REKAPITULASI RENCANA ANGGARAN

Paket
Sumber Dana
Tahun Anggaran

: Perencanaan Site Plans Mesjid dan GOR Bank BJB Bandung


:
: 2016

No

URAIAN

BIAYA LANGSUNG PERSONIL


A.I
Tenaga Ahli
A.II
Tenaga Pendukung

BIAYA LANGSUNG NON PERSONIL


B.I
Operasional dan Peralatan Kantor
B.II
Biaya Mobilisasi Personil
B.III
Sewa Peralatan
B.IV Peralatan Transportasi
B.V
Biaya Rapat, Asistensi dan Presentasi
B.VI Biaya Pengolahan Data
B.VII Pembuatan Laporan

A
Jumlah
B
PPN (10%)
C
Total Harga (A + B)
D
Pembulatan
Terbilang :
Bandung, ...... Februari 2016
nama perusahaan

nama
Direktur

NGGARAN

B Bandung

JUMLAH BIAYA (Rp.)

ng, ...... Februari 2016


perusahaan

ur

94,500,000.00
69,000,000.00

3,200,000.00
67,600,000.00
5,000,000.00
23,000,000.00
6,000,000.00
6,000,000.00
3,650,000.00
277,950,000.00
27,795,000.00
305,745,000.00
305,745,000.00

Paket
Sumber Dana
Tahun Anggaran

: Perencanaan Site Plans Mesjid dan GOR Bank BJB Bandung


:
: 2016

No

Uraian

Jumlah Orang

Jumlah Bulan

A BIAYA LANGSUNG Personil


A.I

Tenaga Ahli

1
2

Team Leader
Ahli Arsitektur

1.00
1.00

Org
Org

3.00 Bln
3.00 Bln

3
4
5

Ahli Landscape
Ahli Cost Estimate
Ahli Geodetik

1.00
1.00
1.00

Org
Org
Org

3.00 Bln
3.00 Bln
3.00 Bln

A.II

Asisten tenaga Ahli

1
2

Ass.Ahli Arsitektur
Ass. Ahli Landscape

2.00
2.00

Org
Org

3.00 Bln
3.00 Bln

3
4

Ass.Ahli Estimate
Ass. Geodetik

1.00
1.00

Org
Org

3.00 Bln
3.00 Bln

A.III

Tenaga Pendukung

1
2

Administrasi
Operator Computer

1.00
2.00

Org
Org

3.00 Bln
3.00 Bln

3
4

Drafter/Operator CAD
Driver

2.00
1.00

Org
Org

3.00 Bln
3.00 Bln

TOTAL I (Biaya langsung Personil)

TOTAL I (Biaya Langsung Personil)

Harga Satuan
(Rp)

Jumlah Harga (Rp)

19,000,000.00
15,000,000.00

57,000,000.00
45,000,000.00

15,000,000.00
15,000,000.00
15,000,000.00

45,000,000.00
45,000,000.00
45,000,000.00
237,000,000.00

7,000,000.00
7,000,000.00

42,000,000.00
42,000,000.00

7,000,000.00
7,000,000.00

21,000,000.00
21,000,000.00
126,000,000.00

2,000,000.00
2,500,000.00

6,000,000.00
15,000,000.00

2,500,000.00
1,500,000.00

15,000,000.00
4,500,000.00

Langsung Personil)

40,500,000.00

403,500,000.00

Paket
Sumber Dana
Tahun Anggaran

: Perencanaan Site Plans Mesjid dan GOR Bank BJB Bandung


:
: 2016

No
B

Uraian

Volume

Satuan Jumlah Bulan

Harga Satuan
(Rp)

BIAYA LANGSUNG NON PERSONIL


I. Operasional & Peralatan kantor
a. Alat Tulis Kantor (ATK)
b. Biaya Komunikasi dan Perawatan Kantor

1.00
1.00
Sub Total I

Ls
Ls

1,000,000.00
2,200,000.00

II. Biaya Mobilisasi Personil


a. Mobilisasi dan Demobilisasi Tenaga Ahli
Kegiatan Lapangan
b. Survey Lapangan

5.00

Org/PP

3.00 Kali

2,000,000.00

8.00
Sub Total II

Org/pp

40.00 Hari

115,000.00

III. Sewa Peralatan


a. Sewa GPS Geodetik
b Sewa GPS Navigasi
b. Sewa Kamera Digital

3.00
Unit
3.00
Unit
2.00
Unit
Sub Total III

2.00
3.00
3.00

Bln
Bln
Bln

3,000,000.00
1,000,000.00
500,000.00

1.00
Bln/Unit
3.00
Bln/Unit
Sub Total IV

3.00
3.00

Bln
Bln

6,500,000.00
1,250,000.00

6.00
Kali
6.00
Kali
Sub Total VI

3.00
3.00

Bln
Bln

500,000.00
1,000,000.00

3.00

Bln

1,500,000.00

IV. Peralatan transportasi


a. Sewa kendaraan roda 4
b Sewa Kendaraan Roda 2

VI. Biaya Rapat, asistensi dan Presentasi


a. Biaya asistensi
b. Biaya rapat dan presentasi

VII. Biaya Pengolahan Data


a.

Sewa Komputer + Printer

4.00

Unit

1.00
5.00
1.00
5.00
1.00
5.00
5.00
2.00
5.00
5.00
5.00
1.00
Sub Total VII

Buku
Buku
Buku
Buku
Buku
Buku
Buku
Buku
Buku
Buku
Buku
buah

VII. Pembuatan laporan


a.

b.
d.
e.
f.

Laporan
Draf Laporan Pendahuluan
Laporan Pendahuluan
Draf Laporan Antara
Laporan Antara
Draf laporan Akhir
Laporan Akhir
Laporan Bulanan
Album Peta
Rencana Kerja dan Syarat-syarat (RKS)
Bill of Quantity
Gambar Site Plans
Laporan dalam bentuk softcopy dalam hardisk External

Total II (Biaya LangsungNon Personil)

3.00

Bln

100,000.00
150,000.00
100,000.00
200,000.00
100,000.00
500,000.00
100,000.00
950,000.00
200,000.00
100,000.00
750,000.00
650,000.00

Jumlah Harga
(Rp)

1,000,000.00
2,200,000.00
3,200,000.00

30,000,000.00
36,800,000.00
66,800,000.00
18,000,000.00
9,000,000.00
3,000,000.00
30,000,000.00
19,500,000.00
11,250,000.00
30,750,000.00
9,000,000.00
18,000,000.00
27,000,000.00
18,000,000.00
18,000,000.00

100,000.00
750,000.00
100,000.00
1,000,000.00
100,000.00
2,500,000.00
1,500,000.00
1,900,000.00
1,000,000.00
500,000.00
3,750,000.00
650,000.00
13,850,000.00
189,600,000.00

Paket
Sumber Dana
Tahun Anggaran

: Perencanaan Site Plans Mesjid dan GOR Bank BJB Bandung


:
: 2016

No

A
A.I

Uraian

Jumlah Orang

Jumlah

BIAYA LANGSUNG PERSONIL


Tenaga Ahli

Team Leader

1.00

Org

60.00 Hari

2
3

Ahli Arsitektur
Ahli Cost Estimate

1.00
1.00

Org
Org

60.00 Hari
60.00 Hari

Ahli Geodetik

1.00
Org
Sub Total I

60.00 Hari

A.II

Tenaga Pendukung

1
2

Surveyor
Administrasi

4.00
1.00

Org
Org

60.00 Hari
60.00 Hari

3
4

Operator Computer
Drafter/Operator CAD

2.00
2.00

Org
Org

60.00 Hari
60.00 Hari

Driver

1.00
Org
Sub Total III

60.00 Hari

TOTAL I (Biaya Langsung Personil)

Harga Satuan
(Rp)

Jumlah Harga
(Rp)

425,000.00

25,500,000.00

400,000.00
375,000.00

24,000,000.00
22,500,000.00

375,000.00

22,500,000.00
94,500,000.00

125000
125,000.00

30,000,000.00
7,500,000.00

100,000.00
125,000.00

12,000,000.00
15,000,000.00

75,000.00

4,500,000.00
69,000,000.00

163,500,000.00

Paket
Sumber Dana
Tahun Anggaran

: Perencanaan Site Plans Mesjid dan GOR Bank BJB Bandung


:
: 2016

No

B
B.I

Uraian

Volume

Satuan

Jumlah

BIAYA LANGSUNG NON PERSONIL


Operasional dan Peralatan Kantor
a. Alat Tulis Kantor (ATK)
b. Biaya Komunikasi dan Perawatan Kantor

1.00
1.00

Ls
Ls

1.00
1.00

Sub Total I

B.II

Biaya Mobilisasi Personil


a. Mobilisasi dan Demobilisasi Tenaga Ahli

5.00

Org/PP

4.00 Kali

8.00

Org/pp

30.00 Hari

1.00

Unit

1.00 Bln

1.00
1.00
Sub Total III

Unit
Unit

1.00 Bln
2.00 Bln

1.00
4.00

Unit
Unit

2.00 Bln
2.00 Bln

1.00

Kali

4.00 kali

1.00
Sub Total VI

Kali

4.00 Kali

2.00
Sub Total VII

Unit

2.00 Bln

Draf Laporan Pendahuluan


Laporan Pendahuluan

1.00
1.00

Buku
Buku

1.00 Buku
5.00 Buku

Draf laporan Akhir


Laporan Akhir

1.00
1.00

Buku
Buku

1.00 Buku
5.00 Buku

b.
d.

Rencana Kerja dan Syarat-syarat (RKS)


Bill of Quantity

1.00
1.00

Buku
Buku

1.00 Buku
1.00 Buku

e.
f.

Gambar Site Plans


Laporan dalam bentuk softcopy dalam flashdisk 16GB

1.00
1.00

Buku
buah

1.00 Buku
1.00 Buah

Kegiatan Lapangan
b. Survey Lapangan

Sub Total II

B.III

Sewa Peralatan
a. Sewa GPS Geodetik
b Sewa GPS Navigasi
b. Sewa Kamera Digital

B.IV

Peralatan Transportasi
a. Sewa kendaraan roda 4
b Sewa Kendaraan Roda 2

Sub Total IV

B.V

Biaya Rapat, Asistensi dan Presentasi


a. Biaya asistensi
b.

B.VI

Biaya rapat dan presentasi

Biaya Pengolahan Data


a.

Sewa Komputer + Printer

B.VII Pembuatan Laporan


a.

Laporan

Sub Total VIII

Total II (Biaya Langsung Non Personil)

Harga Satuan
(Rp)

1,000,000.00
2,200,000.00

Jumlah Harga
(Rp)

1,000,000.00
2,200,000.00
3,200,000.00

2,000,000.00

40,000,000.00

115,000.00

27,600,000.00
67,600,000.00

3,000,000.00

3,000,000.00

1,000,000.00
500,000.00

1,000,000.00
1,000,000.00
5,000,000.00

6,500,000.00
1,250,000.00

13,000,000.00
10,000,000.00
23,000,000.00

500,000.00

2,000,000.00

1,000,000.00

4,000,000.00
6,000,000.00

1,500,000.00

6,000,000.00
6,000,000.00

100,000.00
150,000.00

100,000.00
750,000.00

100,000.00
300,000.00

100,000.00
1,500,000.00

200,000.00
100,000.00

200,000.00
100,000.00

750,000.00
150,000.00

750,000.00
150,000.00
3,650,000.00
114,450,000.00