Professional Documents
Culture Documents
Construction Specification 252-Clearing and Grubbing: 1. Scope
Construction Specification 252-Clearing and Grubbing: 1. Scope
1. Scope
Theworkconsistsofclearing,grubbing,anddisposingoftrees,snags,logs,brush,stumps,
shrubs,andrubbishfromthedesignatedareas.
2. Protectionofexistingvegetation
Treesandothervegetationdesignatedtoremainundisturbedshallbeprotectedfromdamage
throughoutthedurationoftheconstructionperiod.Anydamagesresultingfromthecontractor's
operationsorneglectshallberepairedorreplacedbythecontractor.
3. Marking
Thelimitsofthearea(s)tobeclearedandgrubbedwillbemarkedbystakes,flags,treemarkings,
orothersuitablemethods.Treestobeleftstandinganduninjuredwillbedesignatedbyspecial
markingsthatareconducivetopreventinginjurytothetreeandshallbeplacedonthetrunk
about6feetabovethegroundsurface.
4. Clearingandgrubbing
Alltreesnotmarkedforpreservationandallsnags,logs,brush,stumps,shrubs,rubbish,and
similarmaterialsshallbeclearedfromwithinthelimitsofthedesignatedareas.Unless
otherwisespecified,allstumps,roots,androotclustersthathaveadiameterof1inchorlarger
shallbegrubbedouttoadepthofatleast2feetbelowsubgradeforconcretestructuresand1foot
belowthegroundsurfaceatembankmentsitesandotherdesignatedareas.
5. Disposal
Allmaterialsclearedandgrubbedfromthedesignatedareasshallbedisposedofatlocations
shownonthedrawingsorinamannerspecifiedinsection7.Thecontractorisresponsiblefor
complyingwithalllocalrulesandregulationsandthepaymentofanyandallfeesthatmayresult
fromdisposalatlocationsawayfromtheprojectsite.
6. Measurementandpayment
Compensationforanyitemofworkdescribedinthecontract(butnotlistedinthebidschedule)
willbeincludedinthepaymentfortheitemofworktowhichitismadesubsidiary.Suchitems
andtheitemstowhichtheyaremadesubsidiaryareidentifiedinsection7.
7. Itemsofworkandconstructiondetails
Itemsofworktobeperformedinconformancewiththisspecificationandtheconstructiondetails
are:
Subsidiary Item - Clearing and Grubbing
(1) This item shall consist of clearing, grubbing, and disposing of materials from the
construction site as designated on the drawings or as staked in the field.
*OPTIONA
(2) All woody debris is to be buried in waste areas shown on the drawings. Debris may be
chipped, ground, or burned prior to being buried. Materials to be disposed of by
NRCSApril17,2007
KS*
252-1
NRCSApril17,2007
KS*
252-2