Professional Documents
Culture Documents
Pembangunan Gedung Terminal Tahap I - Bandar Udara Mopah, Merauke 6-Sep-16
Pembangunan Gedung Terminal Tahap I - Bandar Udara Mopah, Merauke 6-Sep-16
ITEM PEKERJAAN
SAT
VOLUME
JUMLAH
BOBOT
(%)
KONTRAK
A
B
1.1
1.2
1.3
1.4
1.4.1
1.4.2
1.5
2
2.1
2.2
Pekerjaan Persiapan
427,061,000.00
Pekerjaan Struktur
38,128,387,946.80
0.67%
JUMLAH
BOBOT (%)
427,061,000.00
59.47%
11,300,595,879.18
3,196,972,800.00
1,062,633,600.00
8,803,200.00
196,595,200.00
4.99%
1.66%
0.01%
0.31%
3024.00
2940.00
168.00
16.00
m3
m3
m3
kg
kg
m2
m3
m3
127.88
57.95
59.94
5,106.09
3,360.97
216.72
6.66
3.33
13,427,400.00
4,520,100.00
156,996,406.44
71,781,413.22
47,248,516.26
44,004,996.00
7,932,060.00
5,094,567.00
0.02%
0.01%
0.24%
0.11%
0.07%
0.07%
0.01%
0.01%
m3
m3
m3
kg
kg
kg
m2
m3
m3
753.38
338.22
349.64
31,846.96
2,348.84
12,880.93
1,744.20
43.68
21.84
79,104,900.00
26,381,160.00
915,786,178.64
447,704,563.68
33,019,992.72
181,080,113.94
390,875,220.00
52,022,880.00
33,413,016.00
0.12%
0.04%
1.43%
0.70%
0.05%
0.28%
0.61%
0.08%
0.05%
m3
m3
kg
m2
m3
m3
21.53
2.15
169.54
3.10
0.86
0.43
2,260,650.00
5,631,335.90
2,383,393.32
868,465.00
1,024,260.00
657,857.00
0.00%
0.01%
0.00%
0.00%
0.00%
0.00%
m3
kg
m2
7.75
631.79
62.00
20,299,001.50
8,881,703.82
17,369,300.00
0.03%
0.01%
0.03%
631.79
62.00
m3
kg
kg
m2
6.25
382.89
226.56
50.00
16,370,162.50
5,382,667.62
3,184,980.48
14,007,500.00
0.03%
0.01%
0.00%
0.02%
6.25
127.63
75.52
25.00
1,690,705,668.96
11,362,884.00
658,561,570.76
23,746,800.00
2.64%
0.02%
1.03%
0.04%
67.85
6.76
1507.74
28.27
328,482,521.64
313,693,585.92
21,394,307.88
95,523,547.68
304,223,723.50
365,742,216.00
52,491,937.00
800,000.00
5,505,280.00
9,099,720.00
2,848,750.00
50,503,672.00
0.51%
0.49%
0.03%
0.15%
0.47%
0.57%
0.08%
0.00%
0.01%
0.01%
0.00%
0.08%
678.48
40.56
9046.41
226.16
3,196,972,800.00
1,033,116,000.00
8,803,200.00
196,595,200.00
4.99%
1.61%
0.01%
0.31%
127.88
57.95
59.94
3126.127
2016.582
216.72
6.52
3.37
13,427,400.00
4,520,100.00
156,996,406.44
43,947,097.42
28,349,109.76
44,004,996.00
7,763,718.11
5,159,981.70
0.02%
0.01%
0.24%
0.07%
0.04%
0.07%
0.01%
0.01%
7.99
6.97
423.20
224.06
14.14
0.75
0.38
85.82
0.00
49.86
9725.59
704.65
3864.28
318.12
19.72
9.86
9,010,774.50
130,592,323.09
136,722,390.39
9,905,997.82
54,324,034.18
71,289,907.65
23,481,940.61
15,081,780.97
0.01%
53.81
0.20%
0.21%
0.02%
0.08%
0.11%
0.04%
0.02%
46.62
2972.38
219.23
1202.22
232.56
5.82
2.91
PEKERJAAN LANTAI 2
PELAT LANTAI
1. Beton k - 300
2. Pekerjaan bekisting
3. Besi 10
m3
m2
kg
493.45
3,564.09
54,757.60
1,229,629,041.90
998,479,813.50
769,782,340.80
1.92%
1.56%
1.20%
KOLOM
1. Beton k - 300
2. Besi D. 16
3. Besi D. 13
4. Besi 10
5. Bekisting
6. Pipa 10,5", t = 6,5 mm
7. Grouting
8. Plat t = 16 mm
9. Base Plat t = 12 mm
10. Stiffner t = 10 mm
11. Angkur 19
12. zincromate
m3
kg
kg
kg
m2
kg
bh
kg
kg
kg
kg
kg
76.72
5,500.93
3,369.60
5,203.54
802.44
27,420.12
48.00
1,899.07
1,436.17
1,186.92
1,025.54
31,942.29
191,178,721.44
77,332,073.94
47,369,836.80
73,151,365.32
162,935,442.00
792,441,468.00
4,800,000.00
43,678,610.00
33,031,910.00
29,673,000.00
14,417,041.32
121,380,702.00
0.30%
0.12%
0.07%
0.11%
0.25%
1.24%
0.01%
0.07%
0.05%
0.05%
0.02%
0.19%
BALOK
1. Beton k - 300
2. Besi D. 22
3. Besi D. 13
4. Besi 10
5. Bekisting
m3
kg
kg
kg
m2
444.94
64,625.77
3,308.14
20,935.63
2,390.90
1,108,746,875.88
908,509,074.66
46,505,832.12
294,313,086.54
535,800,690.00
1.73%
1.42%
0.07%
0.46%
0.84%
m3
m2
kg
25.49
209.24
3,046.15
63,518,581.98
58,618,586.00
42,822,776.70
0.10%
0.09%
0.07%
2.7
BALOK
1. Beton k - 300
2. Besi D. 13
3. Besi 10
4. Bekisting
m3
kg
kg
kg
14.05
1,607.39
691.10
140.51
35,011,223.10
22,596,688.62
9,715,483.80
31,488,291.00
0.05%
0.04%
0.02%
0.05%
2.8
PEKERJAAN ATAP
ATAP TR - 1
1. Pipa 8,5", t = 6 mm
2. Pipa 6", t = 6 mm
3. Pelat t = 16 mm
4. Baut HTB 19
5. Zincromate
kg
kg
kg
bh
kg
172,229.65
333,344.55
13,425.60
2,808.00
518,999.81
4,977,436,885.00
9,633,657,495.00
308,788,800.00
70,200,000.00
1,972,199,278.00
ATAP TR - 6
1. Pipa 8,5", t = 6 mm
2. Pipa 6", t = 6 mm
3. Pelat t = 16 mm
4. Baut HTB 19
5. Zincromate
kg
kg
kg
bh
kg
30,441.49
7,587.41
3,172.16
672.00
41,201.05
879,759,061.00
219,276,149.00
72,959,680.00
16,800,000.00
156,563,990.00
1.37%
0.34%
0.11%
0.03%
0.24%
ATAP TR - 5
1. Pipa 10", t = 6,5mm
2. Pipa 6", t = 6 mm
3. Pelat t = 16 mm
4. Baut HTB 19
5. Zincromate
kg
kg
kg
bh
kg
18,534.11
2,711.42
1,144.44
512.00
19,678.55
535,635,779.00
78,360,038.00
26,322,120.00
12,800,000.00
74,778,490.00
0.84%
0.12%
0.04%
0.02%
0.12%
ATAP TR - 2
Pipa 4", t = 6 mm
Pelat t = 16 mm
Baut HTB 19
Zincromate
kg
kg
bh
kg
8,977.69
1,001.39
448.00
9,979.07
259,455,241.00
28,940,171.00
11,200,000.00
37,920,466.00
0.40%
0.05%
0.02%
0.06%
2.5
2.6
678,344,364.39
3,024.00
3,024.00
168.00
16.00
m3
kg
kg
kg
m2
kg
kg
bh
kg
kg
kg
kg
2.4
17.63%
m'
m'
bh
ttk
131.82
22314.24
1521.86
6794.96
1498.27
12655.44
1816.33
8.00
239.36
395.64
113.95
13290.44
64,110,219,254.19
7.76%
15.03%
0.48%
0.11%
3.08%
100.00%
4689.67
226.26
2297.23
149.83
9694.00
181.63
65,927,424.23
3,180,713.69
32,294,416.60
30,422,372.35
280,156,600.00
5,249,193.70
-
2.15
3.10
0.10%
0.00%
0.05%
0.05%
0.44%
0.01%
27000.00
170000.00
4,913,000,000.00
-
11,727,656,879.18
2789.28
190.23
2215.07
780,300,000.00
-
JUMLAH
BOBOT (%)
REALISASI
BOBOT (%)
VOLUME
1.22%
7.66%
18.29%
JUMLAH
427,061,000.00
KOLOM
1. Beton k - 300
2. Besi D. 22
3. Besi D. 16
4. Besi 10
5. Bekisting
6. Pipa 10,5", t = 6,5 mm
7. Pipa 6", t = 6 mm
8. Grouting
9. Base Plat t = 12 mm
10. Stiffner t = 10 mm
11. Angkur 19
12. zincromate
2.3
0.67%
623,350
18,267,894
5,949,378
3,149,901
2,871,533
897,347
576,344
5,650,350
122,104,824
41,785,759
3,081,866
16,900,811
52,116,696
6,936,384
4,455,069
5,631,336
868,465
8,881,704
17,369,300
16,370,163
1,794,223
1,061,660
7,003,750
169,070,567
1,893,814
109,760,262
2,968,350
39,211,698
2,674,288
8,417,279
678,344,364.39
1.06%
41,984,189.78
30.00
0.0010%
0.0285%
0.0093%
0.0049%
0.0045%
0.0014%
0.0009%
0.0088%
804.11
0.14
14.79
0.1905%
0.0652%
0.0048%
0.0264%
0.0813%
0.0108%
0.0069%
10.77
0.0088%
0.0014%
0.0139%
0.0271%
0.0255%
0.0028%
0.0017%
0.0109%
0.2637%
0.0030%
0.1712%
0.0046%
0.0612%
0.0042%
852.67
377.00
0.0131%
1.06%
10,542,000
11,304,136
168,342
1,552,688
1,130,325
11,986,804
5,299,895
41,984,189.78
0.07%
0.0164%
0.0176%
0.0003%
0.0024%
0.0018%
0.0187%
0.0083%
0.07%
11,342,580,068.97
3,024.00
2,970.00
168.00
16.00
127.88
57.95
59.94
3,930.23
2,016.58
216.72
6.66
3.37
100.60
49.86
9,725.59
704.65
3,864.28
318.12
19.72
9.86
10.77
5,542.34
226.26
2,674.23
149.83
9,694.00
181.63
27,000.00
170,000.00
-
3,196,972,800
1,043,658,000
8,803,200
196,595,200
13,427,400
4,520,100
156,996,406
55,251,233
28,349,110
44,004,996
7,932,060
5,159,982
10,563,462
130,592,323
136,722,390
9,905,998
54,324,034
71,289,908
23,481,941
15,081,781
1,130,325
77,914,229
3,180,714
37,594,312
30,422,372
280,156,600
5,249,194
780,300,000
4,913,000,000
11,769,641,068.97
BOBOT (%)
RENCANA
JUMLAH
BOBOT (%)
0.67%
17.69%
740,858,760.33
4.99%
1.63%
0.01%
0.31%
0.02%
0.01%
0.24%
0.09%
0.04%
0.07%
0.01%
0.01%
0.02%
0.20%
0.21%
0.02%
0.08%
0.1112%
0.0366%
0.0235%
7.99
53.81
56.37
46.62
2972.38
219.23
1202.22
232.56
5.82
2.91
3.88
67.85
6.76
1507.74
28.27
0.12%
0.00%
0.06%
0.05%
0.44%
0.01%
1.22%
7.66%
18.36%
21.97
2789.28
190.23
1698.74
337.11
623,350
5,650,350.00
4,396,860.00
122,104,823.82
41,785,759.28
3,081,865.99
16,900,810.63
52,116,696.00
6,936,384.00
4,455,068.80
10,149,500.75
169,070,566.90
1,893,814.00
109,760,261.79
2,968,350.00
54,747,086.94
39,211,698.24
2,674,288.49
23,880,886.92
68,450,337.79
740,858,760.33
1.16%
0.00%
0.01%
0.01%
0.19%
0.07%
0.00%
0.03%
0.08%
0.01%
0.01%
0.02%
0.26%
0.00%
0.17%
0.00%
0.09%
0.06%
0.00%
0.04%
0.11%
1.16%
KETERANGAN