HANDOVER CERTIFICATE

Page: 1 of 1
Date: 24/11/03
Rev.: 1.0
CLIENT:

RD005 Project Handover Certificate

H.A.ONeil

CLIENT ADDRESS:
SITE:

The George Boutique Hotel, Limerick

JOB NUMBER:
PROJECT:
1.
2.
3.
4.

Waterways House, Grand Canal Quay, Dublin2

JN 3876

George Boutique Hotel BMS Controls System

Commissioning Certificate Passed:


Electrical Control Panel(s) Passed:
All Outstanding Items Completed:
All Commissioning Completed:

Certificate Passed
Certificate Passed
See Below
Complete

Outstanding Items: SF-101 Unit not operating - to be repaired by others


Outstanding items listed are projected to be completed by:
Items Handed Over:

MCC01/02/03 and BMS front-end graphics package

The above project has been inspected by the signatories of this certificate and is taken over on behalf of
the client as and from :
24-November-2006
The warranty period for the project expires on :

25-November-2007

Clients Signature: _______________

Manutec Ltd Signature:

Position: _______________________

Position: Project

Date: ___________________

Date: 24-November-2006

Manager