MIx Design

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 77

RINGKASAN HASIL PEMERIKSAAN BAHAN JALAN

NO

JENIS PEMERIKSAAN
3-5

SPLIT
1-2

ABU BATU

PASIR

SIRTU

TANAH

0,5 - 1

1 AYAKAN(% LOLOS)
2"
1 1/2"
1"
3/4"
1/2"
3/8"
4
8
10
16
30
40
50
100
200
2 BERAT ISI (GR/CC)
3 BERAT JENIS (GR/CC)
APPARENT
SSD
BULK
ABSORTION (%)
4 ABRATION TEST (%)
5 SAND EQUVALENT (%)
6 KEPIPIHAN
(%)
7 PEMADATAN BERAT
Komposisi Campuran
Dengan Perbandinagn Berat
Perbandingan Volume
PEMADATAN
Berat Jenis
D Max
(t/m3)
( ) Opt
( %)
ATTERBERG
Liquit Limit
(%)
Plastik Indeks
(%)
8 DESIGN CBR
CBR 100% D Max
Dengan Penetrasi 1 "
2"
9 MIX DESIGN (HOT MIX)
Komposisi Campuran
Kadar Aspal Optimun (%)
AGGREGATE
Split Ukuran 3 - 5
(%)
Split Ukuran 1 - 2
(%)
Split Ukuran 0,5-1
(%)
Abu Batu
Pasir
10 MARSHAL TEST
Density
(Gr/cc)
Stability
Kg
Flow
mm
Marshall Quotien Kg/mm
% Rongga Terhadap
Campuran (VIM)
% Rongga Terisi Aspal (VFB)
% Rongga Terisi AGREGAT (VFB)
% VIM Refusal

URUGAN

AC-BC

LPA

AC-BC

LPB

ASBP-BC

ASBP-WC

KETERANGAN

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB-44

DESIGN MIX FORMULA AC-WC


Estimate Design Binder Content :
Pb

0.035 (% CA) + 0.045 (%FA) + 0.18 (% Filler) + Constant

Proportion of Aggregate :
-

Crushed Stone 1-2


Dust Stone
Sand
Total Aggregate

=
=
=
=

###
###
###
###

%
%
%
%

Note :
Constanta AC = 0.5 - 1.0 %

RESULT TEST OF AGGREGATE COMBINED


Sieve Number
Agg. Combined

CA
FA
FF

=
=
=

Pb
Pb

=
=

100.00
#REF!
#REF!

I"
100

3/4"

1/2"

3/8"

#4

#8

#16

#30

#50

#200

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

###
###

=
=

###
###

0.035*67.02 + 0.045*27.60 + 0.18*5.39 + 0.75


#REF!
6.0 %

Result :
Variation of Wearing Content =

5.0 % , 5.5 % , 6.0 % , 6.5 % , 7.0 % and 7.5 %

Prepared and Tested by


Contractor,
Date
Sign.

Withnessed and Approved by


Consultant,
Date
Sign.

Name :

Name :

Withnessed and Approved by


Enginer Representative
Date
Sign.

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB-44

DESIGN MIX FORMULA AC-WC


Estimate Design Binder Content :
Pb

0.035 (% CA) + 0.045 (%FA) + 0.18 (% Filler) + Constant

Proportion of Aggregate :
-

Crushed Stone 1-2


Dust Stone
Sand
Total Aggregate

=
=
=
=

43.0
47.0
10.0
100.0

%
%
%
%

Note :
Constanta AC = 0.5 - 1.0 %

RESULT TEST OF AGGREGATE COMBINED


Sieve Number
Agg. Combined

CA
FA
FF

=
=
=

Pb
Pb

=
=

100.00
0.35
0.00

I"

3/4"

1/2"

3/8"

#4

#8

#16

#30

#50

#200

100

100

69.32

28.94

3.64

0.35

0.02

0.00

0.00

0.00

=
=

99.65
0.35

0.35
0.00

0.035*99.65+ 0.045*0.35 + 0.18*0 + 0.75


4.25
6.0 %

Result :
Variation of Wearing Content =

5.0 % , 5.5 % , 6.0 % , 6.5 % , 7.0 % and 7.5 %

Prepared and Tested by


Contractor,
Date
Sign.

Withnessed and Approved by


Consultant,
Date
Sign.

Name :

Name :

Withnessed and Approved by


Enginer Representative
Date
Sign.

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB-44

DESIGN MIX FORMULA AC-WC


Estimate Design Binder Content :
Pb

0.035 (% CA) + 0.045 (%FA) + 0.18 (% Filler) + Constant

Proportion of Aggregate :
-

Crushed Stone 1-2


Dust Stone
Sand
Total Aggregate

=
=
=
=

42.0
53.0
5.0
100.0

%
%
%
%

Note :
Constanta AC = 0.5 - 1.0 %

RESULT TEST OF AGGREGATE COMBINED


Sieve Number
Agg. Combined

CA
FA
FF

=
=
=

Pb
Pb

=
=

100.00
0.34
0.00

I"

3/4"

1/2"

3/8"

#4

#8

#16

#30

#50

#200

100

100

70.03

26.31

2.16

0.34

0.01

0.00

0.00

0.00

=
=

99.66
0.34

0.34
0.00

0.035*66.67 + 0.045*27.19 + 0.18*6.14 + 0.75


4.25
6.0 %

Result :
Variation of Wearing Content =

5.0 % , 5.5 % , 6.0 % , 6.5 % , 7.0 % and 7.5 %

Prepared and Tested by


Contractor,
Date
Sign.

Withnessed and Approved by


Consultant,
Date
Sign.

Name :

Name :

Withnessed and Approved by


Enginer Representative
Date
Sign.

Name :

ROAD BETTERMENT PROJECT


PEMELIHARAAN BERKALA JALAN MAJENE - MAMUJU
PACKAGE : 6 TAHUN ANGGARAN 2008

DESIGN MIX FORMULA AC-WC


Estimate Design Binder Content :
Pb

0.035 (% CA) + 0.045 (%FA) + 0.18 (% Filler) + Constant

Proportion of Aggregate :
-

Crushed Stone 1-2


Dust Stone
Sand
Total Aggregate

=
=
=
=

0.0
0.0
0.0
0.0

%
%
%
%

Note :
Constanta AC = 0.5 - 1.0 %

RESULT TEST OF AGGREGATE COMBINED


Sieve Number
Agg. Combined

CA
FA
FF

=
=
=

Pb
Pb

=
=

100.00
0.34
0.00

I"

3/4"

1/2"

3/8"

#4

#8

#16

#30

#50

#200

100

100

70.03

26.31

2.16

0.34

0.01

0.00

0.00

0.00

=
=

99.66
0.34

0.34
0.00

0.035*66.67 + 0.045*27.19 + 0.18*6.14 + 0.75


4.25
6.0 %

Result :
Variation of Wearing Content =

5.0 % , 5.5 % , 6.0 % , 6.5 % , 7.0 % and 7.5 %

Prepared and Tested by


Contractor,
Date
Sign.

Withnessed and Approved by


Consultant,
Date
Sign.

Name :

Name :

Withnessed and Approved by


Enginer Representative
Date
Sign.

Name :

ROAD BETTERMENT PROJECT


PEMELIHARAAN BERKALA JALAN MAJENE - MAMUJU
PACKAGE : 6 TAHUN ANGGARAN 2008

PROPERTIES OF HIGHT DURABILITY ASPHALT MIX


BY THE MARSHALL METHOD
Type of Mix

: Asphalt Concrete Binder Course (AC-BC)

Sp. Grafity of Bitumen

(T):

Bulk Spgr. of Total Agg.

( U ):

Pen. Grade of Bitumen

Effect. Spgr. of Total Agg.

(V):

Absorb. of Bitumen by Mix (W) :

% Bitumen Content

Volume

Bulk

Max.

% Total Volume

of

Spgr.

Spgr.

Effect.

of Total

Speci-

Comb.

Comb.

Asphalt

Mix

Mix

men

Mix

Mix

Spl.

by Wt.

Effective

No.

of Total

Weight Grams from Lab.

: 60/70

In Air

In Water

s.s.d

A- W(100-A)
100

E-D

C/F

H
100
100-A A
------- + --V
T

Lab. No.

Date of Test

Purpose

Location

Station

% Void

Agg.

Stability (Kg)

in

in

Asphalt

Mix

Agg.

Filled

(VIM)

(VMA)

(VFA)

Meas

Marshall

Adjust

Adjust

Flow

Quetien

Dial

Specimen

(mm)

Kg/mm

from
(B*G)/T

(100-A)G

100-I-J

I+K

(A*G)/T*100
(A*G)/T+L

Lab.

N*Clbr. O*Correc

Prepared and Tested by


Remark's :

Withnessed and Checked by

Contractor,
Date

Sign.

Name :

Withnessed and Approved by

Consultant,
Date

P
Q

Sign.

Name :

Engineer's Representative
Date

Sign.

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

PLOTING MARSHALL DATA FOR AC-BINDER COURSE

2.350

1400

DENSITY ( gr/cm3 )

2.345

STABILITY ( Kg )

1300

2.340
2.335

1200

2.330

1100

2.325

1000

2.320
2.315

900

2.310

800

2.305
2.300

700
4.0

4.5

5.0

5.5

6.0

6.5

7.0

4.0

7.5

4.5

5.0

Asphalt Content %

5.5

6.0

6.5

7.0

7.5

Asphalt Content %

600

FLOW ( mm )

QUOTIENT ( Kg/mm )

500

4
400

300

3
3

200

2
100

2
1

0
4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

4.0

4.5

5.0

Asphalt Content %

8.0

5.5

6.0

6.5

7.0

7.5

7.0

7.5

Asphalt Content %

19

VIM ( % )

VMA ( % )

18

7.0

17

6.0

16
5.0
15
4.0

14

3.0

13

2.0

12
4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

4.0

4.5

Asphalt Content %

100

5.0

5.5

6.0

6.5

Asphalt Content %

8.000

VFA ( % )

VIM REFUSAL ( % )

7.000

90

6.000
80

5.000

70

4.000
3.000

60

2.000
50

1.000

40

0.000
4.0

4.5

5.0

5.5

6.0

Asphalt Content %

6.5

7.0

7.5

4.0

4.5

5.0

5.5

6.0

Asphalt Content %

6.5

7.0

7.5

% Asp.

Dens.

VIM

4.5

2.320

7.253

4.9

5.9

14.993

14

58.124

63

933.071

800

5.0

2.335

5.972

4.9

5.9

14.899

14

65.337

63

1040.218

800

5.5

2.339

5.115

4.9

5.9

15.198

14

70.804

63

1093.791

800

6.0

2.343

4.254

4.9

5.9

15.497

14

76.115

63

1165.223

800

6.5

2.340

3.699

4.9

5.9

16.066

14

79.857

63

1200.938

800

7.0

2.334

3.243

4.9

5.9

16.717

14

82.930

63

1093.791

800

4.9

5.9

7.5

VMA

VFA

14

Stability

63

800

Flow

Quotient

Vim Refusal

3.130

323.963

200

3.450

309.393

200

5.271

2.5

3.750

296.870

200

4.208

2.5

3.650

364.636

200

0.920

2.5

3.583

344.113

200

2.5

4.167

263.036

200

2.5

200

2.5

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

PLOTING MARSHALL DATA FOR DESIGN MIX FORMULA AC-BC

2.350

1400

DENSITY ( gr/cm3 )

STABILITY ( Kg )

1300

2.345
2.340

1200

2.339

2.335

1100

2.330

1000

2.325

900

2.320

800

2.315

1115

700
4

4.5

5.5

6.5

7.5

4.0

4.5

5.0

Asphalt Content %

5.00

5.5

6.0

6.5

7.0

7.5

Asphalt Content %

600

FLOW ( mm )

4.50

QUOTIENT ( Kg/mm )

500

4.00
400

3.53

3.50

335
300

3.00
2.50

200

2.00
100

1.50
1.00

0
4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

4.0

4.5

5.0

Asphalt Content %

5.5

6.0

6.5

7.0

7.5

7.0

7.5

Asphalt Content %

19

VIM ( % )

VMA ( % )

18

17

16

5.39
5

15.38

15
4

14

13

12
4.0

4.5

5.0

5.5

6.0

6.5

7.0

7.5

4.0

4.5

5.0

Asphalt Content %

100

5.5

6.0

6.5

Asphalt Content %

VFA ( % )

VIM REFUSAL ( % )

90

6
80

70

69.34

3.69

60

2
50

40

0
4.0

4.5

5.0

5.5

6.0

Asphalt Content %

6.5

7.0

7.5

4.0

4.5

5.0

5.5

6.0

Asphalt Content %

6.5

7.0

7.5

% Asp.
VIM

Min
Max

4.5

5.0

5.16

5.45

7.253 5.972

5.5

5.75

5.115

6.0

6.5

7.0

7.5

4.254 3.699 3.243

4.9

4.9

4.9

4.9

4.9

4.9

4.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9
4.9
5.39

% Asp.

4.5

5.0

VMA

14.993

14.899

Min

14

14

5.45

15.38

2.35
2.315

% Asp. Dens.

4.5
5.0
5.45
5.5
6.0
6.5
7.0

2.320
2.335
2.339
2.339
2.343
2.340
2.334

5.5

6.0

6.5

7.0

15.198

15.497

16.066

16.717

14

14

14

14

7.5
14
% Asp.

4.5

VFA

58.124

Min

63

4.84

5.5

6.0

6.5

7.0

65.337

5.0

5.45

70.804

76.115

79.857

82.930

63

63

63

63

63

63
69.34

7.5
63
% Asp.

4.5

5.0

Stability

933.07

1040.22

Min

800

800

5.45

5.5

6.0

6.5

7.0

7.5

1093.79 1165.22 1200.94 1093.79


800
1115

800

800

800

800
% Asp.

4.5

5.0

Flow

3.13

3.45

Min

5.45

3.53

5.5

6.0

6.5

7.0

3.75

3.65

3.58

4.17

7.5
2
% Asp.
Quotient

Min

4.5

5.0

5.45

323.96 309.39
200

5.5

6.0

6.5

7.0

7.5

296.87 364.64 344.11 263.04

200

200
335

200

200

200

200
% Asp.
Vim Refusal
Vim

Min

4.5
Vim Refusal

5.0

5.45

5.5

5.73

6.0

6.5

7.0

4.25

3.70

3.24

2.5

2.5

2.5

5.27

4.21

0.92

7.25

5.97

5.11

2.5

2.5

2.5
2.5
3.69

7.5

2.5

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB-44

PRESENTATION OF DESIGN MIX FORMULA AC-BC


AND SELECTION BITUMENT CONTENT
Proportion of Aggregate :
-

Crushed Stone 1-2


Dust Stone
Sand
Total Aggregate

43.0
47.0
10.0
100.0

%
%
%
%

MIX PROPERTY

PERCENT BITUMENT CONTENT AND SPECIFICATION LIMIT


3.0

4.0

5.0

6.0

7.0

Marshall Stability
Marshall Flow
Marshall Quotient
Void Filled with Bitument (VFA)
Void in Mineral Aggregate (VMA)
Void in Mix (VIM)
VIM at Refusal Density

Remark's :
Bitument Content Design

Date

Prepared and Tested by


Contractor,
Sign.

Name :

5.45

Witnhnessed and Checked by


Consultant,
Date
Sign.

Name :

Withnessed and Approved by


Engineer Representative
Date
Sign.

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

SIEVE ANALYSIS TEST


AASHTO T.27 - 74

Ref. No.

: 005/LARA/LAB/JMF/23JUNI 2007

Location

: LABORATORIUM AMP LARA

Sampled by

: Jul

Description

: PASS 3/4" # 1/2" ( HOT BIN IV )

Wt. of sample =

Date : Mei, 18 th '2007

2657

gr.

Date Test

: Mei, 18 th '2007

Tested by

: Amri

Calculated by

: Nas
2482

Wt. of sample =

Sieve

Size

Individual

Accumulative

No.

mm

Wt. Ret.

Wt. Ret.

Ret.

(gr)

(gr)

Individual

Passing Average

Spec.

Accumulative

Wt. Ret.

Wt. Ret.

Ret.

(gr)

(gr)

1"

25.4

100

100

3/4"

19.00

0.00

100.00

100

0.00

1/2"

12.50

412

412

15.51

84.49

82.30

494

494

19.90

3/8"

9.50

432

844

31.77

68.23

67.86

313

807

32.51

#4

4.75

920

1764

66.39

33.61

33.63

840

1647

66.36

#8

2.36

#16

1.18

#30

0.60

#50

0.30

#200

0.075
2657

2657

100.00

0.00

0.00

2482

2482

100.00

Pan
100

#200

#50

#30

#16

#8

#4

0.075

0.30

0.60

1.18

2.36

4.75

3/8" 1/2

3/4

1"

90
80

PASSING ( % )

70
60
50
40
30
20
10
0

SIEVE SIZ E ( mm )

9.5 12.5 19.0 25.4

20
10
0

SIEVE SIZ E ( mm )

Date

Prepared and Tested by

Withnessed and Checked by

Withnessed and Approved by

Contractor,

Consultant,

Engineer's Representative

Sign.

Name :

Date

Sign.

Name :

Date

Sign.

Name :

: Mei, 18 th '2007

gr.
Accumulative
Passing
%
100
100.00
80.10
67.49
33.64

0.00

Comb. 1-2

1"

25.40

100.00

100

3/4"

19.00

100.00

100

1/2"

12.50

82.30

100

3/8"

9.50

67.86

100

#4

4.75

33.63

100

#8

2.36

0.00

100

#16

1.18

0.00

100

#30

0.60

0.00

100

#50

0.30

0.00

100

#200

0.08

0.00

100

d and Approved by

's Representative

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

SIEVE ANALYSIS TEST


AASHTO T.27 - 74

Ref. No.

: LAB/EIB-44/V - 03/11

Location

: Stock AMP Plan 2 Anabanua

Sampled by

: Chandra

Description

: Dust Stone

Wt. of sample =

1000

Date : May, 04th '2003

gr.

Date Test

: May, 05th '2003

Tested by

: Chandra

Calculated by

: Hadrawi
1000

Wt. of sample =

Sieve

Size

Individual

Accumulative

Individual

No.

mm

Wt. Ret.

Wt. Ret.

Ret.

(gr)

(gr)

1"

25.4

100

100

3/4"

19.00

100

1/2"

12.50

100

3/8"

9.50

100

100

#4

4.75

13

13

1.30

98.70

98.55

16

16

1.60

Passing Average

Spec.

Accumulative

Wt. Ret.

Wt. Ret.

Ret.

(gr)

(gr)

100

100

#8

2.36

108

121

12.10

87.90

86.10

141

157

15.70

#16

1.18

336

457

45.70

54.30

55.40

278

435

43.50

#30

0.60

100

557

55.70

44.30

40.40

200

635

63.50

#50

0.30

158

715

71.50

28.50

27.85

93

728

72.80

#200

0.075

112

827

82.70

17.30

16.15

122

850

85.00

173

1000

100.00

0.00

0.00

150

1000

100.00

Pan
100

#200

#50

#30

#16

#8

#4

0.075

0.30

0.60

1.18

2.36

4.75

3/8" 1/2

3/4

1"

90
80

PASSING ( % )

70
60
50
40
30
20
10
0

SIEVE SIZ E ( mm )

9.5 12.5 19.0 25.4

10
0

SIEVE SIZ E ( mm )

Date

Prepared and Tested by

Withnessed and Checked by

Withnessed and Approved by

Contractor,

Consultant,

Engineer's Representative

Sign.

Name :

Date

Sign.

Name :

Date

Sign.

Name :

: May, 05th '2003


: Chandra
: Hadrawi
gr.
Accumulative
Passing
%
100
100
100
100
98.40
84.30
56.50
36.50
27.20
15.00
0.00

Comb. Dust

1"

25.40

100.00

100

3/4"

19.00

100.00

100

1/2"

12.50

100.00

100

3/8"

9.50

100.00

100

#4

4.75

98.55

100

#8

2.36

86.10

100

#16

1.18

55.40

100

#30

0.60

40.40

100

#50

0.30

27.85

100

#200

0.08

16.15

100

d and Approved by

's Representative

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

SIEVE ANALYSIS TEST


AASHTO T.27 - 74

Ref. No.

: LAB/EIB-44/V - 03/12

Location

: Ex. Bila River ( Barukku )

Sampled by

: Chandra

Description

: Sand

Wt. of sample =

1000

Date : May, 04th '2003

gr.

Date Test

: May, 05th '2003

Tested by

: Chandra

Calculated by

: Hadrawi
1000

Wt. of sample =

Sieve

Size

Individual

Accumulative

Individual

No.

mm

Wt. Ret.

Wt. Ret.

Ret.

(gr)

(gr)

1"

25.4

100

100

3/4"

19.00

100

1/2"

12.50

100

3/8"

9.50

11

11

1.10

98.90

99.00

#4

4.75

50

61

6.10

93.90

94.50

Passing Average

Spec.

Accumulative

Wt. Ret.

Wt. Ret.

Ret.

(gr)

(gr)

100

100

0.90

40

49

4.90

#8

2.36

55

116

11.60

88.40

87.70

81

130

13.00

#16

1.18

231

347

34.70

65.30

61.75

288

418

41.80

#30

0.60

100

447

44.70

55.30

51.75

100

518

51.80

#50

0.30

329

776

77.60

22.40

23.25

241

759

75.90

#200

0.075

194

970

97.00

3.00

2.80

215

974

97.40

30

1000

100.00

0.00

0.00

26

1000

100.00

Pan
100

#200

#50

#30

#16

#8

#4

0.075

0.30

0.60

1.18

2.36

4.75

3/8" 1/2

3/4

1"

90
80

PASSING ( % )

70
60
50
40
30
20
10
0

SIEVE SIZ E ( mm )

9.5 12.5 19.0 25.4

10
0

SIEVE SIZ E ( mm )

Date

Prepared and Tested by

Withnessed and Checked by

Withnessed and Approved by

Contractor,

Consultant,

Engineer's Representative

Sign.

Name :

Date

Sign.

Name :

Date

Sign.

Name :

: May, 05th '2003


: Chandra
: Hadrawi
gr.
Accumulative
Passing
%
100
100
100
99.10
95.10
87.00
58.20
48.20
24.10
2.60
0.00

Comb. Sand

1"

25.40

100.00

100

3/4"

19.00

100.00

100

1/2"

12.50

100.00

100

3/8"

9.50

99.00

100

#4

4.75

94.50

100

#8

2.36

87.70

100

#16

1.18

61.75

100

#30

0.60

51.75

100

#50

0.30

23.25

100

#200

0.08

2.80

100

d and Approved by

's Representative

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

SPECIFIC GRAVITY AND ABSORPTION


OF COARSE AGGREGATE
AASHTO T.84 - 88

Ref. No.
Location
Sampled by
Description

:
:
:
:

LAB/EIB-44/V - 03/10
Stock Pile AMP Plant 2 Anabanua
Chandra
Date : May, 04th' 2003
Crush Stone 1-2 cm

II

gr

648

742

gr

658

755

gr

412

472

gr/cc

2.634

2.622

2.628

gr/cc

2.675

2.668

2.671

A/(A-C)

gr/cc

2.746

2.748

2.747

(B-A)/A*100

1.543

1.752

1.648

Weight of dry sample in air

Wt. of sample s.s.d. condition

Wt. of saturated sampel in water


Bulk Specific Gravity

Remark's :

A/(B-C)

Bulk Specific Gravity s.s.d. basis

Absorption

: May, 07th '03


: Chandra
: Hadrawi

TEST NO.

Apparent Specific Gravity

Date test
Tested by
Calculated by

B/(B-C)

AVERAGE

Prepared and Tested by


Date

Contractor,
Sign.

Name :

Withnessed and Checked by


Date

Consultant,
Sign.

Name :

Withnessed and Approved by


Engineer's Representative
Date
Sign.

Name :

: May, 07th '03


: Chandra
: Hadrawi

AVERAGE

2.628
2.671
2.747
1.648

and Approved by

Representative

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

SPECIFIC GRAVITY AND ABSORPTION


OF FINE AGGREGATE
AASHTO T.84 - 88

Ref. No.
Location
Sampled by
Description

:
:
:
:

LAB/EIB-44/V - 03/11
Stock Pile AMP Plant 2 Anabanua
Chandra
Date : May, 04th' 2003
Dust Stone

TEST NO.

Wt. of sample s.s.d. condition

Date test
Tested by
Calculated by

II

gr

500

500

Weight of dry sample in air

gr

488.7

488

Wt. of pic. + water

gr

672.6

678.2

gr/cc

983.8

989.6

A/(B+500-C)

gr/cc

2.588

2.587

500/(B+500-C)

gr/cc

2.648

2.651

A/(B+A-C)

gr/cc

2.753

2.763

(500-A)/A*100

2.312

2.459

Wt. of pic. + sample + water in air


Bulk Specific Gravity
Bulk Sp. Gravity s.s.d. basis
Apparent Specific Gravity
Absorption
Remark's :

Prepared and Tested by


Date

Contractor,
Sign.

Name :

Withnessed and Checked by


Date

Consultant,
Sign.

Name :

Withnessed and Approved by


Engineer's Representative
Date
Sign.

Name :

: May, 07th' 2003


: Chandra
: Hadrawi

AVERAGE

2.588
2.650
2.758
2.386

hnessed and Approved by

ngineer's Representative

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

SPECIFIC GRAVITY AND ABSORPTION


OF FINE AGGREGATE
AASHTO T.84 - 88

Ref. No.
Location
Sampled by
Description

:
:
:
:

LAB/EIB-44/V - 03/12
Stock Pile AMP Plant 2 Anabanua
Chandra Date : May, 04th' 2003
Sand

TEST NO.

Wt. of sample s.s.d. condition

Date test
Tested by
Calculated by

II

gr

500

500

Weight of dry sample in air

gr

489

490

Wt. of pic. + water

gr

672.6

678.2

gr/cc

984.9

989.2

A/(B+500-C)

gr/cc

2.605

2.593

500/(B+500-C)

gr/cc

2.664

2.646

A/(B+A-C)

gr/cc

2.767

2.737

(500-A)/A*100

2.249

2.041

Wt. of pic. + sample + water in air


Bulk Specific Gravity
Bulk Sp. Gravity s.s.d. basis
Apparent Specific Gravity
Absorption
Remark's :

Prepared and Tested by


Date

Contractor,
Sign.

Name :

Withnessed and Checked by


Date

Consultant,
Sign.

Name :

Withnessed and Approved by


Engineer's Representative
Date
Sign.

Name :

: May, 07th' 2003


: Chandra
: Hadrawi

AVERAGE

2.599
2.655
2.752
2.145

hnessed and Approved by

ngineer's Representative

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

UNIT WEIGH

FLOWING

AASTHO T.19 - 74

RODDING

Ref. No.

LAB/EIB-44/V - 03/10

Location

Stock Pile AMP Plant 2 Anabanua

Date test

: May, 07th' 2003

Sampled by

Chandra

Tested by

: Chandra

Description

Crush Stone 1-2 cm

Calc. by

: Hadrawi

Date : May, 04th '2003

TEST NO.

Weight of mould

gr

8069

8069

Weight of sample + mould

gr

12757

12754

C = B-A

gr

4688

4685

cc

3092.5

3092.5

E = C/D

gr/cc

1.516

1.515

Weight of sample
Volume Mould
Unit Weight
Void Content

= {(F*G)-E}/(F-G)*1

Bulk Spgr.

Unit Weight of water

Average Voids

AVERAGE

1.515

Table.2 Dimention of Measures Metric System


Capacity

Date

Inside Diameter

Inside Height

Thick of metal min. (mm)

Size of Agg.

Litre

( mm )

( mm )

Bottom

Wall

Max. (mm)

155 + 2

160 + 2

5.0

2.5

12.5

10

205 + 2

305 + 2

5.0

2.5

25.0

15

255 + 2

295 + 2

5.0

3.0

40.0

30

355 + 2

305 + 2

5.0

3.0

100

Prepared and Tested by

Withnessed and Checked by

Witnessed and Approved by

Contractor,

Consultant,

Engineer's Representative

Sign.

Date

Sign.

Date

Sign.

Name :

Name :

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

UNIT WEIGH

FLOWING

AASTHO T.19 - 74

RODDING

Ref. No.

LAB/EIB-44/V - 03/11

Location

Stock Pile AMP Plant 2 Anabanua

Date test

: May, 07th' 2003

Sampled by

Chandra

Tested by

: Chandra

Description

Dust Stone

Calc. by

: Hadrawi

Date : May, 04th '2003

TEST NO.

Weight of mould

gr

7758

7758

Weight of sample + mould

gr

11811

11887

C = B-A

gr

4053

4129

cc

3092.5

3092.5

E = C/D

gr/cc

1.311

1.335

Weight of sample
Volume Mould
Unit Weight
Void Content

= {(F*G)-E}/(F-G)*1

Bulk Spgr.

Unit Weight of water

Average Voids

AVERAGE

1.323

Table.2 Dimention of Measures Metric System


Capacity

Date

Inside Diameter

Inside Height

Thick of metal min. (mm)

Size of Agg.

Litre

( mm )

( mm )

Bottom

Wall

Max. (mm)

155 + 2

160 + 2

5.0

2.5

12.5

10

205 + 2

305 + 2

5.0

2.5

25.0

15

255 + 2

295 + 2

5.0

3.0

40.0

30

355 + 2

305 + 2

5.0

3.0

100

Prepared and Tested by

Withnessed and Checked by

Witnessed and Approved by

Contractor,

Consultant,

Engineer's Representative

Sign.

Date

Sign.

Date

Sign.

Name :

Name :

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

UNIT WEIGH

FLOWING

AASTHO T.19 - 74

RODDING

Ref. No.

LAB/EIB-44/V - 03/12

Location

Stock Pile AMP Plant 2 Anabanua

Date test

: May, 07th' 2003

Sampled by

Chandra

Tested by

: Chandra

Description

Sand

Calc. by

: Hadrawi

Date : May, 04th '2003

TEST NO.

Weight of mould

gr

7758

7758

Weight of sample + mould

gr

12043

12386

C = B-A

gr

4285

4628

cc

3092.5

3092.5

E = C/D

gr/cc

1.386

1.497

Weight of sample
Volume Mould
Unit Weight
Void Content

= {(F*G)-E}/(F-G)*1

Bulk Spgr.

Unit Weight of water

Average Voids

AVERAGE

1.441

Table.2 Dimention of Measures Metric System


Capacity

Date

Inside Diameter

Inside Height

Thick of metal min. (mm)

Size of Agg.

Litre

( mm )

( mm )

Bottom

Wall

Max. (mm)

155 + 2

160 + 2

5.0

2.5

12.5

10

205 + 2

305 + 2

5.0

2.5

25.0

15

255 + 2

295 + 2

5.0

3.0

40.0

30

355 + 2

305 + 2

5.0

3.0

100

Prepared and Tested by

Withnessed and Checked by

Witnessed and Approved by

Contractor,

Consultant,

Engineer's Representative

Sign.

Date

Sign.

Date

Sign.

Name :

Name :

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

RESISTANCE TO ABRATION
by use the Los Angeles Machine
ASSTHO T.96 - 87

Ref. No.

: LAB/EIB-44/V - 03/10

Location

: Stock Pile AMP Plant 2 Anabanua

Date Test

: May, 09th' 2003

Sampled by

: Chandra

Tested by

: Lab. Badoka

Description

: Crush Stone 1-2 cm

Date : May, 04th ' 2003

Calculated by : Lab. Badoka

SIEVE NO.

WEIGHT OF SAMPLE ( gr )

Passing

Retained

1 "

1"

1250

1"

3/4"

1250

3/4"

1/2"

1250

2500

1/2"

3/8"

1250

2500

3/8"

1/4"

1/4"

#4

2500

#4

#8

2500

5000

5000

5000

5000

5000

12

11

Total Weight
Ball Nos

SAMPLE NO.

Wt. of sample (before)

5000

gr

5000

gr

Wt. of sample (after)

4095

gr

4227

gr

18.10

15.46

Value = (A-B)/A*100
AVERAGE

Prepared and Tested by

16.78

Withnessed and Checked by

Contractor,
Date

II

Sign.

Consultant,
Date

Sign.

Withnessed and Approved by


Engineer's Representative
Date

Sign.

Name :

Name :

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

SPECIFIC GRAVITY AND ABSORPTION


OF AGGREGATE COMBINED FOR AC-WC

Ref. No.
Location
Sampled by

: LAB/EIB-44/V - 03/13
: Stock Pile AMP Plant 2 Anabanua
: Chandra
Date : May, 04th' 2003

Description

: Crush 1-2 =
: Dust
=
=
: Sand
=
=

MATERIAL

12.00
16.00
38.50

Date test
Tested by
Calculated by

%
%
%

COMBINED

BULK SP.GR.
OVEN DRY

SP. GRAVITY
SSD

SP. GRAVITY
APPARENT

(%)

( gr/cc )

( gr/cc )

( gr/cc )

12.00

2.628

2.671

2.747

Dust Stone

16.00

2.588

2.650

2.758

Sand

38.50

2.599

2.655

2.752

Combined Value

66.50

3.912

3.995

4.140

1
Crush Stone 1-2

Remark's :
-

Efective Specific Gravity


(2.607+2.753)/2
Absorption (2.680-2.607)/(2.680*2.607)*1.037*100

=
=

4.026
0.749

Prepared and Tested by


Date

Contractor,
Sign.

Name :

Withnessed and Checked by


Date

Consultant,
Sign.

Name :

Withnessed and Approved by


Date

Engineer Representative
Sign.

Name :

: May, 08th '03


: Chandra
: Hadrawi

ABSORPTION
(%)
6
1.648
2.386
2.145

3.131

essed and Approved by

gineer Representative

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

SIEVE ANALYSIS OF
ASPHALT CONCRETE WEARING COURSE (AC-WC)
Ref. No.

: LAB/EIB-44/IX-03/14

Location

: Stock Pile AMP Plant 2 Anabanua

Date Test

: May, 06th' 2003

Sampled by

: Chandra

Tested by

: Chandra

Description

: Grading Combined for AC-WC

Calc.

: Sahnun

Date : Mayt, 04th '2003

SIEVE

SIZE

NO.

mm

Agg. 1-2

Dust

Sand

Agg. 1-2

Dust

Sand

RESULT

3/4"

19.00

100.00

100

100

43.00

47.00

10.00

100.00

100

1/2"

12.50

28.64

100

100

12.32

47.00

10.00

69.32

90-100

3/8"

9.50

0.71

40

100.00

0.31

18.63

10.00

28.94

Max. 90

#4

4.75

0.00

1.16

31.01

0.00

0.54

3.10

3.64

#8

2.36

0.00

0.54

0.99

0.00

0.25

0.10

0.35

28-58

#16

1.18

0.00

0.00

0.21

0.00

0.00

0.02

0.02

#30

0.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#50

0.30

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#200

0.075

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4-10

100

MODIFIED / MIX DESIGN

#200

#50

#30

#16

#8

#4

0.075

0.30

0.60

1.18

2.36

4.75

COMBINED

3/8 1/2

3/4 1"

90
80

PASSING (%)

70
60
50
40
30
20
10
0
9.5 12.5 19.0 25

SIEVE SIZE (mm )

MIX OF DECISION MIX DESIGN PERCENT AND COMBINED GRAD


NO.
1

KIND OF MATERIAL
CRUSH 1-2

: 25.4

2.36

MIX DESIGN PERCENT (%)


mm

43.0

SPEC.

DUST

: 9.50

0.075 mm

47.0

SAND

: 12.5

0.075 mm

10.0

Prepared and Tested by

Witnessed and Checked by

Contractor,
Date

Sign.

Name :

Consultant,
Date

Sign.

Name :

Withnessed and Approved by


Engineer's Representative
Date

Sign.

Name :

ay, 06th' 2003

ENT (%)

SPEC.

100
90-100
Max. 90
28-58
4-10
comb.

Spec

Restriction Zone

Fuller

1"

25.40

100

3/4"

19.00 ###

100

1/2"

12.50 69.32

100

3/8"

9.50 28.94

100

#4

4.75 3.64

100

#8

2.36 0.35

100

39.1

39.1

39.10

#16

1.18 0.02

100

25.6

31.6

28.60

#30

0.60 0.00

100

19.1

23.1

21.10

0.30 0.00

100

15.5

15.5

15.50

0.075 0.00

100

#50
#200

100 100
90

100.00

100

82.80

90

73.20
53.60

28

58

10

8.30

ed and Approved by

r's Representative

100.0

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

SPECIFIC GRAVITY AND ABSORPTION


OF AGGREGATE COMBINED FOR AC-WC

Ref. No.
Location
Sampled by

: LAB/EIB-44/V - 03/13
: Stock Pile AMP Plant 2 Anabanua
: Chandra
Date : May, 04th' 2003

Description

: Crush 1-2 =
: Dust
=
=
: Sand
=
=

MATERIAL

43.00
47.00
10.00

Date test
Tested by
Calculated by

%
%
%

COMBINED

BULK SP.GR.
OVEN DRY

SP. GRAVITY
SSD

SP. GRAVITY
APPARENT

(%)

( gr/cc )

( gr/cc )

( gr/cc )

43.00

2.628

2.671

2.747

Dust Stone

47.00

2.588

2.650

2.758

Sand

10.00

2.599

2.655

2.752

Combined Value

100.00

2.606

2.659

2.753

1
Crush Stone 1-2

Remark's :
-

Efective Specific Gravity


(2.606+2.753)/2
Absorption (2.679-2.606)/(2.679*2.606)*1.037*100

=
=

2.679
1.089

Prepared and Tested by


Date

Contractor,
Sign.

Name :

Withnessed and Checked by


Date

Consultant,
Sign.

Name :

Withnessed and Approved by


Date

Engineer Representative
Sign.

Name :

: May, 08th '03


: Chandra
: Hadrawi

ABSORPTION
(%)
6
1.648
2.386
2.145

1.982

essed and Approved by

gineer Representative

Name :

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

SIEVE ANALYSIS OF
ASPHALT CONCRETE WEARING COURSE (AC-WC)
Ref. No.

: LAB/EIB-44/IX-03/15

Location

: Stock Pile AMP Plant 2 Anabanua

Date Test

: May, 06th' 2003

Sampled by

: Chandra

Tested by

: Chandra

Description

: Grading Combined for AC-WC

Calc. by

: Sahnun

Date : Mayt, 04th '2003

SIEVE

SIZE

NO.

mm

Agg. 1-2

Dust

Sand

Agg. 1-2

Dust

Sand

RESULT

3/4"

19.00

100.00

100

100

42.00

53.00

5.00

100.00

100

1/2"

12.50

28.64

100

100

12.03

53.00

5.00

70.03

90-100

3/8"

9.50

0.71

40

100.00

0.30

21.01

5.00

26.31

Max. 90

#4

4.75

0.00

1.16

31.01

0.00

0.61

1.55

2.16

#8

2.36

0.00

0.54

0.99

0.00

0.29

0.05

0.34

28-58

#16

1.18

0.00

0.00

0.21

0.00

0.00

0.01

0.01

#30

0.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#50

0.30

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#200

0.075

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4-10

100

MODIFIED / MIX DESIGN

#200

#50

#30

#16

#8

#4

0.075

0.30

0.60

1.18

2.36

4.75

COMBINED

3/8 1/2

3/4 1"

90
80

PASSING (%)

70
60
50
40
30
20
10
0
9.5 12.5 19.0 25

SIEVE SIZE (mm )

MIX OF DECISION MIX DESIGN PERCENT AND COMBINED GRAD


NO.
1

KIND OF MATERIAL
CRUSH 1-2

: 25.4

2.36

MIX DESIGN PERCENT (%)


mm

42.0

SPEC.

DUST

: 9.50

0.075 mm

53.0

SAND

: 12.5

0.075 mm

5.0

Prepared and Tested by

Witnessed and Checked by

Contractor,
Date

Sign.

Name :

Consultant,
Date

Sign.

Name :

Withnessed and Approved by


Engineer's Representative
Date

Sign.

Name :

ay, 06th' 2003

ENT (%)

SPEC.

100
90-100
Max. 90
28-58
4-10
comb.

Spec

Restriction Zone

Fuller

1"

25.00

100

3/4"

19.00 ###

100

1/2"

12.50 70.03

100

3/8"

9.50 26.31

100

#4

4.75 2.16

100

#8

2.36 0.34

100

39.1

39.1

39.10

#16

1.18 0.01

100

25.6

31.6

28.60

#30

0.60 0.00

100

19.1

23.1

21.10

0.30 0.00

100

15.5

15.5

15.50

0.075 0.00

100

#50
#200

100 100
90

100.00

100

82.80

90

73.20
53.60

28

58

10

8.30

ed and Approved by

r's Representative

100.0

ROAD BETTERMENT PROJECT


PANGKAJENE SIDRAP - ANABANUA - PALOPO
PACKAGE : EIB - 44

SPECIFIC GRAVITY AND ABSORPTION


OF AGGREGATE COMBINED FOR AC-WC

Ref. No.
Location
Sampled by

: LAB/EIB-44/V - 03/13
: Stock Pile AMP Plant 2 Anabanua
: Chandra
Date : May, 04th' 2003

Description

: Crush 1-2 =
: Dust
=
=
: Sand
=
=

MATERIAL

42.00
53.00
5.00

Date test
Tested by
Calculated by

%
%
%

COMBINED

BULK SP.GR.
OVEN DRY

SP. GRAVITY
SSD

SP. GRAVITY
APPARENT

(%)

( gr/cc )

( gr/cc )

( gr/cc )

42.00

2.628

2.671

2.747

Dust Stone

53.00

2.588

2.650

2.758

Sand

5.00

2.599

2.655

2.752

Combined Value

100.00

2.605

2.659

2.753

1
Crush Stone 1-2

Remark's :
-

Efective Specific Gravity


(2.605+2.753)/2
Absorption (2.679-2.605)/(2.679*2.605)*1.037*100

=
=

2.679
1.100

Prepared and Tested by


Date

Contractor,
Sign.

Name :

Withnessed and Checked by


Date

Consultant,
Sign.

Name :

Withnessed and Approved by


Date

Engineer Representative
Sign.

Name :

: May, 08th '03


: Chandra
: Hadrawi

ABSORPTION
(%)
6
1.648
2.386
2.145

1.998

essed and Approved by

gineer Representative

Name :

You might also like