Shut down job of Pyrosection- Raw Mill

Sr.no

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

Job description
Raw Mill
Bag Filter hopper end cone repaire work.
Inspection of all Rotary feeder Chain sprocket.
Raw Mill diaphgram bolts inspection and tightening.
Weigh feeder-3 vent line duct modification.
Lime stone crusher gap Checking.
Apron feeder conveyor Complete inspection.
Raw Mill inlet outlet Lubrication system filter cleaning.
Stone and bricks house keeping near lime stone area
Mechanical housekeeping in above area.
L.S. Yard tunnel belt 100 BC3 take up weight trolly to be covered for
rain/Water
Yard trolly system to check at end with limit switch.
LS Crusherto yard trolly belt at takeup belt is not in centre 100 BC1
Belt 100 BC1 roller sound observed.
tipper belt 100 BC2 at tail end matarial spillage need to be plate
privision to self dust removals.
Cleaning on the gear box mchine/ Equipment.
Floor area cleaning/Housekeeping
100 BC1 belt discharge skirt to be adjusted
Weight feeder discharge hopper vent line to be modified & corrected
Lime Stone weight feeder scraper rubber to be checked & adjusted
Tunnel Belt 200 BC3 skirt to be modified for dust control
100 BC4 Belt discharge point chute modification In stopage
100 BC4 discharge chute area plarform ladder to be provided
Housekeeping in tunnel area

24

Tunnel water pump(100 BC3) foundation to be fixed on ground or on


wall

25

LS apron feeder discharge side to be covered by the rubber to control


the dust

26

Apron feeder discharge chute (Entrance to crusher) top plate bulge


required replace

27

Apron feeder bucket bolts checked and broken 6 nos replaced.

ection- Raw Mill


men power

1F+1KH+1W

start

4/10/2016

end

Remarks

4/15/2016 Completed.
Pending
Pending
Completed
Completed
Completed

Pending
Complete

6 roler replaced

continue.
Complete.

Completed.
Completed.

Completed