Attachment to D.O. No. 101 s.

2005
Annex C

CERTIFICATE OF ACCEPTANCE
Contract ID No. : 11Z00011
Project / Location: CONTRACT PACKAGE 09 REHABILITATION OF FLOOD
CONTROL FACILITIES IN CABUGAO, SANTA AND CANDON
CITY PROVINCE OF ILOCOS SUR, REGION I, UNDER THE
POST
ONDOY AND PEPENG SHORT-TERM INFASTRACTURE
REHABILITATION PROJECT, FLOOD CONTROL COMPONENT.
Contractor
: MBB CONSTRUCTION

This is to certify that the above-stated project has been accepted as of


___________ (date) August 21, 2013.
Based on the Acceptance Report of the Inspectorate Team date
August 21, 2012, the project is free from failures and defects which are traceable to
poor workmanship, use of poor quality materials and non-compliance with Plans and
Specifications of the Contract.

RODOLFO C. DION
District Engineer

Attachment to D.O. No. 101 s. 2005


Annex C

CERTIFICATE OF ACCEPTANCE
Contract ID No. : 13AC0093
Project / Location: REHABILITATION/RECONSTRUCTION/UPGRADING OF
VIGAN SAN VICENTE ROAD, K0408+(-1652) K0408+201,
SAN VICENTE, BANTAY & VIGAN CITY, ILOCOS SUR
Contractor

: MBB CONSTRUCTION

This is to certify that the above-stated project has been accepted as of


___________ (date) August 21, 2013.
Based on the Acceptance Report of the Inspectorate Team date
August 21, 2012, the project is free from failures and defects which are traceable to
poor workmanship, use of poor quality materials and non-compliance with Plans and
Specifications of the Contract.

REYNALDO S. ORGANO
OIC - District Engineer

Attachment to D.O. No. 101 s. 2005


Annex C

CERTIFICATE OF ACCEPTANCE
Contract ID No. : 12AD0143
Project / Location: IMMEDIATE REPAIR & IMPROVEMENT ALONG STA. MARIABURGOS ROAD, K0374+800-K0376+000, INTERMITTENT
SECTION
Contractor
: MBB CONSTRUCTION

This is to certify that the above-stated project has been accepted as of


___________ (date) March 3, 2014.
Based on the Acceptance Report of the Inspectorate Team date
March 12, 2013, the project is free from failures and defects which are traceable to poor
workmanship, use of poor quality materials and non-compliance with Plans and
Specifications of the Contract.

RODOLFO C. DION
District Engineer

Attachment to D.O. No. 101 s. 2005


Annex C

CERTIFICATE OF ACCEPTANCE
Contract ID No. : 13AD0011
Project / Location: PACKAGE III:
A) CONSTRUCTION OF SAN ROQUE PRIMARY SCHOOL,
SANTIAGO, ILOCOS SUR
B) CONSTRUCTION OF NAGSAYAOAN E/S, STA. MARIA, I. S.
C) REHABILITATION OF SAN ESTEBAN NORTH CENTRAL MPB
VILLA QUIRINO, SAN ESTEBAN, ILOCOS SUR
Contractor
: MBB CONSTRUCTION

This is to certify that the above-stated project has been accepted as of


___________ (date) July 17, 2014.
Based on the Acceptance Report of the Inspectorate Team date
July 17, 2013, the project is free from failures and defects which are traceable to poor
workmanship, use of poor quality materials and non-compliance with Plans and
Specifications of the Contract.

RODOLFO C. DION
District Engineer

Attachment to D.O. No. 101 s. 2005

Annex A

CERTIFICATE OF COMPLETION
Contract ID No. : 12AD0026
Project / Location: RESTORATION OF SCOURED BRIDGE APPROACH &
REVETMENT MNR, BUCONG BRIDGE NORTHEAST
APPROACH
Contractor
: MBB CONSTRUCTION

This is to certify that the above-stated project has been satisfactorily completed
on March 19, 2010 in accordance with the Plans and Specifications.
This certification does not relieve the Contractor of his obligation and
responsibilities in undertaking repair works on any defect or failure that may occur in
any section of the project during the defects liability period starting from the date of
completion as herein stated. Neither is he relieved of his obligation and responsibilities
pursuant to the provisions of R. A. 9184.

District Engineer

Conformed:

MBB CONSTRUCTION
Contractor