Estimation and Costing Long Wall and Short wall Method

Length of Long wall = C/C length + One width of wall = 20.75 + 0.75 = 21.5 ft
Length of Short wall = C/C length - One width of wall = 15.75 - 0.75 = 15 ft

Details of Measurements:
S.No

Description of Work

No

Length (ft)

Measurements
Width (ft)

Earthwork in Excavation
of Foundation
1

5a

5b

a. Long wall
b. Short wall

2
2

21.5
15

2.5
2.5

Concrete in Foundation
a. Long wall
b. Short wall

2
2

21.5
15

2.5
2.5

2
2
2

21.5
21.5
21.5

1.875
1.5
0.75

2
2
2

15
15
15

1.875
1.5
0.75

Damp Proof Course


2" thick
a. Long wall
b. Short wall

2
2

21.5
15

0.75
0.75

Brick Work in
Super Structure
a. Long wall
b. Short wall

2
2

21.5
15

0.75
0.75

Deduction
Door opening
windows opening
Lintel over door

1
3
1

3
5
4

0.75
0.75
0.75

Brick Work in
foundation and Plinth
a. Long wall
1st footing
2nd footing
Plinth wall
b. Short wall
1st footing
2nd footing
Plinth wall

lintel over window

0.75

21.5

16.5

Final Brick work


6

Concrete in slab

Mild Steel bars in


R.C.C @ 1%

1/100 x Quantity of Conc in slab x 490 lb/ft3x (1/2.204)

ting Long Wall and Short wall Method


21.5
15

21.5 ft

15 ft

Measurements

Quantity (Cft)

Remarks

2.75
2.75
Total =

295.625
206.25
501.875

= 20.75 + 0.75 = 21.5 ft


= 15.75 - 0.75= 15 ft

0.25
0.25

26.875
18.75
45.625

0.75
0.75
1

60.46875
48.375
32.25

0.75
0.75
1

42.1875
33.75
22.5
239.53125

Height/Depth (ft)

Total =

Total =

sft
-

32.25
22.5
54.75

10.5
10.5

338.625
236.25
574.875

7
5
0.75

15.75
56.25
2.25

Total =

Total =

0.75

10.125
84.375
490.5

0.5

177.375

Total =
F.Total =

onc in slab x 490 lb/ft3x (1/2.204)

394.345508167

Weight in kg

Estimation and Costing Long Wall and Short wall Metho


Abstract of Estimate:
S.No

Description of Work

Unit

Quantity

Rate

Earthwork in Excavation
of Foundation

Cu-ft

501.875

15

Concrete in Foundation

Cu-ft

45.625

40

Brick Work in
foundation and Plinth

Cu-ft

239.53125

50

Damp Proof Course


2" thick

Sq-ft

54.75

25

Brick Work in
Super Structure

Cu-ft

490.5

50

Concrete in slab

Cu-ft

177.375

45

Mild Steel bars in


R.C.C @ 1%

per 1000 kg

394.345508167

80000

Total Cost =

Rs.
Millions

Wall and Short wall Method

Cost
7528.125

1825

11976.5625

1368.75
24525
7981.875
31547.6406533575
86752.9531533575
0.087

Remarks