Energy Sector Initiative in Tanzania
Energy Sector Initiative in Tanzania
Presented by
Introduction
The National Climate Change Strategy
Impacts of Climate Change
Initiatives undertaken at National level (energy sector)
Strategies of Climate Change adaptation and mitigation
Current Power Situation
Challenges/Constrains
Future Power Demand and Investment Plan
Conclusion
John Lazimah
Investment Business Unit - TANESCO
22nd January 2014 at The Kunduchi Beach Hotel & Resort
Dar es Salaam
Background
Tanzania Electric Supply
Company Limited is a parastatal
organization under the Ministry
of Energy and Minerals (MEM)
established in 1964.
Introduction
22 23 January 2014
Vision
To be an efficient and
commercially focused utility
supporting the development of
Tanzania and to be a power
house of East Africa.
Mission
To generate/purchase, transmit
and supply electricity in the
most effective, competitive and
sustainable manner possible.
Presents
an opportunity to
address climate change
adaptation and participate in
the global effort to reduce
GHG emissions in the context
of sustainable development
Receptiveness
Reiterates
Tanzanias
commitment to address
Climate Change (The country
is amongst the highly
vulnerable group of countries
of climate change)
22 23 January 2014
Improving
the energy
availability to reduce
deforestation
Improving energy
diversification
Improving energy efficiency
22 23 January 2014
22 23 January 2014
22 23 January 2014
Initiatives undertaken at
National level (energy sector)
Strategies on CC Adaptation
Energy Sector
22 23 January 2014
10
22 23 January 2014
Strategies on CC Mitigation
Energy Sector
Drought
l
22 23 January 2014
Transmission System :
Distribution System :
12
ENERGY SOURCE
POTENTIAL
STATUS OF
DEVELOPMENT
None
371 MW
None
4.7GW of electricity
562 MW
13
14
ENERGY SOURCE
POTENTIAL
STATUS OF
DEVELOPMENT
Wind: Makambako,
Singida,
Litembe(Mtwara),
Mkumbara (Tanga),
Gomvu (Dar), Karatu
(Manyara) and Mafia
Average wind
speed 5 -8m/s
None
Potential to
35MW from bagasse
generate 500MW
and woody residue
To
15
16
17
18
Location
Expected
Online
Kabanga Nickel 32
Kagera
2016
Bulyanhulu
Gold
20
Shinyanga 2013
Mibongo Gold
20
Kigoma
2016
Textile Mill
30
Shinyanga 2014
30
Lindi
2018
Dangote Cement
plant
40
Williamson
Diamond
10
Shinyanga 2013
Mtwara
2015
Mbeya
2016
Williamson
Diamond
12
Shinyanga 2014
Buckreef Gold
Geita
2015
30
Geita
2015
Williamson
Diamond
Shinyanga 2015
100
Iringa
2018
Shinyanga
2015
10
Shinyanga
2015
Mine
Ntaka
Nickel
Hill
Geita Gold
Mchuchuma
Iron Smelter
Golden
Gold
Ridge
Dutwa Nickel
Liquidified
Natural
Gas
Power
plant(LNG)
100
Mtwara
2018
19
20
Mtwara
2017
Ikwiriri
factory
Lindi
2014
30
Mtwara
2017
Mtwara
Factory
Investment Plan
Based on the Power System Master
Plan that covers both short term
and long term investment plans
The long term goal is to have
affordable power to every citizen of
Tanzania so as to reduce poverty as
per MKUKUTA II (NSGRP)
Sugar
Fertilizer
Dawasapumping
Expansion
Ruvu
12
Coast
2015
Coast
2015
Eagle
Co. Ltd
Coast
2015
Cement
20
21
22
YEAR
Project
Addition
Type
MW
63
2013
Mwanza
HFO
2014
Wind
50
2014
Kinyerezi I
Gas
150
2015
Gas
600
2015
Gas
210
2016
Kinyerezi II
Gas
240
2017
Mtwara
Gas
400
23
Transmission Plans
YEAR Project
Addition
Voltage Level (kV)
YEAR
Length (km)
2015
Singida - Arusha
400
414
2015
Bulyanhulu - Geita
220
55
2015
400
198
2015
Makambako - Songea
220
250
2016
400
670
2016
400
700
2016
Chalinze - Dodoma
400
350
2016
400
340
Project/Initiative
Electricity V
ORIO project in Ngara, Biharamulo and Mpanda
districts
TEDAP
Improving the reliability of Electric power supply in the
city of Dar es Salaam
Attending pending and new applications for customer
connections
Demand Side Management Initiative
Sustainable Water Management Initiative
25
Type
MW
Kakono
Hydro
53
Malagarasi
Hydro
45
Rusumo
Hydro
27
Masigira
Hydro
118
Mtwara
Gas
600
Hydro
358
Rumakali Project
Hydro
222
Stieglers Gorge
Hydro
1,200
Coal
400
Type
MW
Mchuchuma
Coal
400
Shinyanga/Dodoma
Solar
160
Songwe
Hydro
27
Singida
Wind
160
22 23 January 2014
Addition
27
22 23 January 2014
26
Distance (km)
100
540
140
228
250
200
358
656
808
200
200
29
Challenges/Constrains of Power
Sector in Tanzania
32
Conclusion
Ahsante