Professional Documents
Culture Documents
Murex Training at Analyst360
Murex Training at Analyst360
Knowledge Specialism
Practitioner Specialism
Business analysis
Foundation Certification in
Commercial Awareness
Requirement Engineering
Foundation Certification in
Business Analysis
Foundation Certification in
Business Change
Foundation Certification in
IS Project Management
System Development
Essentials
Data Management Essentials
PRINCE2 OVERVIEW
DIRECTING A PROJECT
Project definition
Authorization Responsibilities
Stage Direction
STARTING UP A PROJECT
Project Issues
Assessing/Reviewing Progress
Project Support
Project Assurance
INITIATING A PROJECT
CONTROLLING A STAGE
Cost/Benefit Analysis
CLOSING A PROJECT
Risk Management
Subversion (SVN)
Concurrent Versions System (CVS):
Perforce
GIT
Mercurial
Migration from Centralized version Control systems to Distributed version
Control systems.
2. Build Automation and Artifact repository manager:
ANT
Maven
Nexus
Jenkins / Hudson
Team city
Build Forge
Bamboo
4. Application Servers
Apache Tomcat
IBM Web sphere ND
Horizontal and Vertical clustering on web sphere ND.
5. Scripting
Shell Scripting with Linux and UNIX administration.
Jython and Python
6. Project Management Tools :
JIRA
7. Code Coverage and Analysis Tools:
Sonar
SCM
1 License Management
Inventory all licenses in use.
Check in contract the authorized number of licenses to be used.
Compare License in use versus licenses contracted.
Check under licensed/over licensed.
License matrix , Deployment , Distribution , Versionetc.
2 IT-Procurement & Sourcing.
Check the need for software and hardware from End user.
Check with the preferred vendors for pricing & availability.
Create requisition based on quote.
Once requisition approved by End users departmental head, then proceed with the PO to vendor.
Once PO is received by the vendor, the product is released and received by end user.
Invoice processing.
Maintaining Serial Keys.
Month end closing
3 Order Management
PO creation.
Quote creation.
Selecting and advising the best product.
Canceling the order.
Return Merchandise Authorization.
Expedite Orders
Adhoc reports, open order report , vendor ordered list, Product list.
4 Vendor Management
Preferred vendor selection.
Selecting best vendor based on vendor performance analysis CPI.
W-9 forms, vendor check list.
Vendor performance matrix.
Termination of vendors.
Contract negotiations.
Gathering Business needs/Requirements.
Negotiate contract terms.
Vendor performance reviews
Manage vendor scorecards.
5 Contract management
Implementation of contract management.
Basic need, strategy ahead.
Monitoring the contract renewal dates and making the demand with end user's accordingly.
Uploading the contracts in a contract management tool; making it a alert ready system
Fundamentals of MSA, Draft, SOW, contract, RFP, RFQetc.
6 Software asset management
CFA
Level1
Level2
Level3
Topic Area
Level I
Level II
Level III
15
10
10
Quantitative Methods
12
5-10
Economics
10
5-10
20
15-25
Corporate Finance
5-15
Equity Investments
10
20-30
5-15
Fixed Income
12
5-15
10-20
Derivatives
5-15
5-15
Alternative Investments
5-15
5-15
Portfolio Management
5-15
45-55
100
100
Total
100
IFRS
Fair Value Measurement
Business Combinations
Financial Instruments
Foreign Currency
Leases
Income Taxes
Revenue Recognition
Intangible Assets
Joint Arrangements
Inventories
Investment Property
IFRS Chapters
1.Small and Medium-sized Entities
11 Inventories
12 Investments in associates
14 Investment in Property
17 Leases
19 Revenue
20 Government Grants
21 Borrowing Costs
22 Employee Benefits
23 Income Tax
Electrical Courses:
Overview of EPC Industry and requirement of Electrical Systems Design
Role of Electrical Design Engineer in Industry.
Knowing Client requirements & collection of specific data for projects.
Understanding various phases of projects.
Use of International Standards, Design Basis, std. practices/procedure and
specifications.
Estimation of Plant Electrical Load.
Development of Single Line Diagrams (SLD) and Control Schematics.
Selection, sizing, protection, specification, data-sheets of Electrical equipments.
Cable Selection and Sizing and Routing.
Illumination Design.
Earthing & Lightening Protection Design.
Hazardous Area Classification.
Substation/switchyard design.
Short Circuit Analysis (Fault Calculations and Stability Studies)
Load Flow Analysis
Motor Starting Study
Substation Design
Substation Design Teams
Legislation, Standards, Drawings and Documents
Substations
Network Topology
Planning
Physical arrangements
Civil Design Considerations
Interlocking, lighting protection ,lighting and noise
Auxiliary Supplies.
Switchgear.
Transformers and reactors
Earthing.
Gas Insulated Equipment
Surge arresters , line traps , power insulators, bushing, busbars & connectors cabling.
Why should you attend this session?
Gain expertise in managing the substation design project start to finish
Minimize future instillation and operational issues
Enhance your understanding of the interaction of all elements of a substation
Develop your ability to specific key, long-term assets.
Develop essential skills that are critically short supply in the industry.
Enhance safety through knowledge of appropriate earthing and protection.
Unix
Unix Scripting
Unix Getting Started
Unix File Management
Standard Unix Streams
Unix File Permission Setup
The Permission Indicators
Directory Access Modes
Changing Permissions
Unix Environment
Printing Files
The pr Command
The lp and lpr Commands
The lpstat and lpq Commands
The cancel and lprm Commands
Sending Email
Unix Pipes and Filters
The grep Command
4 days
3 days
3 days
2 days
2 days
3 days
3 days
3 days
10
3 days
11
3 days
12
3 days
13
2 days
14
2 days