Water Removal Works: Course 4

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 24

Water removal works

Course 4
March 2009

Piezometer tube

Making of the isopiesic lines

Hydrogeologic
maps

Underground water

wells

Water removal works

Basic law in soil mechanics

Ditch to lower the water table

Well points

Multi-stage set up for lowering water table

Reverse filter design

Spread / individual / isolated


footings

Design stages

Assess the footing dimensions;


According to the rigidity, the height
is established;

The necessary reinforcement is


estimated for the r.c.elements;
The drawings are made according to
the designed elements.

You might also like