CDI-T 5th Management (1-12)
CDI-T 5th Management (1-12)
Fifth Edition
1st January 2012
Management
Rev. CDI-T 1/12
Cover
(C) 2012 Chemical Distribution Institute
ACKNOWLEDGEMENT
The contribution made by all members of the CDI-T Technical Committee, the Centre for
Maritime and Industrial Safety Technology, the European Chemical Industry Council and the
American Chemistry Council in the preparation of this, the Fifth Edition of the Terminal
Questionnaire, is gratefully acknowledged.
Management
Rev. CDI-T 1/12
Introduction Page 1
(C) 2012 Chemical Distribution Institute
CDI-Terminals
Terminal Inspection Report
INDEX OF CHAPTERS
PART 1, MANAGEMENT QUESTIONNAIRE
M0
General Information
M1
Management Responsibility
M2
Training
M3
M4
M5
The Customer
M6
Personnel
M7
Operations
M8
Maintenance
M9
M10
M11
Administration
M12
Personnel Safety
M13
Occupational Health
M14
Environmental Protection
M15
Security
PART 2, TECHNICAL QUESTIONNAIRE
TA.
SYSTEMS
TA1
Fire Fighting
TA2
Power Distribution
TA3
Vehicle Circulation
TA4
Emergency Response
TA5
Tank Cleaning
TA6
TA7
TA8
Security
TA9
Hoses
TB.
AREAS
TB1
TB2
TB3
Tank Farm
TB4
TB5
TB6
Warehouse
TB7
Buildings
Management
Rev. CDI-T 1/12
Introduction Page 2
(C) 2012 Chemical Distribution Institute
CDI-Terminals
Management Questionnaire
INTRODUCTION
The Background
This CDI-T Questionnaire was originally developed as part of the CEFIC Safety and Quality
Assessment System for Terminal Operations.
The aim of the Questionnaire is to give an accurate assessment of the terminal at the time the
inspection is carried out. The Questionnaire is essentially a quality assessment of the terminal,
its operations and personnel, which also incorporates essential aspects of safety and
environmental protection.
The Questionnaire does not attempt to pass or fail the terminal for any particular purpose but
rather to give an assessment of performance at the time of the inspection.
The Inspector
The highest standards of ethical behaviour are expected from CDI Inspectors. The findings
presented in the Report are to be regarded as confidential and the property of the terminal
owner and on no account shall the Inspector discuss the contents of the Report with any third
party.
The Inspector will be an observer only and shall not interfere or become involved in the
operation of the terminal or be a party in any discussion between the terminal, customer, local
authorities, etc.
A courteous and considerate approach is expected of the Inspector in all dealings with the
terminal's personnel. The Inspector should take care to ensure that his actions do not in any
way delay or interfere with the normal operation of the terminal. The Inspector shall not operate
any equipment, but he may request equipment to be run or operated under test. The Inspector
may relate industry best practice, but he is not permitted to advise on specific operational or
constructional matters.
The Inspector is expected to set a good example with respect to his own safety procedures
during the period of the inspection. The Inspector will wear, as appropriate for the location,
protective clothing and equipment including boiler suit, safety helmet, safety shoes, safety
gloves, ear protectors and goggles / safety glasses.
The terminal's safety procedures and notices displayed at the terminal must be complied with by
the Inspector. The Inspector shall not enter restricted areas unless the Manager's permission
has been obtained and any relevant permits / checklists have been completed correctly. The
Inspector will not enter an enclosed space unless entry procedures are fully complied with.
The Questionnaire
There are three categories of questions, these are:
TPQ indicates a Terminals Particulars Question. These may be completed by all terminals
and principally deal with the capacity and facilities available at the terminal.
SI indicates a Self Inspection Question. Terminals having been previously inspected by CDIT, may complete these questions in the days prior to the inspection taking place. These
questions principally concern procedures and records, and are subject to audit by the Inspector.
Where an Inspector finds that SI questions have not been answered correctly, the Inspector has
the right to revert to a full inspection of the Chapter, the Department or the entire Terminal.
Management
Rev. CDI-T 1/12
Introduction Page 3
(C) 2012 Chemical Distribution Institute
CDI-Terminals
Management Questionnaire
INTRODUCTION
I indicates an Inspection Question. These questions will be inspected by the Inspector,
irrespective of previous inspections.
Questions are to be answered ''Yes'' or ''No'', with provision for a ''N/A'' answer when a piece of
equipment or facility does not exist.
Questions within the Questionnaire which clearly do not apply to the terminal should be marked
as N/A. Examples of non applicable questions are where an operational assessment is required
of equipment fitted and the terminal does not carry the equipment listed.
A "No" answer to a question does not necessarily imply that the terminal is not in compliance.
All "No" answers must be supported with an observation explaining the reason and/or
circumstance that exists.
Prior to the Inspection
Prior to an inspection being carried out, the terminal should complete the appropriate questions
in the Questionnaire, ready for presenting to the Inspector. This practice will greatly reduce the
time for inspection and provide the Inspector with all pertinent information regarding the
terminal.
An inspection shall not normally be carried out during hours of darkness. The only exception to
this is when special arrangements have been made with the Manager prior to the Inspector
arriving at the terminal.
The Opening Meeting
On arriving at the terminal, the Inspector will identify himself to the Manager and outline the
objectives and requirements of the inspection. The Inspector and the Manager should agree the
sequence for the inspection and construct a timetable, listing key personnel and their availability
to assist with the inspection. The inspection should be planned and carried out in a manner
which will not conflict with the safe operation of the terminal.
During the inspection, it is recommended that the Inspector is accompanied at all times by a
responsible and suitably qualified person(s), nominated by the Manager.
Proper planning at the Opening Meeting will enable the inspection to be carried out efficiently
and with the minimum of disruption to the normal working of the terminal.
The Inspection
Immediately following the Opening Meeting, the Inspector is required to go out on site for 4 to
5 hours to observe the actual operating conditions of the terminal.
It is a requirement that all questions, statements and information in the Questionnaire are
completed. Sampling of questions within the Report, other than pre-completed SI questions, is
not permitted. However, sampling within a particular question is permitted. For example, when
assessing the question on the operating instructions, the Inspector is not expected to sight
every operating instruction at the terminal but only a sufficient number to make a broad
judgment that they are displayed or readily available.
Management
Rev. CDI-T 1/12
Introduction Page 4
(C) 2012 Chemical Distribution Institute
CDI-Terminals
Management Questionnaire
INTRODUCTION
With the terminal in operation, some areas may not be capable of inspection, e.g. tanks,
restricted loading bays. When any question is not addressed due to operational reasons, the
N/A check box should be marked and a note made in the relevant Remarks section.
With the exception of "familiarity" type questions which by their nature are subjective, answers
to all other questions must be based on objective evidence. Objective evidence is defined as
qualitative or quantitative information, records or statements of fact which is based on
observation, measurement or test and which can be verified.
Asking for a procedure, is implicit that the procedure is implemented, followed and enforced.
Inspectors will employ the methodology of tell me,, show me, prove to me in establishing
the answers to questions. The assurance of the terminal's staff will not be accepted by the
Inspector as compliance with a particular question, without objective evidence being produced
to support their assertions.
Should a request for the demonstration or test of a particular piece of equipment be refused,
then the details will be noted in the relevant Remarks section. Requests for a test of equipment
shall not be made where this will result in a major disruption to the terminal's normal operations.
i.e. stopping operations, blackout, etc.
The Closing Meeting
On completion of the inspection, the Inspector will hold a Closing Meeting with the Manager. At
the Closing Meeting the Inspector will provide the Manager with a copy of the Report Summary
containing the inspectors observations and remarks.
The Inspector will discuss with the Manager the answers given in the Report Summary and if
requested to do so, explain how the answers have been determined. Should a "No" answer or
observation be contested, then the Inspector will give the Manager the opportunity to produce
objective evidence to satisfy the requirement. If satisfactory evidence of compliance is
produced, then the answer to the question may be amended. Answers to questions, should not
be amended after the Inspector leaves the terminal.
The Manager must be given the opportunity to comment in writing on the contents of the
Questionnaire. Any written comments from the Manager will be entered to the database by the
Inspector.
The Manager will be requested to sign for the Report Summary. The Manager's signature is for
receipt only and does not infer that the Manager agrees with the assessment. However, the
Manager must be made aware that release of the Report is bound by agreement between the
Terminal Company and CDI-T, in that: the Tank Terminal Company undertakes to distribute
copies of the Report only via the services provided by CDI-T.
The inspection does not result in a pass or fail. The Report is for consideration by a potential
customer(s) only. The Inspector shall not make any recommendations for the correction of any
items marked as "No" in the Questionnaire, nor indicate to the Manager, or any other person,
the standard of the terminal or the possible eventual outcome of the inspection.
Management
Rev. CDI-T 1/12
Introduction Page 5
(C) 2012 Chemical Distribution Institute
CDI-Terminals
Management Questionnaire
INTRODUCTION
Processing the Report
During, or on completion of the inspection, the Inspector will enter all the inspection data
(together with any comments from the Manager), into his computer terminal and then up-load
the Report to the CDI-T database in accordance with the procedures governing control of the
database system.
Except in exceptional circumstances (or when instructed by CDI), copies of the Report must not
be faxed, or transmitted by any other means, to any person or business who is not the terminal
owner. Inspection data is privy to the Inspector (which includes persons employed by the
Inspector or under the direct control of the Inspector) and the terminal owner. Persons who do
not have approved access to the electronic database, are not permitted to sight the inspection
data in hand-written or typed hard copy.
The use of the electronic database provides a level of security for the inspection data which is
severely compromised if information is faxed or mailed to uncontrolled third parties.
The Inspector is responsible for the security of the inspection data (hard copy and electronic)
between the time of carrying out the inspection and uploading the data to the database. Within
the confines of this procedure, the Inspector shall ensure that a back up of the inspection data is
available in the event that the original inspection data is lost prior to uploading to the database.
After uploading inspection data to the database, all hard copy inspection data shall be retained
by the Inspector for a period of three years. Thereafter, the documents may be disposed of in a
safe and secure fashion.
After Inspection
On receipt of the Report to the database, the database will automatically send the Report
Number and Security Code to the e-mail of the person entered in question M0.7.
From the date the Report is entered to the database, the terminal has an exclusive 14 day
period to review the Report and revoke any access permissions. The terminal has a total period
of ninety days from the date the Report is entered to the database to enter initial comments to
any negative answers. The terminal may edit Section M0 and enter additional comments at any
time within the life of the Report. Entering and updating the comments is an important
expectation of the chemical companies accessing the Report.
On receipt of the Report to the database, a CDI-T Attestation document will be issued and
mailed to the Manager. These authenticated documents are issued by CDI Administration and
serve as verification of the terminal having undertaken the CDI-T inspection.
Management
Rev. CDI-T 1/12
Introduction Page 6
(C) 2012 Chemical Distribution Institute
CDI-Terminals
Management Questionnaire
Letter to the Terminal Manager
Dear Sir,
AFTER THE INSPECTION
At the Closing Meeting, the Inspector will request that you sign and receive a copy of the
Report Summary. You are invited to add any comments that you may have at this stage, and
these will be entered to the database.
On departing your terminal, the Inspector is obligated to enter the report to the database as
quickly as possible, though depending on his work commitment and travel , a 14 day period is
permitted. Once your report is accepted on the database, the database will send you an e- mail
message advising you of the report number and security code.
Via the website at www.cdit.nl, you have an exclusive 14 day period to review the Report and
revoke any access permissions. You have a total period of ninety days from the date the
Report is entered to the database to enter initial comments to any negative answers. You may
edit Section M0 and enter additional comments at any time within the life of the Report.
Entering and updating the comments is an important expectation of the chemical companies
accessing the Report. CDI will provide you with every help and assistance in navigating
through the various menu options. If you encounter difficulty, please do not call the Inspector,
please contact CDI or the Pharox Program Manager: Mr. E. Horring: ehorring@pharox.nl.
An Attestation document will be automatically issued and mailed to your desk. Should you
require an authenticated hard copy of the report, please contact CDI. You may also display the
CDI-T Inspected Logo on your company literature, details are available from CDI.
Yours faithfully,
CDI-T, Administration
Management
Rev. CDI-T 1/12
Introduction Page 7
(C) 2012 Chemical Distribution Institute
CDI-Terminals
Management Questionnaire
ABBREVIATIONS
LIST OF ABBREVIATIONS USED IN THE QUESTIONNAIRE
ADNR
ACC
BCH
Code for the Construction and Equipment of Ships Carrying Dangerous Chemicals in Bulk (IMO)
BLC
CDI
CEFIC
CFC
Chloro/Fluoro Compound
COF
Certificate of Fitness
DWT
Deadweight
ESD
Emergency Shut-down
FFE
GFCI
Inspection Question
IBC
International Code for the Construction and Equipment of Ships Carrying Dangerous Chemicals in Bulk (IMO)
ICS
IFR
ILO
IMO
IMDG
ISGOTT
ISGINTT
ISO
ISPS
Management
Rev. CDI-T 1/12
Introduction Page 8
(C) 2012 Chemical Distribution Institute
CDI-Terminals
Management Questionnaire
ABBREVIATIONS
LEL
LOA
Length Overall
LSA
MARPOL
MOC
Management of Change
MSDS
N/A
OCIMF
P&A
PERC
P/V
Pressure/Vacuum
RC
Responsible Care
RCCB
Res
ROV
RTC
RTT
SI
Self-Inspection Question
SSSCL
Ship/Shore Safety Checklist for Safe Transport, Handling and Storage of Dangerous Substances in Port Areas
TPQ
TSG (C)
TSG (G)
UEL
USCG
VEC
VOC
VTU
WHO
Management
Rev. CDI-T 1/12
Introduction Page 9
(C) 2012 Chemical Distribution Institute
Terminal:
Consecutive
Number
Management
Rev. CDI-T 1/12
Reference
Management
Rev. CDI-T 1/12
Management
Rev. CDI-T 1/12
Management
Rev. CDI-T 1/12
Management
Rev. CDI-T 1/12
Management
Rev. CDI-T 1/12
Management
Rev. CDI-T 1/12
Management
Rev. CDI-T 1/12
Management
Rev. CDI-T 1/12
Chapter M0
Question
M0.1
M0.2
M0.3
Address of Terminal :
M0.4
Country of Terminal :
M0.5
Phone Number :
M0.6
Fax Number :
M0.7
M0.8
M0.9
Terminal/General Manager :
M0.10
Commercial Manager :
M0.11
M0.12
Operations Manager :
M0.13
M0.14
M0.15
M0.16
Others (specify) :
Office hours :
M0.18
Operating hours :
M0.19
Management
Rev. CDI-T, 1/12
Page 1
(C) 2012 Chemical Distribution Institute
Chapter M0
GENERAL INFORMATION (Terminal Particulars Questions)
Question
M0.21
Certificate No :
M0.22
Issued by :
M0.23
Environment :
M0.24
Certificate No :
M0.25
Issued by :
Safety :
M0.26
Certificate No :
M0.27
Issued by :
Security :
M0.28
ISPS Certificate No :
M0.29
Issued by :
M0.30
Others (specify) :
M0.31
Certificate No :
M0.32
Issued by :
M0.33
Others (specify ):
M0.34
Certificate No :
M0.35
Issued by :
Management
Rev. CDI-T, 1/12
Page 2
(C) 2012 Chemical Distribution Institute
Chapter M0
GENERAL INFORMATION (Terminal Particulars Questions)
Question
Facilities :
M0.36
Storage Tanks :
Tank
Type
Tank
Capacity
M3
No. of
Tanks
Material of
Construction
Coating
Heating
Cooling
Nitrogen
Mixing
Are berths owned by the Terminal, the Port Authority or other third party ?
M0.38
Are berths maintained by: the Terminal, the Port Authority or other third party ?
M0.39
M0.40
Are berths operated by: the Terminal, the Port Authority or other third party
personnel ?
Number of berths for sea-going vessels :
M0.41
M0.42
M0.43
M0.44
Max. Displacement :
M0.45
M0.46
M0.47
M0.48
M0.49
Barges :
M0.50
M0.51
Management
Rev. CDI-T, 1/12
Page 3
(C) 2012 Chemical Distribution Institute
Chapter M0
Question
M0.52
M0.53
M0.54
M0.55
M0.56
M0.57
M0.59
M0.60
Drumming facilities :
M0.61
M0.62
Other Heating :
M0.63
M0.64
M0.65
M0.66
M0.67
Management
Rev. CDI-T, 1/12
Page 4
(C) 2012 Chemical Distribution Institute
Chapter M0
Question
M0.68
M0.69
M0.70
UN Class 1.0,
UN Class 2.0,
UN Class 3.0,
UN Class 4.0,
UN Class 5.0,
UN Class 6.0,
UN Class 7.0,
UN Class 8.0,
UN Class 9.0,
Explosives
Gases
Flammable liquids
Flammable solids
Oxidizing substances
Toxic and infectious substances
Radioactive substances
Corrosives
Miscellaneous dangerous substances
Inspection Date :
M0.71
Management
Rev. CDI-T, 1/12
Page 5
(C) 2012 Chemical Distribution Institute
Chapter M1
Question
MANAGEMENT RESPONSIBILITY
Quality Management System
M1.1
Yes
No
SI
General Policy
Has the company written policy reflecting management's active commitment to :
M1.2
SI
RC
M1.3
- environment ?
SI
RC
M1.4
- security ?
SI
RC
M1.5
- quality ?
SI
RC
SI
RC
M1.6
M1.7
SI
RC
M1.8
- environment ?
SI
RC
M1.9
- security ?
SI
RC
M1.10
- quality ?
SI
SI
RC
M1.12
- environment ?
SI
RC
M1.13
- security ?
SI
RC
M1.14
- quality ?
SI
RC
SI
RC
M1.16
SI
RC
M1.17
SI
RC
M1.18
Are Quality and HSE&S objectives and targets within the context of the
Quality/HSE&S policy statement(s) ?
SI
RC
M1.19
SI
RC
M1.20
SI
RC
Management
Rev. CDI-T, 1/12
Page 6
(C) 2012 Chemical Distribution Institute
Chapter M1
MANAGEMENT RESPONSIBILITY
Question
Yes
No
M1.21
SI
RC
M1.22
SI
RC
M1.23
SI
RC
M1.24
SI
RC
M1.25
Has the company a policy statement which clearly reflects a commitment to the
Responsible Care Guiding Principles?
SI
RC
M1.26
SI
RC
Does the Quality Management System include a process to seek public opinion
and input with regard to products stored and terminal operations ?
SI
RC
M1.28
SI
RC
SI
RC
M1.30
SI
RC
M1.31
SI
RC
M1.29
SI
RC
M1.33
SI
RC
SI
RC
- HSE&S ?
SI
M1.36
- Quality Assurance ?
SI
Does the senior management set specific objectives for the Co-ordinators for:
M1.37
- HSE&S ?
SI
RC
M1.38
- Quality Assurance ?
SI
RC
Management
Rev. CDI-T, 1/12
Page 7
(C) 2012 Chemical Distribution Institute
Chapter M1
MANAGEMENT RESPONSIBILITY
Question
Yes
No
- HSE&S ?
SI
RC
M1.40
- Quality Assurance?
SI
RC
SI
RC
M1.41
M1.42
SI
RC
M1.43
SI
RC
SI
RC
M1.45
SI
RC
SI
RC
SI
RC
M1.46
M1.47
M1.48
SI
RC
M1.49
Does each employee have a job description which describes their responsibility
for HSE&S and Quality ?
SI
RC
M1.50
M1.51
SI
M1.52
SI
RC
SI
RC
SI
RC
RC
Meetings
M1.53
M1.54
M1.55
M1.56
- technology ?
SI
RC
M1.57
- operational techniques ?
SI
RC
Management
Rev. CDI-T, 1/12
Page 8
(C) 2012 Chemical Distribution Institute
Chapter M1
MANAGEMENT RESPONSIBILITY
Question
Yes
No
M1.58
- products handled ?
SI
RC
M1.59
- amended legislation ?
SI
RC
M1.60
SI
RC
RC
M1.61
SI
M1.62
SI
M1.63
SI
M1.64
SI
SI
M1.65
RC
M1.66
Are HSE&S and Quality items discussed at regular meetings between operation
managers and supervisors?
SI
RC
M1.67
SI
M1.68
SI
RC
M1.69
SI
RC
M1.70
SI
RC
M1.71
RC
M1.72
Do the HSE&S and Quality reviews verify that adequate resources are allocated
to meet the objectives and targets ?
SI
RC
- HSE&S ?
SI
RC
M1.74
- Quality ?
SI
RC
- HSE&S ?
SI
RC
M1.76
- Quality ?
SI
RC
SI
RC
Management
Rev. CDI-T, 1/12
Page 9
(C) 2012 Chemical Distribution Institute
Chapter M1
MANAGEMENT RESPONSIBILITY
Question
Yes
No
- for HSE&S?
SI
RC
M1.79
- for Quality?
SI
RC
M1.80
SI
RC
M1.81
SI
RC
M1.82
SI
M1.83
Are the persons given the responsibility for auditing independent of the
activities to be reported on ?
SI
SI
RC
SI
RC
M1.84
Are action plans developed and are corrective actions taken as identified by the
audit?
Risk Assessment
M1.85
M1.86
- products handled ?
SI
RC
M1.87
- product throughput ?
SI
RC
M1.88
SI
RC
M1.89
SI
RC
M1.90
SI
RC
M1.91
SI
RC
M1.92
SI
RC
M1.93
SI
RC
M1.94
SI
RC
M1.95
SI
RC
SI
RC
SI
RC
SI
RC
SI
RC
M1.96
M1.97
M1.98
M1.99
M1.100
SI
M1.101
- engineering out ?
SI
Management
Rev. CDI-T, 1/12
Page 10
(C) 2012 Chemical Distribution Institute
Chapter M1
MANAGEMENT RESPONSIBILITY
Question
Yes
No
- operating discipline ?
SI
- organisational measures ?
SI
M1.102
M1.103
M1.104
- existing products ?
SI
RC
M1.106
- existing processes/procedure ?
SI
RC
SI
RC
M1.108
SI
RC
SI
RC
SI
RC
M1.109
M1.110
M1.111
- investment ?
SI
RC
M1.112
SI
RC
- safety ?
SI
RC
M1.114
- environment ?
SI
RC
M1.115
- health ?
SI
RC
M1.116
- security ?
SI
RC
M1.117
- quality ?
SI
RC
SI
RC
M1.119
SI
RC
M1.120
SI
RC
SI
RC
M1.121
Management
Rev. CDI-T, 1/12
Page 11
(C) 2012 Chemical Distribution Institute
Chapter M2
TRAINING
Question
Yes
No
Have training needs been identified, based on an inventory of all tasks and
responsibilities ?
Is the inventory reviewed in line with the MOC process ?
SI
SI
RC
SI
RC
M2.4
SI
RC
M2.5
SI
RC
M2.6
SI
RC
Training Program
M2.7
SI
M2.8
SI
M2.9
SI
RC
M2.10
SI
RC
M2.11
Are records maintained of who has been trained and in what subjects ?
SI
RC
M2.12
SI
SI
M2.14
SI
- management responsibility ?
SI
M2.16
SI
M2.17
- HSE&S policies ?
SI
RC
M2.18
- emergency plans ?
SI
RC
Management
Rev. CDI-T, 1/12
Page 12
(C) 2012 Chemical Distribution Institute
RC
Chapter M2
TRAINING
Question
Yes
No
SI
RC
M2.20
SI
RC
SI
M2.22
- operations ?
SI
M2.23
- maintenance ?
SI
M2.24
- HSE&S procedures?
SI
M2.25
SI
M2.26
SI
M2.27
SI
M2.28
- emergency plans ?
SI
M2.29
SI
M2.30
SI
M2.31
SI
Management
Rev. CDI-T, 1/12
Page 13
(C) 2012 Chemical Distribution Institute
RC
RC
Chapter M3
Question
M3.1
Yes
No
SI
RC
SI
M3.3
SI
M3.4
SI
M3.5
SI
M3.6
SI
M3.7
SI
RC
M3.8
SI
RC
M3.9
SI
RC
M3.10
SI
RC
M3.11
SI
RC
M3.12
SI
M3.13
- audit plan ?
SI
M3.14
SI
M3.15
- training records ?
SI
RC
M3.16
SI
RC
M3.17
SI
RC
M3.18
- setting of objectives ?
SI
Do written procedures contained within the QMS cover the following terminal
operations:
M3.19
SI
RC
M3.20
SI
RC
M3.21
SI
RC
M3.22
SI
RC
M3.23
- equipment design ?
SI
RC
M3.24
- maintenance ?
SI
RC
Management
Rev. CDI-T, 1/12
Page 14
(C) 2012 Chemical Distribution Institute
Chapter M3
QUALITY MANAGEMENT SYSTEM
Question
Yes
No
M3.25
- documentation ?
SI
RC
M3.26
SI
RC
M3.27
- bottling/drumming/filling ?
SI
RC
M3.28
- blending operations ?
SI
RC
M3.29
SI
RC
M3.30
SI
RC
M3.31
SI
RC
M3.32
SI
RC
SI
RC
SI
RC
SI
RC
M3.33
M3.34
Are documents contained within the QMS readily available to all employees of
the company ?
Is there a document control system in place for all written procedures contained
with the QMS ?
Quality Improvement Plan
M3.35
M3.36
Has the Quality Assurance Co-ordinator been involved in setting up the plan
and its objectives ?
SI
M3.37
SI
RC
M3.38
SI
RC
M3.39
SI
RC
M3.40
Does the review consider new or unique methods of improving the quality of
the product or service ?
SI
RC
M3.41
SI
RC
Quality Objectives
M3.42
Have quality objectives been set for the performance of personnel in the quality
plan ?
SI
RC
M3.43
Have written Key Performance Indicators (KPI) been set for achieving a level of
service for the company's customers ?
SI
RC
SI
M3.45
SI
M3.46
SI
Management
Rev. CDI-T, 1/12
Page 15
(C) 2012 Chemical Distribution Institute
Chapter M3
Question
Yes
No
M3.47
- reliability of hardware ?
SI
M3.48
- correctness of documentation ?
SI
SI
M3.50
SI
M3.51
SI
M3.52
SI
M3.53
SI
Management
Rev. CDI-T, 1/12
Page 16
(C) 2012 Chemical Distribution Institute
Chapter M4
THE SUPPLIER OF GOODS AND SERVICES
Question
Yes
No
Purchasing
M4.1
SI
M4.2
SI
M4.3
SI
M4.4
SI
Quality Control
M4.5
Are checks carried out on equipment, materials and services supplied, to ensure
that they meet the contract quality specifications requirements ?
SI
RC
M4.6
SI
RC
M4.7
SI
M4.8
SI
Contractors
I
RC
Are the terminal's policies, procedures and practices made known to their
contractors?
SI
RC
Are all contractors' staff given induction training in the terminal's safety and
quality requirements before being allowed to commence work ?
SI
M4.9
M4.10
M4.11
Management
Rev. CDI-T, 1/12
Page 17
(C) 2012 Chemical Distribution Institute
Chapter M5
THE CUSTOMER
Question
Yes
No
The Contract
M5.1
M5.2
SI
SI
Contract Review
M5.3
SI
M5.4
SI
M5.5
SI
M5.6
SI
M5.7
SI
M5.8
RC
Does the terminal solicit from the customer, all relevant information to execute
the contract satisfactorily ?
SI
SI
M5.11
SI
M5.12
SI
M5.13
SI
M5.14
SI
SI
M5.16
SI
M5.17
SI
M5.18
- the product is compatible with all materials with which it will come in
contact ?
SI
M5.19
SI
Quality Control
M5.20
SI
M5.21
Does this procedure require the Terminal to formally inform the customer about
the cause of quality defects ?
SI
Management
Rev. CDI-T, 1/12
Page 18
(C) 2012 Chemical Distribution Institute
RC
Chapter M6
PERSONNEL
Question
Yes
No
Recruitment
Is a profile (specification) defined for filling each position of entry into the
organisation in terms of :
M6.1
SI
M6.2
- promotion potential ?
SI
M6.3
SI
- interviews ?
SI
M6.5
- attitude/psychological tests ?
SI
M6.6
- check of references ?
SI
- employment history?
SI
M6.8
- criminal record?
SI
M6.9
- medical examination ?
SI
SI
M6.11
SI
M6.12
SI
SI
M6.14
SI
M6.15
SI
M6.16
M6.17
Management
Rev. CDI-T, 1/12
Page 19
(C) 2012 Chemical Distribution Institute
I
SI
Chapter M6
PERSONNEL
Question
Yes
No
M6.18
M6.19
Has the company a policy prohibiting the use of drugs and alcohol at the
terminal ?
SI
M6.20
SI
Employee Review
M6.21
M6.22
M6.23
SI
I
Manning
M6.24
M6.25
M6.26
M6.27
M6.28
M6.29
- shift to shift ?
M6.31
- vacation ?
M6.32
Management
Rev. CDI-T, 1/12
Page 20
(C) 2012 Chemical Distribution Institute
Chapter M7
OPERATIONS
Question
Yes
No
Operating Instructions
SI
RC
RC
RC
M7.1
Are all operations broken down into their individual tasks and documented ?
M7.2
M7.3
- cleaning of equipment ?
SI
RC
M7.5
- loading/unloading trucks ?
SI
RC
M7.6
- loading/unloading railcars ?
SI
RC
M7.7
- loading/unloading ships ?
SI
M7.8
- loading/unloading barges ?
SI
RC
M7.9
SI
RC
M7.10
- tank operation ?
SI
RC
M7.11
- pumps ?
SI
RC
M7.12
- compressors ?
SI
RC
M7.13
SI
RC
M7.14
- filters ?
SI
RC
M7.15
- drum filling ?
SI
RC
M7.16
- tank/tank transfers ?
SI
RC
M7.17
- sampling?
SI
RC
M7.18
- tank gauging ?
SI
RC
M7.19
SI
RC
M7.20
SI
RC
M7.21
SI
RC
M7.22
- purging of lines ?
SI
RC
M7.23
- pigging of lines ?
SI
RC
M7.24
SI
RC
M7.25
SI
RC
M7.26
Management
Rev. CDI-T, 1/12
SI
Page 21
(C) 2012 Chemical Distribution Institute
RC
RC
Chapter M7
OPERATIONS
Question
Yes
No
M7.27
- emission control ?
SI
RC
M7.28
SI
RC
M7.29
- heating ?
SI
RC
M7.30
- nitrogen blanketing ?
SI
RC
M7.31
SI
RC
M7.32
SI
RC
M7.33
- environmental aspects ?
SI
RC
M7.34
- safety aspects ?
SI
RC
M7.35
SI
RC
M7.36
- emergency response ?
SI
RC
M7.37
- commissioning of equipment ?
SI
RC
M7.38
- emergency shut-down ?
SI
RC
M7.39
SI
RC
SI
RC
RC
SI
RC
M7.40
M7.41
M7.42
M7.43
Are procedures in place to restrict the use of electrical and electronic equipment
and devices within the hazardous areas of the terminal ?
RC
M7.44
Does the procedure require that the equipment and devices be approved
intrinsically safe or be certified for use in hazardous areas ?
RC
M7.45
RC
RC
Management
Rev. CDI-T, 1/12
Are all inspectors and surveyors given induction training in the terminal's safety
and quality requirements before being allowed to commence work ?
Page 22
(C) 2012 Chemical Distribution Institute
Chapter M7
OPERATIONS
Question
Yes
No
M7.47
Are written instructions issued with regard to working safely, and having
knowledge of product(s)?
RC
M7.48
Are there procedures to check that inspectors and surveyors receive specific
terminal training as per required by the terminal?
RC
RC
M7.50
Is there a written work order system in place to ensure that the product is
ultimately transferred to the correct destined tank ?
RC
Outgoing
M7.51
RC
M7.52
Is there a written work order system in place to ensure that the product is
transferred from the correct tank of origin?
RC
M7.53
Is there a procedure to identify the transportation unit (ship, truck, rail car,
container) is correct as per the client documentation ?
RC
Planning
Are operations planned for :
M7.54
- ships ?
SI
RC
M7.55
- barges ?
SI
RC
M7.56
- road trucks ?
SI
RC
M7.57
- railcars ?
SI
RC
M7.58
- drumming ?
SI
RC
M7.59
- pipeline transfers ?
SI
RC
Does the terminal have procedures in place, to inspect the berth and equipment
prior to arrival of the vessel ?
SI
RC
M7.61
SI
RC
M7.62
SI
RC
Management
Rev. CDI-T, 1/12
Page 23
(C) 2012 Chemical Distribution Institute
Chapter M7
OPERATIONS
Question
Yes
No
M7.63
Does the terminal have available a list of vessel acceptance criteria for each
berth within the terminal?
RC
M7.64
Are the acceptance criteria reviewed with pilots and mooring crews, and
checks conducted that incoming vessels and barges meet the terminal's
acceptance criteria?
RC
M7.65
Does the terminal have procedures in place to ensure that vessels accepted to
berth meet minimum standards of safe operation ?
SI
RC
M7.66
RC
M7.67
Does the terminal have a procedure in place to ensure that a pre-cargo transfer
conference is undertaken, including completion of a Ship/Shore Safety Checklist
?
Does the terminal have procedures in place to designate circumstances when
transfer must be stopped immediately ?
SI
RC
SI
RC
M7.69
Does the terminal have clearly defined and documented climatic and tidal
operating limits for all types and sizes of vessels visiting the terminal?
SI
RC
M7.70
Does the terminal receive and review an updated weather forecast at least
every 12 hours ?
RC
M7.71
SI
RC
M7.68
SI
RC
M7.73
SI
RC
SI
RC
SI
RC
SI
RC
SI
RC
SI
RC
SI
RC
M7.74
M7.75
M7.76
M7.77
M7.78
For ship to ship transfers (double banking), are berth structures subjected to a
formal engineering study and risk assessment ?
Do these studies include mooring fixtures and fendering ?
Mooring Management
M7.79
Have mooring plans for each berth been developed and implemented ?
If Yes, do the plans address:
M7.80
RC
M7.81
- number of lines with reference to ship size and weather conditions, tidal
changes ?
RC
Management
Rev. CDI-T, 1/12
Page 24
(C) 2012 Chemical Distribution Institute
Chapter M7
OPERATIONS
Question
Yes
No
Water Depth
M7.82
SI
RC
M7.83
SI
RC
M7.84
SI
RC
M7.85
SI
RC
M7.86
SI
RC
SI
RC
SI
RC
SI
RC
Pilotage
M7.87
M7.88
M7.89
M7.90
Are the available tugs of sufficient power to supports vessels berthing at the
terminal ?
SI
RC
M7.91
SI
RC
SI
RC
M7.93
RC
M7.94
RC
- product ?
SI
RC
M7.96
- quantity ?
SI
RC
M7.97
SI
RC
M7.98
- handling sequence ?
SI
RC
M7.99
- flow rates ?
SI
RC
M7.100
- maximum pressures ?
SI
RC
SI
RC
M7.101
Management
Rev. CDI-T, 1/12
Page 25
(C) 2012 Chemical Distribution Institute
Chapter M7
OPERATIONS
Question
Yes
No
M7.102
SI
RC
M7.103
SI
RC
Operations - Pipeline
M7.104
SI
RC
M7.105
SI
RC
M7.106
SI
RC
M7.107
SI
RC
M7.108
SI
RC
M7.109
SI
RC
M7.110
SI
RC
Operations - Drumming
M7.111
SI
RC
M7.112
SI
RC
M7.113
SI
RC
M7.114
SI
RC
M7.115
Is there a procedure to ensure the marking and labelling of the drums comply
with the applicable regulations ?
SI
RC
M7.116
SI
RC
M7.117
SI
RC
M7.118
SI
RC
SI
RC
M7.120
SI
RC
SI
RC
M7.121
Management
Rev. CDI-T, 1/12
Are there procedures to check that drivers responsible for loading/unloading the
vehicles are properly trained?
Page 26
(C) 2012 Chemical Distribution Institute
Chapter M7
OPERATIONS
Question
Yes
No
Control of Operations
M7.122
RC
M7.123
RC
M7.124
RC
M7.125
RC
SI
RC
M7.127
SI
RC
M7.128
SI
RC
M7.129
SI
RC
M7.130
SI
RC
Management
Rev. CDI-T, 1/12
Page 27
(C) 2012 Chemical Distribution Institute
Chapter M8
MAINTENANCE
Question
Yes
No
Preventive Maintenance
M8.1
SI
- tankage
SI
M8.3
SI
M8.4
- breakaway couplings
SI
M8.5
- dry-disconnect couplings
SI
M8.6
SI
M8.7
- heat exchangers
SI
M8.8
- PV-valves
SI
M8.9
- loading racks
SI
M8.10
- bottling system
SI
M8.11
- drumming system
SI
M8.12
- sewer/draining system
SI
M8.13
- loading arms
SI
M8.14
- hoses
SI
M8.15
SI
M8.16
- water treatment
SI
M8.17
SI
M8.18
- safety/emergency equipment
SI
M8.19
- utilities
SI
M8.20
- fire extinguishers
SI
M8.21
- fire pumps
SI
M8.22
SI
Management
Rev. CDI-T, 1/12
Page 28
(C) 2012 Chemical Distribution Institute
Chapter M8
MAINTENANCE
Question
Yes
No
M8.24
M8.25
M8.26
Maintenance - Inspections
M8.27
SI
M8.28
SI
RC
- weigh bridges
SI
M8.30
- quantity meters
SI
M8.31
- lifting/hoisting gear
SI
M8.32
- pressure vessels
SI
M8.33
- safety/emergency equipment
SI
M8.34
- gangways
SI
M8.35
SI
M8.36
SI
SI
M8.38
SI
M8.39
SI
M8.40
- fire extinguishers
SI
M8.41
SI
Management
Rev. CDI-T, 1/12
Page 29
(C) 2012 Chemical Distribution Institute
Chapter M8
MAINTENANCE
Question
Yes
No
M8.42
M8.43
M8.44
M8.45
M8.46
M8.47
M8.48
M8.49
SI
RC
RC
SI
RC
SI
SI
- pressure gauges/sensors
SI
test frequency:
SI
- gas detectors
M8.54
test frequency:
SI
M8.55
calibrated frequency:
SI
M8.56
M8.57
M8.58
M8.59
M8.60
M8.61
M8.62
M8.63
Management
Rev. CDI-T, 1/12
SI
- in-line samplers
SI
test frequency:
SI
- overflow alarm
SI
test frequency:
SI
SI
test frequency:
- associated fail-safe and automatic shut-down systems
SI
SI
test frequency:
Page 30
(C) 2012 Chemical Distribution Institute
Chapter M8
MAINTENANCE
Question
Yes
No
SI
SI
- weigh bridges
SI
frequency:
SI
- flow meters
SI
frequency:
SI
SI
frequency:
SI
SI
frequency:
SI
SI
frequency:
Reviews
M8.75
SI
M8.76
SI
Management
Rev. CDI-T, 1/12
Page 31
(C) 2012 Chemical Distribution Institute
Chapter M9
Question
Yes
No
Reporting
Does a written procedure define :
M9.1
- what is to be reported ?
M9.2
M9.3
M9.4
M9.5
- when (timing) ?
M9.6
M9.7
- by whom ?
M9.8
M9.9
- to whom (distribution) ?
M9.10
Quality
SI
HSE&S
SI
Quality
SI
HSE&S
SI
Quality
SI
HSE&S
SI
Quality
SI
HSE&S
SI
Quality
SI
HSE&S
SI
Quality
SI
HSE&S
SI
Quality
SI
HSE&S
SI
Quality
SI
HSE&S
HSE
SI
Quality
SI
HSE&S
SI
Quality
SI
RC
HSE&S
SI
RC
Quality
SI
HSE&S
SI
Quality
SI
HSE&S
SI
- actual losses ?
M9.12
M9.13
- potential losses ?
M9.14
M9.15
- accidents ?
M9.16
M9.17
- near misses ?
M9.18
Does the detail include :
M9.19
- prime causes ?
M9.20
M9.21
- contributory causes ?
M9.22
M9.23
M9.24
Management
Rev. CDI-T, 1/12
Page 32
(C) 2012 Chemical Distribution Institute
Chapter M9
Question
Yes
No
Investigation
Does a written procedure define :
M9.25
M9.26
M9.27
M9.28
M9.29
- by whom ?
M9.30
Quality
SI
HSE&S
SI
Quality
SI
HSE&S
SI
Quality
SI
HSE&S
SI
Quality
M9.32
HSE&S
to
SI
SI
Corrective Actions
M9.33
M9.34
HSE&S
SI
SI
Quality
SI
RC
M9.36
HSE&S
SI
RC
Quality
SI
RC
HSE&S
SI
RC
Quality
SI
RC
HSE&S
SI
RC
- responsibilities ?
M9.38
M9.39
- due dates ?
M9.40
Management
Rev. CDI-T, 1/12
Page 33
(C) 2012 Chemical Distribution Institute
Chapter M9
Question
Yes
No
M9.42
M9.43
M9.44
M9.45
M9.46
Quality
SI
HSE&S
SI
Quality
SI
HSE&S
SI
SI
RC
SI
RC
HSE&S
SI
RC
Quality
SI
RC
HSE&S
SI
RC
Quality
SI
RC
HSE&S
SI
RC
Quality
SI
RC
HSE&S
SI
RC
M9.47
Are lessons learned shared :
M9.48
M9.49
M9.50
M9.51
M9.52
- with stakeholders ?
M9.53
Management
Rev. CDI-T, 1/12
Page 34
(C) 2012 Chemical Distribution Institute
Chapter M10
Question
Yes
No
Catastrophic Events
M10.1
SI
Interface Management
Have contacts been established for fallback response regarding :
M10.2
SI
RC
M10.3
SI
RC
M10.4
- service problems ?
SI
RC
Alternative Supplies
M10.5
SI
M10.6
Have procedures been established with the customer for communication after
office hours ?
SI
Have procedures been agreed with the customer to establish fallback plans in
relation to :
M10.7
- quality of product ?
SI
M10.8
- berth availability ?
SI
M10.9
SI
M10.10
- equipment failure ?
SI
Mutual Arrangements
M10.11
Has the terminal mutual arrangements with neighbours, other operators and
services to provide help in an emergency ?
SI
RC
RC
- accessible/clearly communicated ?
SI
RC
M10.14
SI
RC
M10.15
RC
SI
RC
M10.12
- up-to-date ?
M10.13
M10.16
Management
Rev. CDI-T, 1/12
Does the company Emergency Plan clearly reference the different types of
incident that the company may suffer?
Page 35
(C) 2012 Chemical Distribution Institute
Chapter M10
Question
Yes
No
SI
RC
M10.18
- security requirements ?
SI
M10.19
SI
RC
M10.20
- response equipment?
SI
RC
M10.21
- product incidents?
SI
RC
M10.22
- waste incidents?
SI
RC
M10.23
- transport incidents?
SI
RC
M10.24
SI
RC
M10.25
SI
RC
- an emergency ?
SI
RC
M10.27
- each exercise ?
SI
RC
M10.28
SI
M10.29
Where used, do the local fire brigade participate in training exercises on site ?
SI
RC
Communications
M10.30
SI
RC
SI
M10.32
- ER groups ?
SI
M10.33
- customers ?
SI
M10.34
SI
RC
M10.35
- stakeholders ?
SI
RC
Resources
M10.36
SI
M10.37
SI
Management
Rev. CDI-T, 1/12
Page 36
(C) 2012 Chemical Distribution Institute
Chapter M10
Question
Yes
No
M10.38
SI
RC
M10.39
SI
RC
Community
M10.40
SI
RC
M10.41
SI
RC
SI
RC
M10.42
Management
Rev. CDI-T, 1/12
Page 37
(C) 2012 Chemical Distribution Institute
Chapter M11
ADMINISTRATION
Question
Yes
No
Records
Are records kept of all product transfers which include :
M11.1
SI
M11.2
SI
M11.3
SI
M11.4
SI
M11.5
SI
M11.6
SI
M11.7
SI
M11.8
SI
M11.9
SI
M11.10
Is there a signature and date on each activity report, verifying that the operation
was carried out according to the procedures ?
M11.11
M11.12
M11.13
SI
I
SI
Insurance
M11.14
Does the Terminal carry insurance cover for third party liability?
Accounting System
M11.15
SI
M11.16
Have standards for payments of accounts been agreed with the customers ?
SI
M11.17
Is there a system in place to check whether all accounts are settled within
agreed periods ?
SI
M11.18
SI
Order Processing
M11.19
SI
Management
Rev. CDI-T, 1/12
SI
- order acceptance ?
Page 38
(C) 2012 Chemical Distribution Institute
Chapter M11
Question
ADMINISTRATION
Yes
No
M11.21
SI
M11.22
SI
M11.23
SI
M11.24
SI
M11.25
Management
Rev. CDI-T, 1/12
Page 39
(C) 2012 Chemical Distribution Institute
SI
SI
Chapter M12
PERSONNEL SAFETY
Question
Yes
No
M12.2
M12.3
M12.4
M12.5
RC
Preventive Approach
M12.6
Have hazardous activities associated with the job been identified (job safety
analysis) ?
RC
M12.7
RC
M12.8
Are critical job skills required to carry out such activities defined, provided and
supported ?
M12.9
M12.10
M12.11
RC
SI
M12.13
SI
M12.14
SI
SI
M12.15
M12.16
M12.17
Are rules and procedures communicated before beginning the assigned job ?
M12.18
M12.19
M12.20
M12.21
SI
Management
Rev. CDI-T, 1/12
Page 40
(C) 2012 Chemical Distribution Institute
SI
RC
Chapter M12
Question
PERSONNEL SAFETY
M12.22
Is there a requirement for the supervisor to brief operators before the intended
operation is carried out?
Yes
No
SI
M12.24
SI
M12.25
SI
M12.26
SI
M12.27
SI
M12.28
SI
M12.29
SI
M12.30
SI
M12.31
- emergency response?
SI
M12.32
SI
- hot work?
SI
M12.34
- cold work?
SI
M12.35
SI
M12.36
SI
M12.37
- scaffolding?
SI
M12.38
- digging?
SI
M12.39
SI
M12.40
SI
M12.41
SI
M12.42
M12.43
Are the above listed operations only carried out after a specific permit has been
issued?
Is the permit issued by an authorised person?
Management
Rev. CDI-T, 1/12
Page 41
(C) 2012 Chemical Distribution Institute
Chapter M12
PERSONNEL SAFETY
Question
Yes
No
M12.45
M12.46
M12.47
M12.48
M12.49
- the necessary steps to prepare the equipment or area for the intended
work?
M12.50
M12.51
Are at least 2 signed copies made of each permit, one for the issuer and one
available at the location ?
M12.52
M12.53
Does the layout of the permit include a check list of all the conditions to be met
before the permit can be used?
M12.55
- accept the job when finished and endorse the permit accordingly?
Does the permit clearly show whether entry into the enclosed space can be
made with or without breathing apparatus?
M12.57
If breathing apparatus is not required, does the permit indicate how an adequate
supply of air is to be maintained?
M12.59
- set down the requirements for cleaning and purging and check that they
are properly satisfied?
M12.60
- make sure that relevant tests are conducted of the atmosphere inside?
M12.61
M12.62
- carry out a physical check of the work site to ensure that specific
precautions have been taken ?
Management
Rev. CDI-T, 1/12
Is a hot work permit issued to perform work involving flames or high enough
temperatures to ignite flammable or combustible material?
Page 42
(C) 2012 Chemical Distribution Institute
Chapter M12
PERSONNEL SAFETY
Question
Yes
No
Before issuing the permit, does the issuer satisfy himself that:
M12.64
M12.65
M12.66
M12.67
- adequate precautions are taken to contain all sparks from welding and
cutting to prevent ignition of any ground contamination ?
M12.68
- all sewers, manholes or catch basins in the vicinity of the work area are
covered?
M12.69
M12.70
M12.71
Are periodic tests made to make sure that the work area remains safe
during hot work?
Smoking
M12.72
M12.73
M12.74
Are checks conducted to make sure that smoking material is not introduced in
no-smoking areas?
SI
Is there a procedure defining what safety equipment and protective clothing has
to be used and under what circumstances?
Does the procedure specifically designate where and when lifejackets
should be worn ?
SI
SI
SI
M12.77
Is the procedure consistent with the protection required in the Safety Data Sheet
for the products involved?
M12.78
M12.79
Are warning signs posted in areas where PPE has to be worn, indicating what
PPE is required?
Are the following items of PPE specified for use throughout the terminal:
M12.80
- hard hat?
M12.81
- safety shoes?
Management
Rev. CDI-T, 1/12
Page 43
(C) 2012 Chemical Distribution Institute
Chapter M12
PERSONNEL SAFETY
Question
M12.82
M12.83
M12.84
Yes
No
I
I
M12.86
- filter mask ?
M12.87
- boots ?
M12.88
M12.89
- chemical suit ?
M12.90
- protective gloves?
SI
SI
M12.93
- procurement of PPE ?
SI
M12.94
SI
M12.95
SI
SI
M12.97
SI
M12.98
Is there a procedure in place to ensure that visitors are made aware of health
and safety hazards?
SI
M12.99
Does the procedure require that visitors wear the appropriate PPE for the
work site ?
SI
M12.100 Are caution signs used to warn against potential immediate hazards, where they
exist?
M12.101
M12.102
Are cautions signs in the local language and English, or of the pictorial type ?
Warning Signs
M12.103 Are emergency procedures posted in each work area for raising alarm and
summoning assistance ?
Management
Rev. CDI-T, 1/12
Page 44
(C) 2012 Chemical Distribution Institute
Chapter M13
OCCUPATIONAL HEALTH
Question
Yes
No
Have all tasks been examined to identify and evaluate all occupational health
hazards ?
SI
RC
RC
Does the terminal have all the necessary product data and reference codes for
products transported and/or handled ?
Does this data include :
M13.3
M13.4
M13.5
M13.7
M13.8
M13.9
Is a review of the health hazard carried out before the first receipt of any new
chemical ?
SI
M13.10
SI
M13.11
SI
M13.12
Are there written procedures for the safe handling and disposal of waste
resulting from interfaces, line cleaning operations, tank cleaning and spills?
SI
- emergency alarms ?
SI
M13.14
- emergency procedures ?
SI
M13.15
- clean-up materials ?
SI
M13.16
Are records maintained of chemical substances stored and used for the
company's operations ?
SI
M13.18
SI
Management
Rev. CDI-T, 1/12
Page 45
(C) 2012 Chemical Distribution Institute
Chapter M13
Question
OCCUPATIONAL HEALTH
M13.19
SI
M13.20
SI
M13.21
SI
M13.22
Are records reviewed and actions taken to modify examination and monitoring
programs as found necessary?
SI
Yes
No
SI
SI
M13.26
Is it clearly signposted ?
M13.27
Is it in a safe location ?
SI
SI
M13.28
M13.29
M13.30
M13.31
Are there sufficient first aid kits at critical locations at the terminal?
Are they also clearly signposted ?
Are showers and eye-washers located in the vicinity of cargo handling interface
areas and clearly signposted ?
Do they trigger an alarm ?
M13.32
Do at least two persons per shift hold a current first aid certificate, including
resuscitation (MTM) ?
M13.33
Has the advice of a medical authority been obtained to ensure that equipment
and materials in the first aid unit contain additional items required for specific
hazards ?
Management
Rev. CDI-T, 1/12
Page 46
(C) 2012 Chemical Distribution Institute
Chapter M14
ENVIRONMENTAL PROTECTION
Question
Yes
No
RC
M14.2
Does the staff include persons technically competent and appropriately licensed
and/or certified in environmental protection ?
M14.3
M14.4
RC
General Procedures
M14.5
RC
M14.6
Are environmental reviews made for new facility design and process, and for
design changes in existing facilities ?
RC
M14.7
SI
M14.8
M14.9
RC
Waste Management
M14.10
Are there agreed arrangements with the local statutory authorities for the
disposal of waste (liquid and solid) ?
RC
M14.11
RC
M14.12
RC
M14.13
RC
SI
RC
RC
SI
RC
M14.14
M14.15
M14.16
Is a hazard review conducted for the sewer system which may contain
flammable, reactive or toxic materials ?
Spill Prevention and Response
M14.17
Has a survey been made within the past two years to identify the need for spill
prevention and response methods and equipment ?
M14.18
Have response systems been put in place for on-site spills (storage, loading,
unloading, drumming) ?
M14.19
M14.20
Are fire water retention needs calculated and considered in the spill response
plan ?
SI
Management
Rev. CDI-T, 1/12
Page 47
(C) 2012 Chemical Distribution Institute
Chapter M14
Question
ENVIRONMENTAL PROTECTION
Yes
No
M14.22
M14.23
SI
M14.24
SI
M14.25
Is there an emission control strategy for the facility, including an emission target
?
SI
M14.26
SI
M14.27
SI
M14.28
SI
M14.29
SI
M14.30
Are piping and sewer plans available for the Terminal water and effluent lines ?
I
I
SI
M14.33
M14.34
M14.35
M14.36
M14.37
Management
Rev. CDI-T, 1/12
Page 48
(C) 2012 Chemical Distribution Institute
RC
Chapter M15
SECURITY
Question
Yes
No
Does the terminal, as a Port Facility, have an approved ISPS Security Plan ?
RC
M15.2
RC
M15.3
Does the company security policy emphasise to their staff the importance of
protecting people, property, and operational practices against loss by intentional
destruction or theft ?
RC
M15.4
SI
RC
M15.5
SI
M15.6
SI
Security Organisation/Administration
I
M15.7
M15.8
Is there regular contact with the relevant authorities to plan for assistance on
security matters?
SI
M15.9
SI
RC
B
RC
Access Control
M15.10
Is there a system to monitor entry and movement of: people and vehicles to the
Terminal as a security measure ?
M15.11
M15.12
Is the Terminal fenced with gates which are closed and locked when not
required to be open ?
Data Security
M15.13
Is there a system to protect against illegal access to computer data and systems
?
SI
M15.14
SI
M15.15
SI
M15.16
Are back-ups of computer data stored in a safe place remote from the location
where such data is processed ?
SI
M15.17
SI
Security Inspections
M15.18
SI
M15.19
SI
Management
Rev. CDI-T, 1/12
Page 49
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M0
GENERAL INFORMATION
This section should be completed before the inspection takes place and the pages presented
to the inspector on arrival. Once entered to the database, this section remains open and can
be updated at any time by the terminal management.
M0.7
This is the e-mail of the person who will receive notification of the report being available on the
database, the report number and security code.
M0.9
Terminal/General Manager refers to the person with overall responsibility for the terminal.
Management
Rev. CDI-T, 1/12
GN Page 1
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M0
GENERAL INFORMATION
This section should be completed before the inspection takes place and the pages presented
to the inspector on arrival. Once entered to the database, this section remains open and can
be updated at any time by the terminal management.
Management
Rev. CDI-T, 1/12
GN Page 2
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M0
GENERAL INFORMATION
This section should be completed before the inspection takes place and the pages presented
to the inspector on arrival. Once entered to the database, this section remains open and can
be updated at any time by the terminal management.
Management
Rev. CDI-T, 1/12
GN Page 3
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M0
GENERAL INFORMATION
This section should be completed before the inspection takes place and the pages presented
to the inspector on arrival. Once entered to the database, this section remains open and can
be updated at any time by the terminal management.
Management
Rev. CDI-T, 1/12
GN Page 4
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M0
GENERAL INFORMATION
This section should be completed before the inspection takes place and the pages presented
to the inspector on arrival. Once entered to the database, this section remains open and can
be updated at any time by the terminal management.
Management
Rev. CDI-T, 1/12
GN Page 5
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M1
MANAGEMENT RESPONSIBILITY
Question
The Quality Assurance System, adopted by the Terminal must be documented. The Inspector should
satisfy himself that the scope of the certification covers all relevant processes and that the depth of
the system is adequate. The QAS should, as a minimum, comply with the requirements of the ISO
9000 series.
M1.2-17
Policy statements maybe separate or combined into a single document. The policy statement must be
clear and unambiguous concerning management's commitment to the quality of the operations and
services, the safety of all operations, the health of the employees, the protection of the environment,
and the security of the terminal, thereby meeting the customer's requirements at all times.
The policy statement should be signed by the CEO on the site or by the managing director of the
company. The overall responsibility for quality and HSE&S rests at the top of the company and has to
remain there.
The policy should refer to all employee's responsibility for quality and HSE&S and ensure that
customers' requirement's are met
The policy should refer to customers' requirements.
There should be a clear statement that management seeks and encourages involvement and
commitment to the company's quality and HSE&S programmes and objectives.
The policy should be used by management in a positive manner. It should be contained in the
appropriate manuals, displayed in appropriate places and be seen clearly as a directive to all
employees. Inspectors should verify its presence in different places. Check the name and date to
determine that the policy has been signed by the acting CEO. within the last 2 years. Inspectors are
not required to examine the contents of the security plan.
M1.16
M1.17
It is not a requirement for the policy statement to be renewed every two years, but evidence should be
sought that the statement has been reviewed.
M1.18
The inspector should assess the documented objectives and targets against the RC/HSE&S policy
statement(s) ?
M1.19
Evidence should be sought of systems in place to assess stakeholder perspectives of the operations
taking place.
Management
Rev. CDI-T, 1/12
GN Page 6
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M1
MANAGEMENT RESPONSIBILITY
M1.24
Evidence should be sought from correspondence files and response to circulars, satisfaction surveys
and polls with stakeholders.
M1.25, 26,
31, 32, 33
M1.26
M1.27-29
M1.30
Evidence should be sought from the minutes of working groups of industry, regulatory and community
bodies.
M1.31
Evidence should be sought from promotional events and literature, and correspondence with service
providers.
M1.32-33
Reference questions seek evidence from training courses and resource allocations.
M1.34-47
This section combines two different responsibilities. A separate answer should be given for each.
The company should have a Quality and HSE&S Assurance co-ordinator. In a large company these
are full time jobs but in a smaller company these jobs may be part of another job. The function may
not have these particular titles. Others are : Safety Manager, Quality Manager etc.
The co-ordinator(s) must report directly to a senior manager on quality and HSE&S, although they
may report to a lower level on other duties.
The proportion of time spent on quality HSE&S matters will vary with the size of the company and its
variety in operations. Inspectors should consider this, at the end of the audit.
Management
Rev. CDI-T, 1/12
GN Page 7
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M1
MANAGEMENT RESPONSIBILITY
Question
M1.34-47
This section combines two different responsibilities. A separate answer should be given for each.
The company should have a Quality and HSE&S Assurance co-ordinator. In a large company these
are full time jobs but in a smaller company these jobs may be part of another job. The function may
not have these particular titles. Others are : Safety Manager, Quality Manager etc.
The co-ordinator(s) must report directly to a senior manager on quality and HSE&S, although they
may report to a lower level on other duties.
The proportion of time spent on quality HSE&S matters will vary with the size of the company and its
variety in operations. Inspectors should consider this, at the end of the audit.
M1.41
By reading the job descriptions or quality and HSE&S manuals the Inspector should establish
answers to this question. Inspectors are not required to examine the contents of the security plan.
M1.42-43
M1.44
M1.45
M1.48
There should be an organisation chart for the terminal showing individual's job titles and to whom they
are responsible. These titles should be generally descriptive of the work carried out.
M1.49
Additionally each individual should have his responsibilities for quality and HSE&S clearly defined in a
document which can be audited.
M1.51
Look for documentary evidence that assessments are carried out annually.
M1.52
Evidence should be sought the verify the involvement of senior management with day to day
RC/HSE&S initiatives i.e. participation in meetings, training, promotion, signatures.
M1.53 - 54
M1.55
Inspectors should ask to see agenda's and minutes of these meetings or meetings where these items
are covered to verify the answers to these questions. It should be accepted that parts of these
minutes may be confidential and hence covered up but it should be possible to see if the item was
discussed at length.
M1.56 - 60
Management
Rev. CDI-T, 1/12
GN Page 8
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M1
MANAGEMENT RESPONSIBILITY
M1.56 - 60
M1.62
These external audits refer to 3rd party audits (customer audits, CDI-T Inspections, Government, etc)
with corrective actions, responsible persons, improvement plans, etc.
M1.65
M1.66
Inspectors should ask to see documented evidence of these meetings (minutes / actions).
M1.67
M1.68
M1.69 & 70
Inspect minutes and look for reference to earlier minutes and action items. Actions may be addressed
in writing between meetings.
M1.71
Determine from minutes whether this subject is adequately reviewed on both quality and HSE&S.
M1.72
RC/HSE reviews should be examined for evidence to verify that resources allocated are sufficient to
meet to objectives and targets.
M1.73-76
Employees should be made aware of the consequences of poor job performance, at all levels, on
other employees, on customer satisfaction, costs and economic well-being of the organisation.
Bulletin boards, meetings, training, publications and awards are effective ways of promoting quality
and HSE&S attitudes and should be given due prominence.
M1.73 & 74
M1.75 & 76
Management
Rev. CDI-T, 1/12
GN Page 9
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M1
MANAGEMENT RESPONSIBILITY
M1.78 & 79
M1.78-84
For effective control of quality and HSE&S it is necessary to audit each stage of the management
system. The internal company audits can be carried out by members of the staff not directly involved
in the operation. Inspectors should look for a written audit plan which may be included in the quality
HSE&S manuals. A detailed audit system is required. A document, detailing the scope, frequency and
responsibility for such audits must be available for inspection by the Inspector. Inspectors are not
required to examine the contents of the security plan.
M1.85
There should be a written procedure defining the Management Of Change process. The process
should be inclusive of procedural, management, product, technical and legislation changes.
M1.96
Evidence should be sought from written risk assessment exercises for each area.
M1.96 - 121 The organization shall have a system to identify and evaluate potential HSE&S hazards and to
assess and prioritise the associated risks. Products and processes encompasses equipment,
products stored and operations.
Management
Rev. CDI-T, 1/12
GN Page 10
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M1
MANAGEMENT RESPONSIBILITY
M1.96 - 121 The organization shall have a system to identify and evaluate potential HSE&S hazards and to
assess and prioritise the associated risks. Products and processes encompasses equipment,
products stored and operations.
M1.97
M1.111 &
112
M1.113 117
Management
Rev. CDI-T, 1/12
GN Page 11
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M2
TRAINING
All employees, trainees and interns should receive induction training to orientate them to the
Company policies and basic quality and HSE&S procedures.
All employees are expected to have formal training in subjects related to their job. It is expected that
employees attend regular refresher courses as defined in the training program..
Training is required whenever enhanced or additional skills are needed to support a new or changed
work activity.
M2.1-2
To identify training needs, a list of the tasks and/or job description carried out by the individual is
necessary. The inventory of tasks, also required in establishing safe working practices, is an
important part of defining the needs of all operators.
M2.1
Inspectors should examine the inventory to establish its completeness and that it is being used to
identify the training requirements.
M2.2
M2.4 - 6
Check against national training legislation. From the inventory tasks critical to HSE&S and quality can
be identified and training concentrated on these areas. Check that critical tasks are identified.
M2.9
The audit must be in a written form and available for the Inspector to read. The audit should be
carried out at least every two years.
M2.10
The audit must be in a written form and available for the Inspector to read. The audit should be
carried out at least every two years.
M2.11
M2.12
Refresher training should be repeated at least every two years. Look for documented evidence.
Criteria for refresher training should be documented.
M2.14
Evidence should be sought that managers undertake regular knowledge and skills updating.
M2.15-18
The Inspector should review lesson plans and hand-outs in order to satisfy him/herself that each
individual subject is covered.
Management
Rev. CDI-T, 1/12
GN Page 12
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M2
TRAINING
M2.19-20
It is important that these individuals are trained by a recognised (outside) organisation. The Inspector
should verify this by looking at the syllabus for the courses to determine that these courses are of an
acceptable level/contents.
M2.21-29
M2.21-29
Operations training should be reflective of the operational facilities of the terminal, e.g.
loading/unloading of ships, trucks, rail cars, etc. The inspector should verify that each operational
activity is addressed.
M2.29
M2.30
Tests of knowledge are the best way of establishing the effectiveness of the training. The tests may
be of a practical nature and assessed by a person other than the trainer.
Management
Rev. CDI-T, 1/12
GN Page 13
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M3
QUALITY MANAGEMENT SYSTEM
Companies holding a valid ISO9000 series or equivalent quality certificate will be in compliance with
Chapter M3. However evidence should be sought for compliance with questions M3.21, M3.22,
M3.23, M3.24 and M3.32.
Management
Rev. CDI-T, 1/12
GN Page 14
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M3
QUALITY MANAGEMENT SYSTEM
Companies holding a valid ISO9000 series or equivalent quality certificate will be in compliance with
Chapter M3. However evidence should be sought for compliance with questions M3.21, M3.22,
M3.23, M3.24 and M3.32.
Management
Rev. CDI-T, 1/12
GN Page 15
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M3
QUALITY MANAGEMENT SYSTEM
Companies holding a valid ISO9000 series or equivalent quality certificate will be in compliance with
Chapter M3. However evidence should be sought for compliance with questions M3.21, M3.22,
M3.23, M3.24 and M3.32.
Management
Rev. CDI-T, 1/12
GN Page 16
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M4
THE SUPPLIER OF GOODS AND SERVICES
The procurement of products or services should be given the same level of planning and control as
internal activities as they may be vital elements in the delivery of the proper tank storage service.
M4.1
M4.3
M4.4
Meeting should take place at least every six months and be supported by documented evidence.
M4.5
Examples should be taken at random and checked. Look for evidence that checks are carried out.
M4.6
M4.7
Ask the Quality Assurance Co-ordinator if suppliers records have been examined and look for
external audit reports of suppliers.
M4.8
M4.9 - 11
Contracting activities might include specialist activities like tank cleaning and maintenance, waste
treatment, the loading and securing of drums in containers etc.
M4.9
The system for controlling contractors must be as detailed as is required for own staff or refer to
requirements for own staff.
M4.10
Standards for contracting should be documented and form part of the service contract. Verify by
inspecting current service contracts.
Management
Rev. CDI-T, 1/12
GN Page 17
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M5
THE CUSTOMER
Question
A quality service meets agreed customer (purchaser) requirements at all times. Ideally such
requirements should be explicitly defined in the contract. In practice some of them are implicit or only
generally defined.
M5.1
Standard contracts should be in writing. Inspectors should check copy only without examining details.
M5.3 - 8
M5.3
Check if review procedure is in place and that signs of approval are given by each individual function.
M5.4
M5.5
M5.6
M5.7
Look for procedure and related correspondence and verify on a recent deviation from a contract.
M5.8
M5.9
M5.10 - 14
These must be specific to the product of the customer or manufacturer. Generic documents are not to
be accepted. Verify each point from available documents.
Management
Rev. CDI-T, 1/12
GN Page 18
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M6
PERSONNEL
Question
The most important resource in any organisation is that of the individual people involved.
Management should provide a work environment that fosters excellence and a stable and secure
work relationship. See also Training and Promotion of Quality Attitudes.
The confidential nature of individual records must be respected and therefore the Inspector may have
to rely on the personal assurance of the Personnel Manager that such documents exist in the files of
individuals.
M6.2, M6.13, M6.14, M6.15 and M6.16 may only apply to the level of site foremen and above.
M6.1-3
Profile should be documented. In respect of 'conduct and reliability', there should have been contact
with previous employers a check on the individual's employment history.
M6.4-9
M6.10-12
M6.13-15
Personal objectives and goals should be agreed with the supervisor and recorded once a year. The
employee should have a thorough understanding of his goals and be empowered to substantially
contribute to their achievement. Performance against these goals should be reviewed with the
supervisor on a yearly basis.
M6.16
The Inspector should review the company system to administer salaries and other forms of
recognition and check that it is tied to an element of merit.
M6.17
Career planning is a necessary component of an overall approach to quality. Each employee should
be viewed as having a career within the organisation; people are more likely to take an innovative
approach when they know that they have a long-term relationship with the organisation. Career
planning documents should be available.
Management
Rev. CDI-T, 1/12
GN Page 19
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M6
PERSONNEL
Question
M6.18
M6.19
The company policy on prohibiting the use of drugs and alcohol should be communicated in writing.
M6.20
The disciplinary procedure should be a written one and communicated to all employees. Verify by
asking a sample of employees the content of this policy.
M6.25
M6.21 & 22
Regular communication should be a feature of all levels of the management. As well as frequent
informal contacts between senior management and other personnel there should also be more formal
briefings from time to time on personal performance and the working together with direct manager or
supervisor.
M6.21
M6.22
Planned personal contacts will be more effective when records are made and follow-up actions
agreed upon can be checked on progress.
M6.23
M6.25-28
M6.30
The N/A option on this question can only be applied on terminals operating a one shift system e.g.
9am to 5pm operation.
M6.30 & 31
Management
Rev. CDI-T, 1/12
GN Page 20
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M7
OPERATIONS
M7.1
It should be expected that tasks for all operators' jobs would be defined and those critical to HSE&S
and quality identified. This job description would be the same as the one required in M2.1
M7.3
Operating instructions should be readily available during all hours that the Terminal is operating.
Check for location.
M7.4 - 39
Terminals and Inspectors should be aware that these functions may be performed by third parties and
instructions/documentary evidence should support this. These functions may include the use of
portable equipment.
M7.10
Tank operation refers to non-transfer functions such as: heating, circulation, mixing, etc.
M7.24
Be aware testing and inspection may be carried out by third parties, this should be specified in the
procedures.
Management
Rev. CDI-T, 1/12
GN Page 21
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M7
OPERATIONS
M7.31 & 32
M7.38
These instructions should also identify the circumstances when cargo operations should be shut
down immediately, (Ref: TB2.24).
M7.40-43
M7.41
Check procedure and how it is implemented in practice for a recent change in operating instructions.
M7.42
Management
Rev. CDI-T, 1/12
GN Page 22
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M7
OPERATIONS
M7.54 - 59
Planning is a key element in the reduction of turnaround times. Proper planning means that ETA's are
checked with the customer and that operations are geared according to ETA's. Make random check
that each activity is planned accordingly.
M7.61
Vessels handling multiple cargoes require more detailed planning. Check planning documents for
evidence that both line-ups and handling sequences are systematically planned before arrival of
these vessels.
M7.62
Comprehensive planning can only be when vessel (or their representative) and terminal have jointly
agreed loading/discharging arrangements prior to arrival. Select a vessel at random and look for
documented evidence (fax- or telex messages with vessel or agent).
Management
Rev. CDI-T, 1/12
GN Page 23
(C) 2012 Chemical Distribution Institute
Question
M7.67
Management
Rev. CDI-T, 1/12
Guidance Notes
Chapter M7
OPERATIONS
GN Page 24
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M7
OPERATIONS
M7.82
These responsibilities should extend to port and approach channels which may limit the operation of
the terminal.
M7.83
M7.87
The inspector should establish if a process is in place to ensure that, where required, pilotage
services are available to the vessels.
M7.89
The inspector should establish if a process is in place to ensure that, where required, adequate tug
services are available to the vessels.
M7.92 - 103 In this section, N/A answer types can only be used when no board to board transfers take place at the
terminal.
Management
Rev. CDI-T, 1/12
GN Page 25
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M7
OPERATIONS
Question
M7.92 - 103 In this section, N/A answer types can only be used when no board to board transfers take place at the
terminal.
M7.92
Check in permits if operation is allowed for specific product. Inspectors should be aware that some
authorities simply require transfer operations be reported and do not issue an authorisation. In these
cases the question is to be answered as a YES.
M7.93
The applicable transfer checklist (e.g. IMO/ADNR/OCIMF) should be completed and signed by a
loading master or his replacement and a responsible ship's officer. Terminal should also sign, as any
operation alongside a berth is also the responsibility of that terminal.
M7.94
Verify if written agreement is available for each vessel handled and signed by both terminal's and
vessel's representatives.
M7.101-102 Look for a written procedure on board each vessel signed by ship's and shore's representatives.
M7.103
M7.105
Communications should follow fixed patterns, with calls at regular intervals. Check communication
protocol or procedure.
M7.106
Emergency shut-down procedures should be well known; readily available and systems/equipment
checked prior to operations. Check by asking appropriate personnel.
M7.107
M7.108
M7.112
M7.113
M7.114
Verify from procedures how this is carried out with respect to product, customer requirements,
national and international regulations.
M7.119
These safety instructions shall define responsibilities, safety clothing, maximum speed, emergency
procedure and response. This may be in written form or other formal method of instruction.
M7.121
Management
Rev. CDI-T, 1/12
GN Page 26
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M7
OPERATIONS
Question
M7.122
M7.123
M7.124-125 Turnaround times should be regularly monitored; delay causes analysed and appropriate actions
taken to prevent recurrence. Look for documented evidence.
M7.126
Management
Rev. CDI-T, 1/12
Regular Performance Monitoring may take the form of internal audits and/or customer surveys.
GN Page 27
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M8
MAINTENANCE
Question
A quality tank storage service can be provided only by reliable equipment. This section seeks to
ensure that effective routine inspection and maintenance programmes are in place which require that
equipment is adequately serviced, lubricated and adjusted and otherwise maintained to manufactures'
recommendations to prevent abnormal wear (and tear) and to detect defects before they cause
accidents or breakdowns.
Abnormal wear, accidental damage and abuse detected through preventive maintenance inspections
will be investigated. Repair and replacement costs will be recorded and analysed as loss data.
Remedial and follow up actions will be taken as is done with other accidental loss.
M8.1
Preventive maintenance should be carried out on all moving equipment. This must be separate from
any regulatory inspections.
M8.2-21
Check the maintenance programme for inclusion of each item and verify that the item is serviced in
accordance with the programme.
M8.10 & 11
M8.10
The question refers to the actual bottling machinery and not the cleaning or packing processes.
M8.11
The question refers to the actual drumming machinery inclusive of the belt system.
M8.13
This refers to marine loading arms and must extend to include, emergency release systems.
M8.15
This includes mooring facilities, fendering, cranes, hose hoists, cathodic protection system, etc.
Management
Rev. CDI-T, 1/12
GN Page 28
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M8
MAINTENANCE
Question
M8.23
Critical instruments may be considered as those instruments used to monitor and to prevent
dangerous conditions developing, such as high level, high temperature, pressure build-up, vapour
product release, etc.
M8.27
M8.28
Seek evidence from reports. This is intended as going further than the basic statutory requirements.
M8.29 - 34
M8.35
M8.36
Management
Rev. CDI-T, 1/12
GN Page 29
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M8
MAINTENANCE
M8.43
Check records. It must be clear from these records that the reported conditions do not conform with
standards.
M8.44
M8.45
Look for evidence from memos, reports etc. to the responsible management.
M8.46
M8.47
Service records are an effective means to establish the reliability of equipment. Inspect records and
see if they are established at regular intervals. Examples of major equipment may include: loading
arms, product pumps, compressors, boilers, etc.
M8.49
M8.51
M8.51 - 63
The frequency of testing should be stated in procedures and verified from test records. Frequency
may be dictated by manufactures or may be mandated by local authorities.
M8.53
Management
Rev. CDI-T, 1/12
GN Page 30
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M8
MAINTENANCE
M8.64
This question refers to measuring equipment used for product transfer invoicing. Look for
documented evidence.
M8.65 - 74
This series of questions are applicable to critical safety and quantity measurement and shall include
both fixed and portable equipment. The frequency of testing should be stated in procedures and
verified from test records.
M8.69 & 70
The question refers to permanent / fixed equipment and not portable hydrometers.
Management
Rev. CDI-T, 1/12
GN Page 31
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M9
NON - CONFORMITY REPORTING ON QUALITY AND HSE&S
The quality of the service provided depend for a large part on how a company handles nonconformances and customers' complaints. Therefore data should be available at every phase of the
service quality loop from soliciting business through customer reaction and feedback. The collection
and analysis of this data indicate a means of improving the service before it becomes a major issue.
This chapter combines the reporting on both Quality and HSE&S. Some terminals may operate under
a combined Quality/HSE&S systems, providing a single procedure to satisfy the requirements of both.
M9.1-10
M9.5
M9.11-18
M9.19-24
Management
Rev. CDI-T, 1/12
GN Page 32
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M9
NON - CONFORMITY REPORTING ON QUALITY AND HSE&S
M9.25 - 30
The procedure should detail the collecting of evidence to enable root cause analysis.
M9.31 & 32
M9.33 & 34
M9.35 & 36
Look at procedure and verify on reports. Names and dates should be assigned for effective follow-up
actions.
M9.37 - 40
Management
Rev. CDI-T, 1/12
GN Page 33
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M9
NON - CONFORMITY REPORTING ON QUALITY AND HSE&S
M9.41 - 44
M9.45
M9.46 & 47
M9.48 - 53
M9.53
Evidence should be sought from incident and accident investigation files and RC/HSE&S circulars.
Management
Rev. CDI-T, 1/12
GN Page 34
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M10
FALLBACK PLANS & EMERGENCY PREPAREDNESS
Even in the best controlled operation the unforeseen occurs from time to time. To cope with such
situations the terminal needs to have an effective fallback plan to cover failure of equipment or nonconforming products or service. Note this is not necessarily the same as an Emergency Plan .
M10.2 - 4
The liaison between the two companies should be close and regular. Effective quality planning should
be a reality. Look for evidence of this close contact for the situations indicated.
M10.5
M10.6-9
Procedure should require names and after office phone numbers of both terminal's and customer's
key-contacts.
M10.7 - 10
Verify if procedures are in place for each of the four items mentioned; verify from documents or by
interviewing attendees.
M10.12 - 15 Each Terminal should have an Emergency Response Plan. This plan must be in writing and available
at all key locations. The plan should describe the various tasks for designated persons and their
replacements in all possible emergencies. Drills should be carried out regularly to check the plan and
adjustments should be made when required.
M10.14
Management
Rev. CDI-T, 1/12
GN Page 35
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M10
FALLBACK PLANS & EMERGENCY PREPAREDNESS
be
subject
M10.36
M10.37
Management
Rev. CDI-T, 1/12
to
an
GN Page 36
(C) 2012 Chemical Distribution Institute
evaluation.
Check
from
evaluation
Question
Guidance Notes
Chapter M10
FALLBACK PLANS & EMERGENCY PREPAREDNESS
M10.38
Equipment is only reliable when regularly tested and inspected. Verify from reports/inspection tags.
M10.39
Management
Rev. CDI-T, 1/12
GN Page 37
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M11
ADMINISTRATION
Question
M11.1-9
All nine items should be recorded and kept together for subsequent examination.
M11.8
M11.9
M11.10
M11.11
M11.12
M11.13
M11.14
Insurance details may be included in the terminal company's General Conditions or may form part of
the contracts with individual customers.
M11.15-18
If not on the premises, these may be performed at the terminal company's centralised office and may
require copies to be provided for verification purposes.
M11.15
M11.16
M11.17
An automatic or manual system that regularly checks payments on agreed periods must be in place.
M11.18
M11.19
Management
Rev. CDI-T, 1/12
GN Page 38
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M11
ADMINISTRATION
Question
M11.26
These maybe specific audits or as a part of the QMS audit plan or reports and should take place at
intervals not exceding 12 months.
M11.27
Management
Rev. CDI-T, 1/12
GN Page 39
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M12
PERSONNEL SAFETY
Question
Prevention of injuries through focus on the human element and the people/work environment.
M12.1-5
The interrelation between the condition of the workplace and the personal behaviour at this workplace
is a key element in the prevention of injuries. A system should therefore be in place to optimise
safety at the workplace. Each of the five elements should be adequately documented in procedures.
M12.6
A documented safety analysis on the job description (see chapter M2) or operational procedures
should be provided.
M12.7
M12.8
Persons carrying out critical jobs should be thoroughly informed, trained and supported to minimise
the risks related to these jobs. Look for documented evidence and interview personnel.
M12.9
M12.10
M12.11
Look for training programs, videos, etc, specific to terminal operations and verify by asking persons
involved.
M12.12
M12.13-14
M12.15
M12.16
M12.17
Look for safeguards in distribution scheme or on checklists that such material is communicated
before beginning the assigned job.
M12.18
M12.19
Look for documented procedures (Management of Change) on deviations. Be aware that procedures
at certain terminals may not allow deviations, in this case comment must be made and the question
answered NO.
M12.20
M12.21
The Inspector should select an operating procedure at random and check whether appropriate
emphasis is placed on the need to observe correct safety requirements and attitudes.
Management
Rev. CDI-T, 1/12
GN Page 40
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M12
PERSONNEL SAFETY
M12.22
M12.23-32
Procedures should be written in detail and describe who has particular responsibilities and the
standard of performance expected. Be aware for M12.28 and M12.29 testing and inspection may be
carried out by third parties, this should be specified in the procedures.
M12.33 - 41 The minimum requirements of each procedure should be listed to demonstrate justification of the term
'comprehensive'.
M12.39
The question refers to primary and secondary containment. E.g. tank, line, bund, etc.
M12.42
M12.43
Management
Rev. CDI-T, 1/12
GN Page 41
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M12
PERSONNEL SAFETY
Question
M12.49
For example: isolating the tank, purging the line, disconnecting valves, etc.
M12.50
No working permit should be issued for longer than one working day
M12.51
A copy of the WP should be either displayed at or carried by the responsible person at the location.
M12.53
M12.54
This is relevant to jobs of short duration; in the case of longer jobs, signs of updating should be
evident on the permit.
M12.55
M12.56
M12.57
Acceptable alternatives include controlled compressed air, blower fan and trunking, exhaust or ejector
fan and trunking, extending to the bottom of the vessel.
M12.60
M12.62
Specific precautions, may include the use of standby man, life lines, safety harness, etc.
M12.63
Hot work includes: burning, welding and soldering; operating gasoline, diesel or LPG driven
equipment; grinding, drilling, grit blasting or wire buffing; incendiary electrical work.
Management
Rev. CDI-T, 1/12
GN Page 42
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M12
PERSONNEL SAFETY
M12.65
12.72 - 73
These questions can be answered as N/A in cases where smoking is not permitted on site as a
condition of employment.
12.74
The checks should include the possible scenario of personnel leaving the site to smoke outside the
gate and carrying their smoking material with them.
Management
Rev. CDI-T, 1/12
GN Page 43
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M12
PERSONNEL SAFETY
Question
M12.85 - 90 Basis information contained in the MSDS. Check written procedures on 'critical' products and
operations. The necessary equipment should be specified and its use enforced by rules and
regulations.
M12.91 - 95 Check organisation chart and procedure.
M12.91 - 95 Check organisation chart and procedure.
M12.92
Occupational (Industrial) Safety is a requirement for the terminal to protect employees from all
recognized hazards.
M12.94
Testing of PPE shall include, but is not limited to: the regular pressure testing of breathing air bottles,
leak proof testing of gas suits and the calibration of personal exposure measuring devices.
M12.96
M12.97
Check who has the responsibility for checking, before answering positively.
Management
Rev. CDI-T, 1/12
GN Page 44
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M13
OCCUPATIONAL HEALTH
Question
Occupational health control is concerned with the protection of employees from occupational illness
and giving necessary emergency care following an injury or illness. Supervisors should educate
employees about the health hazards or products they handle or could be exposed to in their work. In
addition supervisors should conduct programmes to ensure that all hazardous substances are
controlled and that prompt emergency treatment is available if needed.
M13.1
As in M7.1, it should be expected that tasks for all operators' jobs are defined, analysed and those
critical to health identified. This job inventory would be the same as the one required in M2.1
M13.2
Inspect reference material, hard copy/electronic database. This should be up to date and there must
be evidence of it being used. TLV = Threshold Limit Value
M13.6 - 8
For each identified occupational health hazard controls should be established such as engineering
methods, appropriate procedures and personal protective equipment.
M13.9
M13.11
Check procedures
M13.12
M13.15
M13.16
This question does not include ''non-industrial'' cleaning products. Verify from records/stock reports.
M13.17
Check for documentation. Pre-placement medical examinations will usually comprise tests on oversensitivity to particular substances or similar situations.
M13.18
Work areas with potential health hazards should be monitored for hazardous substances and levels
of exposure to ensure that employees are using controls and are instructed. As a further check
periodical tests should be carried out to check exposure to critical chemicals. Check medical
procedure to see that this is done.
Management
Rev. CDI-T, 1/12
GN Page 45
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M13
OCCUPATIONAL HEALTH
Question
M13.19
Verify from safety co-ordinator or medical advisor. Frequency of monitoring should be established.
M13.21
M13.23
M13.24
Larger Terminals should have a separate treatment room; for small terminals a simpler solution is
acceptable.
M13.25
Inspect locally
M13.26
Verify by inspection.
M13.28
Verify by inspection.
M13.29
Inspect locally.
M13.32
M13.33
Must be documented.
Management
Rev. CDI-T, 1/12
GN Page 46
(C) 2012 Chemical Distribution Institute
Question
Guidance Notes
Chapter M14
ENVIRONMENTAL PROTECTION
OTHER THAN IN QUESTION TA6.13, the CDI-T inspection does not consider effluent and
sewage from sanitary sources.
M14.1
M14.2
M14.3
M14.5
M14.6
M14.7
M14.8 & 9
In the case that no incidents have occurred, this should be entered as N/A and appropriate comment
made.
M14.10
Methods for disposing of tank and line washing may include treatment, collection by registered
disposal company or incineration. Whatever arrangements have been agreed should be evidenced
from letters etc.
M14.11
M14.12
M14.13
Verify contract. Check that mode, liabilities and responsibilities are all included in the agreement.
M14.15
M.14.16
This question refers to sewers for process water from the terminal.
M14.17
M14.18
M14.19
M14.20
Management
Rev. CDI-T, 1/12
GN Page 47
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M14
ENVIRONMENTAL PROTECTION
Question
M14.21-30
Air quality management is a system of measures and procedures to minimise the adverse effect of
tank storage activities on air quality.
M14.21
M14.22
M14.21-30
Air quality management is a system of measures and procedures to minimise the adverse effect of
tank storage activities on air quality.
M14.23
M14.24
M14.31
M14.34
M14.35
M14.36
Check for evidence of effort, e.g. close monitoring, procedural changes, investments etc.
M14.37
Management
Rev. CDI-T, 1/12
GN Page 48
(C) 2012 Chemical Distribution Institute
Guidance Notes
Chapter M15
SECURITY
Question
M15.1
Note: An ISPS Plan may not be required at certain terminals not handling sea-going vessels.
M15.5
M15.7
M15.8
For review, exercise, or drill purpose, at least a recorded contact within the last two years.
M15.10
The object of this question is to verify that at any moment in time, the terminal is fully aware of who
and what vehicles are on site.
M15.11
Spare key boxes should be kept locked and under control of a responsible person. Check for a key
control system.
M15.12
Verify by observation during audit, fences and gates should be full height sufficient to deter intruders.
M15.14
M15.15
M15.17
Management
Rev. CDI-T, 1/12
GN Page 49
(C) 2012 Chemical Distribution Institute
4th Edt.
5th Edt.
M0.1
Chapter M0
M0.1
M0.2
M0.2
M0.3
M0.3
M0.4
M0.4
M0.5
M0.5
M0.6
Change
4th Edt.
M0.41
5th Edt.
M0.45
New
M0.46
New
M0.47
M0.48
New
Change
4th Edt.
M1.8
M0.49
M0.43
M0.50
Reword
M0.51
New
Change
M1.9
M1.9
M1.10
M1.10
M1.11
Reword
M1.12
New
New
M0.42
5th Edt.
M1.11
M1.13
M1.12
M1.14
M1.18
M1.16
M1.19
M0.7
New
M0.44
M0.6
M0.8
Reword
M0.45
Deleted
M1.17
M1.20
M0.7
M0.9
M0.53
New
M1.18
M1.21
M0.8
M0.10
M0.54
New
M1.19
M1.17
M0.9
M0.11
M0.55
New
M1.13
M1.20
M0.10
M0.12
M0.56
New
M1.14
M1.21
M0.11
M0.13
M0.57
New
M1.15
M1.22
M0.12
M0.14
M0.46
M0.58
Reword
M1.16
M1.23
M0.13
M0.15
M0.47
M0.59
M1.17
Moved RW
M0.14
M0.16
M0.48
M0.60
DD Yes/No
M1.18
Moved
M0.15
M0.17
M0.49
M0.61
DD Yes/No
M1.19
Moved
M0.16
M0.18
M0.50
M0.62
Reword
M1.20
Moved
M0.17
M0.19
M0.18
M0.20
M0.19
Reword
Reword
M0.41
M0.52
M1.15
M0.51
M0.63
Reword
M1.21
M0.52
M0.64
Reword
M1.22
M0.21
M0.53
M0.65
Reword
M0.20
M0.22
M0.54
M0.66
Reword
M0.21
M0.23
M0.55
M0.67
M0.22
M0.24
M0.56
M0.23
M0.25
M0.57
M0.24
M0.26
M0.58
M0.25
M0.27
M0.26
M0.28
M0.27
M0.29
M0.28
M0.29
Reword
Moved
M1.24
M1.25
New
M1.23
M1.26
Reword
Reword
M1.24
M1.27
Deleted
M1.25
M0.68
Reword
M1.26
M0.69
Reword
M1.27
M0.70
Reword
M1.28
M0.71
New
M1.29
M0.59
Deleted
M1.30
M1.30
M0.30
M0.60
Deleted
M1.31
M1.31
M0.31
M0.61
Deleted
M1.32
M1.32
M0.30
M0.32
M0.62
Deleted
M1.33
M1.33
M0.31
M0.33
M0.63
Deleted
M1.34
M1.34
M0.32
M0.34
M0.64
Deleted
M1.35
M1.35
Reword
M0.33
M0.35
M0.65
Deleted
M1.36
M1.36
Reword
Deleted
M1.28
Reword
Deleted
M1.29
Reword
Deleted
M0.34
Deleted
M0.66
Deleted
M1.37
M1.37
Reword
M0.35
Deleted
M0.67
Deleted
M1.38
M1.38
Reword
M0.36
Deleted
M1.39
New
M1.40
New
Reword
M0.37
M0.36
New Table
M1.1
Chapter M1
M1.1
Reword
M0.37
DD Yes/No
M1.2
M1.2
Reword
M1.39
M1.41
M0.38
DD Yes/No
M1.3
New
M1.40
M1.42
M0.39
DD Yes/No
M1.3
M1.4
M1.41
M1.43
M1.4
M1.5
M1.42
M1.44
M0.38
M0.40
M0.39
M0.42
M1.6
M1.6
M0.40
M0.43
M1.7
M1.7
M1.8
M0.41
M0.44
New
New
M1.5
Moved
Management
Mapping Document
Mapping Page 1
M1.43
M1.45
M1.44
M1.46
Reword
M1.45
M1.47
New
M1.46
M1.48
4th Edt.
5th Edt.
Change
Reword
4th Edt.
M1.79
5th Edt.
Change
M1.49
M1.50
New
M1.97
M1.89
M2.17
M2.18
M1.48
M1.51
Reword
M1.98
M1.90
M2.18
M2.19
M1.49
M1.52
M1.80
M1.99
M2.19
M2.20
M1.50
M1.53
M1.81
M1.100
M2.20
M2.21
M1.51
M1.54
M1.82
M1.101
M2.21
M2.22
M1.52
M1.55
M1.83
M1.102
M2.22
M2.23
M1.53
M1.56
M1.84
M1.103
M2.23
M2.24
M1.54
M1.57
M1.85
M1.104
M2.24
M2.25
M1.55
M1.58
M1.86
M1.105
Reword
M2.25
M2.26
M1.56
M1.59
Reword
M1.106
New
M2.26
M2.27
M1.60
New
M1.107
Reword
M2.27
M2.28
M1.108
M2.16
5th Edt.
M1.47
M1.87
M1.96
4th Edt.
Change
M2.17
M1.57
M1.61
New
M2.28
M2.29
M1.58
M1.62
M1.88
Deleted
M2.29
M2.30
M1.59
M1.63
M1.89
Moved RW
M2.30
M2.31
M1.60
M1.64
Reword
M1.65
New
M1.109
New
M3.1
Chapter M3
M3.1
Reword
M1.61
M1.66
Reword
M1.110
New
M3.2
M3.2
Reword
M1.62
M1.67
Reword
Reword
M3.3
M3.3
Reword
M1.63
M1.68
M1.64
M1.69
Reword
M1.70
New
M1.90
Moved
M1.91
M1.111
New
M3.4
M3.4
Reword
M1.112
New
M3.5
M3.5
Reword
Deleted
M3.6
M3.6
Reword
M3.7
M3.7
Reword
M3.8
New
M1.92
M1.65
M1.71
M1.93
M1.113
M1.66
M1.72
M1.94
M1.114
M1.67
M1.73
M1.95
M1.115
M3.8
M3.9
M1.68
M1.74
M1.96
M1.116
M3.9
M3.10
M1.69
M1.75
M1.97
M1.117
M1.70
M1.76
M1.77
M1.77
M3.10
M3.11
Reword
M1.118
New
M3.11
M3.12
Reword
M1.119
New
M3.12
M3.13
M1.71
M1.78
M1.120
New
M3.13
M3.14
M1.72
M1.79
M1.121
New
M3.14
M3.15
M1.73
M1.80
M3.15
M3.16
M1.74
M1.81
M3.16
M3.17
M1.75
M1.82
M1.76
M1.83
M1.77
M1.78
M2.1
M2.2
Reword
Chapter M2
M2.1
Reword
M2.2
M2.3
M3.17
M3.18
M3.18
M3.19
Moved/RW
M2.3
M2.4
M3.19
M3.20
M1.84
Reword
M2.4
M2.5
M3.20
M3.21
M1.85
M1.5
M2.5
M2.6
M3.21
M3.22
M1.86
New
M2.6
M2.7
M3.22
M3.23
M1.87
New
M2.7
M2.8
M3.23
M3.24
M1.88
New
M2.8
M2.9
M3.24
M3.25
M1.89
New
M2.9
M2.10
M3.25
M3.26
M1.90
New
M2.10
M2.11
M3.26
M3.27
M1.91
New
M2.11
M2.12
M1.92
New
M2.12
M2.13
M1.93
New
M2.13
M2.14
M1.94
New
M2.14
M2.15
M3.28
M3.31
M1.95
New
M2.15
M2.16
M3.29
M3.32
Management
Mapping Document
New
Mapping Page 2
M3.27
Reword
M3.28
New
M3.29
Reword
M3.30
New
4th Edt.
5th Edt.
Change
4th Edt.
5th Edt.
Change
4th Edt.
5th Edt.
M3.30
M3.33
Reword
M5.2
Deleted
M6.1
M6.1
M3.31
M3.34
Reword
M5.3
Deleted
M6.2
M6.2
M3.32
M3.35
M5.4
Deleted
M6.3
M6.3
M3.36
M3.37
M5.5
Deleted
M6.4
M6.4
M3.37
M3.36
M5.6
Deleted
M6.5
M6.5
M3.38
New
M5.7
Deleted
M6.6
M6.6
M5.8
Deleted
M6.7
M6.7
Reword
M5.9
Deleted
M6.8
M6.8
Deleted
M5.10
Deleted
M6.9
M6.9
New
M5.11
Deleted
M6.10
M6.10
M3.36
Moved
M5.12
Deleted
M6.11
M6.11
M3.37
Moved
M5.13
Deleted
M6.12
M6.12
M3.33
M3.39
M3.34
M3.40
M3.35
M3.41
M3.38
M3.42
M3.39
Reword
M5.14
Deleted
M6.13
M6.13
Deleted
M5.15
Deleted
M6.14
M6.14
Reword
M5.16
Deleted
M6.15
M6.15
M3.40
M3.43
M3.41
M3.44
M5.17
Deleted
M6.16
M6.16
M3.42
M3.45
M5.18
Deleted
M6.17
M6.17
M3.43
M3.46
M5.19
Deleted
M6.18
M6.18
M3.44
M3.47
M5.20
Deleted
M6.19
M6.19
M3.45
M3.48
Change
Reword
M5.21
Deleted
M6.20
M6.20
M3.49
New
M5.22
Deleted
M6.21
M6.21
M3.50
New
M5.23
Deleted
M6.22
M6.22
M3.51
New
M5.24
Deleted
M6.23
M6.23
M3.52
New
M5.25
M3.53
New
M5.26
M5.1
M6.24
M6.25
M3.46
Deleted
M5.27
M5.2
M6.25
M6.26
M3.47
Deleted
M5.28
M5.3
Reword
M6.26
M6.27
M3.48
Deleted
M5.29
M5.4
Reword
M5.30
M5.5
M4.1
Chapter M4
M4.1
Reword
M5.31
M5.6
M6.27
M6.30
M4.2
M4.3
M5.32
M5.7
M6.28
M6.31
Reword
M4.2
M4.3
Reword
M5.33
M5.8
M6.32
New
Moved/RW
M5.34
M5.9
Chapter M7
M7.1
M4.3
Deleted
M4.4
M4.4
Reword
M5.35
M5.10
M4.5
M4.5
Reword
M5.36
M5.11
Deleted
M5.37
M5.12
M5.38
M5.13
M5.39
M5.14
M4.6
M4.7
M4.6
M4.8
M4.7
M4.9
M4.8
M4.10
M4.11
Reword
M5.40
Deleted
M5.41
M5.15
Deleted
M5.42
M5.16
M5.43
M5.17
M6.24
M7.1
Deleted
Reword
M6.28
New
M6.29
New
M7.2
New
M7.2
M7.3
Reword
M7.3
M7.4
M7.4
M7.5
M7.5
M7.6
M7.6
M7.7
M7.7
M7.8
M7.8
M7.9
M4.12
M4.9
M4.13
M4.10
Reword
M5.44
M5.18
M7.9
M7.10
M4.14
M4.11
Reword
M5.45
M5.19
M7.10
M7.11
M4.15
Deleted
M5.46
M5.20
M7.11
M7.12
M4.16
Deleted
M5.47
M5.21
M7.12
M7.13
M7.13
M7.14
M7.14
M7.15
M5.48
Chapter M5
M5.1
Deleted
Deleted
Chapter M6
Management
Mapping Document
Mapping Page 3
New
Reword
4th Edt.
5th Edt.
Change
4th Edt.
5th Edt.
Change
4th Edt.
M7.15
M7.16
M7.64
TB2.2
M7.16
M7.17
M7.65
New
M7.73
M7.110
M7.17
M7.18
M7.66
TB2.3
M7.74
M7.111
M7.18
M7.19
M7.48
Deleted
M7.75
M7.112
M7.19
M7.20
M7.49
M7.67
M7.76
M7.113
M7.20
M7.21
M7.21
M7.22
M7.50
M7.69
M7.22
M7.23
M7.23
M7.24
M7.68
New
M7.72
5th Edt.
Change
M7.109
M7.77
M7.114
M7.78
M7.115
M7.70
TB2.14
M7.79
M7.116
M7.71
New
M7.80
M7.117
M7.25
New
M7.72
New
M7.81
M7.118
M7.26
New
M7.73
New
M7.82
M7.119
Reword
M7.120
New
M7.24
M7.27
M7.74
New
M7.25
M7.28
M7.75
New
M7.83
M7.121
M7.26
M7.29
M7.76
New
M7.84
M7.122
M7.27
M7.30
M7.77
New
M7.85
M7.123
M7.28
M7.31
M7.78
New
M7.86
M7.124
M7.29
M7.32
M7.79
New
M7.87
M7.125
M7.30
M7.33
M7.80
New
M7.88
M7.126
M7.31
M7.34
M7.81
New
M7.89
M7.127
M7.32
M7.35
M7.82
M7.53
M7.90
M7.128
M7.33
M7.36
M7.83
M7.54
M7.91
M7.129
M7.34
M7.37
M7.84
New
M7.92
M7.35
M7.38
M7.85
New
M7.93
M7.130
M7.36
M7.39
M7.86
New
M7.37
M7.40
M8.1
Chapter M8
M8.1
M7.38
M7.41
M8.2
M8.2
M7.39
M7.42
Reword
M7.51
M7.87
M7.88
M7.52
New
M7.89
Deleted
M8.3
M8.3
M7.43
New
M7.90
New
M8.4
M8.4
M7.44
New
M7.91
New
M8.5
M8.5
M7.45
New
M7.53
Moved
M8.6
M8.6
M7.46
New
M7.54
M8.7
M8.7
M7.47
New
M7.55
M7.92
M8.8
M8.8
M7.48
New
M7.56
M7.93
M8.9
M8.9
M7.49
New
M7.57
M7.94
M8.10
M8.10
M7.50
New
M7.58
M7.95
M8.11
M8.11
M7.51
New
M7.59
M7.96
M8.12
M8.12
M7.52
New
M7.60
M7.97
M8.13
M8.13
M7.53
New
Moved
Reword
Reword
M7.61
M7.98
M8.14
M8.14
M7.40
M7.54
M7.62
M7.99
M8.15
M8.15
M7.41
M7.55
M7.63
M7.100
M8.16
M8.16
M7.42
M7.56
M7.64
M7.101
M8.17
M8.17
M7.43
M7.57
M7.65
M7.102
M8.18
M8.18
M7.44
M7.58
M7.66
M7.103
M8.19
M8.19
M7.45
M7.59
M7.67
M7.104
M8.20
M8.20
M7.68
M7.105
M8.21
M8.21
M7.46
M7.61
M7.69
M7.106
M8.22
New
M7.47
M7.62
M7.70
M7.107
M8.23
New
M7.71
M7.108
M7.60
M7.63
New
TB2.1
Management
Mapping Document
Mapping Page 4
M8.22
Reword
Moved
4th Edt.
5th Edt.
M8.23
M8.24
M8.24
M8.25
M8.26
Change
Reword
4th Edt.
M8.67
M8.22/RW
5th Edt.
Change
M8.72
4th Edt.
M9.43
5th Edt.
M9.33
M8.73
New
M9.44
M9.34
M8.74
New
M9.45
M9.35
M8.25
M8.27
M8.68
M8.75
M9.46
M9.36
M8.26
M8.28
M8.69
M8.76
M9.47
M9.37
M8.27
M8.29
Chapter M9
M9.1
M9.48
M9.38
M9.1
M9.49
M9.39
M8.30
New
M8.28
M8.31
M9.2
M9.2
M9.50
M9.40
M8.29
M8.32
M9.3
M9.3
M9.51
M9.41
M8.30
M8.33
M9.4
M9.4
M9.52
M9.42
M9.5
M9.5
M9.53
M9.43
M8.34
New
M8.31
M8.35
M9.6
M9.6
M9.54
M9.44
M8.32
M8.36
M9.7
M9.7
M9.55
M9.45
M8.33
M8.37
M9.8
M9.8
M9.56
M9.46
M8.34
M8.38
M9.9
M9.9
M9.57
M9.47
M8.35
M8.39
M9.10
M9.10
M9.58
M9.48
M8.36
M8.40
M9.11
M9.11
M9.59
M9.49
M8.37
M8.41
M9.12
M9.12
M9.60
M9.50
M8.38
M8.42
M9.13
M9.13
M9.61
M9.51
M8.39
M8.43
M9.14
M9.14
M9.62
M9.52
M8.40
M8.44
M9.15
M9.15
M9.63
M9.53
M8.41
M8.45
M9.16
M9.16
M8.42
M8.46
M9.17
M9.17
M8.43
M8.47
Reword
M9.18
M9.18
M10.1
M10.2
M8.48
New
M9.19
M9.19
M10.2
M10.3
M9.20
M9.20
M10.3
M10.4
M8.44
M8.49
M8.45
M8.50
M8.46
M8.51
M8.47
Change
Chapter M10
M10.1
New
M9.21
M9.21
M10.4
M10.5
M9.22
M9.22
M10.5
M10.6
M8.52
M9.23
M9.23
M10.6
M10.7
M8.48
M8.53
M9.24
M9.24
M10.7
M10.8
M8.49
M8.54
M9.25
Deleted
M10.8
M10.9
M8.50
M8.55
M9.26
Deleted
M10.9
M10.10
M8.51
M8.56
M9.27
Deleted
M10.10
M10.11
M8.52
M8.57
M9.28
Deleted
M10.11
M10.12
M8.53
M8.58
M9.29
Deleted
M10.12
M10.13
M8.54
M8.59
M9.30
Deleted
M10.13
M10.14
M8.55
M8.60
M9.31
M9.25
M10.14
M10.15
M8.56
M8.61
M9.32
M9.26
M8.57
M8.62
M9.33
M9.27
M10.15
M10.17
M8.58
M8.63
M9.34
M9.28
M10.16
M10.18
M8.59
M8.64
M9.35
M9.29
M10.17
M10.19
M8.60
M8.65
M9.36
M9.30
M10.20
M8.61
M8.66
M9.37
M9.31
M10.21
New
M8.62
M8.67
M9.38
M9.32
M10.22
New
M8.63
M8.68
M10.23
New
M8.64
M8.69
M8.65
M8.70
M8.66
M8.71
Reword
Reword
Reword
Reword
M9.39
Deleted
M9.40
Deleted
M10.18
M10.24
M9.41
Deleted
M10.19
M10.25
M9.42
Deleted
M10.20
M10.26
Management
Mapping Document
M10.16
Mapping Page 5
New
4th Edt.
5th Edt.
M10.21
Change
M10.27
4th Edt.
5th Edt.
Change
4th Edt.
5th Edt.
M12.4
M12.4
M12.51
M12.52
M10.28
New
M12.5
M12.5
M12.52
M12.53
M10.29
New
M12.6
M12.6
M12.53
M12.54
M10.22
M10.30
M12.7
M12.7
M12.54
M12.55
M10.23
M10.31
M12.8
M12.8
M12.55
M12.56
M10.24
M10.32
M12.9
M12.9
M12.56
M12.57
M10.25
M10.33
M12.10
M12.10
M12.57
M12.58
M10.26
M10.34
M12.11
M12.11
M12.58
M12.59
M10.27
M10.35
M12.12
M12.12
M12.59
M12.60
M10.28
M10.36
M12.13
M12.13
M12.60
M12.61
M10.29
M10.37
M12.14
M12.14
M12.61
M12.62
M10.30
M10.38
M12.15
M12.15
M12.62
M12.63
M10.31
M10.39
M11.1
M12.16
M12.16
M12.63
M12.64
M10.40
New
M12.17
M12.17
M12.64
M12.65
M10.41
New
M12.18
M12.18
M12.65
M12.66
M10.42
New
M12.19
M12.19
M12.66
M12.67
M12.20
M12.20
M12.67
M12.68
M12.21
M12.21
M12.68
M12.69
Chapter M11
M11.1
Change
Reword
Reword
M11.2
M11.2
M12.22
M12.22
M12.69
M12.70
M11.3
M11.3
M12.23
M12.23
M12.70
M12.71
M11.4
M11.4
M12.24
M12.24
M12.71
M12.72
M11.5
M11.5
M12.25
M12.25
M12.72
M12.73
M11.6
M11.6
M12.26
M12.26
M12.73
M12.74
M11.7
M11.7
M12.27
M12.27
M12.74
M12.75
M11.8
M11.8
M12.28
M12.28
M11.9
M11.9
M12.29
M12.29
M12.75
M12.77
M11.10
M11.10
M12.30
M12.30
M12.76
M12.78
M11.11
M11.11
M12.31
M12.31
M12.77
M12.79
M11.12
M11.12
M12.32
M12.32
M12.78
M12.80
M11.13
M11.13
M12.33
M12.33
M12.79
M12.81
M11.14
M11.14
M12.34
M12.34
M12.80
M12.82
M11.15
M11.15
M12.35
M12.35
M11.16
M11.16
M12.36
M12.36
M12.81
M12.84
M11.17
M11.17
M12.37
M12.37
M12.82
M12.85
M11.18
M11.18
M12.38
M12.38
M12.83
M12.86
M11.19
M11.19
M12.39
M12.39
M12.84
M12.87
M11.20
M11.20
M12.40
M12.40
M12.85
M12.88
M11.21
M11.21
M12.41
New
M12.86
M12.89
M11.22
M11.22
M12.41
M12.42
Reword
M12.87
M12.90
M11.23
M11.23
M12.42
M12.43
M12.88
M12.91
M11.24
M11.24
M12.43
M12.44
M12.92
M12.94
M11.25
M11.25
M12.44
M12.45
M12.89
M12.93
Reword
M11.26
M11.26
M12.45
M12.46
M12.90
M12.94
Reword
M11.27
M11.27
M12.46
M12.47
M12.91
M12.95
Reword
M12.1
Chapter M12
M12.1
M12.76
M12.83
Reword
New
Reword
M12.47
M12.48
M12.92
Deleted
M12.48
M12.49
M12.93
Deleted
Moved
M12.2
M12.2
M12.49
M12.50
M12.94
M12.3
M12.3
M12.50
M12.51
M12.95
Management
Mapping Document
New
Mapping Page 6
M12.96
Reword
4th Edt.
M12.96
5th Edt.
Change
4th Edt.
5th Edt.
Change
4th Edt.
5th Edt.
M12.97
Reword
M14.6
M14.6
M15.15
M15.16
M12.98
New
M14.7
M14.7
M15.16
M15.17
M12.99
New
M14.8
M14.8
M15.17
M15.18
M12.97
M12.100
Delete N/A
M14.9
M14.9
M15.18
M15.19
M12.98
M12.101
Reword
M14.10
M14.10
M12.102
New
M14.11
M14.11
M12.99
M12.103
Reword
M14.12
M14.12
M14.13
M14.13
M14.14
M14.14
M14.15
M14.15
M14.16
M14.16
M13.1
M13.2
Chapter M13
M13.1
M13.2
M13.3
Delete
M13.4
M13.3
M14.17
M14.17
M13.5
M13.4
M14.18
M14.18
M13.6
M13.5
M14.19
M14.19
M13.7
M13.6
M14.20
M14.20
M13.8
M13.7
M14.21
M14.21
M13.9
M13.8
M14.22
M14.22
M13.10
M13.9
M14.23
M14.23
M13.11
M13.10
M14.24
M14.24
M13.12
M13.11
M13.13
M13.12
M13.14
M14.25
M14.25
M14.26
M14.26
M13.13
M14.27
M14.27
M13.15
M13.14
M14.28
M14.28
M13.16
M13.15
M13.17
M13.16
M13.18
Reword
M14.29
M14.29
M14.30
M14.30
M13.17
M14.31
M14.31
M13.19
M13.18
M14.32
M14.32
M13.20
M13.19
M14.33
M14.33
M13.21
M13.20
M14.34
M14.34
M13.22
M13.21
M14.35
M14.35
M13.23
M13.22
M14.36
M14.36
M13.24
M13.23
M14.37
M14.37
M13.25
M13.24
M13.26
M13.25
M13.27
M13.26
M13.28
M13.27
M15.2
M15.3
M13.29
M13.28
M15.3
M15.4
M13.30
M13.29
M15.4
M15.5
M13.31
M13.30
M15.5
M15.6
M13.32
M13.31
M15.6
M15.7
M13.33
M13.32
M15.7
M15.8
Reword
M13.34
M13.33
M15.8
M15.9
Reword
M15.9
M15.10
M15.10
M15.11
M14.1
Reword
Reword
M15.1
Chapter M15
M15.1
M15.2
Chapter M14
M14.1
M14.2
M14.2
M15.11
M15.12
M14.3
M14.3
M15.12
M15.13
M14.4
M14.4
M15.13
M15.14
M14.5
M14.5
M15.14
M15.15
Reword
Management
Mapping Document
Mapping Page 7
New
Change