SUBJECT: EXTRA WORKS

1. Tile works for technical staff service office


Area =
12 m^2
Item

Quantity

0.6x0.6 Granite Tiles


Tile Grout
Cement
Sand

40
1
5
--

Unit cost
120.00
50.00
250.00
-Material cost
Manpower cost
TOTAL

Amount
4,800.00
50.00
1,250.00
-6,100.00
2,140.00
8,240.00

2. Electrical works for Ground floor lobby of the Main R and D building
Item

Quantity

Pinlight socket
LED Bulb(6watts)
Electrical wire
Switches
Outlet
Panel board with Circuit
Breakers

52
40
3
21
7
1

Unit cost
195.00
230.00
2,500.00
95.00
95.00
5,000.00
Material cost
Manpower cost
TOTAL

Amount
10,140.00
9,200.00
7,500.00
1,995.00
665.00
5,000.00
34,500.00
12,080.00
46,580.00

3. Repainting and Cleaning of the existing jalousie


windows on the new Technical Staff Service Office, and Seed Distribution Office
Item
Lacq. Flo
Lacq. Thinner
Primer paint
Finishing paint
Paint brush
Sand papar

Quantity
2
3
1
2
4
25

Unit cost
600.00
350.00
525.00
525.00
80.00
25.00
Material cost
Manpower cost
TOTAL

Amount
1,200.00
1,050.00
525.00
1,050.00
320.00
625.00
4,770.00
2,150.00
6,920.00