Daily Report

Project Name: Myanmar Aquarium Project


Project Code:

4YG 04700

Proj Start Date

2014

Contract Period

31-Dec-2016

Remain Period

Estimate Completion Date

Report Date :

26-Jul-2016

Wednesday

1 Year Calendar Day


159

No. of Day
AM

Weather

Calendar Day

Report No.

6~8

8~10

DPR-0357

PM
10 ~12

12~2

Surveyer Geotech Workers

Mason

2~4

Fine
4~6

Rain

Smith

Welder

15

17

Work Force
Trades

PM

Today

PE

SSE

Trades

Scaffolde Steel
r
Erector

Site Engr QA/QC

QS

3
Roofing
worker

Painter

D&W
Installer

Admin

Safety

Security Site Store


3

Office
Staff

Driver

20

Carpente
r
10

Ceiling
worker

Total
84

Today
Machine & Equipments onsite
Description

previous

Today

Remarks

Cum.

Description

Excavator

60 Ton Crane

Dozer

50 Ton Crane

Water Boxer

25 Ton Crane

Boom Lift

Generator

previous

Today

Cum.

Remarks

Description

previous

Today

Cum.

Remarks

Material Delivery On Site


Description
AG (G35) Normal

FO-OP-01 REV-00

Unit
M3

Quantity
Today

Total

Description

Unit

Quantity
Today

Total

Description

Unit

Quantity
Today

Total

Remarks

Page: 1/3

Daily Report
Project Name: Myanmar Aquarium Project
Project Code:

4YG 04700

Report Date :

26-Jul-2016
QC - Test Sampling

Item

No. of Day

Report No.

DPR-0357

Remarks

Test 4 Nos ( Mould No.305 ~ 308 )


Sample
Taken

HSE

Wednesday

For ST - 5 on Ground Floor at F & B ( Bet; GL A10 & A11 )

LTI Free Day

UA,UC

Near Miss

FAI

MTC

LTA

377233 hrs

Daily TBT
Conducted By
Safety Officer

Material Handling & Storage Safety

Works Carried out Details


Trades Of Work
I

Block - A ; F & B Building

Staircase

1.1

2
2.1

3
3.1

4
4.1

Casting Concrete for ST-5

Location

Remark

On Ground Floor ; Bet: GL A10 & A11

COMPLETE

On Ground Floor

In Progress

On Second Floor ; Bet: GL A5 & A9

In Progress

On Second Floor

42%

Lift
Fixing Formwork for Lift Wall

Slab
Formwork Stopper Installation for Second Floor Slab

Steel Erection
Fixing Purlin for Roof

FO-OP-01 REV-00

Page: 2/3

Daily Report
Project Name: Myanmar Aquarium Project
Project Code:

4YG 04700

Visitors
on site

Report Date :

26-Jul-2016
Special Event

Wednesday

Project Manager

Signature

Report No.

DPR-0357

Site
Instructio
n

Purpose

Name

No. of Day

Project Engineer
Name
Signature

Sai Thaung Nyunt

Prepare By: Site Engineer


Name

Chu Pwint May

Signature

FO-OP-01 REV-00

FO-OP-01 REV-00

Page: 3/3