Professional Documents
Culture Documents
M Faris Naufal 03031281419092 - Tugas Ekontek - B Indralaya 2014
M Faris Naufal 03031281419092 - Tugas Ekontek - B Indralaya 2014
M Faris Naufal 03031281419092 - Tugas Ekontek - B Indralaya 2014
M. FARIS NAUFAL
NIM 03031281419092
TUGAS EKONOMI TEKNIK KIMIA
KELAS B - INDRALAYA
Penyelesaian Soal
No. 2
Penyelesaian Soal
No. 5
Penyelesaian Soal
No. 1
Penyelesaian Soal
No. 6
ENGINEERS
Diketahui
Plot
Surface Area
Tekanan Desain
Purchased Cost
ENGINEERS
Diketahui
C' (Komponen)
S (Jumalah Stream)
E (Feed External)
Total Variabel yang dibutuhkan
Total Output
Solusi
ENGINEERS
Metana
Etana
Propana
n-Butana
2) Neraca Massa
Laju alir Natural Gas
Fraksi Etana dalam Sales Gas
Komponen
Metana
Etana
Propana
n-Butana
Total
3) Cost Estimation
Harga Jual Sales Gas (0% propana dan butana)
Produk Etana (1% metana, 2% propana, 0% buatna)
Produk Propana ( 0% metana, n-butana, dan 2% etana)
BM Metana
16
BM Propan
44
ENGINEERS
DIFFERENT SELECTION
FOR TEAR STREAM STYRENE SYNTHESIS PRO
S02 = S03
S04
S05
S14
2) Biaya Utilitas
Air Pendingin
Steam Saturated
Tin C
Cold 1
Cold 2
Hot 1
Hot 2
60
116
160
250
1500 ft2
150 psig
$40,000
Tw
Estimated
Area (m2)
10
$40,000.00 /year
3
5
1
(C' + 2)*S
25
S-E
4
Output*(C'+2)
20
(Recycle)
TV - JP
1500
Hal 1
Urutan Perhitungan
% mol
LHV (kcal/gmol)
83%
12.00%
4.00%
1.00%
191.8
341.3
488.5
635.4
2500000
0.05
gmol/jam
Output
Metana
Etana
2075000
0
109210.52631579 190789.47368421
0
0
0
0
2500000
$2.85 / GJ (LHV)
$0.18 /kg
$0.20 /kg
30
58
0
0
100000
25000
Harga Jual
$75,982.53
$1,620,000.00
$880,000.00
$2,575,982.53
DIFFERENT SELECTION
TREAM STYRENE SYNTHESIS PROCESS
112.8 lb/EB/h
0
112.8
268.1660377359
380.8
56.4
169.2
402.2
571.4
84.6
Hal 6
S02 = S10
S04
S05
S14
197.4
469.3
666.7
98.7
Cost
r Pendingin
1000 gal
$0.15
am Saturated
1 Mg 6200 kPa
$15
1 Mg 2850 kPa
$13.20
$11
$7
$46.35
Total Cost Op
Tot
m Cp
(MJ/h C)
27.4
22.6
31.7
38
h
(kW K m2)
0.2
0.2
0.2
0.2
Estimated
Cost ($)
Network
Cost ($)
Dimana :
_ = 10 C
(minimum)
Untuk Tw = 10 C
Network
Area (m2)
Estimated
Number of Shells
Final
N sheels
1540
361800
376100
n Perhitungan
6
Hal 2
Hal 5
$8,863.64
$2,567,118.90
S02 = S10
S04
S05
S14
225.6
536
761.6
112.8
453393.321327541
$453,393.32
$493,439.67
Kurs Dollar ke Rupiah
12987.013
Rp 6.408.307.409,00
93,439.67
ollar ke Rupiah
2987.013
08.307.409,00
Hal 3