YEE ooresrcorcanons
FA BOOM
Angle lttice allay steel construction, with pin joints. Open
throat with four Doom point sheaves on ant-ticton-bea-
rings of bottom diameter 610 rm
10 part boom host reeving standard for all haom lengths.
Maximum Rated LOB aeons nsenee 75,000
“319.67 m operating radius
Basic Boom Length
Boom Upper .. 9.14 m 0)
Drum Shaft Assembly
UningGrane [Cable [Cave | Line | Line
nine Ga | Gapacty | Puts | Speads
Pre gia ‘stra
nm tom | sm | a | rom
FRONT og | 2 | sase | verso | 49
FEAR bs | 20 | was | wren | ae
‘Line pulls and speeds based én first layer of rope
‘ongine at ful load speed
Boom Lower 610 m 204) Ground Pressure
Operating Wear... 7880 kg
{quipped with 75 ferne capacty ue
hook and 71.6 tone counter weight sare
Boom Inserts sansnee 3 m (10 fA) Optional o.5¢no/sqem.
6 m (20) Optional
Heok Block
Angle lattice aloy stool construction,
75 toe 4 sheave with swivel hook
and 8 part host line Standard HS erie ee beeb:
i 10m DAY
Weight of Hook Block Assembly with 4 sheave
ie stamaan®
Jib Hock Block Weight uu. 900 kg
This hook biock assembly can be converted to @ sheave or 5
2 dheave of sng sheave by using requited spacers. Gaesety me
. ‘MAXIMUM JIB RATINGS
Hoist Reeving and Hook Block Assembly
‘Ofiset angie 810m s44m
tebeom ib iio
No.of a Pane: 1 lene eee
Sheaves | une fltloac ko so
necteee |e | o [a | 2 | 1 = 6350 ‘5895
tite 10 125 5670
re 75,000 | 68,040 | 45,960 | 22,680 | 11,340 | 18" (max) 5895 5445,
‘Sib ratings at any operating radius are the seme as Crane
Hoowaiecs | es | coma | 720 | ons Tatings srown in ‘able for msin boom when operated at that
* Note: Use 171.6 kg cheek plate
radius but not to exceed maximum jb ratings shown. Maxi-
‘mum jb operating raduus not to exceed lanath of main boom
‘on which itis being used.RATED CRANE LOADS IN KG (AS PER IS 4573)
Opening | tsa0m | ve20m | exam | arson | z2aim | coven | sesim | saaen | w20rm | asta
Tats’ | toon | town | toon | boom | oom’ | “room Sor | oe | ae | Soe
se | 20] = ~
scr | eaves | ideo = |
cio | soso | sass iis z :
yee | bose | Sass Bes
ate ‘ye00s | 9000 veuso | eas | ta120 wo] — | “on
Gs | ts | (e ee | ies | ies | 1S | i | ae | wae | =
tes | toras | tasao | fasts | testo | tam | toaro ioe | ttre | tis90 | tie’o
Hare | Maxo | tres | tron | tonos | tesco | toage tons | ‘one | ‘ores | "onan
tex | ‘seas | ‘ooae | ‘ase | ‘ooas | “seus | ‘008 ee | oes | exo | ores
970 = | ges | erao | eos | szo | rors rr | 70 | Yass | 7080
1823 > | fees | 550 | fons | Seto | os tees | Gsm | ces | oi
sat me | Gee | Geo | eens | bio eso | Sis | Seto | Sore
na co | mt | tate | Simo | sie | sro fire | soe | sooo | stor
base : feo | ans | doo fre | feo | Sea0 | Ses
~ | | S|
z= das | ano | 2aes
= bas | iaeo | irae
es | 200
NOTE
(@) Ratings are as per
1S 4973, ie, 79% of
{ping lad fr forward
iapitty and. 79% for
backward stability.
() Capacities include the
weight of the hook
block, sings, etc.
(6) Capacities are for mac
ine standing on firm,
level uniiorm support
ing surtace and depend
upon
the mounting,
Ground. boom length,
radius of operation and
proper handling: all of
which must be taken
into account by the
user,
(@) Deduct 680 kg tor
6.10m jib and 910 kg
for 9.14miib.
CAUTION
Machine must pot be used
{or liting operations with the
gantry in lowered position.Main Boom Construction
lee Boom Construction Grane cn corer |
50! a> same:
= same
= ss same
80’