Piping Geomerty Summary (Line Sizing) : Production Well 2, 3 and 6 (Southern Production System)
Piping Geomerty Summary (Line Sizing) : Production Well 2, 3 and 6 (Southern Production System)
Length (m)
ProductionRiser_1
Flowline (manifold_2 to riser base)
Flowline_2 (P2 to manifold_2)
Flowline_3 (P3 to manifold_2)
Flowline_6 (P6 to manifold_2)
Production Casing_P2
Production Tubing_P2
Production Casing_P3
Production Tubing_P3
Production Casing_P6
Production Tubing_P6
Length(m)
ProductionRiser_2
Flowline (manifold_1 to riser base)
Flowline_1 (P1 to manifold_1)
Flowline_4 (P4 to manifold_1)
Flowline_5 (P5 to manifold_1)
Production Casing_P1
Production Tubing_P1
Production Casing_P4
Production Tubing_P4
Production Casing_P5
Production Tubing_P5
Water Injection Well 1, 2, 3 & 4
Component
InjectionRiser_3
Flowline (WI1 to Inj_Manifold_1)
Flowline (WI4 to Inj_Manifold_1)
Length(m)
Length(m)
Length(m)
Coating
Insulated
Insulated
Insulated
Insulated
Insulated
Buried
Buried
Buried
Buried
Buried
Buried
Coating
Insulated
Insulated
Insulated
Insulated
Insulated
Buried
Buried
Buried
Buried
Buried
Buried
Thickness (in)
Coating
Insulated
Insulated
Insulated
Thickness (in)
Coating
Thickness (in)
Coating
Wells
Injection Rate
MMscf/d
Early Life
Gas Lift (if necessary)
Injection point MD
ft
Injection Rate
MMscf/d
Mid Life
Gas Lift (if necessary)
Injection point MD
ft
Injection Rate
MMscf/d
Late Life
Gas Lift (if necessary)
Injection point MD
ft
P1
P2
P3
P4
P5
P6
Wells
P1
P2
P3
P4
P5
P6
Wells
P1
P2
P3
P4
P5
P6
ly Life
cessary)
Pressure
psi
Choke
Bean Size
in
Pressure
psi
Choke
Bean Size
in
Pressure
psi
Choke
Bean Size
in
d Life
cessary)
te Life
cessary)
Temperature
F
Temperature
F
e Results
Arrival Pressure,Temperature & flowrate
Pressure
psi
Temperature
F
Oil Flowrate
STB/d
WI1
WI2
WI3
WI4
WI1
WI2
WI3
WI4
WI1
WI2
WI3
WI4
Temperature
F
Well
P1
P2
P3
P4
Total
Mid Life
Late Life
Wellhead Pressures
and Temperatures
Scale
Inhibitor
Corrosion
Inhibitor
Ethanol
psi
Dosage Rate
gpm