Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

FLSmidth Cross-Bar Cooler

Its the smart way to upgrade your cooler


to the new standard. With its modular
design, the FLSmidth Cross-Bar Cooler is
flexible enough to enable complete or
partial upgrades of most existing clinker
coolers.

More capacity, less expense

-
-
-
-
Standard units are preassembled in the
workshop to ensure high quality and fast,
easy, cost-effective installation.

Eliminate bottlenecks
Increase capacity and/or availability
Decrease operating costs
No fall through of clinker

Contact your FLSmidth representative


for an ROI calculation tailored to your
facility. Most plants show a return on
investment within less than three years.

Upgrade results at Capitol Aggregates, Texas


Before

After

FLSmidth CFG (Controlled Flow Grate)


cooler

FLSmidth Cross-Bar Cooler with ABC

Sloped cooler with 37.5 m2 grate area


designed for 1816 t/d

Horizontal cooler with 44.2 m2 grate

Standard cooler loss: 118 kcal/kgcl

Standard cooler loss: 96 kcal/kgcl

Tertiary air temperature: <700C


(separate take-off)

Tertiary air temperature: >900C

fixed inlet (8x61)

area (+18%) designed for 2000 t/d

(common kiln hood) while maintaining


similar secondary air temperature

Fan power consumption: high!

Project Centre Denmark


FLSmidth A/S
Vigerslev All 77
DK-2500 Valby
Copenhagen
Tel: +45 3618 1000
Fax: +45 3630 1820
E-mail: info@flsmidth.com

Fan power consumption: (-20%)

Project Centre USA


FLSmidth Inc.
2040 Avenue C
Bethlehem, PA 18017-2188
Tel: +1 610-264-6011
Fax: +1 610-264-6170
E-mail: info-us@flsmidth.com

The upgrade process


Since every project is unique, we
thoroughly study your existing equipment and operational process to
ensure the best solution. Typical steps
to the upgrade process encompass the
following:
- Install new grate/cross-bar units
with supporting structure below.
- Install a new Air-Blast Controlled
(ABC) fixed inlet.
- Install the required hydraulic drive
system and piping.
- Replace or upgrade the existing
cooling air fans, as necessary.
- Upgrade or install new PLC program
and supplementary electrical parts
and instrumentation.
The upper cooling casing (housing)
may or may not be reused, depending
on the existing coolers size and condition. The existing kiln firing hood and
clinker crusher will also be evaluated.
Cost-effective installation
Cooler upgrades can typically be
accomplished with a one- to two-week
extension of your yearly maintenance
outage. While the ROI calculation
differs for every plant, increased
production typically easily justifies the
shutdown. Request a customised ROI
calculation for details.

Project Centre India


FLSmidth Private Limited
FLSmidth House
34, Egatoor, Kelambakkam
(Rajiv Gandhi Salai, Chennai)
Tamil Nadu 603 103
Tel: +91-44-4748 1000
Fax: +91-44-2747 0301
E-mail: indiainfo@flsmidth.com

Copyright 2011 FLSmidth A/S. ALL RIGHTS RESERVED. FLSmidth is a (registered) trademark of FLSmidth A/S. This brochure makes no offers, representations
or warranties (express or implied), and information and data contained in this brochure are for general reference only and may change at any time.

www.flsmidth.com

C 01-11 400-3-ENG V2

When is an upgrade
appropriate?
Upgrading to the FLSmidth Cross-Bar
Coolers advanced clinker cooling
technology is worth considering if
you would like to:

You might also like