Pro HN - 008 Procedure For Honing of Bolt Holes

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

GULF SPIC ENGINEERING (L. L.

C)
AL-AWEER GAS TURBINE POWER STATION H PHASE III
PROCEDURE FOR HONING OF BOLT HOLES

PROCEDURE FOR HONING OF BOLT HOLES

DOC No: GSE/PRO/HN 008 Rev 0

Page 1 of 2

GULF SPIC ENGINEERING (L. L. C)


AL-AWEER GAS TURBINE POWER STATION H PHASE III
PROCEDURE FOR HONING OF BOLT HOLES
1

SCOPE
The document briefs the procedure to be followed for HONING of coupling
bolt holes in gas turbine couples of AL-AWEER GAS TURBINE POWER
STATION H PHASE III.

PROCEUDRE

2.1 A fixture will be prepared to align the boring machine with the coupling
bolt holes for rigid boring operation.
2.2 Existing bore dimensions will be measured and recorded.
2.3 The boring machine will be aligned with the bolt holes and the same will
be offered for approval.
2.4 After completion of the boring operation, the finished bore dimension will
be taken for approval.
2.5 After getting concurrence, Honing operation will be commenced. The
operation will be carried out until a minimized value is obtained for each
hole.
2.6 The final bore dimension after honing will be recorded for approval.
2.7 The existing bolt dimensions will be measured and evaluating the same,
additional machining of the bolts will be decided to suit the tolerance
from the specifications.
2.8 Installation of the bolts will be carried out in the presence of SIE/ETA.
2.9 Preparing final completion report.
2.10 The operation time frame shall be envisaged to take 4~5 working days
from the date of commencement
3

ATTACHMENT
Attachment I -

WORK PROGRESS CHART

Page 2 of 2