Project Status
Start Public
1st PAC Community 2nd PAC
November Meeting 2nd 3rd
Meeting Walk- Meeting
2007 #1 Public Public Meeting
through
Meeting November 10,
February June 4, April 15, 2009
27, 2008 June 19, 2009
2008 May 18,
2008
2009
3
Areas of Assessment
Traffic Analysis
Land Use & Zoning
Demographics
Pedestrian
Safety
Transit
Parking
Goods Movement
4
General Corridor
Wide Improvement
Measures
15
Pedestrian Safety
Upgrade markings
Upgrade or repair pedestrian ramps
Construct pedestrian refuge islands
Increase bus stop length to eliminate
bus queuing in crosswalks
Relocate and install bus shelters and
relocate bus stops to provide better
access
Install “Yield to Pedestrian” signs at
various intersections
Install Leading Pedestrian Intervals
(LPI’s) some intersections
16
Traffic Congestion
Optimize traffic signal timing for smoother progression
and coordination to improve operations and reduce
aggressive behavior due to excessive delays
Increase bus stop lengths to accommodate two buses
simultaneously and minimize bus spillback into
crosswalks and intersections
17
Traffic Congestion
18
Parking
19
Site Specific
Improvement
Measures
20
Church Avenue at
McDonald Avenue &
Beverly Road
Install new bus shelters on both
sides of Church Avenue
Install bulbouts and pedestrian
ramps
Narrow Beverly Road with
wider sidewalks and bulbouts
that normalize the intersection
Restriping of crosswalks, stop
bars and other pavement
markings
Signal timing changes and
offset optimizations
21
Church Avenue at
Ocean Parkway
Provide raised pedestrian refuge
island and median extension
Install pedestrian signals
Install pavement markings to
discourage illegal left turns from
the southbound service road
Upgrade No Turn signs on
Northbound Ocean Parkway.
Install No Left Turn sign on
Southbound Service, add “Yield
to Pedestrian” signs at all
approaches
Restriping of crosswalks, stop
bars and other pavement
markings
Signal timing and offset changes
22
Coney Island Avenue at
Church Avenue and
Albemarle Road
Add a northbound protected left
turn phase
Install bulbouts and pedestrian
ramps
New traffic pattern with “Right
Turns In Only” at Albemarle
Road from Coney Island Avenue
Install quick curb on Coney
Island Avenue to prevent left
turns at Albemarle Road and
carwash
Restriping of crosswalks, stop
bars and other pavement
markings
Offset optimizations
23
Church Avenue at
East 18th Street
24
Church Avenue at
Ocean Avenue
Prohibit southbound left turns on
to Church Avenue
Provide raised pedestrian refuge
island
Install northbound left turn bays
on Ocean Avenue
Day-lighting
Restriping of crosswalks, stop
bars and other pavement
markings
Signal timing changes and offset
optimizations
25
Church Avenue at
Flatbush Avenue &
E. 21st Street
Install “don’t Block the Box” sign
with appropriate striping on 21st
Street intersection
Install north and southbound left
and right turn bays on Flatbush
Avenue
Provide metered parking on south
curb of Church Ave between
Flatbush and East 21st Street
Restriping of crosswalks, stop
bars and other pavement
markings
Signal timing changes and offset
optimizations
26
Separation of left, through
and right turn movements on
Flatbush Avenue to prevent
turning vehicles from
blocking traffic while waiting
for a gap
PROPOSAL
27
Church Avenue at
Bedford Avenue
28
Church Avenue at
Rogers Avenue
29
Church Avenue at
Nostrand Avenue
30
Church Avenue at
New York Avenue
Remove parking from the
northbound and southbound
curbside to facilitate right
turn
Relocate northbound far side
bus shelter and replace it
with new shelter.
Install new bus shelter on
the far side of eastbound
approach
Installation of “Yield to
Pedestrian” signs
Restriping of crosswalks,
stop bars and other
pavement markings
Signal timing changes and
offset optimizations 31
Church Avenue at
Utica Avenue
Prohibit northbound and
southbound left turns on to
Church Avenue
Installation of a new large
size bus shelter on the
northbound far side
Installation of “Yield to
Pedestrian” signs
Restriping of crosswalks,
stop bars and other
pavement markings
Signal timing changes and
offset optimizations
32
Corridor Wide New Pedestrian Ramp
Installation Map
PROJECT STUDY
AREA (WEST)
33
Corridor Wide New Pedestrian Ramp
Installation Map
N
PROJECT STUDY
AREA (EAST)
34
Anticipated Benefits
Delays Reduction
DELAYS COMPARISON BETWEEN FUTURE WITHOUT IMPROVEMENTS DELAYS COMPARISON BETWEEN FUTURE WITHOUT IMPROVEMENTS
AND 2017 ALTERNATE-A IMPROVEMENTS WITH SPECIFIC AND 2017 ALTERNATE-A IMPROVEMENTS WITH SPECIFIC
INTERSECTION CHANGES (EASTBOUND) INTERSECTION CHANGES (WESTBOUND)
600 600
DELAY (SECONDS)
DELAY (SECONDS)
500 500
400 400
300 300
200 200
100 100
0 0
AM PEAK MIDDAY PEAK PM PEAK SATURDAY MIDDAY AM PEAK MIDDAY PEAK PM PEAK SATURDAY MIDDAY
TIME PERIOD TIME PERIOD
Speed Improvements
ARTERIAL SPEED COMPARISON BETWEEN FUTURE WITHOUT ARTERIAL SPEED COMPARISON BETWEEN FUTURE WITHOUT
IMPROVEMENTS AND 2017 ALTERNATE-A IMPROVEMENTS WITH IMPROVEMENTS AND 2017 ALTERNATE-A IMPROVEMENTS WITH
SPECIFIC INTERSECTION CHANGES (EASTBOUND) SPECIFIC INTERSECTION CHANGES (WESTBOUND)
10 10
ARTERIAL SPEED
ARTERIAL SPEED
8 8
(MILES/HOUR)
(MILES/HOUR)
6 6
4 4
2 2
0 0
AM PEAK MIDDAY PEAK PM PEAK SATURDAY MIDDAY AM PEAK MIDDAY PEAK PM PEAK SATURDAY MIDDAY
TIME PERIOD TIME PERIOD
35
Anticipated Benefits
Air Quality Results
25.00
20.00
15.00
10.00
5.00
0.00
NOX
NOX
NOX
NOX
CO
CO
CO
CO
VOC
VOC
VOC
VOC
AM PEAK MIDDAY PEAK PM PEAK SATURDAY MIDDAY
Contaminants & Time Periods
Parking Improvements
Installation of muni-meters, initiation of ParkSmart pilot program will increase the curb side
parking between 80 to 100 additional vehicular spaces
36
Alternate Proposal
Peak Direction Parking Regulation Modifications
AM Peak (7:30 AM to 9:30 AM): Creating two peak direction travel
lanes in the westbound direction by westbound curbside parking
restrictions
PM Peak (4:30 PM to 6:30 PM): Creating two peak direction travel
lanes in the eastbound direction by eastbound curbside parking
restrictions
Curbside parking space removal (AM peak = 333, PM Peak = 241)
37