METHOD

OF CODUCTING SPECIAL DRIVE TEST

1. DT in all tier-1 cities brand launch cities will be conducted


with prepaid number for both calling and called parties.
2. DT will be conducted during busy hour [17:00 to 19:30]// [
12:00 to 14:00 ]
3. Main purpose of this DT will be to check the off net and on net
connectivity and retain ability of CMPAK network.
4. The DT engineer will have to attempt 300 calls with below
mentioned distribution to check the off net and on net
connectivity.
CMPAK CMPAK
(40% intra city & 10% inter city) Calls
CMPAK MOBILINK
10% Calls
CMPAK TELENOR
10% Calls
CMPAK WARID
10% Calls
CMPAK UFONE
10% Calls
CMPAK- PTCL
10% Calls
5. SMS: 50 per city and check sending and receiving time.
6. The call duration of each call will be 25 sec with a gap of 5
sec for next call. This is important.
7. For retain ability the DT engineer will have to make a long call
in parallel with connectivity testing.
8. DT should be done in a way to cover the maximum area of
that city.
9. The template is attached along with this plan.