Professional Documents
Culture Documents
Process Industry Practices Civil: CVC01017 Plant Site Data Sheet
Process Industry Practices Civil: CVC01017 Plant Site Data Sheet
Process Industry Practices Civil: CVC01017 Plant Site Data Sheet
CVC01017
Plant Site Data Sheet
CVC01017
Plant Site Data Sheet
(Refer to PIP CVC01016)
Page 1 of 4
March 2000
Owners Name:
Plant Site Name and Location (City, State, Country):
Units:
U.S. Customary
SI
(This will apply to all units throughout this document.)
Building Code
Design at this plant site shall be in accordance with the following building code(s):
(check)
Phone:
NPDES (Storm Water Pollution Prevention Plan) Governing Authority, Name, Address, and Phone:
No
CVC01017
Plant Site Data Sheet
(Refer to PIP CVC01016)
Page 2 of 4
March 2000
NAD 27 or
NAD 83
ft (m) =
deg.
(latitude),
(longitude) based on
the
coordinate system
Wind Direction
Prevailing wind direction
true north or
NE
%
E
%
SE
%
SW
NW
plant north
Temperature
Highest max. temperature:
F (C)
Summer:
F (C)
Summer:
F (C)
Relative humidity:
Summer:
Source:
Owner
ASHRAE
Rainfall
Design rainfall intensity:
Winter:
F (C)
Winter:
Other
inch/hr (mm/hr), based on a
min. rainfall
- year storm
inch (mm), based on the
F (C)
- year storm
- year storm
to
Floods
100-year flood elevation:
ft (m) above
Plant datum or
MSL
ft (m) above
Plant datum or
MSL
Railroads
Railroad design at this site shall be in accordance with the following railroad code:
(check)
American Railway Engineers Association (AREA)
Other
Local operating railroad:
Railcar clearances: Vertical
Minimum weight and type rail:
ft (m)
Horizontal
ft (m)
CVC01017
Plant Site Data Sheet
(Refer to PIP CVC01016)
Page 3 of 4
March 2000
ft (m)
Shoulder width
ft (m)
Horizontal clearance
ft (m) from
Vertical clearance
ft (m)
centerline,
edge of road
ft (m)
Shoulder width
ft (m)
Horizontal clearance
ft (m) from
Vertical clearance
ft (m)
centerline,
edge of road
ft (m)
Shoulder width
ft (m)
Horizontal clearance
ft (m) from
Vertical clearance
ft (m)
centerline,
edge of road
Water Distribution
Cooling water
psi (kPa)
Fire water
psi (kPa)
Potable water
psi (kPa)
Fire water
psi (kPa)
Wind Loads
All wind loads at this site shall be computed in accordance with the following code,
using the site specific parameters indicated below:
ASCE 7-
mph (km/hr)
3-second gust or
Recurrence interval:
50 year
100 year
Other:
Exposure category:
Topographic factor:
Kzt
fastest mile
year
D
N/A
CVC01017
Plant Site Data Sheet
(Refer to PIP CVC01016)
Page 4 of 4
March 2000
Earthquake Loads
All seismic loads at this site shall be computed in accordance with the following code,
using the site specific parameters indicated below:
ASCE 7-
or
=
Ca =
Cv =
For UBC:
Earthquake zone, Z =
Soil profile type and site coefficient, S =
Snow Loads
All snow loads at this site shall be computed in accordance with the following:
ASCE 7-
Frost Depth
Site frost depth: