DIRECTORATE GENERAL OF WATER RESOURCES

MINISTRY OF PUBLIC WORKS AND PUBLIC HOUSING

Weekly Work Done Report


Please,

QA/QC Dept.
NO.
1

modify
20th June ~ 3rd July,
2016

DESCRIPTION

20

21

Last Week
June
22 23 24

the date

This Week
25

26

27

June
28 29

30

July
2

Remarks

*line
means
actual,
dotted
line
means
plan

SHOTCRETE
Inlet Slope Protection

100

50

Outlet West Side of Slope Protection


Slope Protection at Spillway

100
100

50
50

Tunnel
CONCRETE TYPE B
Slope Protection EL65.64 at Intake Tower (28 May 2016)
Slope Protection EL46.50 at Intake Tower (02 June 2016)

100

50

100
100

50
50

50% Completed on 4 June 2016

Slope Protection EL48.20 at Intake Tower (12 June 2016)


Slope Protection EL49.30 at Intake Tower (15 June 2016)

50
50
50

50
50
50

50% Completed on 19 June 2016

50

Sampling material at JB PLANT


Looking for other laboratories to compare test result

100
0

100
0

100% Completed on 12 June 2016

PULLED-OUT TEST ROCK BOLT


Setting the Anchor

100

100

100% Completed on 10 June 2016

50

Slope Protection EL50.35 at Intake Tower (19 June 2016)


Slope Protection EL51.40 at Intake Tower (23 June 2016)
3

PROGRESS
%
Plan
Actual

Completed on 13 April

50% Completed on 9 June 2016

50% Completed on 22 June 2016


50% Completed on 26 June 2016

MERAH PUTIH CEMENT

Pulled-out test
REKRUTMEN NEW STAFF

waiting equipment
After Holiday (15 July 2016)

DIRECTORATE GENERAL OF WATER RESOURCES


MINISTRY OF PUBLIC WORKS AND PUBLIC HOUSING

Weekly Work Done Report


Please,

QA/QC Dept.
NO.
1

modify
30th May ~ 12h June,
2016

DESCRIPTION

30

31

Last Week
May to June
1
2
3

This Week
June
8
9
10

the date

11

12

Remarks

*line
means
actual,
dotted
line
means
plan

SHOTCRETE
Inlet Slope Protection

50

50

Outlet West Side of Slope Protection


Slope Protection at Spillway

50
50

50
50

Tunnel
CONCRETE TYPE B
Slope Protection EL56.50 at Intake Tower (22 April 2016)
Slope Protection EL56.50 at Intake Tower (3 May 2016)

50

50

100

100

100% Completed on 20 May 2016

100
100

100
100

100% Completed on 31 May 2016

50
50

50
50

50% Completed on 20 May 2016

50
50

50
50

50% Completed on 26 May 2016

50
50

50% Completed on 4 June 2016

Slope Protection EL46.50 at Intake Tower (02 June 2016)

50
50

MERAH PUTIH CEMENT


Sampling material at JB PLANT
Independent test (08 June 2016) at Balai Irrigation Bandung

0
0

0
0

0
50

0
50

100
50

100
50

( B4T BANDUNG )

Grading
Atterberg limit

100
100

100
100

For Core Material n Common Embankment

Specific gravity
Proctor

100
50

100
50

50

50

Slope Protection EL58.20 at Intake Tower (9 May 2016)


Slope Protection EL59.40 at Intake Tower (13 May 2016)
Slope Protection EL59.70 at Intake Tower (16 May 2016)
Slope Protection EL61.38 at Intake Tower (19 May 2016)
Slope Protection EL63.75 at Intake Tower (22 May 2016)
Slope Protection EL65.64 at Intake Tower (28 May 2016)
3

PROGRESS
%
Plan
Actual

Result & Approval Letter


DCP or PLATE BEARING TEST

4
5

INSPECTION H - BEAM for STEEL SUPPORT


TEST H - BEAM for STEEL SUPPORT

SOIL TEST
Main Dam

CBR

Completed on 13 April

100% Completed on 07 June 2016

50% Completed on 23 May 2016

50% Completed on 29 May 2016

50% Completed on 9 June 2016

Based on Mr. Nedi Letter do new test

Result & Approval Letter

DIRECTORATE GENERAL OF WATER RESOURCES


MINISTRY OF PUBLIC WORKS AND PUBLIC HOUSING

Weekly Work Done Report


Please,

QA/QC Dept.
NO.
1

4
5
6
7
8

modify
9th May ~ 22nd May,
2016

DESCRIPTION
SHOTCRETE
Inlet Slope Protection
Outlet West Side of Slope Protection
Slope Protection at Spillway
Outlet Tunnel
CONCRETE TYPE B
Slope Protection EL56.50 at Intake Tower (22 April 2016)
Slope Protection EL56.50 at Intake Tower (3 May 2016)
Slope Protection EL58.20 at Intake Tower (9 May 2016)
Slope Protection EL59.70 at Intake Tower (16 May 2016)
MERAH PUTIH CEMENT
Factory visit & sampling material
Independent test (14 April 2016)
Result & Approval Letter
DCP AND PLATE BEARING TEST
INSPECTION BORROW AREA 2, for Commmon Embank.
Result & Approval Letter
INSPECTION H - BEAM for STEEL SUPPORT
TEST H - BEAM for STEEL SUPPORT
SOIL TEST
Borrow Area 2
Grading
Atterberg limit
Specific gravity
Proctor
CBR
Result & Approval Letter

PROGRESS
%
Plan
Actual
50
50
50
50

50
50
50
50

50
50
50
50

50
50
50
50

100
100

100
91

50

50

10

Last Week
May
11 12 13

14

15

16

17

This Week
May
18 19 20

the date

21

Remarks

22

Completed on 13 April

*line
means
actual,
dotted
line
means
plan

50% Completed on 12 May 2016

50% Completed on 29 April 2016


50% Completed on 10 May 2016
50% Completed on 16 May 2016
50% Completed on 23 May 2016

Special Consultant (Mr. Bambang S.)

At Bogor
Independent Laboratory

50
100
100
100
50

50
100
100
100
50

Waitng for Sieve No # 10

On 23 May, 2016