Date -20/05/2016

Site Visit Report


Project Name PROPOSED EDUCATIONAL BUILDING OF
DEGREE COLLEGE
Following were the observation carried out during Site Visit
1) The Surge Arrester s were broken up Completely and the SUBSTATION
was shutdown due to which whole college was feeded By GENSET
2) VOLTAMP guy replaced the Surge arrester to a new one
3) According to him this damage to surge arrester might had happened due
to the surge from the MSEDCL Side
4) Below Image will give the idea of the Surge arrester in the Substation

Surge Arrester Rating (KV)=HV side voltage x 1.73 x 0.5 (50 %


Extra Volage)
5) After replacing the Surge Arrester to the New one , The temporary supply
to Transformer is Given under NO LOAD Condition to Carry out MAGNETIC
balance test
6) MAGNETIC balance test is done to check whether the transformer Coil is
damaged or not
Magnetic Balance test is done by keeping one phase open and checking
the voltage on the other two phase
Following were result of the Magnetic Balance Test
1) Under Normal Condition When three Phases are given

Voltage Between
Phases
Voltages

V(R-Y) (Volts)

V(Y-B) (Volts)

V(R-B) (Volts)

413

414

410

V(R-Y) (Volts)

V(Y-B) (Volts)

V(R-B) (Volts)

289.91

413.39

125.01

V(R-Y) (Volts)

V(Y-B) (Volts)

V(R-B) (Volts)

206

201.88

412.10

V(R-Y) (Volts)

V(Y-B) (Volts)

V(R-B) (Volts)

413.20

291.01

122.21

2) R phase is OPEN
Voltage Between
Phases
Voltages
3) Y Phase is OPEN
Voltage Between
Phases
Voltages
4) B Phase is OPEN
Voltage Between
Phases
Voltages

For Magnetic balance to be true


Voltages in one phase = voltages of both the phases
7) After Magnetic Balance Test , Megger Test is done
8) Changed the breaker settings of the INCOMER ABB breaker , turned off the DG
Supply and had Given Supply to the Compact Subsatation