Shreno - Agenda - Weekly Progress Review Meeting 062 - 22.07.2016
Shreno - Agenda - Weekly Progress Review Meeting 062 - 22.07.2016
Shreno - Agenda - Weekly Progress Review Meeting 062 - 22.07.2016
DATE
VENUE
TIME
MEETING NO
:
:
:
:
PROPOSED ATTENDEES:
SN
Organization
Attendees
Alchemy
Surendra S Sawant
C&W
GDCL
Progress of Works
1. Progress of Works Civil & Finishes
2. Mockup Completion Schedule
3. Podium & Tower area pending works.
Safety
1. Safety Walkthrough Report
2. Fogging Pest Control Tower Area and Basement
3. House Keeping Issues
4. Steel Stacking Issues
5. Debris Chute maintenance
6. Mobile Toilets Commissioning
7. Staircase Lighting
8. Lighting at Work Location
9. Dewatering issues in Basements
10. Safety Net maintenance
11. Tower Crane Foundation Pit Dewatering not done
12. Fall Resistant system not implemented at site For Blockwork - Top Course
Quality
1. Damaged Ply board removal from site
2. Damaged Column Box FUVI Materials
3.
4.
5.
6.
7.
8.
9.
General
1. Progress of Works Civil & Finishes
2. Mockup Completion Schedule
3. Tower Crane (C & D) and Passenger Hoist Mast Extension
4. Man Power Status/ Availability
5. Material availability stock
6. Penny bar stock not available
7. Damaged Ply board removal from site
8. Virgin Land Area Debris removal
9. Curing Hose leakage
10. Damaged Column Box FUVI Materials
11. Tower Crane (C & D) and Passenger Hoist Mast Extension
12. Man Power Status/ Availability
13. Material availability stock
14. Penny bar stock not available
15. Damaged Ply board removal from site
16. Virgin Land Area Debris removal
17. Curing Hose leakage
18. Podium & Tower area pending works.
19. Damaged Column Box FUVI Materials
20. Demobilizing of Passenger Hoist Tower D