Professional Documents
Culture Documents
Fpso Jasmine Venture Mv7 - Modec Fpso - Fso Project
Fpso Jasmine Venture Mv7 - Modec Fpso - Fso Project
Jasminefieldislocatedapproximately300kmsouthofBangkok
inwaterdepthofapproximately60m.Crudeoilproducedfrom
thereservoiristransportedfromafixedplatformtotheFPSOvia
1.5kmpipeline.
MODECownedFPSOJasmineVentureMV7(exBuffalo
Venture)wasmodifiedandredeployedforJasminefield
development.JasmineVentureMV7isatankerconvertedFPSO
withanexternalturretmooringsystem.TheFPSOwasoperating
atNexen'sBuffalofieldfromDecember1999toDecember2004.
ThisisthefirstcontractforMODECtoredeployitsowned
FPSOtoanotherfield.
ProductionfromJasminefieldstartedinJune2005.MODEC
ownedandoperatedtheFPSOfromJune2005toJune2011.
ScopeofWork
Engineering
Procurement
Modificationandlifeextension
Installation
OperationandMaintenance
UnitName
FPSOJasmineVentureMV7(exBuffaloVenture)
Contract
BareBoatCharter+O&M(Ownershipwastransferredtotheclient)
FirstOil
June2005
CharterPeriod
June2005June2011
Client
PEARLEnergyPteLtd.
Status
Sold
FieldName
JasmineField
Country
Thailand
WaterDepth
60m(196ft)
New/Conv
ModificationofExistingFPSO
MooringType
SOFECExternalTurret
StorageCapacity
800,000bbls
OilProduction
20,000bopd
GasProduction
8mmscfd
WaterProduction
30,000bwpd
RelatedPressReleases
Jun.10,2005
FirstOilfromJasmineField
Dec.27,2004
FPSO"BuffaloVenture"RedeployedforPEARL'sJasmineField
CopyrightMODEC,Inc.Allrightsreserved.