Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

CEEC FRESHMAN GROUP CONTRACT

Members
James L. Baker
Samone A

Course / Block
Intro to Engineering design 4th period

Project Title

Trash to Treasure

Task / Member Responsible / Due Date


Use only readily-available recyclable materials
The product must be useful (that is, not be an artistic sculpture,
decoration, etc.)
A minimum of three items must be used
The product can be either an invention or innovation to an existing
technology.
Next Tuesday

Group Constitution
Stay on task
No dumb ideas
Stay prepared

Article I: Absence Policy


Refer back to the timeline

Article II: Work Policy


Work together to complete the same task

Article III: Leadership


There is no specific leader, we both make decisions together

Article IV: Work Ethic


Work efficiently to complete task

Article V: Member Dismissal


Whomever is able to work on assignment is responsible for completion.

Article VI: Signatures


By signing this contract, the following group members abide to the
articles above. If any member fails to abide by the articles of this
contract, they may be removed from the group.
Member 01 Samone Alexander
Member 02 James Baker

CEEC FRESHMAN GROUP CONTRACT

Signature: Samone Alexander


Signature: James Baker

You might also like