Download as pdf or txt
Download as pdf or txt
You are on page 1of 29

Citywide Congested

Corridors Project
Church Avenue
McDonald Avenue to Utica Avenue
November 10th, 2009
Study Goals and Objectives

 Reduce vehicular congestion and improve air


quality, mobility and safety to enhance the
quality of life for all users (vehicle, transit,
pedestrians, bicyclists) who live, work and
shop in the study area.

 Bring the various stakeholders together in


identifying problems and building consensus
on potential solutions.

2
Project Status

Data Data Existing Future Without Draft Draft Report Final


Collection Evaluation Condition Improvement Recommendations after PAC Draft Final Report
Plan Analysis Condition feedback
Analysis Report

Start Public
1st PAC Community 2nd PAC
November Meeting 2nd 3rd
Meeting Walk- Meeting
2007 #1 Public Public Meeting
through
Meeting November 10,
February June 4, April 15, 2009
27, 2008 June 19, 2009
2008 May 18,
2008
2009

3
Areas of Assessment

 Traffic Analysis
 Land Use & Zoning
 Demographics
 Pedestrian
 Safety
 Transit
 Parking
 Goods Movement

4
General Corridor
Wide Improvement
Measures

15
Pedestrian Safety
 Upgrade markings
 Upgrade or repair pedestrian ramps
 Construct pedestrian refuge islands
 Increase bus stop length to eliminate
bus queuing in crosswalks
 Relocate and install bus shelters and
relocate bus stops to provide better
access
 Install “Yield to Pedestrian” signs at
various intersections
 Install Leading Pedestrian Intervals
(LPI’s) some intersections

16
Traffic Congestion
 Optimize traffic signal timing for smoother progression
and coordination to improve operations and reduce
aggressive behavior due to excessive delays
 Increase bus stop lengths to accommodate two buses
simultaneously and minimize bus spillback into
crosswalks and intersections

17
Traffic Congestion

 Prohibit left turns from side streets


 Ocean, Bedford and Utica Avenues

 Improves traffic flow and reduces delays


 Reduces congestion without removing parking spaces
 Increases pedestrian safety by reducing vehicle conflict
opportunities
 Decreases potential of vehicular accidents

18
Parking

 Initiate a ParkSmart pilot program to increase


parking utilization
 Install muni-meters
 Identify delivery zone windows for commercial
parking regulation
 Church Avenue BID Example:
 How many days a week are deliveries made?
 How many deliveries are made in a day?
 What time of day are deliveries made?
 Where do trucks park while making deliveries?

19
Site Specific
Improvement
Measures

20
Church Avenue at
McDonald Avenue &
Beverly Road
 Install new bus shelters on both
sides of Church Avenue
 Install bulbouts and pedestrian
ramps
 Narrow Beverly Road with
wider sidewalks and bulbouts
that normalize the intersection
 Restriping of crosswalks, stop
bars and other pavement
markings
 Signal timing changes and
offset optimizations

21
Church Avenue at
Ocean Parkway
 Provide raised pedestrian refuge
island and median extension
 Install pedestrian signals
 Install pavement markings to
discourage illegal left turns from
the southbound service road
 Upgrade No Turn signs on
Northbound Ocean Parkway.
Install No Left Turn sign on
Southbound Service, add “Yield
to Pedestrian” signs at all
approaches
 Restriping of crosswalks, stop
bars and other pavement
markings
 Signal timing and offset changes
22
Coney Island Avenue at
Church Avenue and
Albemarle Road
 Add a northbound protected left
turn phase
 Install bulbouts and pedestrian
ramps
 New traffic pattern with “Right
Turns In Only” at Albemarle
Road from Coney Island Avenue
 Install quick curb on Coney
Island Avenue to prevent left
turns at Albemarle Road and
carwash
 Restriping of crosswalks, stop
bars and other pavement
markings
 Offset optimizations
23
Church Avenue at
East 18th Street

 Install LPI’s on Church Avenue


 Increase west crosswalk width
to 20’
 Move eastbound bus stop 10’
west from new stop bar
 Restriping of crosswalks, stop
bars and other pavement
markings

24
Church Avenue at
Ocean Avenue
 Prohibit southbound left turns on
to Church Avenue
 Provide raised pedestrian refuge
island
 Install northbound left turn bays
on Ocean Avenue
 Day-lighting
 Restriping of crosswalks, stop
bars and other pavement
markings
 Signal timing changes and offset
optimizations

25
Church Avenue at
Flatbush Avenue &
E. 21st Street
 Install “don’t Block the Box” sign
with appropriate striping on 21st
Street intersection
 Install north and southbound left
and right turn bays on Flatbush
Avenue
 Provide metered parking on south
curb of Church Ave between
Flatbush and East 21st Street
 Restriping of crosswalks, stop
bars and other pavement
markings
 Signal timing changes and offset
optimizations
26
Separation of left, through
and right turn movements on
Flatbush Avenue to prevent
turning vehicles from
blocking traffic while waiting
for a gap

Dedicated lanes for parking


Parking Lane will be 16 feet wide on
both sides of the street

PROPOSAL
27
Church Avenue at
Bedford Avenue

 Prohibit northbound and


southbound left turns on to
Church Avenue (weekday
AM/PM Peaks only)
 Relocate existing bus shelter
near to the existing bus stop
sign. Replace it with a new bus
shelter
 Restriping of crosswalks, stop
bars and other pavement
markings
 Signal timing changes and offset
optimizations

28
Church Avenue at
Rogers Avenue

 Extend far side bus stop by 50


feet to accommodate two
simultaneous stopped buses
 Install new bus shelter

29
Church Avenue at
Nostrand Avenue

 Relocate bus stops from far side


to near side on both Church
Avenue approaches
 Construct bus pads and install
buss shelters
 Restriping of crosswalks, stop
bars and other pavement
markings
 Signal timing changes and offset
optimizations

30
Church Avenue at
New York Avenue
 Remove parking from the
northbound and southbound
curbside to facilitate right
turn
 Relocate northbound far side
bus shelter and replace it
with new shelter.
 Install new bus shelter on
the far side of eastbound
approach
 Installation of “Yield to
Pedestrian” signs
 Restriping of crosswalks,
stop bars and other
pavement markings
 Signal timing changes and
offset optimizations 31
Church Avenue at
Utica Avenue
 Prohibit northbound and
southbound left turns on to
Church Avenue
 Installation of a new large
size bus shelter on the
northbound far side
 Installation of “Yield to
Pedestrian” signs
 Restriping of crosswalks,
stop bars and other
pavement markings
 Signal timing changes and
offset optimizations

32
Corridor Wide New Pedestrian Ramp
Installation Map

PROJECT STUDY
AREA (WEST)

PROPOSED PEDESTRIAN RAMP INSTALLATION LOCATIONS

33
Corridor Wide New Pedestrian Ramp
Installation Map
N

PROJECT STUDY
AREA (EAST)

PROPOSED PEDESTRIAN RAMP INSTALLATION


LOCATIONS

34
Anticipated Benefits
 Delays Reduction

DELAYS COMPARISON BETWEEN FUTURE WITHOUT IMPROVEMENTS DELAYS COMPARISON BETWEEN FUTURE WITHOUT IMPROVEMENTS
AND 2017 ALTERNATE-A IMPROVEMENTS WITH SPECIFIC AND 2017 ALTERNATE-A IMPROVEMENTS WITH SPECIFIC
INTERSECTION CHANGES (EASTBOUND) INTERSECTION CHANGES (WESTBOUND)

600 600
DELAY (SECONDS)

DELAY (SECONDS)
500 500

400 400

300 300

200 200

100 100

0 0
AM PEAK MIDDAY PEAK PM PEAK SATURDAY MIDDAY AM PEAK MIDDAY PEAK PM PEAK SATURDAY MIDDAY
TIME PERIOD TIME PERIOD

FUTURE WITHOUT IMPROVEMENT 2017 FUTURE WITHOUT IMPROVEMENT 2017


2017 ALTERNATE-A IMPROVEMENTS (SPECIFIC INTERSECTION CHANGES) 2017 ALTERNATE-A IMPROVEMENTS (SPECIFIC INTERSECTION CHANGES)

 Speed Improvements
ARTERIAL SPEED COMPARISON BETWEEN FUTURE WITHOUT ARTERIAL SPEED COMPARISON BETWEEN FUTURE WITHOUT
IMPROVEMENTS AND 2017 ALTERNATE-A IMPROVEMENTS WITH IMPROVEMENTS AND 2017 ALTERNATE-A IMPROVEMENTS WITH
SPECIFIC INTERSECTION CHANGES (EASTBOUND) SPECIFIC INTERSECTION CHANGES (WESTBOUND)

10 10
ARTERIAL SPEED

ARTERIAL SPEED
8 8
(MILES/HOUR)

(MILES/HOUR)
6 6

4 4

2 2

0 0
AM PEAK MIDDAY PEAK PM PEAK SATURDAY MIDDAY AM PEAK MIDDAY PEAK PM PEAK SATURDAY MIDDAY
TIME PERIOD TIME PERIOD

FUTURE WITHOUT IMPROVEMENT 2017 FUTURE WITHOUT IMPROVEMENT 2017


2017 ALTERNATE-A IMPROVEMENTS (SPECIFIC INTERSECTION CHANGES) 2017 ALTERNATE-A IMPROVEMENTS (SPECIFIC INTERSECTION CHANGES)

35
Anticipated Benefits
 Air Quality Results

Comparison of Emissions Rate Summaries at all Peak Time


Periods
Emissions Rates (Kilograms/Hour)
30.00

25.00

20.00

15.00

10.00

5.00

0.00
NOX

NOX

NOX

NOX
CO

CO

CO

CO
VOC

VOC

VOC

VOC
AM PEAK MIDDAY PEAK PM PEAK SATURDAY MIDDAY
Contaminants & Time Periods

FUTURE WITHOUT IMPROVEMENT 2017


2017 ALTERNATE-A IMPROVEMENTS (SPECIFIC INTERSECTION CHANGES)

 Parking Improvements

 Installation of muni-meters, initiation of ParkSmart pilot program will increase the curb side
parking between 80 to 100 additional vehicular spaces

36
Alternate Proposal
 Peak Direction Parking Regulation Modifications
 AM Peak (7:30 AM to 9:30 AM): Creating two peak direction travel
lanes in the westbound direction by westbound curbside parking
restrictions
 PM Peak (4:30 PM to 6:30 PM): Creating two peak direction travel
lanes in the eastbound direction by eastbound curbside parking
restrictions
 Curbside parking space removal (AM peak = 333, PM Peak = 241)

37
Next Steps

 Review Public Meeting Comments


 Final Report (Spring/Summer 2010)

38
QUESTIONS AND
COMMENTS
http://www.nyc.gov/html/dot/html/motorist/churchave.shtml