MRO Sap Id Today's Remarks: 31/mar/2015 Actix Processing, M 0 in Report (M 2 in Report)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

MRO

18/18

18/18

N/A

SAP ID

Today's Remarks

I-RJ-KTPI-ENB-6003

31/Mar/2015 Actix
Processing,M>0
In
31/Mar/2015 Actix
Report(m=2
in
Report)
Processing,Azimuth in

I-RJ-SGWR-ENB-6000

report is
wroung,Correct
azimuth is 60/140/310

I-RJ-KORI-ENB-6002
31/Mar/2015 All KPI blank.Actix Processing

ar/2015 Actix Reprocessing,Azimuth


17/18
I-RJ-JDPR-ENB-I007
In report is 0/120/240, Site forge 30/150/270 & Cell ref is 30/150/270,KPI is

24/Mar/2015
KPI
MT need
to
be
blank
in SFin
&actix
also
mismatch
Blank,Actix
Processing
changed
to
zerotoon
blank in
actix
cellref,
need
25/Mar/2015
Actix
Siteforge
report.Actix
processing
change not
Team,Report
28/Mar/2015
28/Mar/2015HO
AllBlank
KPI
28/Mar/2015
Azumith
generating
Properly
in
Actix
blank.Actix
Processing
not according
to
site
site forge
30/Mar/2015
need
30/Mar/2015
Actix
forge.MT
24/Mar/2015
KPI
to be30/Mar/2015
changed to zero
Reprocessing,Azimuth
History
Blank,Actix
Processing
on
Actix
RP
In
report
isCellref
0/120/240,
Actix,Azimuth
in
report
27/Mar/2015
All
KPI
31/Mar/2015
Actix
Site
forge 30/150/270
is
wroung,Correct
blank
in SF
Processing,M>0
In
& Cell
ref&isalso
azimuth
is in
60/140/310
blank
actix
Report(m=2
in Report)
30/150/270,KPI
is
31/Mar/2015
report.Actix
processing
17/18
site(single
Actix,Azimuth
in
28/Mar/2015
Allreport
KPI
sector swap)
is
wroung,Correct
blank.Actix
Processing
31/Mar/2015
Actix
azimuth
is 60/140/310
30/Mar/2015
All KPI
Reprocessing,Azimuth
blank.Actix
Processing
In report is 0/120/240,
31/Mar/2015
All KPI
Site forge 30/150/270
blank.Actix
Processing
& Cell ref is
30/150/270,KPI is
17/18 site(single
sector swap)

Validated by

Cycle

Prashant

C1

Prashant

C1

Prashant

C1

Prashant

C1

You might also like