Notes:: FORM NO: PEM-6101-0. Document Title Document No. Project Title

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

FORM NO: PEM-6101-0.

Kg/cm2 (g)

MWC

WHETHER REQMT.
CONSUMPTIVE IN
NATURE

MAX./MIN. LIMIT ON
ACW WORKING
PRESS. (IF ANY)

M3/Hr.

TEMPERATURE RISE

M3/Hr.

PE-ID-999-179-N001
Page 1 of 1

PRESSURE DROP

NO.

DOCUMENT NO.

(WITHIN T.P. INCL. CONTROL


VALVE, PIPE AS APPLICABLE)

NO.

DESIGN PRESSURE
FOR EQUIPMENT

UNIT

EQUIPMENT DESCRIPTION

EQUIPMENT

COOLING WATER REQUIREMENT FOR SWAS ETC.


5X270MW AMRAVATI TPP
NOS. PER
ACW QTY PER
UNIT
STANDBY

SL. No.

PROJECT TITLE

WORKING

DOCUMENT TITLE

REMARKS

Kg/cm2 (g)

1.

SWAS COOLERS (FEED


WATER, DRUM WATER,
SATURATED STEAM & SUPER
HEATED STEAM)

18

12

10

10

NO

ELEVATION

2.

SWAS COOLERS (DEAERATOR


SERVICE)

1.4

12

10

10

NO

ELEVATION

3.

SWAS ROOM FOR CHILLER


SYSTEM

1.4

12

10

10

NO

ELEVATION

NOTES:
1. QUALITY OF COOLING WATER FOR SWAS SHALL BE PASSIVATED DEMINERALISED WATER (PH = 8.5 TO 9.5) WITH DESIGN
TEMPERATURE OF DMCW AT COOLERS INLET AS 38 OC.
2. BHEL EDN- TO NOTE THAT PRESSURE DROPS AND TEMPERATURE RISE ACROSS VARIOUS COOLERS ARE WITHIN BHEL EDNs
TERMINAL POINTS WHICH SHALL BE INCLUSIVE OF PIPING, VALVES, COOLERS ETC.

You might also like