Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

ITEM

SUBJECT
Scope of work - Area:
UNIT - II
1
2
3
4

No of Equipments
No of Lines
Max. Height of
equipment
Area

98 (84+15% of the existing equipment)


450
40M
(65MX60M)=3900 Sq.m.

UNIT -III
1
2
3
4

No of Equipments
No of Lines
Max. Height of
equipment
Area

132(117+15 equipments not in given


layout)
750
60M
(83MX110M)=9130 Sq.m.

Important Points to Remember

1. Scaffolding is in Contractors scope.


2. Needed Laser scanning Raw files, Registered scanned data &
Data base set
3. Needed 3D view of the full asset in colour
4. Needed Digital photos of all scanned areas (360 Panorama views)
5. 3D Laser Scanner should be flame proof

Software Requirements
1. LFM Laser data
2. LFM Net view Laser view

You might also like