Bill of Materials
Bill of Materials
No.
DESCRIPTIONS
I.
GENERAL REQUIREMENTS
II.
III.
SITE WORK
EXCAVATION
BACKFILL
GRAVEL BEDDING
IV.
V.
VI.
VII.
VIII.
IX.
REBAR WORKS
10mm STANDARD LENGTH
12mm STANDARD LENGTH
16mm STANDARD LENGTH
G.I. Wire #16
Quantity
Unit
Unit Cost
50.238 Cu. M.
158.577 Cu. M.
12.297 Cu. M.
224
126
483
50.5
pcs
pcs
pcs
kgs
Amount
111.80
172.00
305.00
60.00
25,043.20
21,672.00
147,315.00
3,030.00
CONCRETE WORKS
PORTLAND CEMENT
SAND
GRAVEL (CRUSHED)
436 bags
24.2 Cu. M.
48.41 Cu. M.
225.00 98,100.00
600.00 14,520.00
600.00 29,046.00
FORM WORKS
4"X8"X1/2" PLYWOOD
COCOLUMBER 2"X3"X12'
2" C.W. NAILS
70 pcs
520 pcs
42.75 kgs
315.00 22,050.00
132.00 68,640.00
65.00 2,778.75
MASONRY WORKS
CHB
a.) EXTERNAL 6"
b.) INTERNAL 4"
PORTLAND CEMENT
SAND
1811
640
226
18.72
12.00
8.00
225.00
600.00
pcs
pcs
bags
Cu. M.
METAL WORKS
TRUSSES/PURLINS
RAFTERS
RAMP RAILING
ROOF WORKS
G.I. LONG SPAN ROOFING TWIN -RIB
PLAIN G.I. SHEET
WEIGHT OF G.I. RIVETS
WEIGHT OF G.I. WASHERS
PURLINS
288
6
22.5
64
pcs
pcs
kgs
kgs
21,732.00
5,120.00
50,850.00
11,232.00
Item
No.
DESCRIPTIONS
Quantity
Unit
Unit Cost
RAFTERS
SAGRODS
X.
FINISHING WORKS
30X30 cm VITRIFIED CERAMIC TILES
30X30 CM GLAZED CERAMIC WALL TILES
TILE ADHESIVE
TILE GROUT
PRIMER PAINT
TOP COAT PAINT
NEUTRALIZER
Amount
241
512
8
34
7
7
3
pcs
pcs
bags
kgs
gal
gal
gal
220.00
72.50
604.40
617.60
573.64
1,760.00
2,465.00
4,230.80
4,323.20
1,720.92
XI.
ELECTRICAL WORKS
XII.
PLUMBING WORKS
535,628.87