Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9

MRP Element

00 MPS MRP ;
01
02
03
04
06
07
10
15
20
30

42
51 BOM
52 BOM BOM
62
64
96
98

MRP
Stock
SafeSt
SLockSt
CustSt

CCsgmt
ProjSt
SubcSt
BtchSt
/BtSLoc
QM-lot
PldOrd
PldOrd
PrdOrd
POConf
PrcOrd
PMOrdr
NtwOrd
PurRqs
POitem
SA SchLne
JITJITCll
JIT JIT-DS
ForcDS
ShpgNt
WMSTrnReq
SfyReq
DepReq
SimReq
SimReq
SimReq
TotReq
SubReq
IndReq
CusReq
CusReq
ForReq
UnplRq

PRqRel
RelOrd
ScAgDS
PlORel
MtlRes
OrdRes
StTRes
TrnRes
RFQuot
Quottn
CusOrd
SD SchAgr
SD SA-ESP
Contrc
FOCDly
Delvry
RetDly

GdRcpt
GIssue
----->
----->
----->
----->
----->
----->

-----------------------------


69BOM
02
05

03
06
63

04
07
64 63

01
42
44 BOM
46
61
62
80
82

50 BOM BOM
52 BOM BOM
53 BOM 52
55BOM BOM

25

26

40
56 MRP/MPS
56
57
58
59
70 70
96

10

15

20
30

98

MRP
Six character description which stands for the corresponding MRP element and which describes this
element in greater detail. MPR
You can change this short text in Customizing for MRP, or for Consumption-Based Planning, in the IMG
activity Check Texts for the MRP element MPR IMG

The following MRP elements can exist, for example: MPR


Description of MRP element MPR Key
Plant stock Stock
Safety stock / SafeSt
Storage location stock SLocSt
Individual customer stock CustSt
Consignment stock for customer (availability check)

CCsgmt
Project stock ProjSt
Stock with subcontractor SubcSt

Batch stock BtchSt


Batch/storage location stock BtSLoc
Inspection lot for quality management

QM-lot
Planned order PldOrd
Simulation order PldOrd
Production order PrdOrd
Confirmation / POConf
Process order PrcOrd
Maintenance order PMOrdr
Network order NtwOrd
Purchase requisition PurRqs
Purchase order item POitem
SA schedule line SchLne
JIT call JIT / JITCll
JIT delivery schedule JIT JIT-DS
Forecast delivery schedule ForcDS
Shipping notification ShpgNt
Transfer requirements WMSWMS / TrnReq
Safety requirement SfyReq
Dependent requirement DepReq
Sim. dependent reqmt SimReq
Simulation requirement SimReq
Simulated requirement from availability check

SimReq
Total requirements TotReq
Subcontractor requirements of material provided

SubReq
Planned independent requirement IndReq
Customer independent requirement CusReq
External sales order CusReq
Forecast requirement ForReq
Unplanned requirement UnplRq
Release order for a stock transfer requisition / PRqRel
Release order for a stock transfer order RelOrd
Release order for stock transport scheduling agreement

ScAgDS
Release order for stock transfer planned order PlORel

Reservation / MtlRes
Dependent reservation OrdRes
Reservation in another plant

StTRes
Stock transfer reservation

TrnRes
Request for quotation RFQuot
Quotation Quottn
Order CusOrd
SD scheduling agreement SchAgr
SD scheduling agreement; external service agent SA-ESP
Contract / Contrc
Delivery w/o charge FOCDly
Delivery / Delvry
Returns (availability check)) RetDly
Returns item Return
Goods receipt GdRcpt
Goods issue GIssue
Planning / ----->
Direct production ----->
End of planning time fence ----->
Gross requirements planning ----->
End replenishment period ----->
Effective-out date ----->
1 Stock
2 SafeSt(safety stock)
3 PrdOrd(production order)
4 IndReq(planned independent requirement)
5 PldOrd(planned order):
6 PRqRel(release order for a stock transfer requisition)
7 Schedule line

MRP MRP
WB Stock
FE PrdOrd
PA PldOrd
PP IndReq
SH SafeSt

U2 PRqRel
LK SubcSt
BA PurRqs
LE SchLne
BB SubReq
AR OrdRes

MRP
schedule line: : ,.:
1No Scheduling line
Outline Agreement(Contract & Schedule Line), MRP ,
Schedule Line Planned Order.
2Schedule Line in the opening period
Outline Agreement(Contract & Schedule Line), MRP ,
Open period Schedule Line, Planned order.
3Schedule Line
Outline Agreement(Contract & Schedule Line), MRP ,
Schedule line

schedule line, contract

RUN MRP ,, RUN MPS ,


,,,
,.(!) ,
: yuanhang27@saphome.net,!

SCHEDULE line planned order

planed order schedule line ,:


planed order , planed ordr pr , pr po.
,planed order po. schedule line , po,

Schedule Line: ()
1. or Contract ( )
2. schedule agreement( )
3. schedule Line ( ) PO
PP & MM , PP RUN MRP , MM Material Master MM
,

You might also like