Ddocking Stability

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

D o c k i n g

Vessels Name :
GM (Dry) Lodicator Input :
GM (Fluid) Lodicator Input :
Loss Of GM :
Virtual GM :
Trim for 0 GM :
Declivity Of Dock :
Trim as %age LOA :

M.V. Prabhu Parvati


23.80 mts
22.96 mts
1.55 mts
21.41 mts
19.96 mts

Data Inputs

Data Inputs

11 Aug '16

Data Inputs
Summary of weights :

Data Inputs
1,450 MT

10:30

2.40 mts

Hog

2.40 mts
2.95 mts

31260 / 18549
9.2%
I/D %
182
8501
Singapore
9265512
Cosco Dalian

C o n d i t i o n

Date / Time :
2.40 mts

Gross / Net Tonnage :


Approx Prop Immersion :
L B P :
Light Ship Displacement :
Flag :
IMO Number :
Name of Drydock :

0.71%

Data Inputs
I n i t i a l

S t a b i l i t y

0.13mts

2.95 mts
2.95 mts

3.75 mts

3.75 mts

Trim

3.75 mts
Observed Density :
Ballast :
(Ballast Density) :
H.F.O :

1.025
2,186.0 MT
( @ 1.025 )
454.0 MT

M.D.O :

52.0 MT

Lube Oil :

00 MT

Fresh Water :
Light Ship :
Others :
Total :

119.0 MT
8,501 MT
00 MT
11,312 MT

Calculations

1.35mts

Calculations

Mean F'ord Draught :


Stem Correction :
Mean F'ord Corrected :

2.40 mts
-0.0218
2.378 mts

Mean Aft Draught :


Stern Correction :
Mean Aft Corrected :

3.75 mts
0.0687
3.819 mts

Mean Draught F & Aft:


Corrected Trim F - Aft :

3.098 mts
-1.4405

Mean Midships Draught :


Midships Corrected :
Midships Mean Corrected :

2.95 mts
0.0000
2.950 mts

Mean Of Means :
Mean Of Means Corrected :

3.024 mts
2.9871 mts

Lf :
La :
Lm :
TPC :
LCF :
MCTC :
MCTC :
KM :

2.76
8.68
0
49.1871071764
-7.1939
23.6450
527.3292507036
28.7831 mts

I Trim :
II Trim :
Total Trim :

-280.072
13.48
-266.592

Displacement :

13,701.57

Trim Correction :

-266.592

Calculations
Upthrust

(P) =

Virtual Loss =

Trim

x
MCTC
L.C.F.

Trim for 0 GM =

Calculations
135.0000
527.3293
98.1939

724.9887 t

P
x
KM
Displacement

Displacement Corrected for


Trim :
Observed Density :
Displacement corrected for
Density :
Deductibles :
Constants :
Blasting Grit on board :

Calculations

724.9887 t
28.7831
13,434.98

1.5532 mts

GM(i) x LCF x Disp


MCTC x KM

22.96 x 98.19 x 13434.98


527.33 x 28.78

19.96 mts

PPR DD
Comme : Notes &
nts

>> Allowance needs to be made for blasting equipment and staging


material.

13,434.98
1.025
13,434.98
11,312 MT
2,123 MT
1,823 MT
Chief Officer :

K.H. Doctor

You might also like