Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

Summer Training Report

On
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE
BRIDGE
&
NON DESTRUCTIVE TESTING EQUIPMENTS USED FOR
BRIDGE TESTING
At
RESEARCH DESIGN AND STANDARD OGANISATION(RDSO)
LUCKNOW
Submitted for Partial fulfilment of

Bachelor of Technology In CIVIL ENGINEERING

SUBMITTED TO-

SUBMITTED BY-

DEPARTMENT OF CIVIL ENGINEERING

VAIBHAV GUPTA

BBDNITM , LUCKNOW

B. TECH ,4TH YEAR


Roll No. - 1305400175

Presented by:

VAIBHAV GUPTA
(B.Tech, 4thyr)Roll N0- 1305400175
BBDNITM, LUCKNOW

PREFACE
This report has been prepared after getting different theoretical and practical
training in Bridge and Structures Directorate of RDSO from 13-06-2016 to 22-072016 in reference to my collage letter Training & Placement Officer for BBDNITM,
LUCKNOW (UP). The training was divided in six different sections of the Directorate.
They are Steel Bridge Unit-1, Steel Bridge Unit-2, Concrete Bridge Unit-1, Concrete
Bridge Unit-2, Testing Unit and Bridge Inspection Unit. The process of training from
my point of view was excellent for each section was very useful for Civil Engineering
Students with very limited re-sources and time schedule. There are many things in
the Directorate on each subject which can be learnt from regular training and proper
guidance.
A little knowledge which I could get from this training, I am trying to re-produce
some of them in following pages.
Any error in making deliberations may please be ignored.

DATE- 10-08-2016
VAIBHAV GUPTA

ACKNOWLEDGEMENT
I express my sincere gratitude to Executive Director/ Bridge & Structures, Executive
Director/Structures, all Directors of the Directorate along with Assistant Engineers
associated with this summer training for his proper guidance, useful suggestions and
timely treatment where ever required during the entire training. My best wishes to
Director General/RDSO for giving a chance for this summer training and know about
Indian Railways. My special thanks goes to Shri Srijan Tripathi /Director/Bridge and
Structures/SB-I and their team for designing the entire course in a very proper way
irrespective of their busy schedule of dally working.

SUBJECT INDEX
S.No.
1.
2.
3.
4.
5.
6.

Description
Introduction
Bridges and Structures Directorate
Modernization of Bridge on Indian Railways
Design Steps of RCC Precast Bridge Slab
Design of PreStressed Concrete Railway
Bridges
Non destructive testing of railway bridges
Rebound Hammer
Ultrasonic Pulse Velocity Meter
Windsor Probe
Cut And Pull Out
Core Cutter
Permeability Tester
Video Borescope
Corrosion Analyser

Page
No.
1
2
3
5
6
11
11
12
14
14
15
15
16
17

You might also like