Tarban Trade & Services LLC

Hazard Identification & Risk Assessment


Name of the Job Site: OOECP .Provision of Fencing for the GPP Gate House-Project: Abu Tubul-60
Activity: MESH SECURITY FENCE
Sl. No

Subject Area

Mobilization of
manpower for
Ssecurity fence

Equipment &
hand tools

Hazards

Foil handling

Surfaces

Unskilled ,
skilledperson,
Personal injury
unaware about site
condition

Misuse of
equipment
leading to injuries
due to being hit
e.g. bruises, cuts
and abrasions

1.Participants to be briefed on safe


practice for carrying and
behaving with foils.
2.Safety equipment to be worn
3.Safety brief to be given prior to
session commencing
4.Equipment must be left secure when
unattended

Wearing
equipment
incorrectly,
causing injury
due to being
struck by a foil

Material in
working area.

Personal injury

Personal injury

Personal
injury/prperty
damage

Injury due to being


Personal
struck by foil.
injury/prperty
damage

Hard, uneven or
slippery surfaces
causing slips,
trips and falls

Entrapment/
Jewellery/Object
collisions causing
s in Pockets
cuts, bruises and
abrasions.

Existing Control Measure

1.Safety Induction training shall be


given to worker.
2.Job
specific training shall be given on
weekly basis.
3.Trained
person shall be deployed.
4.Work should be carried under
supervision.

Injury due to
faulty equipment

Possible Out
come

Personal
injury/prperty
damage

Personal injury

Injury from Cllisions


with objects,
Personal
causing bruises,
injury/prperty
cuts and abrasions. damage

1.All participants must wear full


protective clothing.
2.Staff Member to check safety
equipment and remain vigilant of
protective equipment whilst participants
are fencing.
1.All equipment should be checked
prior to use and during session
2.All equipment must be checked in line
with monthly safety checks. 3.Staff
Member must check that all foils have
safety buttons on the end

1.Staff Member to give safety talk about


boundaries of area.
2.Staff
Member to set up defined safety area.
3.All participants without masks, and
spectators, to remain in the designated
waiting area.
4.Staff Member to
remain vigilant at all times.
5.Safety brief must make clear that they
must stop fencing immediately if
someone calls STOP 6.Safety brief
must make clear that masks MUST be
worn
when foils are in hands

1.Area checked for hazards before


session.
2.Participants checked to ensure they
are wearing suitable
footwear.
3.Safety brief must state that
participants cannot run while fencing
Participants checked to ensure they
have removed jewellery and objects
from pockets.

1.Activity area must be clear of all


obstructions.
2.Any equipment not in use should be
removed from the activity area.

Additional
Control
Measures

Probability
Rating

Severity
Rating

Risk
Level

Residual
Action By
Risk

Site
Engineer

Site
Engineer

Site
Engineer

Site
Engineer

Site
Engineer

Site
Engineer

Site
Engineer

Site
Engineer

Stacking and
7 handling of
equipment.

10

Personal
injury/prperty
damage

Injury from Cllisions


Personal
Plate compactor with objects,
injury/prperty
for compaction causing abrasions.
damage

Erecting
Panels/Pinning

Unstable
Structure

11

Fire

12

Over-exertion
due to
completion of
work

13

Manual handling
injury
Falling objects
Obstruction

Weather

Falling objects
Impact injuries

Personal
injury/prperty
damage

Structural Collapse
Caused by High
winds

Damage by fire or
smoke to persons
and/or
property

Muscle strains

Risk of sunburn,
heat exhaustion
and dehydration;
or hyperthermia
during activity

Approved by OOCEP:-

burn injury

Personal injury

Personal injury

Manual handling procedures to be


implemented.
1.All crew to be competent and able in
the task they are to
undertake and all work to be supervised
by a competent
person.
2.All equipment to be positioned in a
way that will not obstruct gangways,
emergency routes or fire exits and will
not endanger the health and safety of
others.
3.All stacked equipment to be
positioned in such a way so
as it is not unstable PPE to be worn in
designated areas.

1.Workers check the condition of


compactor.
2.Experience
person deployed for this activity.
3.Check the oil level and fuel level of
compactor.
4.All
moving part should be guarded
covered the pinch point area.
1.Panels to be supported while pins
installed.
2.Workers to be aware of hammer use.
3.Workers to check local area before
using hammers or
driving pins.
4.Site mgr responsible for ensuring no
underground
services.
1.Fence line to have acceptable wind
speed tolerance
Crew to be on standby
2.May be requirement for additional
stays.
3.Site mgr to inform crew of any
particular site conditions.
1.Crew boss to be aware of any local
requirements i.e. no
smoking areas.
2.Crew boss to ensure that workers are
aware of local fire
procedures
Staff Member to ensure a thorough
warm-up is carried out prior to the
activity starting.
1.Ensure regular water breaks are
taken.
2.If it is hot, ensure participants wear
sun cream and hats
and there is a shaded area available.
3.If it is cold, ensure participants are
wearing suitable clothing to keep warm.

Site
Engineer

Site
Engineer

Site
Engineer

Site
Engineer

Site
Engineer

Site
Engineer

Site
Engineer

You might also like