Carriageway
6500
Shoulder
1500
L-Drain
1000
Subgrade CBR = 7%
Hard Shoulder
Compacted Granular Soil
Soling
Carriageway
3500
25mm PMC
Shoulder
1500
Subgrade CBR = 7%
Hard Shoulder
Compacted Granular Soil
Soling
L-Drain
1000
2. Dzongkhag Roads
Shoulder
500
Carriageway
3500
Shoulder
500
Subgrade CBR = 7%
Hard Shoulder
Compacted Granular Soil
Dzongkhag Road
Soling
L-Drain
600
3. Farm Roads
Carriageway
3500
Shoulder
500
Subgrade CBR = 7%
Hard Shoulder
Compacted Granular Soil
Note: If the traffice is less than 10-15 vpd, single layer base course should sufice
Farm Road
Soling
L-Drain
600
WHAT
WE DO
IN ROAD CONSTRUCTION
MAJOR ACTIVITIES
1.
2.
3.
4.
5.
6.
FORMATION CUTTIN G
SUB-GRADE PREPARATION
BASE COURSE & BLACK TOPPING
SHOULDER
PERMANENT WORKS
BRIDGES
1. FORMATION CUTTING
SLOPE
GRADIENT
GEOMETRIC
DISPOSAL OF SPOIL
FORMATION CUTTING
2. SUB-GRADE PREPARATION
CAMBER
SUB-GRADE PREPARATION
Type I (Old)
Base course = 150 + 100 = 250mm thickness
150mm = 40-63mm, (Rolling)
100mm = 20-50mm, (Rolling)
Premix = 25mm + blinding material (Rolling by applying water)
Sand Seal coat
Resurfacing: 20mm
Type II (New)
Granular Sub-Base (GSB) coarse graded (70mm below)
Wet Mix Macadam (WMM) (40 mm, 20 mm, 10 mm & Soil) mix
with water
Dense Bitumen Macadam (DBM) 20mm + Bitumen
Asphalt Concrete 10mm + Bitumen
Thickness depends upon the actual design for a road
TYPE - I
TYPE - II
4. SHOULDER:
SHOULDER
PERMANENT WORKS
RETAINING WALL
BREAST WALL
RCC WALL
CULVERT
DRAIN
Breast Wall
RCC Wall
Culverts
Culverts
L-Drain
CATCH PIT
CATCH PIT
3. BRIDGE CONSTRUCTION
RCC BRIDGE
STEEL BRIDGE
BAILEY BRIDGE
WOODEN BRIDGE
RCC Bridge
Steel Bridge
Bailey Bridge
Wooden Bridge
WE BUILD
GOOD & DURABLE ROAD
BOOST UP
COUNTRYs SOCIO-ECONOMY
DEVELOPMENT