Maintenance

CT Connection / 2008-07-01 /SJ

ABB Switzerland Ltd. - 1

 Technology and
Protection and Substation Automation
Solutions

REB500

ABB

REB500 Periodical Maintenance General

ABB Switzerland Ltd. - 2


CT Connection / 2008-07-01 /SJ

 REB500 includes continuous and comprehensive selfsupervision and diagnosis of the software and hardware
components. Since it is in the software that the protection
functions are computed, they do not require any periodic
maintenance (details are are given in Section 8.4. Periodic
Maintenance).
 The protection equipment, however, is only part of the overall
protection system, we recommend periodically checking all the
parts that are not automatically supervised (details of the
selfsupervision routines are given in Section 3.6. Selfsupervision).

ABB

REB500 Periodical Maintenance General


The following components must be tested periodically:
 all external circuits (e.g. tripping, BFP starting, CT and VT, etc.)
 all external switching devices (circuit-breakers and isolators)
 all REB500 tripping and signaling contacts
 all REB500 opto-coupler inputs
 all REB500 analog inputs

ABB Switzerland Ltd. - 3


CT Connection / 2008-07-01 /SJ

 the local HMI

ABB

REB500 Maintenance Examples


Conditions
 The isolator image auxiliary supply must not be switched off for
certain checks.
 The feeder must not be grounded for certain checks.
 The maintenance procedure must be gone through step by step.

ABB Switzerland Ltd. - 4


CT Connection / 2008-07-01 /SJ

 The feeder is isolated from the busbars during the test and
therefore cannot conduct power.

ABB

REB500 Maintenance check on a feeder CB

ABB Switzerland Ltd. - 5


CT Connection / 2008-07-01 /SJ

Steps of the feeder maintenance procedure


1.

Isolate Feeder

2.

Check the analog input


circuits.

3.

Check the output circuit using


the HMI500 test generator.

4.

Check the input signals from


the circuit-breaker. Check that
the breaker failure protection
starts.

5.

Check the input signals of


Isolator Image.

6.

Recommissioning the bay

7.

Check Load Currents.

ABB

REB500 Maintenance check on a Bus-Tie CB

ABB Switzerland Ltd. - 6


CT Connection / 2008-07-01 /SJ

Steps of the feeder maintenance procedure


1.

Isolate Bus-Tie Breaker

2.

Check the analog input


circuits.

3.

Check the output circuit using


the HMI500 test generator.

4.

Check the input signals from


the circuit-breaker. Check that
the breaker failure protection
starts..

5.

Recommissioning the bay

6.

Check Load Currents.