DAY 04 21/01/2012

1. PRE CLEANING INSPECTION FOR EXCHANGER E-2301A


INSPECTION WAS CARRIED OUT AFTER DROPPING THE FLOATING HEAD AND
FOLLOWING
OBSERVATIONS NOTED.
TUBE SHEET WAS NOTED COLOURING OF DARK BROWN
TUBES INTERNALS WERE OBSERVED WITH SEA SHELL AND DEBRIS
NO PLUGGING NOTED IN THE TUBES
CHANNEL WAS NOT DROPPED
2. PRE CLEANING INSPECTION FOR EXCHANGER E-2301B
INSPECTION WAS CARRIED OUT AFTER DROPPING THE FLOATING HEAD
FOLLOWING

AND

OBSERVATIONS NOTED.
TUBE SHEET WAS NOTED COLOURING OF LIGHT BROWN
TUBES INTERNALS WERE OBSERVED WITH SEA SHELL AND DEBRIS
NO PLUGGING NOTED IN THE TUBES
CHANNEL WAS NOT DROPPED
3.IN E2305 A&B,E2404 FIN FAN COOLERS, TUBE BOLTS WERE RANDOMLY
MARKED IN V PATTERN IN HEADER FOR OPENING ,TO INSPECT THE INTERNAL S
OF TUBE
4.IN E2316 SEA WATER LINE STAINER HOUSING GUIDE FOUND BEND AND WELDING
FOUND DAMAGED

FABRICATION JOBS

1.CM 71384-WORK ORDER JOB WAS VISUALLY INSPECTED AND FOUND FREE FROM
SURFACE
DEFECTS, DIMENSION CHECKED AND FOUND SATISFACTORY. PT DONE
AND FOD SATISFACTORY BEFORE ERECTION
2. CM 63739-BEVEL WAS VISUALLY INSPECTED AND FOUND FREE FROM SURFACE
DEFECTS
DPI DONE ON BEVEL AND FOUND SATISFACTORY. BEVEL 4X 3EL TOTAL 11
NUMBERS
3. CM 80552 ONE NUMBER SOCKET WELD SPECTFOUND GAP AND WAS
RECOMMENDED TO WELD ONE MORE PASS AND OFFER FOR INSPECTION -PT
FINISHED AFTER ERECTION 3/4
4 CM84135-INSPECTION CARRIED OUT AFTER ERRECTING IN SITE ,AND FOUND
SATISFACTORY.DPICHECKED AND FOUND SATISFACTORY 3/4
5.CM 75888 VISUAL INSPECTION CARRIED OUT AFTER FINAL WELD AND FOUND
SATISFACTORY.DPICHECKED AND FOUND SATISFACTORY. 6