

COMPLIED

COMPLIED
COMPLIED

COMPLIED

COMPLIED
COMPLIED

On additional
charges

Sl.No.

Parameters

Name of the Vendor


Offer Number and Date
CPRI Specification/Requirements

Quantity

MTEKPRO TECHNOLOGIES PVT LTD


ET1601036
To be completed by the Bidder

COMPLIED

PN : 1. A detailed technical catalogue/literature/phamplet and any other technical details shall be sent in hard copy in a sealed cover super scribing tender enquiry number and due
date so as to reach the following address within the due date and time. This is very much essential to evaluate your offer.
2. Letter of authorization issued by the foreign Principal shall also be sent by the Indian agents who have offered on behalf of their Principals.

Address : Joint Director (Purchase)


Central Power Research Institute,
Sir C,V.Raman Road, P.B.No.8066,
BANGALORE-560 080.
PH. No.080-23602919/23602829. Extn: 2271/2274.
Fax : 080 - 2360 4446