FLOW OF PRESENTATION :
Journey of NTPC
Operation Best Practices
NTPC VISION :
INSTALLED CAPACITY :
GAS:1000MW
RENEWABLE:100MW
HYDRO:5984 MW
COAL :38,654MW
START UP
DEVIATIONS
CHEMICAL
PARAMETER
DEVIATIONS
OVERHEATING
/CORROSION
BTL
FLUE GAS
EROSION
WELD
FAILURES
& reviewed
Condensate Dumping
Hot draining as per requirements
EROSION
Tube leakage in BTT - Erosion of Burner transition bends
was observed due to Secondary air from wind box Application of plastic refractory over Burner transition tube
bends
Visual Inspection of tubes in Burner zone for signs of
overheating like bulging etc. during OH
Year
2011-12
0.64
2012-13
1.64
2013-14
10
1.37
2014-15
1.03
2015-16
0.00
1.10
*No tube leakage in the first three months of the last overhauls
1.
Cause / Nos
EROSION
WELD DEFECT
ATTACHMENT
WELD FAILURE
S -Panel
WATER
WALL &
HANGER
TUBES
Cause / Nos
EROSION
(SB Steam)
SHORT TERM
OVER HEATING
(Starvation)
ATTACH MENT
WELD
Weld failure
Cause / Nos
ROOF
TUBES
EROSION
PLATEN
SH /
DIVISIONA
L PANEL /
SPACER
TUBES
WELD
FAILURE
RUBBING
(coil)
REHEATER
Cause / Nos
OVER
-Vertical tubes to be cut by
HEATING
grinding and capping.
(Starvation due to -Steam cleaning of new tubes
blockage.)
before welding.
Monitoring metal temperatures.
Oxide scale measurement.
Visual inspection.
Sponge ball checking of RH tubes for
identifying blockages
Use of Metal caps
WELD
FAILURE
ATTACH MENT
WELD FAILURE
Area
6
RH VENT
/ DRAIN
STUB
Cause / Nos
WELD
FAILURE
FLUEGAS
EROSION
7
ECONOM
ISER
WELDFAILURE
Area
Cause / Nos
Flue Gas
Erosion
LTSH
Modification weld
joint Failure
Manhole door
attachment weld
failure
LTSH
Thank You