CMS #4: TELEGRAPH
CLOSED
AHEAD
W20-3
W20-2
R11-2
M4-10
100
ft
M4-8a
ft
ft
100 ft
A/NS
75' T
W20-1
100
100
W20-1
R11-2
CMS #1: TELEGRAPH
CLOSED
AHEAD
M4-8a
S
TA/N
W1-3R
R9-11a(R)
TA/NS
R9-9
R9-11(L)
W20-5a
W1-3
125 ft
100' NTS
W20-1
100' NTS
125 ft
100 ft
11 ft
12 ft
12 ft
12 ft
12 ft
125 ft
W20-5
R11-2
R1-1
M4-10
100' NTS
W20-1
100' NTS
W20-1
R3-1L
M4-10
TA/NS
100' TA/NS
130 ft
100 ft
100 ft
11 ft
W20-5
Comments:
1) NO CONSTRUCTION TO BE PERFORMED ON HOLIDAYS UNLESS AUTHORIZED BY THE CITY.
2) TRAFFIC SIGNAL IN THE BROADWAY MEDIAN THAT CONTROL WB 15TH TRAFFIC TO BE REMOVED
AND REPLACED WITH "STOP" SIGN & "STOP" PAVEMENT MARKING.
W20-3
3) TRAFFIC SIGNAL FOR NB BROADWAY AT 15TH TO BE BAGGED AND MONITORED FOR TRAFFIC FLOW
4) TRAFFIC SIGNAL FOR SB BROADWAY AT 15TH TO BE BAGGED AND MONITORED FOR TRAFFIC FLOW
5) SB BROADWAY TRAFFIC BETWEEN 15TH AND 17TH TO BE REDUCED TO ONE LANE DURING WATERLINE CONSTRUCTION.
6) WORK HOURS WITHIN THE DESIGNATED WORK ZONE: 7 AM - 5 PM
WORK HOURS THAT INTERFERE WITH TRAFFIC OUTSIDE OF DESIGNATED WORK ZONE: 9 AM - 4 PM
TEMPORARY TRAFFIC CONTROL SHALL BE LEFT IN PLACE 24/7 DURING PHASE 1, 2 AND 3.
Plan Scale
1 in = 50ft