----------------------- Page 1----------------------EXTENSIONP

LANTMARUNDAIII&NEWREFINERYPLANT
MARUNDAIIIAPROJECT
th
Report:30

th
week;onAgustus11 ,2016

Periode:30Juli201605Agustus2016
Goal : To increasing cap acity of p roduction
Contractor:
Construction Management:
PT. KETIRA ENGINEERING
CONSULTANTS

PT. PARAMITA BANGUNSARANA

13
MILESTONESPATHFORWARD
11

MARUNDAIII/IIIA
Weekly#30
8
3
1
12

10

Start UP Operation
Steel struc

Design

Civil work

echanical work/
Piping work
Elec /insulation
work
NOTE :
Commissioning
1.

New Refinery & Fractionation

7.

Plant
Structure & Architecture (100.000% - BAST-2)
TM Refinery 2 (100.000% - BAST)
ME Building (100.000% - BAST)
ISBL Mechanical (100.000% - BAST)
ISBL Electrical (100.000% - BAST)
TankFarm
Tank Structure (86.416% - BAST)
Finish Good Warehouse ASRS
- Structure & Architecture (95.705% - BAST)
- Lighting & In Racking Springkler System ASRS (96.334% - BAST)
- Pekerjaan Tegangan Menengah RND & New Warehouse
(ASRS) Marunda III (99.200% - BAST)
- Elektrikal Warehouse (100.000% - BAST)
- M/E Filling Plant (93.344% - BAST)
- OSBL/ISBL Filling Line (67.349%- Weekly #30)
TM & TR Marsho (100.000% - BAST)
OSBL III/IIIA

OSBL Piping Marunda (98.919% - BAST)

OSBL Power Pompa(99.572% - BAST)


Piling Phase II
Marunda III (74.763% - BAST)
Marunda IIIA (50.151% - BAST)
Infrastructure (94.980% - BAST)

8.

PROGRESS
Loading Unloading (91.205% - BAST)

2.
3.

4.
5.
6.

9.

WTP (98.303% - BAST)


MARUNDAIII/IIIA

10. Loading Dock ASRS


GRADING
Piling & Bored Pile(89.899% - BAST)
MarundaIII/IIIA
Platform(100.000% - BAST)
11. Employee Facilities(100.00%- BAST)
Progress Actual=100.00% (BAST2)
12. Jetty Piping Line ( 76.007 %- Weekly Report #20)
13. Kabel Power Filling Plant (100.00%-BAST)
JAKARTA/JKTO/3/12/008GRADINGtgl16Maret2012
-

Page 1
of 15
----------------------- Page 2-----------------------

PILING(MarundaIIIA)
PILING(MarundaIII)
ProgressKontrakMarundaIIIA=97.656%(BAST)
gress Kontrak Marunda III = 90.601 % (BAST)
JAKARTA/JKTO/4/ 12/020pilingtgl23April2012
JAKARTA/JKTO/4/12/020pilingtgl23April2012
PekerjaanPilingMarundaIII
PekerjaanPilingMarundaIIIA
(Loading/Unloading&WeightBridge)
(NewStorageTank&NewRefinery)
ProgressPemancanganLoading/Unloading
ProgressPemancanganNewStorageTank
248/248=100.00%
855/855=100.00%
ProgressPemancanganWeightBridge
ProgressPemancanganPipeRackNST
36/36=100.00%
30/30=100.00%
ProgressPemancanganNewWarehouse
ProgressPemancanganNewRefinery
450
343/343=100.00%
1574/1574=100.00%
ProgressPemancanganColdStabilityTank
400
10/10=100.00%

Pr

75/75=100.00%
ProgressPemancanganOilTank
126/126=100.00%
NEWREFINERYANDFRACTIONATION
TANKFARM
MarundaIIIA
MarundaIII&IIIA
ProgressContract=100.000%(BAST)
Progress Contract=86.416%(BAST)
078/JAKARTA/PRCPCC/LOA/XII/12tgl04Desember2012
013/JAKARTA/PRCPCC/LOA/I/13tgl31Januari2013
SubStructureWork(incldfoundation equipment)
Tank15x3450MT(CPO)Area
CutofPile,completedupto100%
ankPadupto100.00%
CutandFill,completedupto100%
Asphalt,completedupto100%
LeanConcrete,completedupto100%
Bundwall
PileCapincluderebar,completedupto100%
oundation,completedupto100%
TieBeamincluderebar,completedupto100%
loof,completedupto100%
Slabincluderebar,completedupto100%
Wall(+Acian),completedupto100%
Pedestalincluderebar+anchor,completedupto100%
b,completedupto100.00%
Plintincludeanchore+rebar,completedupto100%
ionTank
ConcreteK350,completedupto100%
Bottom,Shell,Roof,completedupto100.00%

AccessoriesTank,completedupto100.00%
ColdStabilityTank
Staircase,Bridge,Rafter,completedupto100.00%
Slabincluderebar,completedupto100%
Pipetank,completedupto100.00%
Pedestalincluderebar+anchor,completedupto100%
ttank,completedupto100.00%
ConcreteK350,completedupto100%
ipeRackupto100.00%

PipeRackSubStructure,completedupto100%
SteelStructure/EquipmentPlacement

Erection,completedupto100%
Tank10x250MT(RBDOL)Area
EquipmentPlacementupto100%

TankPad

TankPad,completedupto100%
CoolingTower
ErectionTank
Clean
Bottom,Shell,Roof,completedupto100%
BoredPile,completedupto100.00%(20titik/20titik)
soriesTank,completedupto100%
CivilWork,completedupto100.00%
Staircase,Bridge,Rafter,completedupto100%
Dirty
Pipetank,completedupto100%
BoredPile,completedupto100.00%(14titik/14titik)
nk,completedupto100%
CivilWork,completedupto100.00%

FatTrap
Tank5x3450MT(WATER)Area
BoredPile,completedupto100.00%(2titik/2titik)
CivilWork,completedupto100.00%
TankPad,completedupto100%
ErectionTank

TankiA,completedupto100.00%
TankiB,completedupto100.00%
TankiC,completedupto100.00%
TankiD,completedupto100.00%
TankiE,completedupto100.00%

Page
2 of 15
----------------------- Page 3-----------------------

FINISHGOODWAREHOUSEASRS
PILINGPHASEII
MarundaIII

MarundaIII,Progress=74.763%(BAST)
ProgressContractSTR&ARC=95.705% (BAST)
ndaIIIA,Progress=50.151%(BAST)

Maru

048/MARUNDA/PRCPCC/LOA/IV/13tgl9April2013
108/JAKARTA/ PRCPCC/ LoA/ VI/ 13
SubStructureWork
rjaanPilingPhaseIIMarundaIII&IIIA
CutandFill,completedupto100.00%
erTank,Canteen&Remelt)
LeanConcrete,completedupto100.00%
essPemancanganPipeRackdia40cm
PileCapincluderebar,completedupto100.00%
0.00%
TieBeamincluderebar,completedupto100.00%
mancanganWaterTankdia45cm

Peke

(PipeRac

Pr

105

Pr

Pedestalincluderebar+anchor,completedupto100.00%
00%
SlabASRSincluderebar,completedupto100.00%
redPilePipeRackdia50cm

285

Pr

ErectionSteelStructure&ME
46/46=100.00%
Erection,completedupto100.00%
gressPemancanganEmployeeFacilitiesdia45cm
HydrantandSprinklerASRS,completedupto90.00%
00%
Electrical,completedupto95.00%
Mechanical,completedupto90.00%
HVAC,completedupto90.00%
NEWLOADINGUNLOADING
OSBL/ISBLFillingline,completedupto19.767.00%
MarundaIII
INFRASTRUCTURE
Progress Contract=91.205%(BAST)
MarundaIII/IIIA
090/JAKARTA/PRCPCC/LoA/VI/13tgl13Juni2013
ProgressContract=94.980%(BAST)
ingUnloading
Pondasi,completedupto100.00%
139/MARUNDA/PRCPCC/LoA/VIII/13tgl21Agustus2013
Pit,completedupto100.00%
PelatLantai,completedupto100.00%
InfrastructurePlant
SteelStructure,completedupto100.00%
JalandanSaluran,completedupto95.00%
Arsitektur,completedupto100.00%
PipeRack,completedupto100.00%
ME,completedupto100.00%

Pr

70/

Load

PJUPlant,completedupto100.00%
WeightBridge
HydrantPlant,completedupto100.00%
PekerjaanSipil,completedupto100.00%
PenangkalPetirPlant,completedupto100.00%
SteelStructure,completedupto100.00%
Arsitektur,completedupto100.00%
LOADINGDOCKASRS
ME,completedupto100.00%
EMPLOYEEFACILITIES
ProgressContract=100.000%(BAST)
ProgressContract=100.00%(BAST)
PO.NO.3000064183
PilingLoadingDockASRS
PO.NO.3000067632
TiangPancang,completedupto100.00%
StrukturBawah
BoredPile,completedupto100.00%
LantaiLoadingDockASRS
xcavation,completedupto100.00%
Pek.PelatLantai,completedupto100.00%
pletedupto100.00%

TieBeam,completedupto100.00%
BongkarLuLExisting,completedupto100.00%
TambahanPelatlantai,completedupto100.00%
i,completedupto100.00%

Pela

Pile

StrukturAtas

Kolom,completedupto100.00%
Balok,completedupto100.00%
Pelatlantaidak,completedupto100.00%
JETTYPIPINGLINE
/E
MechanicalCompleteupto100.00%
PlumbingCompleteupto100.00%
FireextinguisherCompleteupto100.00%
ProgressContract=76.007%
TataUdaraCompleteupto100.00%

ElektricalCompleteupto100.00%
PO.NO=3000070398
ListrikCompleteupto100.00%
FireAlarmCompleteupto100.00%
TeleponCompleteupto100.00%
PekerjaanPersiapan
Arsitek
Mebolisasidandemolisasicompleteupto99.064%
Atapcompleteupto100.00%
PekerjaanPipaUtama
DindingCompleteUpto100.00%
Pek.DistribusiPipaJalur1(CPO1),completedupto
PlesterdanAciCompleteUpto100.00%
69.302%
KusenCompleteUpto100.00%
Pek.DistribusiPipaJalur2(CPO2),completedupto
PekerjaanLantaiCompleteupto100.00%
69.284%
PekerjaanSanitasiCompleteUpto100.00%
Pek.DistribusiPipaJalur3(CPKO),completedupto
PengecatandindingdalamCompleteUpto100.00%
68.387%
PekerjaanPlafondCompleteUpto100.00%
Pek.DistribusiAirCompressorLine,completeupto
Page 3 of 15
35.000%
----------------------- Page 4----------------------IKDL

(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)

IKDL No. 01 = 100,00 % (BAST)


IKDL No. 01A= 100,00 % (BAST)
IKDL No. 71 = 100,00 %
IKDL No. 02 = 100,00 % (BAST)
IKDL No. 72 = 94,390%
IKDL No. 03 = 100,00 % (BAST)
IKDL No. 73 = 100,00 %
IKDL No. 04 = 100,00 % (BAST)
IKDL No. 74 = 100,00 %
IKDL No. 05 = 100,00 % (BAST)
IKDL No. 75 = 100,00 %
IKDL No. 06 = 100,00 % (BAST)
IKDL No. 76 = 100,00 %
IKDL No. 07 = CANCEL
IKDL No. 77 = 100,00 %
IKDL No. 08 = 100,00 % (BAST)
IKDL No. 78 = 100,00 %

IKDL No. 34 = 100,00 %


(BAST)
IKDL No. 35 = 100,00 %
(BAST)
IKDL No. 36 = 100,00 %
(BAST)
IKDL No. 37 = 100,00 %
(BAST)
IKDL No. 38 = 100,00 %
(BAST)
IKDL No. 39 = 100,00 %
(BAST)
IKDL No. 40 = 100,00 %
(BAST)
IKDL No. 41 = 100,00 %
(BAST)

(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)

IKDL No. 09 = 100,00 % (BAST)


IKDL No. 79 = 100,00 %
IKDL No. 09A = 100,00 % (BAST)
IKDL No. 80 = 100,00 %
IKDL No. 10 = 100,00 % (BAST)
IKDL No. 81 = 100,00 %
IKDL No. 11 = CANCEL
IKDL No. 82 = 100,00 %
IKDL No. 12 = 100,00 % (BAST)
IKDL No. 83 = 100,00 %
IKDL No. 13 = 100,00 % (BAST)
IKDL No. 84 = 100,00 %
IKDL No. 14 = 100,00 % (BAST)
IKDL No. 85 = 100,00 %
IKDL No. 15 = 100,00 % (BAST)
IKDL No. 86 = 100,00 %
IKDL No. 16 = 100,00 % (BAST)
IKDL No. 87 = 100,00 %
IKDL No. 17 = 100,00 % (BAST)
IKDL No. 88 = Cancel
IKDL No. 18 = CANCEL
IKDL No. 89 = Cancel
IKDL No. 19 = 100,00 % (BAST)
IKDL No. 90 = 100,00 %
IKDL No. 20 = 100,00 % (BAST)
IKDL No. 91 = Cancel
IKDL No. 21 = 100,00% (BAST)
IKDL No. 92 = 100,00 %
IKDL No. 21A = 100,00% (BAST)
IKDL No. 93 = 100,00 %
IKDL No. 22 = 100,00 % (BAST)
IKDL No. 94 = 100,00 %
IKDL No. 23 = CANCEL
IKDL No. 95 = 100,00 %

IKDL No. 42 = 100,00 %


(BAST)
IKDL No. 43 = 100,00 %
(BAST)
IKDL No. 44 = 100,00 %
(BAST)
IKDL No. 45 = 100,00 %
(BAST)
IKDL No. 46 = 100,00 %
(BAST)
IKDL No. 46A = 100,00%
(BAST)
IKDL No. 47 = 100,00 %
(BAST)
IKDL No. 48 = 100,00 %
(BAST)
IKDL No. 49 = 100,00 %
(BAST)
IKDL No. 50 = 100,00 %
IKDL No. 51 = 100,00 %
IKDL No. 52 = 100,00 %
(BAST)
IKDL No. 53 = 100,00 %
IKDL No. 54 = 100,00 %
(BAST)
IKDL No. 55 = 100,00 %
(BAST)
IKDL No. 56 = 100,00 %
(BAST)
IKDL No. 57 = 100,00 %
(BAST)

IKDL No. 24 = CANCEL


IKDL No.96= Cancel
IKDL No. 25 = 100,00 % (BAST)

IKDL No. 58 = 100,00 %

IKDL No. 26 = 100,00 % (BAST)

IKDL No. 60 = 100,00 %

IKDL No. 26A = 100,00 % (BAST)


Outstanding :
IKDL No. 27 = 100,00 % (BAST)
IKDL No.97
IKDL No. 27A = 100,00 % (BAST)
IKDL No. 98
IKDL No. 28 = 100,00 % (BAST)
IKDL No.99

IKDL No. 61 = 100,00 %

IKDL No. 29 = CANCEL

IKDL No. 65 = 100,00 %

IKDL No. 30 = 100,00 % (BAST)

IKDL No. 66 = 100,00 %

IKDL No. 31 = 100,00 % (BAST)

IKDL No. 67 = 100,00 %

IKDL No. 32 = 100,00 % (BAST)

IKDL No. 68 = 100,00 %

IKDL No. 33 = 100,00 % (BAST)

IKDL No. 69 = 100,00 %

IKDL No. 59 = 100,00 %

(BAST)
(BAST)
(BAST)
(BAST)
(BAST)
(BAST)

IKDL No. 62 = 100,00 %


IKDL No. 63 = 100,00 %
IKDL No. 64 = 100,00 %

(BAST)
(BAST)
(BAST)
(BAST)
(BAST)

IKDL No. 70 = 100,00


% (BAST)

Page 4 o
f 15
----------------------- Page 5----------------------ListIKDL
No.
Target Finish

Register Code
Subject/ Item
Reference
Status

Document

Progress

Date
Remark

Work

1
01/IKDL-MRD/09/2011
Perubahan Material dan Penambahan p
ada paket pekerjaan
016/SK/Ref-MRD/GM/VIII/2011
27-Sep-11
Approval
Completed
100%
A. Product Tank (250 MT dan 80 MT)
063/Jakarta/LOA/VI/11
Finish

1)
oil dari SUS 304 Seamless Sch 40 Ex China ke Jepang

Perubahan Material Steam C

2) Penambahan pekerjaan insula


tion untuk Tangki 80 MT ( 4 ) dan 250 MT ( 4 ) yang telah ada (Existing)
3) Penambahan pekerjaan jembat
an penghubung antara Tangki 250 MT (F6) ke 80 MT (G7)
B. Big Tank (3450 , 2600, 1200, 55
0 MT )
Finish
1)

Penambahan pekerjaan Insul

ation
2) Penambahan pekerjaan Epoxy
3) Penambahan pekerjaan Sand B
last
4) Perubahan Material Steam Co
il Carbon Steel Sch 40 ke SUS 304 Seamless Sch 40 ( Ex. Jepang)
C. Utility Tank
Finish
1)

Penambahan Tangki air kap

asitas 250 (1 Unit) dan 500 MT (1 Unit)


(catatan : Tank Pad sudah t
ersedia)
2
02/IKDL-MRD/10/2011
Perubahan Material dan Penambahan p
ada paket pekerjaan
063/Jakarta/LOA/VI/11
21-Oct-11
Finish
Approval
Completed
100%
Perubahan Material Steam Coil C
arbon Steel Seamless Sch 40 Ex China ke Jepang
Spesifikasi Material Tersebut:
ASTM A 106 Gr.B Seamless Sch 40 dia. 3"
Kuantitas yang tertulis di Bill
of Quantity untuk 1 (satu) unit adalah
- CS Pipe Sch 40 diameter 3"
254 M
- CS Elbow Sch 40 diameter 3" =
42 buah
3
gujian X-Ray)

03/IKDL-MRD/10/2011
063/Jakarta/LOA/VI/11

Penambahan paket pekerjaan NDT (Pen


27-Okt-11

Finish

Approval

Completed
a) Pengujian 100% X-Ray
100%
b) Pengujian 10% X-Ray
100%

4
aket Pekerjaan

04/IKDL-MRD/10/2011

Perubahan Material dan Penambahan P

063/Jakarta/LOA/VI/11
Approval
Completed

Finish

03-Nov-11
1. Perubahan material pipa sparing

, di Storage Tank ( Big Tank Farm )


100%
2. Perbaikan Pipa Steam Heating Co
il di Tanki C1 dan C2
100%
3. Pembuatan Pipe Rack di area Sto
rage Tank (Big Tank Farm)
100%
4. Perbaikan dinding pembatas di a
rea Boiler
100%
5

05/IKDL-MRD/11/2011

Finish

063/Jakarta/LOA/VI/11
Approval
Completed

Penambahan Paket Pekerjaan Pemipaan


14-Nov-11
100%
A. Big Tank Farm (Storage Tank)
1

Pipa Produk

Pipa Steam, supply ke Tanki

Relokasi Pipa dan Pompa di

Relokasi Steam Header dan S

Big Tank Pump House


team Tracing ( Header dan Jalur )
B. Small Tank Farm (Product Tank)
1
Pipa Produk, Jalur Input dan Output Tanki

Modifikasi dan Penambahan

Pipa Steam, supply ke Tanki

Relokasi Pipa dan Pompa di

Relokasi Steam Header dan S

Small Tank Pump House


team Tracing ( Header dan Jalur )
6

06/IKDL-MRD/12/2011

Penambahan dan Pengurangan Paket P

ekerjaan
063/Jakarta/LOA/VI/11
Approval
Completed

Finish

07-Des-11
100%
A. Big Tank Farm (Storage Tank)
1

Penambahan Pekerjaan

Pengurangan Pekerjaan

B. Small Tank Farm (Product Tank)

07/IKDL-MRD/01/2012

Penambahan Pekerjaan

Pengurangan Pekerjaan

Penambahan Paket Pekerjaan Tangki d

i CBS
03-Jan-12
CANCEL

CANCEL

CANCEL

8
08/IKDL-MRD/01/2012
Penambahan Paket Pekerjaan di CBS (
Pemindahan & pasang Pagar Precon)
063/Jakarta/LOA/VI/11
30-Jan-12
Finish
Approval
Completed
100%
1 Pemindahan Pagar Pre-Con Sisi U
tara pada Proyek CBS ke arah sisi utara terluar dari Tanah PT. Smart - Tbk.
2 Pemasangan Pagar Pre- Con pada
Sisi Timur dan Barat di Tanah paling Utara ( Tanah Baru - sisi Utara ).
3

Pemadatan dan Pemberian Base Co

urse pada Tanah Baru Sisi Utara.


Cancel
4 Pembuatan Lantai Kerja (untuk l
antai Kantin Sementara), di area Depan Warehouse
5

Mini Pile untuk Dudukan Cerobon

g Boiler di area Boiler.


Cancel
9
Finish
.

01A/IKDL-MRD/03/2012
063/Jakarta/LOA/VI/11
Approval
Completed

Perubahan pemipaan di big tank


100%

22-Mar-12
Diganti Memo Lap

perubahan penggunaan tangki di


big tank (B5, B6 dari RBDOL menjadi PFAD
06/MK-PBS/IV/2012
dan C6, C7, C8 dari RBDPO menja
di PFAD)
(5 April 2012
)
10
09/IKDL-MRD/03/2012
Pekerjaan Renovasi Ruangan Utensile
Menjadi Ruangan Pilot Plant
063/Jakarta/LOA/VI/11
13-Mar-12
Finish
Approval
Completed
100%
11
09A/IKDL-MRD/03/2012
Pembangunan Kantin Sementara dan Pe
kerjaan Instalasi Power untuk
063/Jakarta/LOA/VI/11
28-Mar-12
Finish
Approval
Completed
100%
Agitator di Small Tank dan Big Tank
Farm
Penambahan Pekerjaan untuk Pemb
angunan Kantin Sementara, dan
KANTIN CANCEL
Pekerjaan Instalasi Power untuk
Agitator di Small Tank dan Big Tank Farm
12
10/IKDL-MRD/04/2012
Pekerjaan untuk Pemasangan/ Instala
si Pompa di Tangki E5, E6, F5, F6, G5, G6, G7, H5,
063/Jakarta/LOA/VI/11
26-Apr-12
Finish
Approval
Completed
100%
H6, dan H7 serta Penyediaan Fitting
untuk Instalasi.
13
atan kontainer

11/IKDL-MRD/04/2012

Pekerjaan grading untuk area penemp

JAKARTA/JKTO/3/12/008-grading
CANCEL
CANCEL

26-Apr-12
Memo (5 Mei 2012

)
dan bedeng kontraktor (HMS)
10/MK-HMS/V/2012
14
12/IKDL-MRD/06/2012
Penambahan Jalur Pipa CPO dan Pemas
angan Agitator serta pembuatan
063/Jakarta/LOA/VI/11
04-Jun-12
Finish
Approval
Completed
100%
dudukannya.

1 Penambahan jalur Pipa CPO dari


area Unloading ke Tangki CPO (A1 s/d A5 dan B1 & B2)
2 Pemasangan Agitator dan pembuat
an Dudukan Agitator untuk tangki di Area Big Tank Farm dan Small Tank Farm
Small Tank Fini
sh
15

13/IKDL-MRD/06/2012

Penampungan Batubara dan Ruangan Ut

ensile
063/Jakarta/LOA/VI/11
Approval
Completed

Finish

14-Jun-12
100%
1. Perluasan Area untuk Penampungan

Batubara disebelah Workshop Existing.


2. Ruangan Utensile di Area Margari
ne.
16

14/IKDL-MRD/06/2012
063/Jakarta/LOA/VI/11
Approval
Completed

Finish

Perubahan Jalur Condensate


100%

14-Jun-12
BAPB

1. Perubahan Jalur Condensate di Ar


ea Small Tank Farm
01/PBS-MRND/VO/IV/1
2
17
15/IKDL-MRD/08/2012
Pembongkaran Bangunan TPS di Belaka
ng Area Penampungan Batu Bara Existing
063/Jakarta/LOA/VI/11
29-Aug-12
Finish
Approval
Completed
100%
18
16/IKDL-MRD/08/2012
Penambahan Lapisan Base Course di A
rea Depan Big Tank dan Land Area Depan Ware House Existing
063/Jakarta/LOA/VI/11
29-Aug-12
Finish
Approval
Completed
100%
untuk perletakan sementara Equipmen
t New Refinery Marunda IIIA.
19

17/IKDL-MRD/09/2012

Pekerjaan Pembuatan Pipa Jalur Outl

et WWTP.
Finish

063/Jakarta/LOA/VI/11
Approval
Completed

19-Sep-12
100%

20
18/IKDL-MRD/10/2012
Pekerjaan Penambahan/ Perubahan Jal
ur Piping di Tanki D4 (Big Tank Farm)
063/Jakarta/LOA/VI/11
25-Oct-12
CANCEL
CANCEL
Request Cancel by
PBS
21
19/IKDL-MRD/10/2012
Pengurangan dan Penambahan Paket Pe
kerjaan Grading Marunda III & Marunda IIIA
JAKARTA/JKTO/3/12/008-grading
29-Oct-12
Finish
Approval
Completed
100%

22
20/IKDL-MRD/11/2012
Kalibrasi Ulang di Big Tank (Tanki
A4, A5, B5, B6, C6, D7 & D8)
063/Jakarta/LOA/VI/11
06-Nov-12
Finish
Approval
Completed
100%
23
21/IKDL-MRD/01/2013
Penambahan Pekerjaan di Marsho, Pag
ar Pre-Con New CBS, Pemberian Base Course di Loading Unloading,
078/JAKARTA/PRCP-CC/LOA/XII/12
21-Jan-13
Finish
Approval
Completed
100%
Note: Excld. Mar
sho
Pemindahan PJU di New Warehouse
(Item No. 1)
24
Marunda Project

21A/IKDL-MRD/01/2013

Pekerjaan tambah Electrical Marsho

078/JAKARTA/PRCP-CC/LOA/XII/12
Approval
Completed

Finish

21-Jan-13

25
22/IKDL-MRD/02/2013
Perkerasan Base Course Penempatan C
ontainer dan Pembuatan Rack Container
078/JAKARTA/PRCP-CC/LOA/XII/12
25-Feb-13
Finish
Approval
Completed
100%
26
23/IKDL-MRD/03/2013
Penempatan Cold Stability Tank (10
x 50 MT) dan Pemindahan Box Hydrant di area MARSHO Plant
078/JAKARTA/PRCP-CC/LOA/XII/12
11-Mar-13
CANCEL
CANCEL
27
24/IKDL-MRD/03/2013
Penambahan Paket Pekerjaan Grading
CBS Plant Extension Project Marunda
072/JAKARTA/PRCP-CC/LoA/XI/12
16-Apr-13
CANCEL
CANCEL
28
25/IKDL-MRD/04/2013
Penambahan Paket Pekerjaan Piling d
an Pondasi Ex Boiler Belawan & Coal Boiler
47/MARUNDA/PRCP-CC/SPK/IX/12
24-Apr-13
Finish
Approval
Completed
100%
29
26/IKDL-MRD/06/2013
Modifikasi Struktur Baja New Refine
ry, Pekerjaan Pembuatan Area New TPS
078/JAKARTA/PRCP-CC/LOA/XII/12
21-Jun-13
Finish
Approval
Completed
100%
30

26A/IKDL-MRD/06/2013

Pekerjaan Sipil Tambahan New Refine

ry
Finish

078/JAKARTA/PRCP-CC/LOA/XII/13
Approval
Completed
100%

25-Jun-13

31
27/IKDL-MRD/06/2013
Perubahan dan Penambahan Pekerjaan
di New Storage Tank Kapasitas 3450 MT
013/JAKARTA/PRCP-CC/LOA/I/13
28-Jun-13
Finish
Approval
Completed
100%
32
27A/IKDL-MRD/06/2014
Pengurangan Akibat Perubahan dan Pe
nambahan Pekerjaan di New Storage Tank Kapasitas 3450 MT

013/JAKARTA/PRCP-CC/LOA/I/14
Approval
Completed

Finish

29-Jun-13
100%

33
28/IKDL-MRD/07/2013
Pekerjaan Elektrikal Tegangan Menen
gah & Tegangan Rendah Margarine Plant Marunda
066/JAKARTA/PRCP-CC/LOA/V/13
03-Jul-13
Finish
Approval
Completed
100%
34

29/IKDL-MRD/08/2013

Pekerjaan Room Filter Press Refiner

y
083/MARUNDA/PRCP-CC/LoA/V/13
CANCEL
CANCEL

01-Aug-13

Page 5 of 15
----------------------- Page 6----------------------35

30/IKDL-MRD/09/2013

Perubahan Capasitor Bank Pada Panel TM Marsho

066/JAKARTA/PRCP-CC/LOA/V/13
Approval
Completed
100%
36

31/IKDL-MRD/09/2013

47/MARUNDA/PRCP-CC/SPK/IX/12
Approval
Completed
100%

9-Sep-13

Finish

Penambahan Ruang Panel Boiler


26-Sep-13
BAST 28-02-2014

Finish

SPK No.
066 /MARUNDA/PRCP-CC/LoA/V/13 (14 /5/13)
37
32/IKDL-MRD/09/2013
Perubahan Jalur Instalasi Cable Panel Cubicle S
erta Cable Laddernya Untuk TM. MARSHO
No.
02 /BAKP-02/PBS-KETIRA/XI/13 (01/11/13)
30-Oct-13
Finish
Approval
Completed
100%
MEMO L
APANGAN No. 44 /MK-PBS/IX/2013 (25/9/13)
38
33/IKDL-MRD/11/2013
Perubahan dan Penambahan Piling Phase II Pipe R
ack
108/JAKARTA/PRCP-CC/LoA/VI/13
22-Nov-13
Finish
Approval Completed
100%
BAST 06-03-2014
39

34/IKDL-MRD/11/2013

108/JAKARTA/PRCP-CC/LoA/VI/13
Approval Completed
100%
40

35/IKDL-MRD/12/2013

Pengurangan Piling Phase II Pipe Rack


22-Nov-13

Finish

Tambah Kurang Pekerjaan Sipil New Warehouse

048/MARUNDA/PRCP-CC/LoA/IV/13
Approval Completed
100%
41

36/IKDL-MRD/12/2013

072/MARUNDA/PRCP-CC/LoA/V/13
Approval Completed
100%

9-Dec-13

Finish

Pekerjaan Tambah ME Building New Refinery


12-Dec-13

Finish

42
37/IKDL-MRD/12/2013
Pengurangan Piling Phase II Marunda IIIA (Emplo
yee Facilities)
108/JAKARTA/PRCP-CC/LoA/VI/13
9-Jan-14
Finish
Approval Completed
100%
BAST 28-02-2014
43

38/IKDL-MRD/12/2013

013/JAKARTA/PRCP-CC/LoA/I/13
Approval Completed
100%

Perubahan Material New Storage Tank Tanki B1


9-Jan-14
BAST 15-07-2014

Finish

44
39/IKDL-MRD/01/2014
Pekerjaan pemancangan untuk bangunan New WTP &
New WWTP
108/JAKARTA/PRCP-CC/LoA/VI/13
22-Jan-14
Finish
Approval Completed
100%
45

40/IKDL-MRD/01/2014

090/JAKARTA/PRCP-CC/LoA/VI/13
Approval Completed
100%

Pekerjaan Pit Loading Unloading Station


22-Jan-14

Finish

46
41/IKDL-MRD/01/2014
Infrastruktur Penangkal Petir dan PJU Marunda I
II & Marunda IIIA
139/MARUNDA/PRCP-CC/LoA/VIII/13
29-Jan-14
Finish
Approval Completed
100%
47

42/IKDL-MRD/02/2014

048/MARUNDA/PRCP-CC/LoA/IV/13
Approval Completed
100%

Pekerjaan Tambah New Warehouse


19-Feb-14

Finish

48
43/IKDL-MRD/02/2014
Pekerjaan Instalasi Kabel Fedder PJU dan Instal
asi Hydrant
139/MARUNDA/PRCP-CC/LoA/VIII/13
20-Feb-14
Finish
Approval Completed
100%
BAST 15-07-2014
49
44/IKDL-MRD/02/2014
Bobok Pagar Precast dan Lapisan Tanah Dasar Jal
an dan Saluran
139/MARUNDA/PRCP-CC/LoA/VIII/13
28-Feb-14
Finish
Approval Completed
100%
50
45/IKDL-MRD/03/2014
Pembuatan Ramping Untuk Akses Container Racking
ASRS
048/MARUNDA/PRCP-CC/LoA/IV/13
25-Mar-14
Finish
Approval Completed
100%
51

46/IKDL-MRD/03/2014

013/JAKARTA/PRCP-CC/LOA/I/13
Approval
Completed
100%
52
46A/IKDL-MRD/03/2014
rm Marunda III/ IIIA

Pelat Lantai New Storage Tank 15 x 3450 MT


26-Mar-14
BAST 15-07-2014

Finish

Pengurangan Volume Item Pekerjaan Paket Tank Fa

013/JAKARTA/PRCP-CC/LOA/I/13
Approval Completed
100%

26-Mar-14

Finish

53
47/IKDL-MRD/03/2014
Penambahan Pekerjaan Tracing dan Isolasi Untuk
Paket Pekerjaan OSBL Piping
089/MARUNDA/PRCP-CC/LoA/VI/13
27-Mar-14
Finish
Approval Completed
100%
BAST 15-07-2014
54

48/IKDL-MRD/03/2014

048/MARUNDA/PRCP-CC/LoA/IV/13
Approval
Completed
100%
55
49/IKDL-MRD/04/2014
Room - Marunda)
037/SMART/PK/LGL/XI/2013
Approval
Completed
100%
56

50/IKDL-MRD/04/2014

089/MARUNDA/PRCP-CC/LoA/VI/13
Approval
Completed
100%
57
Approval
58

51/IKDL-MRD/05/2014
PO 3000050431
Completed

100%

52/IKDL-MRD/05/2014

089/MARUNDA/PRCP-CC/LoA/VI/13
Approval
Completed
100%
59

53/IKDL-MRD/05/2014

139/MARUNDA/PRCP-CC/LoA/VIII/13
Approval Completed
100%
60

54/IKDL-MRD/05/2014

089/MARUNDA/PRCP-CC/LoA/VI/13
Approval
Completed
100%
61

55/IKDL-MRD/06/2014

139/MARUNDA/PRCP-CC/LoA/VIII/13
Approval Completed
100%

Tambah Untuk Paket Pekerjaan New Warehouse


27-Mar-14

Finish

Elektrikal (Pengadaan dan Pemasangan Power Cold


4-Apr-14

Finish

Pekerjaan Tambah Paket Pekerjaan OSBL


29-Apr-14

Finish

Instalasi Hydrant Sprinkler ASRS


7-May-14
BAST 14-09-2015

Finish

Power Pompa 15 Kw New Stability Tank


13-May-14
BAST 03-10-2014

Finish

PJU Marunda & Panel Fire Pump Hydrant


22-May-14
BAST 03-10-2014

Finish

Instalasi Fire Alarm New Refinery


22-May-14
BAST 01-10-2014

Finish

Infrastruktur Jalan & Saluran


18-Jun-14
BAST 14-09-2015

Finish

62
56/IKDL-MRD/09/2014
Tambah Paket New Warehouse (Finishing Arsitektu
r dan Struktur Baja)
048/MARUNDA/PRCP-CC/LoA/IV/13
5-Sep-14
Finish
Approval Completed
100%
BAST 28-11-2014
63
Approval

57/IKDL-MRD/09/2014
PO. 3000047263
Completed
100%

64
58/IKDL-MRD/10/2014
k Exstension Marunda III

Pekerjaan Tambah TM GRDC dan New Warehouse


8-Sep-14
BAST 07-11-2014

Finish

Pekerjaan Tambah Kurang Infrastruktur Pipe Rac

139/MARUNDA/PRCP-CC/LoA/VIII/13
Approval
Completed
100%

17-Oct-14
BAST 04-11-2014

Finish

65
59/IKDL-MRD/10/2014
Pekerjaan Kurang Paket Loading Unloading Marund
a III
09/JAKARTA/PRCP-CC/LoA/VI/13
20-Oct-14
Finish
Approval
Completed
100%
BAST 31-10-2014
66
60/IKDL-MRD/10/2014
Pekerjaan Tambah Kurang Paket New Loading Unloa
ding Marunda III
09/JAKARTA/PRCP-CC/LoA/VI/13
23-Oct-14
Finish
Approval
Completed
100%
BAST 16-01-2015
67

61/IKDL-MRD/11/2014

139/MARUNDA/PRCP-CC/LoA/VIII/13
Approval Completed
100%
68

62/IKDL-MRD/11/2014

139/MARUNDA/PRCP-CC/LoA/VIII/13
Approval Completed
100%
69
Approval

63/IKDL-MRD/12/2014
PO. 3000054910
Completed
100%

Perkuatan Jembatan Pipe Rack Existing


10-Nov-14
BAST 16-01-2015

Finish

New Loading 3A, CNG Plant & Gas Plant


24-Oct-14
BAST 16-01-2015

Finish

Elektrikal Warehouse Panel P - D, GRV


3-Dec-14
BAST 16-01-2015

Finish

70
64/IKDL-MRD/12/2014
Pekerjaan Kurang Paket Finish Good Warehouse AS
RS ( Struktur, Arsitektur)
048/MARUNDA/PRCP-CC/LoA/IV/13
10-Dec-14
Finish
Approval
Completed
100%
BAST 10-12-2014
71
Approval

65/IKDL-MRD/12/2014
PO. 3000056129
Completed
100%

Pakerjaan Kurang Paket WTP (STR, ARS, ME)


10-Dec-14
BAST 10-12-2014

Finish

72
66/IKDL-MRD/02/2015
Plafond Sandwitch Panel Ruang H1 da H2 Lt.3 New
Warehouse
PO. 3000063117, tgl 07-05-2015
20-Feb-15
Finish
Approval Completed
100%
BAST 05-06-2054
73
Approval

67/IKDL-MRD/02/2015
PO. 3000056870
Completed
100%

Pekerjaan Additional Power Pompa OSBL


27-Feb-15
BAST 05-06-2054

Finish

74
68/IKDL-MRD/02/2015
Pekerjaan Additional Lighting & In Racking Spri
ngkler System ASRS
PO. 3000050431
27-Feb-15
Finish
Approval Completed
100%
BAST 05-06-2054
75
Approval
76

69/IKDL-MRD/03/2015
PO. 3000054910
Completed
100%
70/IKDL-MRD/03/2015

Pekerjaan Additional Elektrikal New Warehouse


6-Mar-15
BAST 01-10-2015

Finish

Pekerjaan Aditional M/E Filling New Warehouse

Approval

PO. 3000058879
Completed
100%

6-Mar-15
BAST 01-10-2015

Finish

089/MARUND
A/PRCP-CC/LoA/VI/13 (PO. 3000069002 tgl 30BAST 01-10-2015 (15-12-2015)
77
71/IKDL-MRD/04/2015
Additional Insulation OSBL Marunda III & IIIA
7-Apr-15
Approval

Completed

Finish

100%

11-2015)
78

72/IKDL-MRD/05/2015

3000065686 tgl 05-08-2015


Approval
Completed
94%

Additional Epoxy New Warehouse

79

73/IKDL-MRD/06/2015

28-May-15
BAST 02-11-2015

Finish

Pekerjaan Tambah Infrastruktur Marunda III & II

IA
Approval

Completed

30-Jun-15
BAST 01-10-2015

100%

80
74/IKDL-MRD/06/2015
ktur, dan ME
Approval
Completed
100%

Finish

Pekerjaan Tambah New Warehouse Struktur, Arsite


30-Jun-15
BAST 01-10-2015

Finish

81
75/IKDL-MRD/09/2015
Pekerjaan Tambah New Warehouse BAPB Tanggal 07
September 2015
PO. 3000070415 tgl 29-01-2016
9-Sep-15
Finish
Approval Completed
100%
BAST 26-10-2015
82
76/IKDL-MRD/09/2015
Pekerjaan Tambah Infrastruktur BAPB Tanggal 07
September 2015
PO. 3000070416 tgl 29-01-2016
9-Sep-15
Finish
Approval Completed
100%
BAST 26-10-2015
83

77/IKDL-MRD/09/2015

PO. 3000068537 tgl 13-11-2015


Approval Completed
100%

Pekerjaan Tambah Paket Filling Plant

84

78/IKDL-MRD/09/2015

9-Sep-15
BAST 26-10-2015

Finish

Tata Udara R.Compressor Lt.1 Filling New Wareho

use
Approval

PO. 3000060196
Completed
100%

22-Sep-15

Finish

85
79/IKDL-MRD/09/2015
cking Efacec
Approval
Completed
100%

Perpanjangan Waktu Pemakaian Crane Instalasi Ra

86
80/IKDL-MRD/10/2015
hap 2 Tanggal 18-09-2015
3000070175 tgl 21-01-2016
Approval
Completed
100%

Tambahan Insaulation OSBL 2, BAPB Insulation Ta

30-Sep-15
BAST 19-10-2015

20-Oct-15
BAST 01-12-2015

Finish

Finish

87
81/IKDL-MRD/12/2015
Pelaksanaan Pekerjaan Tambahan Paket Infrastruk
tur (Civil & Architectur)
139/MA
RUNDA/PRCP-CC/LoA/VIII/13 tgl 21-08-2013
14-Dec-15
Finish
Approval Completed
100%
BAST 01-12-2015
88
82/IKDL-MRD/12/2015
Pelaksanaan Pekerjaan Tambahan Paket Warehouse
(Civil & Architectur)
048/M
ARUNDA/PRCP-CC/LoA/IV/13 tgl 09-04-2013
14-Dec-15
Finish
Approval
Completed
100%
BAST 01-12-2015
89
83/IKDL-MRD/12/2015
Pelaksanaan Pekerjaan Tambahan Paket Infrastruk
tur (Mechanical & Electrical)
139/MA
RUNDA/PRCP-CC/LoA/VIII/13 tgl 21-08-2013
14-Dec-15
Finish
Approval
Completed
100%
BAST 01-12-2015
90
84/IKDL-MRD/12/2015
Pelaksanaan Pekerjaan Tambahan Paket Warehouse
(Mechanical & Electrical)
048/M
ARUNDA/PRCP-CC/LoA/IV/13 tgl 09-04-2013
14-Dec-15
Finish
Approval Completed
100%
BAST 01-12-2015
91
85/IKDL-MRD/01/2016
Pelaksanaan Pekerjaan Pipa Air Hujan dan Pipa A
ir Kotor ( Employee Facilities)
3000067632 tgl 12-10-2015
20-Jan-16
Finish
Approval Completed
100%
BAST 09-05-2016
92
86/IKDL-MRD/01/2016
Pelaksanaan Pekerjaan Tambah MCB 1 Phase 2 Ampe
re ( Employee Facilities)
3000067632 tgl 12-10-2015
20-Jan-16
Finish
Approval Completed
100%
BAST 09-05-2016
93
87/IKDL-MRD/01/2016
Pelaksanna Pekerjaan Tambah Pipa Refrigant Untu
k Tata Udara ( Employee Facilities)
3000067632 tgl 12-10-2015
28-Jan-16
Finish
Approval Completed
100%
BAST 09-05-2016
94
88/IKDL-MRD/2/2016
ployee Facilities)
3000067632 tgl 12-10-2015
CANCEL
CANCEL

Pelaksanaan pekerjaan tambahan kabel tray (Em


15-Feb-16

CANCEL

96
89/IKDL-MRD/3/2016
Pelaksanaan Pekerjaan Tambah Pipe Rack dan Mod
ifikasi Tie Beam (Employee Facilities)
3000067632 tgl 12-10-2015
10-Mar-16
CANCEL
CANCEL
CANCEL
97
90/IKDL-MRD/3/2016
Pelaksanaan Pekerjaan Tambah Perubahan Kapasit
as Biotech (Employee Facilities)
3000067632 tgl 12-10-2015
17-Mar-16
Finish
Approval Completed
100%
BAST 09-05-2016
98
91/IKDL-MRD/3/2016
oses WTP
3000056129 tgl 8-10- 2014
CANCEL
CANCEL

Pelaksanaan Pekerjaan Tambah Instalasi Pipa Pr

100
92/IKDL-MRD/3/2016
lepon dan Stop kontak
3000067632 tgl 12-10-2015
Approval Completed
100%

Pelaksanaan Pekerjaan Tambah Instalasi Data,Te

28-Mar-16

29-Mar-16
BAST 09-05-2016

CANCEL

Finish

101
93/IKDL-MRD/3/2016
PelaksanaanPekerjaan Tambah Plafond selasar (k
alsiboard t=6mm) dan lisplan kbeton
3000067632 tgl 12-10-2015
30-Mar-16
Finish
Approval Completed
100%
BAST 09-05-2016
102

94/IKDL-MRD/4/2016

Pelaksanaan Pekerjaan Tambah Elektrikal

3000067632 tgl 12-10-2015


Approval Completed
100%

5-Apr-16
BAST 09-05-2016

Finish

103
95/IKDL-MRD/5/2016
ng Lot
3000067632 tgl 12-10-2015
Approval Completed
100%

Pelaksanaan Pekerjaan Tambah Selasar dan Parki

104
96/IKDL-MRD/5/2016
ling Line
PO. 3000065708
Approval
CANCEL

Pelaksanaan PekerjaanTambah Jalur OSBL New Fil

105
ipa Angin
PO.
oval

Pelaksanaan Pekerjaan Tambah Instalasi Jalur P

9-May-16
BAST 12-05-2016

Finish

25-May-16

97/IKDL-MRD/6/2016
4
3000070398
TBC

CANCEL

17-Jun-16

106
98/IKDL-MRD/6/2016
Lantai 4 New Warehouse
PO. 3000065708
Approval
TBC

TBC

Appr

Pembuatan Pondasi Equitment di Lantai Dak dan


20-Jun-16

TBC

Pelaksanaan Penambahan Pekerjaan Ruang Compres


sor, Pondasi Pig Receiver, Dudukan Genset Portable dan
106
99/IKDL-MRD/7/2016
PO. 3000070398
TBC

Approval

27-Jul-16

TBC

Pekerjaan Elektrikal.

Weather
LAPORAN CUACA
Proyek :
lant Marunda IIIA
Periode :

Extension Plant Marunda III & New Refinery P


30 Juli s/d 05 Agustus 2016
Waktu / H

ari
Tanggal
0
0

0
0
0

0
0

0
0

0
0
0

0
0

0
0
0

Hari
0
0
0
0
Keterangan

0
0

0
0

0
0

0
0
0

0
0

0
0

0
0
0

0
0
0

:
:

:
:

:
3

3
1

4
1
2

:
6

:
7

7
1

8
1

:
:
8

:
0

:
1

3
5
1

:
:
4

0
9

1
1
1

2
1
1

30-Jul-16
31-Jul-16
01-Aug-16
02-Aug-16
03-Aug-16
04-Aug-16

Sabtu
Minggu
Senin
Selasa
Rabu
Kamis
`

05-Aug-16

Jumat
`

Note :

Hujan
Cerah

Page 6 of 15
----------------------- Page 7----------------------Man Power
JumlahP
ekerja
60
50
40
30
JumlahPeke
rja

20
10
0
30Jul16
4Aug16

31Jul16

Tanggal
2Aug16
3Aug16
JumlahPekerja
22

6
50

1Aug16

2Aug16

5Aug16
30Jul16
4Aug16
59

31Jul16
5Aug16
50

41

1Aug1

43

46

JumlahPekerja
No

NamaPT/Mandor
Ar

ea
30Jul
ug

2Aug

3Aug

4Aug
Aris

1
0

31Jul

1A

5Aug
0

0
Roof/war

ehouse
2
0
cilities

ACP

0
3

0
solasi

2
truktur

3
ktrical

3
BLFilling

Siswandi/Safei
1
1

0
Baja

10
0

Sarno
2

3
OS

Baihaki

PT.WIRACO
28

12
2

2
Sahman

11
8

4
Ele

Parjo

2
Sipil

2
Infras

PT.IME

47
29

Sudarsono
2

30
2
2

0
I

3
Sipil

0
PT.Gapura

34
ngLine

0
ACPEmployeeFa

PT.Dumas
0

0
Sipil

0
34
JettyPipi
2

Sipil
50

TOTAL
41

22

59
43

50

46

Mapping Activities
OILTANK
FINISH
FINISH GOOD WAREHOUSE
GRADINGFINISH
PILINGFINISH
STR/ARSFINISH
M/EINPROGRESS
LOADING/UNLOADING
(OSBL FILLINGLINE)
STATION&WEIGHTBRIDGE
FINISH

WATERTANK
FINISH

JETTY PIPINGLINE
INFRASTRUKTUR
MECHANIKAL IN
FINISH
PROGRES
LOADINGDOCKASRS
PILING/BORPILEFINISH
PLATFORMFINISH
NEWSTORAGETANK
FINISH
GRADINGFINISH
PILINGFINISH
NEWREF
INERYANDFRACTIONATION
FINISH
PILING FINISH
EMPLOYEEFACILITIES
FINISH

Page 7 of 15
----------------------- Page 8-----------------------

SITEPROGRESSPICTURE
LASTWEEK
Photodanketerangangambar

ProgressPekerjaan
ProgressPekerjaan
ProgressPekerjaan
OSBLFillingNewWarehouse
OSBLFillingNewWarehouse
ruktur)

BoxCulvert(Infrast

NewWarehouse

ProgressPekerjaanWeldingPipa8"
Prog
ressPekerjaanPullingKabelPower
ProgressPekerjaanWeldingPipa
(Loading3Area)
Kompressor(Loading3Area)
(Loading3A
rea)
JettyPipingLine

ProgressPekerjaanErection&FitUp
Pro
gressPekerjaanRumahCompressor
ProgressPekerjaanInstalasiPemi
paanPig
Pipa8"(Loading3Area)
JettyPipingLine
Receiver(Loading3Ar
ea)
JettyPipingLine
JettyPipingLine

ProgressPekerjaanPlacement
ProgressPekerjaanInstalasiPemasangan
iPemasangan
Kompresor(Loading3Area)
BallValve8"(Loading3Area)
JettyPipingLine

ProgressPekerjaanInstalas

BallValve8"(Loading

Page 8 of 15
----------------------- Page 9----------------------THISWEEK
Photodanketerangangambar

ProgressPekerjaan
ProgressPekerjaan
ProgressPekerjaan
OSBLFillingNewWarehouse
OSBLFillingNewWarehouse
astruktur)

BoxCulvert(Infr

NewWarehouse

ProgressPekerjaanErection&FitUpPipa
ProgressPekerjaanInstalasiPipaPig
ProgressPekerjaanFitUp&We
a
8"(Loading3Area)
Receiver
8"(L
oading3Area)
JettyPipingLine

ProgressPekerjaanFitUp&Welding
ProgressPekerjaanPabrikasilong
stalasiPipaPig

ProgressPekerjaanIn

Pipa8"(Loading3Area)
elbow90
Receiver
JettyPipingLine
JettyPipingLine

ProgressPekerjaanInstalasiPipaPig
ProgressPekerjaanPullingKabelPower
ProgressPekerjaanInstal
siPemipaanPig
Receiver
Kompressor
Receiver
JettyPipingLine
JettyPipingLine

Page 9 of 15
----------------------- Page 10----------------------Other Project Issues (List Memo)

MARUNDA III/
Big Tank &
1
26-Jun-12

KEC
Done

Cleaning Area Storage Tank


13/MK-PBS/VI/2012
PT. PBS
K3
IIIA

Small Tank

2
26-Jun-12
Coal Storage

KEC
Done

MARUNDA III/
Cleaning Area Coal Storage
14/MK-PBS/VI/2012
PT. PBS
K3
IIIA

MARUNDA III/
Surat Jalan Pengeluaran Excavator

15/MK-HMS/VII/2012
5-Jul-12
Grading Area

KEC

HMS
Done

Logistic
IIIA
MARUNDA III/
Material Import Soil
16/MK-HMS/VII/2012
HMS
Civil

4
10-Jul-12
Grading Area

KEC
Done

IIIA
MARUNDA III/
Pemindahan Box Hydrant di Area Pe
17/MK-PBS/VII/2012
PT. PBS
Mechanical

5
nampungan Batu Bara
10-Jul-12
Coal Storage

KEC
Done

IIIA
MARUNDA III/
Material Import Soil
18/MK-HMS/VII/2012
HMS
Civil

6
24-Jul-12
Grading Area

KEC
Done

IIIA
MARUNDA III/
Pembongkaran bedeng pekerja di ar
19/MK-PBS/VIII/2012
PBS/ SIGMA
Civil

7
ea CBS
29-Aug-12
CBS

KEC
Done

IIIA

8
g
17-Sep-12
Grading Area

KEC
Done

MARUNDA III/
Kemajuan Progres Pekerjaan Gradin
20/MK-HMS/IX/2012
HMS
Civil
IIIA
MARUNDA III/

Big Tank &

9
ension Plant Marunda III
25-Sep-12
KEC
Done

Outstanding Pekerjaan di area Ext


21/MK-PBS/IX/2012
PBS/ SIGMA
All
IIIA

Small Tank
MARUNDA III/
Big Tank &
10
1-Oct-12

KEC
Done

Kalibrasi Untuk Storage Tank


22/MK-PBS/X/2012
PT. PBS
Mechanical
IIIA

Small Tank
MARUNDA III/
Alat Pancang
23/MK-SM/X/2012
PT. SIGMA M
Civil

11
8-Oct-12
Piling Area

KEC
Done

IIIA

New

12
dan Pembuatan Saluran
22-Oct-12
Warehouse

KEC
Done

MARUNDA III/
Pemindahan Tiang PJU (Existing)
24/MK-PBS/X/2012
PT. PBS
Civil, Electrical
IIIA

(NWH)
MARUNDA III/
WWTP
13
8-Nov-12

KEC
Done

Pembuatan Sumpit di Bak WWTP


25/MK-PBS/XI/2012
PT. PBS
Civil
IIIA

Existing

MARUNDA III/
Pemasangan Terpal Pekerjaan Bore
26/MK-PBS/XI/2012
PT. SIGMA M
Civil

14
Pile di Area Boiler
12-Nov-12
Boiler Existing

KEC
Done

IIIA
MARUNDA III/
Marsho
15
arsho Existing
27-Nov-12

KEC
Done

Penambahan pekerjaan diruangan M


27/MK-PBS/XI/2012
PT. PBS
All
IIIA

Existing
Pembongkaran pipa steam dan pipa
hydrant di area Boiler dan
Marunda III/
Boiler Existing
16
30-Jan-13

28/MK-PBS/I/2013
PT. PBS
Mechanical
Warehouse

PT. KEC
Done

IIIA
& NWH

17
ry
13-Feb-13
New Refinery

PT. KEC
Done

Marunda
Percepatan pekerjaan New Refine
29/MK-PBS/II/2013
PT. PBS
All
III/ IIIA

18
Kerja
8-Mar-13
All Area

PT. KEC
Done

Marunda
Pemakaian Peralatan Keselamatan
30/MK-PBS/III/2013
PT. PBS
K3
III/ IIIA
Instruksi Pemancangan Bangunan

Employee Facility and


Marunda
Employee &
19
31/MK-SM/IV/2013

10-Apr-13

PT. KEC

PT. SM
Done

Civil
Water Tank
III/ IIIA

Water Tank

20
rea New CBS
11-Apr-13
PT. KEC
New CBS
Done
sekarang area bio diesel

Marunda
Penundaan Pekerjaan "Grading A" A
32/MK-HMS/IV/2013
PT. HMS
Civil

III/ IIIA

21
CBS Texturizing Plant
11-Apr-13
PT. KEC
New CBS
Done
sekarang area bio diesel

Marunda
Penundaan Pekerjaan "Piling" Area
33/MK-SM/IV/2013
PT. SM
Civil

III/ IIIA
Perbaikan Pengelasan Sambungan P
late Shell And Shell Main
Marunda
New Storage
22
24-Apr-13

34/MK-PBS/IV/2013
PT. PBS
Mechanical
Hole Tank Farm

PT. KEC
Done

III/ IIIA
Tank (NST)
PT. SIGMA

Marunda

Pipe Rack
23
Support Pipe Rack Existing
7-May-13
PT. KEC

Pekerjaan Pondasi Bore Pile Untuk


35/MK-SIGMA/V/2013
2

Done

Civil
MUTIARA

III/ IIIA

Area

Loading
Pit Loading/ Unloading dan Integ
ral & Membrane Waterproofing
Marunda
Unloading

24
1-Jul-13

36/MK-PBS/VII/2013
PT. PBS
Civil

PT. KEC
Done
IKDL 40

New Cooling Tow er


III/ IIIA
(LUL) & New

Refinery
Pekerjaan Collecting Pan dan Fra
me Plint Pompa-pompa dan
Marunda
25
1-Jul-13
New Refinery

37/MK-PBS/VII/2013
PT. PBS
Ars, Mechanical
Equipment di New Refinery

PT. KEC
Done

III/ IIIA

26
ech New Warehouse
1-Jul-13
NWH

PT. KEC
Done

Marunda
Pekerjaan Pipa Air Hujan dan Biot
38/MK-PBS/VII/2013
PT. PBS
Civil, Mechanical
III/ IIIA
Modifikasi Tangga New Refinery

EL+0,00 ke EL+5,65 Sisi


Marunda
27
9-Jul-13
New Refinery

39/MK-PBS/VII/2013
PT. PBS
Str
Selatan

PT. KEC
Done

III/ IIIA
Perubahan Dinding Partisi Acryli
c Menjadi Sandw itch Di New
Marunda
28
29-Jul-13
New Refinery

40/MK-PBS/VII/2013
PT. PBS
Ars
Refinery

PT. KEC
Done

III/ IIIA

29
torage Tank"
6-Aug-13
NST

PT. KEC
Done

Marunda
Perubahan Material Tanki " New S
41/MK-PBS/VIII/2013
2
PT. PBS
Mechanical

IKDL 38
III/ IIIA

30
Loading Unloading
19-Sep-13
LUL

PT. KEC
Done

Marunda
Pitless Menjadi PIT Untuk Lantai
42/MK-PBS/IX/2013
PT. PBS
Civil, Mechanical

IKDL 40
III/ IIIA

31
ess Room New Refinery
26-Sep-13
PT. KEC
New Refinery
Done

43/MK-PBS/IX/2013
Marunda
Perubahan Type Lampu di Filter Pr
PT. PBS
Electrical
(rev-1)
III/ IIIA
Perubahan Rencana Instalasi Pane

l Cubicle ke Transformer
Marunda
R. Trafo
32
5-Sep-13

44/MK-PBS/IX/2013
PT. PBS
Electrical
4000 Kva Untuk TM. Marsho

PT. KEC
Done

III/ IIIA
Existing

33
Area Control Room +5.65
30-Sep-13
PT. KEC
New Refinery
Done
IKDL 36 (Cancel)

Marunda
Rencana Instalasi Stop Kontak di
45/MK-PBS/IX/2013
PT. PBS
Electrical

III/ IIIA

34
trol Room
30-Sep-13
New Refinery

PT. KEC
Done

Marunda
Instalasi Telepon Refinery di Con
46/MK-PBS/IX/2013
PT. PBS
Electrical
III/ IIIA

35
ew Refinery
3-Oct-13
New Refinery

PT. KEC
Done

Marunda
Pembuatan Lantai Cooling Tow er N
47/MK-PBS/X/2013
PT. PBS
Civil
III/ IIIA

36
4-Oct-13
New Refinery

PT. KEC
Done

Marunda
Instalasi Telepon di Control Room
48/MK-PBS/X/2013
PT. PBS
Electrical

IKDL 36
III/ IIIA
49/MK-PBS/X/2013
PT. SIGMA
Marunda
New WTP &
37
16-Oct-13

Piling Plan New WTP & New WWTP

PT. KEC
Done

Civil

IKDL 39
(rev-1)
MUTIARA

III/ IIIA

New WWTP

38
g Kontrol
16-Oct-13
New Refinery

PT. KEC
Done

Marunda
Rencana Instalasi Tata Udara Ruan
50/MK-PBS/X/2013
PT. PBS
Mechanical
III/ IIIA

39
18-Oct-13
PT. KEC
New Refinery
Done
IKDL 36 (Cancel)

Marunda
Material IHB Untuk New Refinery
51/MK-PBS/X/2013
PT. PBS
Mechanical

III/ IIIA
Marunda
Infrastructure
40
ruktur Tahap 1
21-Oct-13

PT. KEC

Pekerjaan Jalan & Saluran Infrast


52/MK-PBS/X/2013
PT. PBS

Done

Civil
III/ IIIA

Area
Marunda
Infrastructure
41
nt
21-Oct-13

PT. KEC
Done

Material Tambahan Pekerjaan Hydra


53/MK-PBS/X/2013
PT. PBS
Mechanical

IKDL 36
III/ IIIA
Area

42
25-Oct-13
NWH

PT. KEC
Done

Marunda
Pekerjaan Ramset Untuk Biotek
54/MK-PBS/X/2013
PT. PBS
Civil

IKDL 42
III/ IIIA

43
1-Nov-13
New Refinery

PT. KEC
Done

Marunda
Pekerjaan Civil New Refinery
55/MK-PBS/XI/2013
PT. PBS
Civil
III/ IIIA

44
ding Dock Warehouse
4-Nov-13
PT. KEC
NWH
Done

Marunda
Perubahan Elevasi Kanopi Pada Loa
56/MK-PBS/XI/2013
1
PT. PBS
Str
III/ IIIA

45
oom
0-Nov-13
PT. KEC
New Refinery
Done
IKDL 36 (Cancel)

Marunda
Instalasi Penerangan di Kontrol R
57/MK-PBS/XI/2013
3
PT. PBS
Electrical

III/ IIIA

Marunda
Infrastructure
46
ruktur Tahap 2
4-Dec-13

PT. KEC
Done

Pekerjaan Jalan & Saluran Infrast


58/MK-PBS/XI/2013
PT. PBS
Civil
III/ IIIA

Area

47
l Refinery
0-Dec-13
New Refinery

PT. KEC
Done

Marunda
Jalur Cable Tray ke Lighting Pane
59/MK-PBS/XII/2013
1
PT. PBS
Electrical

IKDL 36
III/ IIIA
Marunda
Infrastructure
48
6-Dec-13

PT. KEC
Done

Rencana Perubahan Lampu PJU


60/MK-PBS/XI/2013
PT. PBS
Electrical

III/ IIIA
Area

49
i Warehouse
6-Dec-13
NWH

PT. KEC
Done

Marunda
Perubahan Pipa Air Hujan Di Kanop
61/MK-PBS/XII/2013
1
PT. PBS
Mechanical
III/ IIIA
Marunda

Infrastructure
50
ruktur Tahap 3
3-Jan-14

PT. KEC
Done

Pekerjaan Jalan & Saluran Infrast


62/MK-PBS/I/2014
PT. PBS
Civil

IKDL 55
III/ IIIA
Area

Marunda
Infrastructure
51
JU
4-Jan-14

PT. KEC
Done

Rencana Perubahan Titik Pondasi P


63/MK-PBS/I/2014
PT. PBS
Civil, Electrical
III/ IIIA

Area

52
4-Jan-14
NWH

PT. KEC
Done

Marunda
Cubicle TM CR1 New Warehouse
64/MK-PBS/I/2014
PT. PBS
Electrical
III/ IIIA
Marunda

Infrastructure
53
1 Phase (PJU)
6-Jan-14

PT. KEC
Done

Perubahan MCB 3 Phase menjadi MCB


65/MK-PBS/I/2014
PT. PBS
Electrical
III/ IIIA

Area

54
16-Jan-14
New WTP

PT. KEC
Done

Marunda
Pekerjaan Struktur WTP
66/MK-PBS/XI/2013
PT. PBS
Civil, Str
III/ IIIA

55
a Filling
3-Feb-14
NWH

PT. KEC
Done

Marunda
Pekerjaan Atap New Warehouse Are
67/MK-PBS/II/2014
PT. PBS
Ars

IKDL 42
III/ IIIA

56
dan Mezzane
26-Feb-14
NWH

PT. KEC
Done

Marunda
Pemasangan Waremash Area Filling
68/MK-PBS/II/2014
PT. PBS
Str

IKDL 42
III/ IIIA

57
Filling
28-Feb-14
NWH

PT. KEC
Done

Marunda
Penguatan Struktur ASRS dan Area
69/MK-PBS/II/2014
PT. PBS
Str
III/ IIIA

58
5-Mar-14
NWH

PT. KEC
Done

Marunda
Pemindahan Bracing
70/MK-PBS/III/2014
PT. PBS
Str
III/ IIIA

59
7-Mar-14
NWH

PT. KEC
Done

Marunda
Pemasangan Beam WF 150
71/MK-PBS/III/2014
PT. PBS
Str
III/ IIIA

60
refinery II
7-Mar-14
New Refinery

PT. KEC
Done

Marunda
Pengadaan material tambahan untuk
72/MK-PBS/III/2014
PT. PBS
Mechanical
III/ IIIA
Instalasi Grounding LVMDB-4A & L

VMDB-4B Refinery 2
Marunda
61
73/MK-PBS/III/2014
8-Mar-14
New Refinery

PT. KEC

PT. PBS
Done

Electrical
Marunda
III/ IIIA

62
10-Mar-14

PT. KEC

Marunda
Pekerjaan Insulation Dan Tracing
74/MK-PBS/III/2014
PT. PBS

OSBL

Done

Mechanical

IKDL 47
III/ IIIA

63
house dan Konsol Slab
12-Mar-14
PT. KEC
NWH
Done

Marunda
Pekerjaan Talang Canopy New Ware
75/MK-PBS/III/2014
PT. PBS
Str, Ars
III/ IIIA

Page 10 of 15
----------------------- Page 11-----------------------

64

Marunda
Penambahan Cakar Ayam
76/MK-PBS/III/2014
PT. PBS
Civil

14-Mar-14

PT. KEC
NWH

Done

III/ IIIA

65

Marunda
Infrastructure
Pengecatan Struktur Baja Pipe Rack
77/MK-PBS/III/2014
19-Mar-14
PT. PBS
Str
III/ IIIA

66

Done

Area

Marunda
Jalur Instalasi Pipa dari Refinery ke Cooling Tow er
78/MK-PBS/III/2014
24-Mar-14
PT. PBS
OSBL
Mechanical
III/ IIIA

PT. KEC

PT. KEC
Done

67

Marunda
Penambahan DockLevers
79/MK-PBS/III/2014
PT. PBS
Civil, Str

25-Mar-14

PT. KEC
NWH

Done

III/ IIIA

68

Marunda
Penambahan Pekerjaan di Area Warehouse
80/MK-PBS/III/2014
28-Mar-14
PT. PBS
NWH
Civil

PT. KEC
Done

III/ IIIA
Marunda
69

Pengadaaan Material
81/MK-PBS/IV/2014
PT. PBS
Mechanical

2-Apr-14

PT. KEC
OSBL

Done

III/ IIIA
Pengadaaan Material OSBL Jalur Pipa Minyak Termasuk
Marunda
70
82/MK-PBS/IV/2014
PT. PBS
Mechanical
Aksesoris

5-Apr-14

PT. KEC
OSBL

Done

III/ IIIA
Pengadaaan Material OSBL Jalur Pipa Steam Termasuk
Marunda
71
83/MK-PBS/IV/2014
PT. PBS
Mechanical
Aksesoris

5-Apr-14

PT. KEC
OSBL

Done

III/ IIIA

72

Marunda
Support Perkuatan Bordes dan Top Plate Tangga
84/MK-PBS/IV/2014
5-Apr-14
PT. PBS
NWH
Str

PT. KEC

III/ IIIA
Pemasangan Dinding Partisi Lantai 1,2,3 dan 4 Area Filling

Done

Marunda
73
85/MK-PBS/IV/2014
PT. PBS
Ars
New Warehouse

30-Apr-14

PT. KEC
NWH

Done

III/ IIIA

74

Marunda
New Weight
Pekerjaan Pasangan Dinding Jembatan Timbang
86/MK-PBS/V/2014
5-May-14
PT. PBS
Ars
III/ IIIA

75

PT. KEC
Done
IKDL 60

Bridge (NWB)

Marunda
Pekerjaan Grill Saluran New Loading Unloading
87/MK-PBS/V/2014
8-May-14
PT. PBS
LUL
Ars

PT. KEC
Done
IKDL 60

III/ IIIA

76

Marunda
Jalur Air Dearator New Boiloer II
88/MK-PBS/V/2014
13-May-14
PT. PBS
Boiler Existing
Mechanical

PT. KEC
Done

III/ IIIA
Marunda
77

Instalasi Pow er Pompa


89/MK-PBS/V/2014
PT. PBS
Electrical

14-May-14
New Refinery

PT. KEC

19-May-14

PT. KEC

Done

III/ IIIA
Marunda
78

Penambahan Facia
90/MK-PBS/V/2014
PT. PBS
Ars

NWH

III/ IIIA

Done

79

Marunda
Perubahan Panel Pot Warehouse
91/MK-PBS/V/2014
PT. PBS
Electrical

20-May-14

PT. KEC
NWH

Done

III/ IIIA
92/MK-PBS/V/2014
80

Marunda
Pow er Panel New Storage Tank
20-May-14

PT. KEC

PT. PBS

NST

Done

Electrical
(rev)
III/ IIIA

81

Marunda
Support Ledder TM Marsho
93/MK-PBS/V/2014
PT. PBS
Electrical

19-May-14
R. Trafo CBS

PT. KEC
Done
IKDL 57

III/ IIIA

82

Marunda
Pondasi Panel PJU A, B & C
94/MK-PBS/V/2014
PT. PBS
Electrical
III/ IIIA

83

Infrastructure
20-May-14

PT. KEC
Done

Area

Marunda
Pekerjaan TM GRDC dan New Warehouse
95/MK-PBS/V/2014
22-May-14
PT. PBS
NWH
Electrical

PT. KEC
Done
IKDL 57

III/ IIIA

84

Marunda
Infrastructure
Peninggian Dinding Saluran U-Ditch
96/MK-PBS/V/2014
23-May-14
PT. KEC
PT. PBS
Done
Civil
kerja tambah, IKDL 73
III/ IIIA

Area

Marunda
85

Pekerjaan TM R & D
97/MK-PBS/VI/2014
PT. PBS
Electrical

6-Jun-14

PT. KEC
GRDC

Done
IKDL 57

III/ IIIA

86

Marunda
LVMDB 6B Warehouse (revisi)
98/MK-PBS/VI/2014
PT. PBS
Electrical

6-Jun-14

PT. KEC
NWH

Done

III/ IIIA

87

Marunda
Panel Pompa Sirkulasi CPO New Storage Tank
99/MK-PBS/VI/2014
7-Jun-14
PT. PBS
NST
Electrical

PT. KEC
Done
IKDL 67

III/ IIIA

88

Marunda
Perubahan Elevasi Pipa Pendent Sprinkler di New Warehouse
100/MK-PBS/VI/2014
10-Jun-14
PT. KEC
PT. PBS
NWH
Done
Mechanical
IKDL 68
III/ IIIA

89

Marunda
Blind Flange Agitator New Storage Tank 3450 MT
101/MK-PBS/VI/2014
10-Jun-14
PT. PBS
NST
Mechanical

PT. KEC
Done

III/ IIIA

90

Marunda
Hydrant Site Plant
102/MK-PBS/VI/2014
PT. PBS
Mechanical

III/ IIIA

Infrastructure
10-Jun-14

PT. KEC
Done
Instruksi Informasi

Area

91

Marunda
Instalasi Grounding LVMDB CR 3-7
103/MK-PBS/VI/2014
PT. PBS
Electrical

16-Jun-14

PT. KEC
GRDC

Done
kerja tambah, IKDL 57

III/ IIIA

92

Marunda
Instalasi Penerangan Area Cold Stability Tank
104/MK-PBS/VI/2014
16-Jun-14
PT. PBS
New Refinery
Electrical

PT. KEC
Done
kerja tambah

III/ IIIA

93

Marunda
Kabel Pow er Jembatan Timbang
105/MK-PBS/VI/2014
PT. PBS
Electrical

16-Jun-14

PT. KEC
NWB

Done
kerja tambah, IKDL 60

III/ IIIA
Penambahan Kusen dan Rolling Door, perubahan Tangga, Ramping dan
Marunda
94
106/MK-PBS/VI/2014
PT. PBS
Ars
Cladding di As 1

17-Jun-14

PT. KEC
NWH
Done
kerja tambah & perubahan

III/ IIIA
Pemindahan AC dan Penambahan Exhaust Fan di Ruang TM
Marunda

New Refinery

95
107/MK-PBS/VI/2014
PT. PBS
Mechanical
R&D

17-Jun-14

PT. KEC
Done
kerja tambah & perubahan

III/ IIIA
& GRDC
Perubahan Kembali PIT Menjadi Pitless Area New Loading
Marunda
96
108/MK-PBS/VI/2014
PT. PBS
Civil, Mechanical
60
Unloading 2

19-Jun-14

PT. KEC
LUL
Done
Instruksi Informasi, IKDL

III/ IIIA

97

Marunda
Kabel Kontrol Heater TM CR3 R&D
109/MK-PBS/VI/2014
PT. PBS
Electrical

25-Jun-14

PT. KEC
GRDC

Done
kerja tambah, IKDL 57

III/ IIIA

98

Marunda
Cable Leader Pompa OSBL
110/MK-PBS/VI/2014
PT. PBS
Electrical

25-Jun-14

PT. KEC
OSBL

Done
kerja tambah

III/ IIIA
Pekerjaan Penambahan Jalur RO dan Modifikasi Jalur Tanki B1,
Marunda
99
111/MK-PBS/VII/2014
PT. PBS
Mechanical
B2

4-Jul-14

PT. KEC
OSBL

Done
kerja tambah

III/ IIIA

100

Marunda
Loading Unloading & Weightbridge
112/MK-PBS/VII/2014
PT. PBS
Electrical

4-Jul-14
LUL & NWB

PT. KEC
Done
kerja tambah, IKDL 60

III/ IIIA

101

Marunda
Repair Kebocoran Shell ke-10 New Storage Tank B1
113/MK-PBS/VII/2014
5-Jul-14
PT. KEC
PT. PBS
NST
Done
Mechanical
Instruksi Perbaikan
III/ IIIA
Perubahan Elevasi Pipa Pendant Sprinkler Sisi Barat dan Timur
Marunda

102
114/MK-PBS/VII/2014
PT. PBS
Mechanical
68
di New Warehouse

5-Jul-14

PT. KEC
NWH
Done
Instruksi Perubahan, IKDL

III/ IIIA
Pekerjaan Penambahan Instalasi Gutter dan Air Bersih di
Marunda
103
115/MK-PBS/VII/2014
PT. PBS
Mechanical
Jembatan Timbang

8-Jul-14

PT. KEC
NWB

Done
kerja tambah, IKDL 60

III/ IIIA
Pekerjaan Pembuatan Header Talang Air Hujan di New
Marunda
104
116/MK-PBS/VII/2014
PT. PBS
Mechanical

14-Jul-14

PT. KEC
NWH
Done
kerja tambah & perubahan, IKDL

70
Warehouse
III/ IIIA

105

Marunda
Pengadaan Material Expantion Joint Jalur Steam
117/MK-PBS/VII/2014
15-Jul-14
PT. PBS
OSBL
Mechanical

PT. KEC
Done
Instruksi Pengadaan

III/ IIIA

106

Marunda
Penerangan di Pipe Rack di New Storage Tank 3450 MT
118/MK-PBS/VII/2014
15-Jul-14
PT. PBS
NST
Electrical

PT. KEC
Done
kerja tambah

III/ IIIA

107

Marunda
Pembatalan Pekerjaan Unloading 2
119/MK-PBS/VII/2014
PT. PBS
Civil, Ars, ME

19-Jul-14

PT. KEC
LUL
Done
Instruksi Pembatalan, IKDL

60
III/ IIIA

108

Marunda
Instalasi Load Cell WB
120/MK-PBS/VIII/2014
PT. PBS

11-Aug-14

PT. KEC
NWB

Done

Electrical

Instruksi Pekerjaan
III/ IIIA

109

Marunda
Infrastructure
Panel Fire Pump (Paket Infrastruktur)
121/MK-PBS/VIII/2014
12-Aug-14
PT. KEC
PT. PBS
Done
Electrical
Instruksi Pekerjaan
III/ IIIA

110

Marunda
Cable Ledder TM & TR Warehouse
122/MK-PBS/VIII/2014
PT. PBS
Electrical

Area

12-Aug-14

PT. KEC
NWH

Done
kerja tambah, IKDL 57

III/ IIIA

111

Marunda
CBS Tank
Pembersihan dan Lantai Kerja CBS Tank Farm
123/MK-PBS/VIII/2014
14-Aug-14
PT. PBS
Civil, K3
III/ IIIA

112

PT. KEC
Done
kerja tambah

Farm

Marunda
Perubahan Saluran Sekitar Area New Warehouse
124/MK-PBS/VIII/2014
15-Aug-14
PT. PBS
NWH
Infra

PT. KEC
Done
Instruksi Perubahan

III/ IIIA
1. Penggantian Spesifikasi Kabel Panel F. Pump, 2.
Marunda

Infrastructure

113
125/MK-PBS/VIII/2014
19-Aug-14
PT. KEC
PT. PBS
Done
Electrical
kerja tambah & perubahan
Penambahan Tray Untuk Panel F. Pump
III/ IIIA
Area
Pekerjaan Penambahan Support Pendant Sprinkler di New
Marunda
114
126/MK-PBS/VIII/2014
PT. PBS

20-Aug-14

PT. KEC
NWH

Done

Mechanical
Warehouse

kerja tambah, IKDL 68

III/ IIIA
Pekerjaan Bongkaran Pagar Existing Sisi Selatan Bundw all
Marunda

CBS Tank

115
127/MK-PBS/VIII/2014
PT. PBS
Civil
CBS tank Farm

20-Aug-14

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA
Farm
Pekerjaan Urugan Pasir Gutter Ruang Trafo TM New
Marunda
116
128/MK-PBS/VIII/2014
PT. PBS
Electrical
Warehouse

20-Aug-14

PT. KEC
NWH

Done
Instruksi Pekerjaan

III/ IIIA

117

Marunda
Pekerjaan partisi New Warehouse
129/MK-PBS/VIII/2014
PT. PBS
Ars

20-Aug-14

PT. KEC
NWH

Done
Instruksi Pekerjaan

III/ IIIA

118

Marunda
Pekerjaan Tangga, Atap dan Bak Kontrol Air Hujan
130/MK-PBS/VIII/2014
20-Aug-14
PT. KEC
PT. PBS
LUL
Done
Civil, Ars
kerja tambah & perubahan
III/ IIIA

119

Marunda
Pekerjaan Kusen New Warehouse
131/MK-PBS/VIII/2014
PT. PBS
Ars

25-Aug-14

PT. KEC
NWH
Done
kerja tambah kurang & perubah

an
III/ IIIA

120

Marunda
P. Fire Pump
132/MK-PBS/VIII/2014

Infrastructure
27-Aug-14

PT. KEC

PT. PBS

Done
Electrical

kerja tambah
III/ IIIA

121

Marunda
Instalasi Grounding
133/MK-PBS/IX/2014
PT. PBS
Electrical

Area

2-Sep-14

PT. KEC
NWH

Done
kerja tambah, IKDL 57

III/ IIIA

122

Marunda
Kabel Kontrol
134/MK-PBS/IX/2014
PT. PBS
Electrical

3-Sep-14

PT. KEC
NWH

Done
kerja tambah, IKDL 57

III/ IIIA

123

Marunda
Gudang Sementara Efacec di Filling Area
135/MK-PBS/IX/2014
4-Sep-14
PT. PBS
NWH
Civil

PT. KEC
Done
kerja tambah

III/ IIIA
Pembongkaran Batu Kali Existing di Sisi Selatan New
Marunda
124
136/MK-PBS/IX/2014
PT. PBS
Civil
Warehouse

6-Sep-14

PT. KEC
NWH

Done
Instruksi Pekerjaan

III/ IIIA

125

Marunda
Perubahan Elevasi Lampu Highbay di Racking Area WH
137/MK-PBS/IX/2014
15-Sep-14
PT. KEC
PT. PBS
NWH
Done
Electrical
Instruksi Perubahan, IKDL

68
III/ IIIA
Marunda
126

Cable Tray 200 x 100

138/MK-PBS/IX/2014
PT. PBS
Electrical

15-Sep-14

PT. KEC
LUL

Done
kerja tambah

III/ IIIA

127

Marunda
Pekerjaan Kurang Tambah Area Loading Unloading
139/MK-PBS/IX/2014
15-Sep-14
PT. KEC
PT. PBS
LUL
Done
Tata Udara
kerja tambah kurang, IKDL

60
III/ IIIA

128

Marunda
Pekerjaan Partisi dan Plafond New Warehouse
140/MK-PBS/IX/2014
17-Sep-14
PT. KEC
PT. PBS
NWH
Done
Ars
kerja kurang & perubahan

III/ IIIA

129
l

Marunda
Rubber Coating 1 Tanki Internal Water Tank
141/MK-PBS/IX/2014
17-Sep-14
PT. PBS
Water Tank
Mechanical

PT. KEC
Cance
Tidak dieksekusi

III/ IIIA

130

Marunda
Infrastructure
Ramp Akses Masuk Jembatan Timbang Sisi Timur
142/MK-PBS/IX/2014
17-Sep-14
PT. KEC
PT. PBS
Done
Civil, Electrical
kerja tambah, IKDL 73
III/ IIIA

Area

Page 11
of 15

----------------------- Page 12-----------------------

131
e
n

Marunda
Infrastructure
Perubahan Jalur Pipa Hydrant Area New WWTP
143/MK-PBS/IX/2014
24-Sep-14
PT. KEC
PT. PBS
Don
Infra
kerja tambah & perubaha

III/ IIIA
Area
Kerja Kurang; 1. Panel LS.A, LS.B New Loading Unloading &
Marunda
132
144/MK-PBS/IX/2014
PT. PBS
Electrical
Kabel

24-Sep-14

PT. KEC
LUL

Don
kerja kurang

III/ IIIA

133
e

Marunda
1. Kerja Tambah P. PUMP LU dan Kabel
145/MK-PBS/IX/2014
24-Sep-14
PT. PBS
LUL
Electrical

PT. KEC
Don
kerja tambah

III/ IIIA

134
e

Marunda
Sparing Kabel Kontrol Load Cell
146/MK-PBS/IX/2014
PT. PBS
Electrical

25-Sep-14

PT. KEC
NWB

Don
kerja tambah

III/ IIIA

135
e

Marunda
Infrastructure
Pekerjaan Ruang Pompa Hydrant Infrastruktur Plant
147/MK-PBS/IX/2014
29-Sep-14
PT. PBS
Infra

PT. KEC
Don
kerja tambah

III/ IIIA
Area
Pekerjaan Saluran dan Perapihan Area Sisi Barat New
Marunda
136
e

148/MK-PBS/IX/2014
PT. PBS
Infra

30-Sep-14

PT. KEC
LUL

Don
kerja tambah, IKDL 7

3
Loading Unloading
III/ IIIA

137
e
n

Marunda
Pembongkaran Railing New Warehouse
149/MK-PBS/X/2014
2-Oct-14
PT. PBS
NWH
Ars

PT. KEC
Don
Instruksi Pekerjaa

III/ IIIA

138
e

Marunda
Grounding Bangunan ASRS Warehouse
150/MK-PBS/X/2014
PT. PBS
Electrical

6-Oct-14

PT. KEC
NWH

Don
kerja tambah

III/ IIIA

139
e
0

Marunda
Instalasi Kabel Feeder Elektronik Warehouse
151/MK-PBS/X/2014
6-Oct-14
PT. KEC
PT. PBS
NWH
Don
Electrical
kerja tambah, IKDL 7

III/ IIIA

140
e
n

Marunda
Bobok Pondasi RGV Lantai 1 di Area Filling New Warehouse
152/MK-PBS/X/2014
8-Oct-14
PT. KEC
PT. PBS
NWH
Don
Civil
Instruksi Pekerjaa

III/ IIIA

141
e
tambah

Marunda
Perubahan dan Penambahan Pekerjaan di New Warehouse
153/MK-PBS/X/2014
8-Oct-14
PT. KEC
PT. PBS
NWH
Don
Civil, Ars
Instruksi Pekerjaan, kerja

III/ IIIA

Marunda
Penambahan CNP Support Partisi Filling New Warehouse
154/MK-PBS/X/2014
13-Oct-14
PT. PBS
NWH
Ars

142
e

PT. KEC
Don
kerja tambah

III/ IIIA
Marunda
Paving Block Sisi Selatan Jembatan Timbang
155/MK-PBS/X/2014
14-Oct-14
PT. PBS
NWB
Infra

143
e

PT. KEC
Don
kerja tambah

III/ IIIA
Marunda
Tes Rendam (Hydro Test) Pit New Unloading
156/MK-PBS/X/2014
14-Oct-14
PT. PBS
LUL
Mechanical

144
e
n

PT. KEC
Don
Instruksi Pekerjaa

III/ IIIA
Pembuatan Pit New WWTP dan Pit Condensat New Storage
Marunda

New WWTP &

145
e
, IKDL 73

157/MK-PBS/X/2014
PT. PBS
Civil, Mechanical

16-Oct-14

PT. KEC

Don
Instruksi Pekerjaan, kerja tambah

Tank
III/ IIIA

146
e
n

NST

Marunda
Pemasangan Flexible Joint Pipa Suction Unloading
158/MK-PBS/X/2014
20-Oct-14
PT. KEC
PT. PBS
LUL, OSBL
Don
Mechanical
Instruksi Pekerjaa

III/ IIIA
Marunda
147
e

Conduit Steel E81


159/MK-PBS/X/2014
PT. PBS
Electrical

21-Oct-14
New WTP

PT. KEC
Don
kerja tambah

III/ IIIA

148
e

Marunda
Kerja Kurang Kabel Ledder 200 x 100 WTP
160/MK-PBS/X/2014
22-Oct-14
PT. PBS
New WTP
Electrical

PT. KEC
Don
kerja kurang

III/ IIIA

149
e
0

Marunda
Elektrikal Loading Unloading
161/MK-PBS/X/2014
PT. PBS
Electrical

22-Oct-14

PT. KEC
LUL

Don
kerja tambah, IKDL 6

III/ IIIA

150
e
7

Marunda
Kabel Kontrol CPO Pump (P1A & P1B)
162/MK-PBS/X/2014
22-Oct-14
PT. KEC
PT. PBS
OSBL
Don
Electrical
kerja tambah, IKDL 6

III/ IIIA

151
el

Marunda
Pipe Rack
Temporary Support Pipe Rack Existing
163/MK-PBS/X/2014
23-Oct-14
PT. PBS
Str

III/ IIIA

152
e
n

PT. KEC
Canc
Tidak dieksekusi

Area

Marunda
Panel Pompa Existing Storage Tank
164/MK-PBS/XI/2014
2-Nov-14
PT. KEC
PT. PBS
Big Tank Farm
Don
Electrical
Instruksi Pekerjaa

III/ IIIA

153

Marunda
Perubahan Pintu P2 dan Dinding Lift Area New Warehouse
165/MK-PBS/XI/2014
7-Nov-14
PT. KEC

e
tambah

PT. PBS
Civil, Str, Ars

NWH
Don
Instruksi Pekerjaan, Kerja

III/ IIIA

154
e
tambah

Marunda
Interkoneksi Air Limbah ke New WWTP
166/MK-PBS/XI/2014
7-Nov-14
PT. KEC
PT. PBS
OSBL
Don
Mechanical
Instruksi Pekerjaan, Kerja

III/ IIIA

155
e

Marunda
Kerja Tambah Kabel Distribusi PD.RGV & Tray ME WH
167/MK-PBS/XI/2014
12-Nov-14
PT. PBS
NWH
Electrical

PT. KEC
Don
kerja tambah

III/ IIIA

156
e
3

Marunda
Pekerjaan Installasi Jalur Pit New WWTP
168/MK-PBS/XI/2014
13-Nov-14
PT. KEC
PT. PBS
New WWTP
Don
Mechanical
kerja tambah, IKDL 7

III/ IIIA

157
e
ahan

Marunda
Pemindahan Panel PJU, Tiang PJU dan Modifikasi Pipa Hydrant
169/MK-PBS/XII/2014
3-Dec-14
PT. KEC
PT. PBS
PJU Area
Don
Infra (ME)
Instruksi Perubahan/ Pemind

III/ IIIA

158
e
n

Marunda
Pemasangan Titik Lampu Filling Area
170/MK-PBS/XII/2014
4-Dec-14
PT. PBS
NWH
Electrical

III/ IIIA

PT. KEC
Don
Instruksi Pekerjaa

159
e
n

Marunda
Bobokan Dinding Pit dan Chipping Gutter Jembatan Timbang
171/MK-PBS/XII/2014
4-Dec-14
PT. KEC
PT. PBS
NWB
Don
Civil
Instruksi Pekerjaa

III/ IIIA

160
e

Marunda
Instalasi Ruang Server Warehouse
172/MK-PBS/XII/2014
PT. PBS
Electrical

8-Dec-14

PT. KEC
NWH

Don
kerja tambah

III/ IIIA

161
e
n

Marunda
Penggantian Pengaman MCB di Panel Mesin 2,3 & 4
173/MK-PBS/XII/2014
8-Dec-14
PT. PBS
NWH
Electrical

PT. KEC
Don
Instruksi Perubaha

III/ IIIA

162
e
, IKDL 73

Marunda
Infrastructure
Sparing Kabel & Penerangan Pos Jaga ( Infra )
174/MK-PBS/XII/2014
8-Dec-14
PT. KEC
PT. PBS
Don
Infra (Electrical)
Instruksi Pekerjaan, Kerja tambah

III/ IIIA

163
e
n

Area

Marunda
Panel Stop Kontak PC - Efacec & Panel Rooling Door
175/MK-PBS/XII/2014
8-Dec-14
PT. KEC
PT. PBS
NWH
Don
Electrical
Instruksi Pekerjaa

III/ IIIA

164

Marunda
AC Ruang Server New Warehouse
176/MK-PBS/XII/2014
PT. PBS

9-Dec-14

PT. KEC
NWH

Don

e
0

Mechanical

kerja tambah, IKDL 7

III/ IIIA
Penambahan Pekerjaan Kelengkapan Operasional Jembatan
Marunda
165
e
ambah

177/MK-PBS/XII/2014
PT. PBS
Civil

10-Dec-14

PT. KEC
NWB
Don
Instruksi Perubahan, Kerja t

Timbang
III/ IIIA

166
e
7

Marunda
Penambahan Pekerjaan Pow er Pompa OSBL
178/MK-PBS/XII/2014
18-Dec-14
PT. KEC
PT. PBS
OSBL
Don
Electrical
kerja tambah, IKDL 6

III/ IIIA

167
e
n

Marunda
Pekerjaan Penyambungan Pipa Minyak OSBL
179/MK-PBS/XII/2014
20-Dec-14
PT. PBS
OSBL
Mechanical

PT. KEC
Don
Instruksi Pekerjaa

III/ IIIA

168
e
tambah

Marunda
Extend Loading 2 (Existing)
180/MK-PBS/XII/2014
PT. PBS
Civil, Str, Ars

III/ IIIA

169
e
n

Loading 2
22-Dec-14

Don
Instruksi Pekerjaan, Kerja

Existing

Marunda
Cleaning Area New Storage Tank 15 x 3450 MT
181/MK-PBS/XII/2014
23-Dec-14
PT. PBS
NST
K3

III/ IIIA

PT. KEC

PT. KEC
Don
Instruksi Pekerjaa

170
e

Marunda
Plafond Sandw itch Panel Ruang H1 dan H2 Filling Area Lt. 3
182/MK-PBS/XII/2014
29-Dec-14
PT. KEC
PT. PBS
NWH
Don
Ars
Instruksi Perubahan, Kerja tambah,

IKDL 66
III/ IIIA

171
e

Marunda
Outstanding Progress Paket New Warehouse
183/MK-PBS/XII/2014
29-Dec-14
PT. PBS
NWH
Ars, Mechanical

PT. KEC
Don
Outstanding

III/ IIIA

172
e
n

Marunda
Modifikasi MCCB 800A Panel Stacker Crane/ P. PDP-Efacec
184/MK-PBS/I/2015
5-Jan-15
PT. KEC
PT. PBS
NWH
Don
Electrical
Instruksi Perubaha

III/ IIIA

173
e
n

Marunda
Pekerjaan Jalur Pipa Air Bersih WTP (OSBL)
185/MK-PBS/I/2015
6-Jan-15
PT. PBS
OSBL
Mechanical

PT. KEC
Don
Instruksi Pekerjaa

III/ IIIA
Modifikasi Busbar & Perubahan Kapasitas MCCB Panel Fire
Marunda
174
e
tambah

186/MK-PBS/I/2015
PT. PBS
Mechanical

6-Jan-15
PT. KEC
Hydrant Area
Don
Instruksi Pekerjaan, Kerja

Pump
III/ IIIA
Pekerjaan Pembuatan Gerbang Masuk Sisi Timur New Weight
Marunda

Infrastructure

175
187/MK-PBS/I/2015
PT. PBS

9-Jan-15

PT. KEC
Don

e
, IKDL 73

Infra (civil)

Instruksi Pekerjaan, Kerja tambah

Bridge
III/ IIIA
Area
Pemasangan Agitator dan Pembuatan Support Dudukan
Marunda
176
188/MK-PBS/I/2015
PT. PBS
Mechanical

e
n

10-Jan-15

PT. KEC
NST

Don
Instruksi Pekerjaa

Agitator New Storage Tank


III/ IIIA
Modifikasi/ Penggantian Main Breaker PD. Mesin
Marunda
177
e
L 69

189/MK-PBS/I/2015
PT. PBS
Electrical

12-Jan-15

PT. KEC
NWH
Don
Instruksi Perubahan, IKD

Penambahan 6 Unit Panle


III/ IIIA
Marunda
178
e
n

Pembuatan Tiang CCTV


190/MK-PBS/I/2015
PT. PBS
Infra (civil)

16-Jan-15

e
ambah

PT. KEC
Don
Instruksi Pekerjaa

III/ IIIA

179

Infrastructure

Area

Marunda
Modifikasi Jalur Olein ke RBDPO New Storage Tank
191/MK-PBS/I/2015
22-Jan-15
PT. KEC
PT. PBS
NST
Don
Mechanical
Instruksi Perubahan, Kerja t

III/ IIIA

180
e
n

Marunda
Pembongkaran dan Koneksi pipa hydrant site
192/MK-PBS/I/2015
22-Jan-15
PT. KEC
PT. PBS
Hydrant Area
Don
Infra (Mechanical)
Instruksi Pekerjaa

III/ IIIA

Marunda
Local Of Remote Control Pompa Existing Storage Tank
193/MK-PBS/I/2015
26-Jan-15
PT. KEC
PT. PBS
Big Tank Farm
Don
Electrical
Instruksi Perubahan, Kerja tambah,

181
e
IKDL 67

III/ IIIA
Meja Kitchen Zinc dan Double Plafond Area Filling Finish Good
Marunda
182
194/MK-PBS/I/2015
PT. PBS
e
Ars
a pada Lt. 3
Warehouse

28-Jan-15

PT. KEC
NWH
Don
Instruksi Pekerjaan, Meja dipasang hany

III/ IIIA
Finishing Tie Beam dan Pasang Pagar Hollow area Bekas
Marunda

Infrastructure

183
e
, IKDL 76

195/MK-PBS/I/2015
PT. PBS
Civil, Ars

29-Jan-15

PT. KEC

Don
Instruksi Pekerjaan, Kerja tambah

Pagar Panel Pre Cast


III/ IIIA

184
e
n

Area

Marunda
Bongkar Pasang Pipa Hydrant Site Dekat Tanki Solar Existing
196/MK-PBS/I/2015
29-Jan-15
PT. KEC
PT. PBS
Hydrant Area
Don
Civil, Mechanical
Instruksi Pekerjaa

III/ IIIA

185
e
tambah

Marunda
Jalur Angin Blow ing New Loading Unloading
197/MK-PBS/II/2015
3-Feb-15
PT. KEC
PT. PBS
LUL, OSBL
Don
Mechanical
Instruksi Pekerjaan, Kerja

III/ IIIA

186

Marunda
Pressure Gauge Untuk Pompa New Unloading
198/MK-PBS/II/2015
3-Feb-15

PT. KEC

PT. PBS
e
tambah

LUL, OSBL
Don
Instruksi Pekerjaan, Kerja

Mechanical

III/ IIIA
Marunda
Jalur Air Bersih New Loading Unloading
199/MK-PBS/II/2015
4-Feb-15
PT. KEC
PT. PBS
LUL, OSBL
Don
Mechanical
Instruksi Pekerjaa

187
e
n

III/ IIIA
Penghubung Sisi Utara Pelat Lantai New Loading Unloading
Marunda
188
e
, IKDL 76

200/MK-PBS/II/2015
PT. PBS
Civil

13-Feb-15

PT. KEC
LUL
Don
Instruksi Pekerjaan, Kerja tambah

dengan Jalan
III/ IIIA
Marunda
Warehouse Elektrikal dan Fire Alarm
201/MK-PBS/II/2015
18-Feb-15
PT. KEC
PT. PBS
NWH
Don
Electrical
Instruksi Pekerjaan, Kerja tambah

189
e
, IKDL 70

III/ IIIA
Pemindahan Battery Charger Forklift
Marunda
190
202/MK-PBS/II/2015
PT. PBS
Electrical

e
n

18-Feb-15

PT. KEC
NWH

Don
Instruksi Perubaha

New Warehouse Lt. 1


III/ IIIA
Pembuatan Jalur Bypass OSBL
Marunda
191
e
tambah

203/MK-PBS/II/2015
PT. PBS
Mechanical
Loading 3 Untuk Kebutuhan Blow ing

25-Feb-15
PT. KEC
LUL, OSBL
Don
Instruksi Pekerjaan, Kerja

III/ IIIA

192
e

Marunda
ME Filling Plant
204/MK-PBS/II/2015
PT. PBS
Electrical

27-Feb-15

PT. KEC
NWH
Don
Instruksi Perubahan, Kerja tambah,

IKDL 70
III/ IIIA
Pekerjaan Pembuatan Jalur Drain Pendant Springkler di New
Marunda
193
205/MK-PBS/III/2015
PT. PBS
Mechanical

e
5

4-Mar-15

PT. KEC
NWH

Don
Kerja tambah, IKDL 7

Warehouse
III/ IIIA

194
e
7

Marunda
Supply dan Instalasi Kabel Kontrol New Storage Tank
206/MK-PBS/III/2015
5-Mar-15
PT. KEC
PT. PBS
NST
Don
Electrical
Kerja tambah, IKDL 6

III/ IIIA
Pembuatan Jalur Extend Pipe Loading & Tracing+Insullation
Marunda
195
207/MK-PBS/III/2015
PT. PBS
Mechanical

e
1

5-Mar-15
LUL, OSBL

PT. KEC
Don
Kerja tambah, IKDL 7

Jalur RBDPO
III/ IIIA

196
e
n

Marunda
Penerangan di New Storage Tank dan Oil Tank Warehouse
208/MK-PBS/III/2015
6-Mar-15
PT. KEC
PT. PBS
NST, NWH
Don
Electrical
Instruksi Pekerjaa

III/ IIIA
Perkerasan Jalan Sekitar Area New WWTP dan Jembatan
Marunda
197

New WWTP &

209/MK-PBS/III/2015
PT. PBS
Civil

e
6

13-Mar-15

PT. KEC
Don
Kerja tambah, IKDL 7

Timbang
III/ IIIA

NWB

Page 12
of 15
----------------------- Page 13-----------------------

Marunda
Pekerjaan ME Office Finish Good Warehouse Lt. 1
210/MK-PBS/III/2015
16-Mar-15
PT. KEC
PT. PBS
NWH
Done
Electrical
Instruksi Pekerjaan, Kerja tambah, IKDL 75

198

III/ IIIA
Marunda
Pembongkaran Jalur Hydrant Existing Loading Dock ASRS
211/MK-PBS/III/2015
24-Mar-15
PT. KEC
PT. PBS
NWH
Done
Mechanical
Instruksi Pekerjaan, IKDL 75

199

III/ IIIA
Marunda
Pekerjaan Plafond Office Finish Good Warehouse Lt. 1
212/MK-PBS/III/2015
25-Mar-15
PT. KEC
PT. PBS
NWH
Done
Ars
Instruksi Pekerjaan, IKDL 75

200

III/ IIIA
Marunda
Pembuatan Bak Kran Air Loading Unloading
213/MK-PBS/III/2015
25-Mar-15
PT. KEC
PT. PBS
LUL
Done
Civil
Instruksi Pekerjaan

201

III/ IIIA

Marunda
AC Ruang Office Finish Good Warehouse Lt. 1 dan Lt. 2
214/MK-PBS/III/2015
27-Mar-15
PT. KEC
PT. PBS
NWH
Done
Mechanical
Instruksi Pekerjaan, Kerja tambah, IKDL 75

202

III/ IIIA
Marunda
Hydrant Sisi Timur dan Sisi Selatan Penampungan Batu Bara
215/MK-PBS/IV/2015
2-Apr-15
PT. KEC
PT. PBS
Hydrant Area
Done
Mechanical
Instruksi Pekerjaan, IKDL 76

203

III/ IIIA
Marunda
PJU, Tank
Penerangan & Remote on/ off Pompa
216/MK-PBS/IV/2015
2-Apr-15
PT. KEC
PT. PBS
Belum dieksekusi
Electrical
Instruksi Pekerjaan, IKDL 83

204

III/ IIIA

Farm

Marunda
Plumbing & Sanitasi New Warehouse
217/MK-PBS/IV/2015
8-Apr-15
PT. KEC
PT. PBS
NWH
Done
Mechanical
Kerja tambah, IKDL 77

205

III/ IIIA
Marunda
Grounding New Storage Tank
218/MK-PBS/IV/2015
PT. PBS
Electrical

206

8-Apr-15
PT. KEC
NST
Done
Instruksi Pekerjaan, IKDL 76

III/ IIIA
Marunda
Elektrikal New Warehouse
219/MK-PBS/IV/2015
PT. PBS
Electrical

207

III/ IIIA

9-Apr-15
NWH

PT. KEC
Done
Kerja tambah, IKDL 75

Marunda
Tata Suara New Warehouse
220/MK-PBS/IV/2015
PT. PBS
Electrical

208

9-Apr-15
NWH

PT. KEC
Done
Kerja tambah, IKDL 75

III/ IIIA
Marunda
Penerangan
Penerangan Platform dan Selasar New Warehouse
221/MK-PBS/IV/2015
21-Apr-15
PT. KEC
PT. PBS
NWH
Electrical
Kerja tambah, IKDL 75

209

III/ IIIA

Selasar Belum

Marunda
Paving Block Sisi Selatan New Warehouse
222/MK-PBS/IV/2015
22-Apr-15
PT. KEC
PT. PBS
NWH
Done
Civil
Instruksi Pekerjaan

210

III/ IIIA
Marunda
Roof Tank New Warehouse
223/MK-PBS/IV/2015
PT. PBS
Civil, ME

211

28-Apr-15
NWH

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA
Marunda
Modifikasi Gril Besi Saluran Limbah Area New Loading
224/MK-PBS/IV/2015
30-Apr-15
PT. KEC
PT. PBS
LUL
Belum dieksekusi
Str
Instruksi Perubahan

212

III/ IIIA
Bongkar Beton dan Pemindahan Pohon Area Pelat Lantai Loading
Marunda
213
225/MK-PBS/V/2015
PT. PBS
Civil
Dock ASRS
III/ IIIA

4-May-15
PT. KEC
NWH
Done
Instruksi Pekerjaan, IKDL 76

Marunda
Pekerjaan Besi Siku Untuk Lift New Warehouse
226/MK-PBS/V/2015
4-May-15
PT. KEC
PT. PBS
NWH
Done
Civil
Kerja tambah, IKDL 75

214

III/ IIIA
Marunda
Partisi Ruang H1 Filling Area Lt. 3 New Warehouse
227/MK-PBS/V/2015
4-May-15
PT. KEC
PT. PBS
NWH
Done
Ars
Kerja tambah, IKDL 75

215

III/ IIIA
Marunda
Repair Lantai New Loading Unloading
228/MK-PBS/V/2015
4-May-15
PT. KEC
PT. PBS
LUL
Belum dieksekusi
Civil
Instruksi Perbaikan

216

III/ IIIA
Marunda
Power Pekerjaan Lift New Warehouse
229/MK-PBS/V/2015
5-May-15
PT. KEC
PT. PBS
NWH
Done
Electrical
Instruksi Pekerjaan, IKDL 75

217

III/ IIIA
Marunda
WWTP
Pergantian Pompa Summersible WWTP Existing
230/MK-PBS/V/2015
11-May-15
PT. KEC
PT. PBS
Done
Mechanical
Instruksi Perubahan, Kerja tambah, IKDL 76

218

III/ IIIA

Existing

Marunda
Pekerjaan Bobokan di Lantai Dak
231/MK-STW/V/2015
11-May-15
PT. KEC
PT. STW
NWH
Done
Civil
Instruksi Pekerjaan

219

III/ IIIA

Pemindahan Pompa CPKO dan CPO dari Loading Existing ke


Marunda
220
232/MK-PBS/V/2015
PT. PBS
Mechanical
New Loading

19-May-15
PT. KEC
LUL
Done
Instruksi Pemindahan, Kerja tambah

III/ IIIA
Marunda
Infrastructure
Galian Base Coarse pada Saluran dan Jembatan OHB
233/MK-PBS/V/2015
19-May-15
PT. KEC
PT. PBS
Done
Infra (civil)
Instruksi Pekerjaan, Kerja tambah, IKDL 76

221

III/ IIIA

Area

Marunda
Pemasangan PJU Area Sisi Utara New Warehouse
234/MK-PBS/V/2015
19-May-15
PT. KEC
PT. PBS
PJU Area
Done
Infra (Electrical)
Instruksi Pekerjaan, IKDL 76

222

III/ IIIA
Saluran Crossing dari Cooling Tower New Refinery ke Saluran
Marunda

New Refinery

223
235/MK-PBS/V/2015
PT. PBS
Infra (civil)
Limbah Existing

19-May-15

PT. KEC

Done
Instruksi Pekerjaan, Kerja tambah, IKDL 76

III/ IIIA
Drainage
Pasang Ball Valve 4" dari Bongkaran Loading Existing ke New
Marunda
224
236/MK-PBS/V/2015
PT. PBS
Mechanical
Loading

20-May-15
LUL

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA
Bongkar Pasang Plafon dll Untuk Pekerjaan Tata Udara Filling Lt.
Marunda
Instruksi Pekerjaan, Plafond tidak dipasang kemb
ali,
225
237/MK-PBS/V/2015
PT. PBS
Ars, ME
3

27-May-15
NWH

PT. KEC
Done

III/ IIIA
IKDL 75
Pekerjaan Tambahan Hydrant di GRDC, MQC, New Warehouse
Marunda
226
238/MK-PBS/V/2015
PT. PBS
Mechanical
dan Pump House

27-May-15
PT. KEC
NWH, GRDC
Done
Instruksi Pekerjaan, Kerja tambah, IKDL 76

III/ IIIA
Marunda
Pekerjaan Penunjang Pemasangan Lift New Warehouse
239/MK-PBS/V/2015
29-May-15
PT. KEC
PT. PBS
NWH
Done
Civil, Ars
Instruksi Pekerjaan

227

III/ IIIA
Marunda
Perubahan Material Drain Steam Condensat New Storage Tank
240/MK-PBS/VI/2015
3-Jun-15
PT. KEC
PT. PBS
NST
Done
Mechanical
Instruksi Pekerjaan

228

III/ IIIA
Marunda
Pondasi Dudukan Equipment di Lantai DAK New Warehouse
241/MK-PBS/VI/2015
5-Jun-15
PT. KEC
PT. PBS
NWH
Done
Civil
Instruksi Pekerjaan, Kerja tambah, IKDL 75

229

III/ IIIA
Marunda
Pembuatan Jalur PK Stearin CBS ke Loading 3
242/MK-PBS/VI/2015
5-Jun-15
PT. KEC
PT. PBS
LUL, OSBL
Done
Mechanical
Instruksi Pekerjaan, Kerja tambah

230

III/ IIIA
Pelat Lantai Diatas Saluran Sisi Selatan CPKO Plant CBS
Marunda
231
243/MK-PBS/VI/2015
PT. PBS
Infra (civil)

15-Jun-15
PT. KEC
CBS
Done
Instruksi Pekerjaan, Kerja tambah, IKDL 76

(Loading 2 Area)
III/ IIIA
Marunda
Rembesan Air Limbah Saluran Sisi Barat Loading 3
244/MK-PBS/VI/2015
15-Jun-15
PT. KEC
PT. PBS
LUL
Done
Infra (civil)
Instruksi Perbaikan

232

III/ IIIA
Pekerjaan Penambahan AC Area Filling
Marunda
233
245/MK-STW/VI/2015
PT. STW
Mechanical
New Warehouse

15-Jun-15
PT. KEC
NWH
Done
Instruksi Pekerjaan, Kerja tambah

III/ IIIA
Marunda
AC dan Penerangan Ruang Mesin Lift New Warehouse
246/MK-PBS/VI/2015
15-Jun-15
PT. KEC
PT. PBS
NWH
Done
ME
Instruksi Pekerjaan, Kerja tambah, IKDL 75

234

III/ IIIA
Marunda
Pekerjaan Electrical pada Shelter PRS CNG
247/MK-PBS/VI/2015
18-Jun-15
PT. KEC
PT. PBS
LUL, PRS CNG
Done
Electrical
Instruksi Pekerjaan, Kerja tambah, IKDL 76

235

III/ IIIA
Marunda
Pekerjaan Electrical Penarikan Kabel Power dari New Warehouse
248/MK-PBS/VI/2015
20-Jun-15
PT. KEC
PT. PBS
NWH
Done
Electrical
Instruksi Pekerjaan, Kerja tambah, IKDL 75

236

III/ IIIA
Instalasi Telepon dan Fire Alarm Ruang Mesin Lift New
Marunda
237
249/MK-PBS/VI/2015
PT. PBS
Electrical

20-Jun-15
PT. KEC
NWH
Done
Instruksi Pekerjaan, Kerja tambah, IKDL 75

Warehouse
III/ IIIA
Tutup Cover Indoor Hydrant Box
Marunda
238
250/MK-PBS/VI/2015
23-Jun-15
PT. KEC
PT. PBS
NWH
Done
Mechanical
Instruksi Penggantian, Kerja tambah, IKDL 75, IKDL
84
New Warehouse
III/ IIIA
Jalan Sisi Selatan Big Tank (Existing) dan Ramp (Akses Forklift)
Marunda
239
251/MK-PBS/VI/2015
PT. PBS
Infra (civil)

25-Jun-15
PT. KEC
NWH
Done
Instruksi Pekerjaan, Kerja tambah, IKDL 82

Sisi Timur New Warehouse


III/ IIIA
Pekerjaan Electrical dan Mekanikal Pompa Booster dan Pompa
Marunda
240
252/MK-PBS/VI/2015

26-Jun-15
PT. KEC
NWH
Done
Instruksi Pekerjaan, Kerja tambah, IKDL 75, IKDL

PT. PBS
ME
84
Transfer New Warehouse

III/ IIIA
Pekerjaan Instalasi Tata Udara Ruang Trafo Lt. 1 & LVMDP New
Marunda
241
253/MK-STW/VII/2015
PT. STW
ME
Warehouse

1-Jul-15
PT. KEC
NWH
Done
Instruksi Pekerjaan, Kerja tambah

III/ IIIA
Marunda
Penambahan Flow Meter Untuk Air Bersih New Warehouse
254/MK-PBS/VII/2015
7-Jul-15
PT. KEC
PT. PBS
NWH
Done
Mechanical
Kerja tambah

242

III/ IIIA

243

Marunda
Finishing Ruang Mesin Lift

255/MK-PBS/VII/2015
PT. PBS
Civil, Ars

7-Jul-15
PT. KEC
NWH
Done
Instruksi Pekerjaan, Kerja tambah, IKDL 82

III/ IIIA
Marunda
Pintu Rolling Door Sisi Timur New Warehouse ASRS
256/MK-PBS/VII/2015
11-Jul-15
PT. KEC
PT. PBS
NWH
Done
Ars
Kerja tambah, IKDL 75

244

III/ IIIA

Marunda
Pest Management Control New Warehouse
257/MK-PBS/VII/2015
27-Jul-15
PT. KEC
PT. PBS
NWH
K3
Instruksi Perbaikan

245

III/ IIIA
Marunda
Repair Jalur Rel RGV New Warehouse ASRS
258/MK-PBS/VIII/2015
4-Aug-15
PT. KEC
PT. PBS
NWH
Done
Civil
Instruksi Perbaikan

246

III/ IIIA
Marunda
New WTP,
Pekerjaan Pondasi dan Elektrikal Pompa Demin WTP
259/MK-PBS/VIII/2015
5-Aug-15
PT. KEC
PT. PBS
Done
Civil, ME
Kerja tambah IKDL 83

247

III/ IIIA

Water Tank

Marunda
Penarikan Kabel Power Agitator Oil Tank Filling Plant
260/MK-PBS/VIII/2015
5-Aug-15
PT. KEC
PT. PBS
NWH
Done
Electrical
Instruksi Pekerjaan, Kerja Tambah IKDL 84

248

III/ IIIA

Marunda
Penyelesaian Insulation dan Tracing OSBL Marunda III dan IIIA
261/MK-PBS/VIII/2015
5-Aug-15
PT. KEC
PT. PBS
OSBL
On Progress
Mechanical
Instruksi Penyelesaian

249

III/ IIIA
Marunda
Pembuatan Picking Plaform ASRS
262/MK-PBS/VIII/2015
5-Aug-15
PT. KEC
PT. PBS
NWH
Done
Civil
Instruksi Pekerjaan, Kerja Tambah IKDL 84

250

III/ IIIA
Pekerjaan Instalasi Compress air distribution line - ASRS
Marunda
251
263/MK-PBS/VIII/2015
PT. PBS
Mechanical
Wrapping Machine

12-Aug-15
PT. KEC
NWH
Done
Instruksi Pekerjaan, Kerja Tambah IKDL 84

III/ IIIA
Marunda
Pekerjaan Elektrikal Power Air Compressor
264/MK-PBS/VIII/2015
21-Aug-15
PT. KEC
PT. PBS
NWH
Done
Electrical
Instruksi Pekerjaan, Kerja Tambah IKDL 84

252

III/ IIIA
Penambahan Pekerjaan Pembuatan Jalur air dan Pengadaan
265/MK-PBS/VIII/2015
Marunda
253
25-Aug-15
PT. KEC
PT. PBS
LUL, PRS CNG
Done
Mechanical
Instruksi Pekerjaan, Emergency Shower Cancel
Emergency Shower untuk area Shelter PRS CNG.
(rev1)
III/ IIIA
Marunda
Pekerjaan Tata Udara Ruang Compressor Lt. 1 New Warehouse
266/MK-STW/VIII/2015
26-Aug-15
PT. KEC
PT. STW
NWH
Done
Mechanical
Instruksi Pekerjaan, Kerja tambah, IKDL 78

254

III/ IIIA

Marunda
Pembuatan R Jalan Sisi Utara New Storage Tank
267/MK-PBS/VIII/2015
26-Aug-15
PT. KEC
PT. PBS
NST
Done
Infra (civil)
Instruksi Perbaikan

255

III/ IIIA
Marunda
Dinding, Kawat Burung dan Kanstin Area New Warehouse
268/MK-PBS/VIII/2015
28-Aug-15
PT. KEC
PT. PBS
NWH
Done
Civil, Ars
Instruksi Perbaikan, Outstanding

256

III/ IIIA
Marunda
Gudang BE
Penambahan Pintu Besi Ruang Compressor BE Warehouse
269/MK-PBS/IX/2015
1-Sep-15
PT. KEC
PT. PBS
Done
Civil, Ars
Instruksi Pekerjaan, Kerja tambah, IKDL 82

257

III/ IIIA

Existing

Marunda
Power AC New Warehouse Lantai 3
270/MK-PBS/IX/2015
2-Sep-15
PT. KEC
PT. PBS
NWH
Done
Electrical
Instruksi Pekerjaan

258

III/ IIIA
Pembuatan Lubang Pada Plafond Ruang H1 New Warehouse
Marunda
259
271/MK-STW/IX/2015
PT. STW
Mechanical
Lantai 3

4-Sep-15
NWH

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA
Modifikasi Panel AC dan Tarik Kabel untuk Tata Udara New
Marunda
260
272/MK-PBS/IX/2015
PT. PBS
Electrical
Warehouse Lantai 3

8-Sep-15
PT. KEC
NWH
Done
Instruksi Perubahan, IKDL 84

III/ IIIA
Perubahan dan Perbaikan Pekerjaan Pipa Air Bersih dan

Marunda
261
273/MK-PBS/IX/2015
PT. PBS
Infra (civil, ME)
Infrastruktur

9-Sep-15
PT. KEC
OSBL, Infra
Done
Instruksi Perubahan dan Perbaikan

III/ IIIA
Marunda
Pembongkaran Pipe Rack dan Lantai Loading Unloading Existing
274/MK-PBS/IX/2015
10-Sep-15
PT. KEC
PT. PBS
LUL Existing
Done
Civil, Str
Instruksi Pekerjaan, Kerja Tambah IKDL 81

262

III/ IIIA
Marunda
Perbaikan Jalur Lintasan RGV New Warehouse ASRS
275/MK-PBS/IX/2015
10-Sep-15
PT. KEC
PT. PBS
NWH
Done
Civil
Instruksi Perbaikan, kerja tambah IKDL 82

263

III/ IIIA
Marunda
Saluran Sisi Timur New Warehouse
276/MK-PBS/IX/2015
11-Sep-15
PT. KEC
PT. PBS
NWH
Done
Infra (civil)
Instruksi Perbaikan, kerja tambah IKDL 82

264

III/ IIIA

Page 13 of 15
----------------------- Page 14----------------------Penggantian Louvre Sisi Timur
Marunda
265
277/MK-PBS/IX/2015
PT. PBS
Ars
New Warehouse ASRS

15-Sep-15
NWH

PT. KEC
Done
Instruksi Perubahan

III/ IIIA

266

Marunda
Pemindahan Kembali Battery Charger Forklift New Warehouse Lt. 1
278/MK-PBS/IX/2015
15-Sep-15
PT. KEC
PT. PBS
NWH
Done
Electrical
Instruksi Perubahan, IKDL 84
III/ IIIA
Penambahan Jalur Pipa untuk Inspection Test Valve pada Hydrant
Marunda

267
279/MK-PBS/IX/2015
PT. PBS
Mechanical
dan Springkler ASRS

15-Sep-15
PT. KEC
NWH
Done
Instruksi Perubahan, IKDL 84

III/ IIIA
Bongkar Pasang dan Perapihan Dinding serta Pengadaan Tangga
Marunda
268
280/MK-PBS/IX/2015
PT. PBS
Civil, Ars

15-Sep-15
PT. KEC
NWH
Done
Instruksi Perbaikan, kerja tambah IKDL

82
R. Compressor area New Warehouse
III/ IIIA
Instalasi Kabel Power untuk Orcid Fly Catcher (OFC) New
Marunda
269
281/MK-PBS/IX/2015
PT. PBS
Electrical
Warehouse Lantai 1

16-Sep-15
PT. KEC
NWH
Done
Instruksi Pekerjaan, IKDL 84

III/ IIIA
Tambahan 1 Set Kontrol untuk Dockleveler Loading Dock New
Marunda
270
282/MK-PBS/IX/2015
PT. PBS
Electrical
Warehouse ASRS

21-Sep-15
NWH

PT. KEC
Done
Kerja tambah IKDL 84

III/ IIIA

271

Marunda
Supply dan Penarikan Kabel dari LVDB 6 (Warehouse) ke PD. WTP
283/MK-PBS/IX/2015
29-Sep-15
PT. KEC
PT. PBS
New WTP
Done
Electrical
Kerja tambah IKDL 84

III/ IIIA

272

Marunda
Pemasangan Kembali Plafond New Warehouse
284/MK-PBS/IX/2015
29-Sep-15
PT. PBS
NWH
Ars

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA

273

Marunda
Instalasi Elektrikal (Ground Tank, CPO & CPKO, Panel LVDB4B)
285/MK-PBS/X/2015
5-Oct-15
PT. KEC
PT. PBS
Tank Farm
Done
Electrical
Instruksi Pekerjaan, Kerja Tamabh IKDL

83
III/ IIIA
Canopy Panel Tank Farm & Pondasi Equipment Filling New
Marunda

Tank Farm,

274
286/MK-PBS/X/2015
PT. PBS
Civil, Electrical
Warehouse
III/ IIIA

275

Marunda
Pembuatan Flatform untuk CNG
287/MK-PBS/X/2015
PT. PBS
Str

5-Oct-15

PT. KEC
On Progress
Intruksi Pekerjaan

NWH

5-Oct-15
PT. KEC
CNG
Belum dieksekusi
Instruksi Pekerjaan, Kerja Tambah

III/ IIIA
Pembuatan Power Outlet Orcid Fly Catcher (OFC) Lantai 3 New
Marunda
276
288/MK-PBS/X/2015
PT. PBS
Electrical
84
Warehouse
III/ IIIA

15-Oct-15
PT. KEC
NWH
Done
Instruksi Pekerjaan, Kerja Tambah IKDL

Pekerjaan Pasang dan Bongkar Wrapping dan Speed Up Springkler


Marunda
277
289/MK-PBS/X/2015
PT. PBS
ME

23-Oct-15
PT. KEC
NWH
Done
Instruksi Pekerjaan, Kerja Tambah IKDL

84
untuk New Warehouse ASRS
III/ IIIA

278

Marunda
Instalasi stop kontak ruang meeting Lt. 1
290/MK-PBS/X/2015
26-Oct-15
PT. PBS
NWH
Electrical

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA
Pemindahan Battery Charger Forklift Lt. 2 dan Lt. 3 New
Marunda
279
291/MK-PBS/X/2015
PT. PBS

30-Oct-15
NWH

Electrical
Warehouse

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA

280

Marunda
Pemindahan outdoor AC Lt.3 New Warehouse.xls
292/MK-STW/Xll/2015
5-Nov-15
PT. STW
NWH
Mechanical

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA

281

Marunda
Employee
Waterproofing Membrane Lantai Dak Employee Facilities.xlsx
293/MK-PBS/Xl/2015
11-Nov-15
PT. KEC
PT. PBS
Done
ARS
Instruksi Pekerjaan
III/ IIIA

Facilities

Pondasi Cooling Tower,Canopy Chiller dan Chiller di Lantai Dak


Marunda

282
294/MK-PBS/Xl/2015
PT. PBS
Civil
New Warehouse

17-Nov-15
NWH

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA

283

Marunda
Pengadaan Pompa Dan Man Hole Disaluran Samping Big Tank
295/MK-PBS/Xl/2015
19-Nov-15
PT. KEC
PT. PBS
NWH
Done
Infra
Instruksi Pekerjaan
III/ IIIA

284

Marunda
Pekerjaan Filling Line Di New Warehouse
296/MK-PBS/Xl/2015
19-Nov-15
PT. PBS
NWH
Mechanical

PT. KEC
On Progress
Instruksi Pekerjaan

III/ IIIA

285

Marunda
Acceories Material Pekerjaan Filling Line Di New Warehouse
297/MK-PBS/Xl/2015
24-Nov-15
PT. KEC
PT. PBS
NWH
On Progress
Mechanical
Instruksi Pekerjaan
III/ IIIA

286

Marunda
Employee
Pemasangan Grounding Di Area Employee Facilities
298/MK-PBS/Xl/2015
26-Nov-15
PT. KEC
PT. PBS
Cancel
Electrical
Instruksi Pekerjaan
III/ IIIA

287

Facilities

Marunda
Employee
Pekerjaan Tambah Instalasi Plumbing Area Employee Facility
299/MK-PBS/Xll/2015
1-Dec-15
PT. KEC
PT. PBS
Done
Mechanical
Instruksi Pekerjaan

III/ IIIA

288

Facilities

Marunda
Pekerjaan Tambah Kurang Untuk New Warehouse Filling Line
300/MK-PBS/Xll/2015
4-Dec-15
PT. KEC
PT. PBS
NWH
On Progress
Mechanical
Instruksi Pekerjaan
III/ IIIA
Pekerjaan Tambah Instalasi Plumbing, Sanitary & Exhaust Fan
Marunda

Employee

289
301/MK-PBS/Xll/2015
PT. PBS
Mechanical
Area Employee Facility
III/ IIIA

290

10-Dec-15

PT. KEC
Done
Instruksi Pekerjaan

Facilities

Marunda
Pemindahan Saklar Lampu yang kena Pintu Sliding di Lt.2
302/MK-PBS/Xll/2015
18-Dec-15
PT. KEC
PT. PBS
NWH
Done
Electrical
Instruksi Pekerjaan
III/ IIIA
Pekerjaan Tambah Perubahan Kapasitas Biotech Area Employee
Marunda

Employee

291
303/MK-PBS/Xll/2015
PT. PBS
Mechanical

23-Dec-15

PT. KEC

Done
Instruksi Pekerjaan, Kerja Tambah IKDL

90
Facility
III/ IIIA

Facilities

Instalasi Pompa Untuk Pembuangan Air Limbah dari Gutter Oil


Marunda
292
304/MK-PBS/Xll/2015
PT. PBS
Mechanical
Tank ke Manhole WWTP
III/ IIIA

23-Dec-15
NWH

PT. KEC
Belum dieksekusi
Instruksi Pekerjaan

293

Marunda
Membuat Walkway Diatas Plafond Lt.2 Office DHL
305/MK-PBS/Xll/2015
23-Dec-15
PT. KEC
PT. PBS
NWH
Belum dieksekusi
Civil
Instruksi Pekerjaan
III/ IIIA

294

Marunda
Pemasangan Level Sensor CT Tank Refinery 2
306/MK-PBS/Xll/2015
23-Dec-15
PT. PBS
NWH
Electrical

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA

295

Marunda
,Acceories Material Pekerjaan Filling Line 2 Di New Warehouse
307/MK-PBS/XII/2015
23-Dec-15
PT. KEC
PT. PBS
NWH
On Progress
Mechanical
Instruksi Pekerjaan
III/ IIIA

296

Marunda
Pemindahan Stop Kontak
308/MK-PBS/XIl/2015
PT. PBS
Electrical

30-Dec-15
NWH

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA
Pekerjaan Tambah Instalasi Pipa Air Hujan dan Pipa Air Kotor Area
Marunda

Employee

297
309/MK-PBS/l/2016
PT. PBS

8-Jan-15

PT. KEC

Done
Instruksi Pekerjaan, Kerja Tambah IKDL

Mechanical
85
Employee Facilities
III/ IIIA

Facilities

Pekerjaan bobokan dinding ruang trafo dan panel Lt.1 New


Marunda
298
310/MK-STW/l/2016

8-Jan-16

PT. KEC

PT. STW

NWH

Mechanical
Warehouse

Done
Instruksi Pekerjaan

III/ IIIA

299

Marunda
Perbaikan Jalan Existing
311/MK-PBS/l/2016
PT. PBS
Civil

8-Jan-16
NWH

PT. KEC
Belum dieksekusi
Instruksi Pekerjaan

III/ IIIA

300

Marunda
Employee
,Pekerjaan Tambah MCB 1 Phase 2 Ampere
312/MK-PBS/l/2016
12-Jan-16
PT. KEC
PT. PBS
Done
Electrical
Instruksi Pekerjaan, Kerja Tambah IKDL

86
III/ IIIA

301

Facilities

Marunda
Pekerjaan bongkar pasang filling line New Warehouse
313/MK-PBS/l/2016
25-Jan-16
PT. KEC
PT. PBS
NWH
On Progress
Mechanical
Instruksi Pekerjaan
III/ IIIA

302

Marunda
Employee
Pekerjaan tambah instalasi tata udara Employee Facilities
314/MK-PBS/l/2016
25-Jan-16
PT. KEC
PT. PBS
Done
Mechanical
Instruksi Pekerjaan, Kerja Tambah IKDL

87
III/ IIIA

303

Facilities

Marunda
Perbaikan Box Culvert Dan Beton Jalan Masuk Pos 6
315/MK-PBS/lI/2016
2-Feb-16
PT. KEC
PT. PBS
NWH
On Progress
Civil
Instruksi Pekerjaan

III/ IIIA
Pekerjaan Stop Kontak, Saklar, Lampu Selasar dan Sound System
Marunda
304
316/MK-PBS/Il/2016
PT. PBS

5-Feb-16
NWH

Electrical
di New Warehouse

PT. KEC
Done
Instruksi Pekerjaan

III/ IIIA

305

Marunda
Employee
Pelaksanaan kerja tambah kabel Tray
317/MK-PBS/Il/2016
10-Feb-16
PT. KEC
PT. PBS
Done
Electrical
Instruksi Pekerjaan Kerja Tambah IKDL

88
III/ IIIA

Facilities

Pemasangan Accessories PHE, Penambahan Jalur Angin,


Marunda
306
318/MK-PBS/Il/2016

PT. KEC
On Progress
Electrical
Instruksi Pekerjaan
Pembuangan Steam dan Bak Penampungan Air AC Ruang Server

PT. PBS

11-Feb-16
NWH

III/ IIIA

307

Marunda
Pekerjaan Penyambungan Pipa Hydrant Pos 6 ke Hydrant Existing
319/MK-PBS/Il/2016
15-Feb-16
PT. KEC
PT. PBS
NWH
On Progress
Mechanical
Instruksi Pekerjaan
III/ IIIA

308

Marunda
Pembuangan Dari Safety Valve PHE Cooling ke Cooling Tower
320/MK-PBS/Il/2016
17-Feb-16
PT. KEC
PT. PBS
NWH
Done
Mechanical
Instruksi Pekerjaan
III/ IIIA

309

Marunda
Employee
Pekerjaan Tambah Pipe Rack dan Modifikasi Tie Beam (REVISI)
321/MK-PBS/Il/2016
29-Feb-16
PT. KEC
PT. PBS
On Progress
Civil
Instruksi Pekerjaan Kerja Tambah IKDL

89
III/ IIIA

310

Facilities

Marunda
Paket pekerjaan Ruang Tunggu Supir 1 (Struktur, Arsitek, ME)
322/MK-PBS/Il/2016
29-Feb-16
PT. KEC
PT. PBS
R.Tunggu Supir
On Progress
Civil,Ars,ME
Instruksi Pekerjaan
III/ IIIA

311

Marunda
Pekerjaan Tambah Mechanical Electrical
323/MK-PBS/III/2016
10-Mar-16
PT. KEC
PT. PBS
R.Tunggu Supir
On Progress
ME
Instruksi Pekerjaan
III/ IIIA

312

Marunda
Acceories Material New Filling Line
324/MK-PBS/III/2016
11-Mar-16
PT. PBS
NWH
Mechanical

PT. KEC
Instruksi Pekerjaan

III/ IIIA

313

Marunda
Modifikasi Pile Cap Untuk Pembesaran Titik Pancang
325/MK-PBS/III/2016
15-Mar-16
PT. KEC
PT. PBS
R.Tunggu Supir
Done
Civil
Instruksi Pekerjaan
III/ IIIA

314

Marunda
Pekerjaan Tambah Instalasi Plumbing Area WTP
326/MK-PBS/III/2016
16-Mar-16

PT. KEC

PT. PBS

WTP
Done
Instruksi Pekerjaan, Kerja Tambah IKDL

Mechanical
91
III/ IIIA

Marunda
employee
Pekerjaan Tambah Instalasi Data, Telepon dan Stop kontak
327/MK-PBS/III/2016
29-Mar-16
PT. KEC
PT. PBS
On Progress
Electrical (IT)
Instruksi Pekerjaan, Kerja Tambah IKDL

315

92
III/ IIIA

Facilities

Marunda
Accesories Material Pekerjaan Filling Line New Warehouse
328/MK-PBS/III/2016
29-Mar-16
PT. KEC
PT. PBS
NWH
Mechanical
Instruksi Pekerjaan

316

III/ IIIA

Marunda
Employee
Pekerjaan Tambah Plafond Selasar (Kalsiboard 6mm)
329/MK-PBS/III/2016
29-Mar-16
PT. KEC
PT. PBS
Ars
Instruksi Pekerjaan, Kerja Tambah IKDL

317

93
III/ IIIA

Facilities

Marunda
Jetty Piping
Air Receiver Tank Kapasitas 20 m
330/MK-PBS/IV/2016
4-Apr-16
PT. KEC
PT. PBS
On Progress
Mechanical
Instruksi Pekerjaan,

318

III/ IIIA

319

Marunda
Pekerjaan Tambah Elektrikal
331/MK-PBS/IV/2016
PT. PBS
Electrical

Line

Employee
1-Apr-16

PT. KEC
Belum dieksekusi
Instruksi Pekerjaan, Kerja Tambah IKDL

94
III/ IIIA

Facilities

Marunda
Jetty Piping
Pekerjaan Tambah Painting Jalur Pipa Angin 4"
332/MK-PBS/IV/2016
8-Apr-16
PT. KEC
PT. PBS
On Progress
Mechanical
Instruksi Pekerjaan,

320

III/ IIIA

Line

Page 14 of 15
----------------------- Page 15-----------------------

ang Server New Warehouse


PT. KEC
PT. PBS
Done
Mechanical

Marunda
321
Bongkar Pasang Pipa Hydrant di Ru
333/MK-PBS/IV/2016
11-Apr-16
NWH
Instruksi Pekerjaan,
III/ IIIA
Pekerjaan Tambah Pig Launcher dan

Pekerjaan Kurang Pompa


Marunda
Jetty Piping
322
334/MK-PBS/IV/2016
14-Apr-16
PT. KEC
n Progress

PT. PBS
Mechanical

O
Instruksi Pekerjaan,
Transfer
III/ IIIA

Line

Penambahan Stop Kontak 2 Titik da


n Perubahan Grouping Lampu
Marunda
323
335/MK-PBS/IV/2016
PT. KEC
Done

PT. PBS
Electrical

15-Apr-16
NWH
Instruksi Pekerjaan,
Ruang Meeting Lt.1New Warehouse

III/ IIIA

Angin
PT. KEC
n Progress

PT. PBS
Mechanical

Marunda
Jetty Piping
324
,Pekerjaan Tambah Pengelasan Pipa
336/MK-PBS/V/2016
4-May-16
O
Instruksi Pekerjaan,
III/ IIIA

Line

Marunda
Employee
325
Pekerjaan di Employee Facilities
337/MK-PBS/V/2016
9-May-16
PT. KEC
n Progress
95

PT. PBS
Ars

O
Instruksi Pekerjaan, IKDL

III/ IIIA

ay New Warehouse Filling


PT. KEC
PT. PBS
n Progress
Mechanical

Facilities

Marunda
326
Pekerjaan Bongkar Pasang Cover Tr
338/MK-PBS/V/2016
13-May-16
NWH
O
Instruksi Pekerjaan,
III/ IIIA

t.3
PT. KEC

PT. PBS
Electrical

Marunda
327
Pekerjaan di Area New Warehouse L
339/MK-PBS/V/2016
17-May-16
NWH
Instruksi Pekerjaan,
III/ IIIA
Pekerjaan Perbaikan Pembuangan Ai

r AC di Office Lantai 1 New


Marunda
328
340/MK-PBS/V/2016
PT. KEC

23-May-16
NWH
Instruksi Pekerjaan,

PT. PBS
Mechanical
Warehouse
III/ IIIA

Pekerjaan Perubahan Lampu TL menj


adi Lampu TL LED diarea
Marunda
329

R.Tunggu

341/MK-PBS/V/2016
PT. KEC
m dieksekusi

PT. PBS
Elektrical

27-May-16

Belu
Instruksi Pekerjaan,
Ruang Tunggu Supir
III/ IIIA

Line
PT. KEC
n Progress

PT. PBS
Mechanical

Supir

Marunda
330
Accessories Material New Filling
342/MK-PBS/VI/2016
7-Jun-16
NWH
O
Instruksi Pekerjaan,
III/ IIIA

Refinery 2
PT. KEC

PT. PBS
Mechanical

Marunda
331
Perubahan Jalur FMCP dan KMCP di
343/MK-PBS/VI/2016
10-Jun-16
NWH
Instruksi Pekerjaan,
III/ IIIA
Penambahan Ruang Compressor, Pond

asi Pig Receiver, &


Marunda
Jetty Piping
332
344/MK-PBS/VI/2016
16-Jun-16
PT. KEC
n Progress
99

PT. PBS
Sipil

O
Instruksi Pekerjaan, IKDL
Dudukan Genset Portable
III/ IIIA

r untuk Jetty Pipe Line


PT. KEC
PT. PBS
Cancel
Mechanical
97

Line

Marunda
Jetty Piping
333
Pembatalan Penambahan Pig Launche
345/MK-PBS/VI/2016
20-Jun-16
Instruksi Pekerjaan, IKDL

III/ IIIA

Line

Pekerjaan Penggantian kabel Power


Panel PJU.A (NYFGby 4 x 10
Marunda
334
346/MK-PBS/VI/2016
PT. KEC

PT. PBS
Elektrical

R.Tunggu
28-Jun-16
Instruksi Pekerjaan,

mm2 + NYA 6 mm2)


III/ IIIA

PT. KEC

PT. PBS
Mechanical

Supir

Marunda
335
Perapihan Bongkaran Loading 1
347/MK-PBS/VII/2016
20-Jul-16
NWH
Instruksi Pekerjaan,
III/ IIIA
Pekerjaan Penambahan Panel Pompa

dan Kabel Power Jetty


Marunda
Jetty Piping
336
348/MK-PBS/VI/I2016
25-Jul-16
PT. KEC

PT. PBS
Elektrical

Instruksi Pekerjaan,
Piping Line
III/ IIIA

Line

Marunda, 11 Agustus 2016


Marunda, 11 Agustus 2016
Prepared by :
Prepared by :
PT.Ketira Engineering Consultants
PT.Ketira Engineering Consultants

Page 15 of 15

You might also like