MSD ASSIGNMENT II: SPREADSHEET BASED MANUF

ANALYSIS:
Mixed Model Sequencing using the Goal
bij
GOAL_1

Qi=planned production quantity of the products(Ai)


Product(Ai, i=1,2,.a)
Ti= operation time per unit of product Ai on the
process l total operation time per day
cycle time=C

A1

Pr
od
uct
s,
Ai

A2
A3

max{sigmaQiTi/sigmQi}

[Nj]=
Q=
[Nj]/Q=

Goal_2

Q=Total production quantity of all products,Ai


Nj=Total necessary quantity of parts aj to be
consumed
for producing
all products
Ai aj to be
Xjk=Total necessary
quantity
of the part
utilized for producing the products of setermined
sequence
from necessary
first to Kth quantity of the part aj
Nj/Q= Average
per unit of a product

Xjk=

K*Nj/Q=Avrage
Dk=sqrt[sum{sqr(k*Nj/Q- Xjk-1
K=k+1
Xjk=Xjk-1 +

bij

-bij)}]

k=
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

BASED MANUFACTURING SYSTEMS

ng using the Goal Chasing algorithm


Parts,aj

Product, Ai

Planned Production
Quantity, Qi

a1

a2

a3

a4

A1

A2

A2

0.5

0.8

0.7

0.5

Xjk-1

bi*j

X1,k

X2,k

X3,k

Q=

10

10

0
0
1
2
2
3
3
3
4
5
5

0
1
2
2
3
4
5
6
6
7
8

X4,k
0

1
1
2
3
3
4
5
6
6
7

Dk,1=

Dk,2=

1.11
0.85
0.82
1.87
1.32
1.64
0.93
0.57
1.56
1.73

1.01
0.57
1.44
1.64
0.87
1.87
1.21
0.85
0.79
1.73

0
0
1
2
2
3
3
3
4
5
5

Dk,3=

Dk,i*=

i*=

0.79
1.59
0.93
0.28
0.87
0.28
0.82
1.59
1.01
0.00

0.79
0.57
0.82
0.28
0.87
0.28
0.82
0.57
0.79
0.00

3
2
1
3
2
3
3
1
2
3

A3
A3
A3
A3
A3
A3
A3
A3
A3
A3

A2
A2
A2
A2
A2
A2
A2
A2
A2

A1
A1
A1
A1
A1
A1
A1
A1

A3
A3
A3
A3
A3
A3
A3

A2
A2
A2
A2
A2
A2

A3
A3
A3
A3
A3

A3
A3 A1
A3 A1 A2
A3 A1 A2 A3