Project:

Title:

Geo-Technical Investigation for Proposed Construction of (Stilt+3)


Residential Building at Y-Block, 5th Street Old No. 30, New No. 22, 5th
Avenue, Anna Nagar, Chennai, INDIA

Geo-Technical Investigations Report for Residential


Building (Stilt+3) floors

Report No.

Revision

BLDG-2013-9

R0

Revision Details:

R0
Rev.

22-05-2013 Initial Submission


Date

Details

Init.

Sign. Init. Sign. Init.

Prepared

Checked

Sign.
Approved

Geo-Technical Investigation Report for Proposed Construction


of (Stilt+3) floors Residential Building at Old No. 30, New No. 22,
th
th
Y Block 5 Street, 5 Avenue, Anna Nagar, Chennai, TN

LIST OF CONTENTS

LIST OF CONTENTS ..................................................................................................................................... 1


1.0 INTRODUCTION ........................................................................................................................... 2
2.0 EXPLORATION PROGRAM............................................................................................................. 2
3.0 DETAILS OF STRUCTURES ............................................................................................................. 2
4.0 FIELD BORING AND SAMPLING ..................................................................................................... 2
4.1 STANDARD PENETRATION TEST .................................................................................................... 3
5.0 SUBSOIL PROFILE ......................................................................................................................... 3
6.0 SHALLOW FOUNDATIONS ............................................................................................................ 4
7.0 DISCUSSION ON FOUNDATION ..................................................................................................... 5
8.0 RECOMMENDATIONS .................................................................................................................. 5
ATTACHMENT A1: BORELOGS ............................................................................................................. 6
ATTACHMENT A2: SUMMARY OF LABORATORY TEST RESULTS - SOIL ..................................................... 7
ATTACHMENT A3: TEST GRAPHS .......................................................................................................... 8
ATTACHMENT A4: PILE CAPACITY CALCULATIONS .................................................................................. 9

Report No. BLDG-2013-9

Geo-Technical Investigation Report for Proposed Construction


of (Stilt+3) floors Residential Building at Old No. 30, New No. 22,
th
th
Y Block 5 Street, 5 Avenue, Anna Nagar, Chennai, TN

1.0

INTRODUCTION
Mr. K. Jamal Mohideen, Anna Nagar, Chennai 600 040 has awarded the work of conducting
detailed Geotechnical Investigations for proposed construction of Residential Building of (Stilt+3)
floors at Old No. 30, New No. 22, Y Block 5th Street, 5th Avenue, Anna Nagar, Chennai, TN to
M/s Indu Geo Solutions, Chennai. The Geotechnical investigations were completed on 18th & 19th
May 2013. This report contains the results of the Geotechnical Investigation completed to date
along with foundation recommendations. The proposed structure is of (Stilt+3) Residential
Apartment.

2.0

EXPLORATION PROGRAM
The scope of work completed at this site is summarized below:
Making of Two (02) number of Standard Soil Investigation Borehole upto 20m depth below or
upto Refusal strata, whichever is earlier on the existing Ground Level.
Conducting SPTs at regular depth intervals,
Collecting disturbed and undisturbed soil samples,
Conducting relevant field and laboratory tests,
Submitting report with field and laboratory test results and recommendations for suitable
foundation options.

3.0

DETAILS OF STRUCTURES
The proposed structure is residential building (Stilt+3) floors. The exact details of columns are not
available at the time of preparation of this report. Assuming approximate column spacing of 4 to
5m c/c considering this, central column load works about 120 to 150 tonnes for proposed building.
These loads are assumed for the purpose of foundation only and for the structural design, exact
loads are to be estimated based on a suitable structural analysis.

4.0

FIELD BORING AND SAMPLING


One no of Calyx drilling machine rig was mobilized and drilling operation work was done. 150 mm
diameter boreholes were made at locations specified by Engineer-in-charge. These boreholes were
sunk to 20.00m depth. SPT tests were conducting at 1.0m and 1.5m regular intervals and at all type
of soil stratum and disturbed samples were collected.

Report No. BLDG-2013-9

Geo-Technical Investigation Report for Proposed Construction


of (Stilt+3) floors Residential Building at Old No. 30, New No. 22,
th
th
Y Block 5 Street, 5 Avenue, Anna Nagar, Chennai, TN

4.1

STANDARD PENETRATION TEST


SPT split spoon sampler of standard dimensions was driven into the soil from the borehole bottom
using 63.5 kg hammer with a fall of 75 cm height. The SPT weight was lifted to the specified height
and allowed to fall freely on the anvil with the use of cat-head winch with one to one and half turn
of the drum. Blow counts for the penetration of every 15 cm were recorded and the N value is
reported as the blow counts for 30 cm penetration of the sampler excluding the first 15 cm
penetration as seating drive.

When the number of blows exceeded 50 to penetrate the first or second 15 cm length of the
sampler, the SPT N is regarded as more than 100 as described in IS 2131 - 1981. The test is
terminated in such case and a record of the penetration of the sampler under 50 blows is made. SPT
refusal is recorded when there is no penetration of the sampler at any stage and also when a
rebound of the sounding system is recorded. These tests were conducted at close intervals of 1.0m
so that a continuous SPT N profile is available.

Disturbed soil collected in the SPT sampler was preserved in polythene covers and transported to
the laboratory. Additional polythene cover was used to prevent the loss of moisture during the
transit period.

5.0

SUBSOIL PROFILE
LAYER I: Silty Clay

The top soil is silty clay of stiff in nature and is present up to the 9.0m from the existing ground
level. The SPT N value is 6 to 17. A sandy layer is sand witched by silty clay in borehole one (BH-1).
LAYER II: Silty Sand

The second layer of Silty sandy Clay is encountered from 9.0m to 15.0m with SPT N value is 24 to
31. This layer is dense in nature.
LAYER III: Silty Sand

The third layer of Silty sand is encountered and the borehole is termination in this layer. The
denseness of soil stratum is increasing towards the borehole termination. The ground water is not
encountered at the time of investigation (May 2013).

Report No. BLDG-2013-9

Geo-Technical Investigation Report for Proposed Construction


of (Stilt+3) floors Residential Building at Old No. 30, New No. 22,
th
th
Y Block 5 Street, 5 Avenue, Anna Nagar, Chennai, TN

6.0

SHALLOW FOUNDATIONS
The Safe Bearing Capacity (SBC) recommendations are calculated for shallow footings for general
sub soil profile.
A properly designed foundation has to satisfy the following two limit states.
1) Limit state of collapse (i.e. Shear strength)
2) Limit state of serviceability (i.e. Settlement)
SHEAR CRITERIA:

The first criterion is depends on shear strength. The calculations are based on TERZAGHI bearing
capacity equation as recommended by IS: 6403 (with factor of Safety) which takes care of L/B ratio
(shape), foundation depth etc., along with other parameters.
The intensity of loading at the base of the foundation, which would cause shear failure of the soil
support, is termed as Ultimate Bearing Capacity (UBC).

The following equation is used to calculate Ultimate Bearing Capacity (UBC),


UBC = C*NC*Sc*dc + q * (Nq-1) * Sq * dq + 0.5 * B * * N * S * d * W'

Safe bearing capacity (SBC) is the maximum intensity of loading that the foundation will safely carry
without the risk of shear failure of soil irrespective of any settlement that may occur. Safe Bearing
Capacity can be obtained by dividing the UBC with suitable factor of safety.
SBC = UBC/2.5

SETTLEMENT CRITERIA:
The intensity of loading that will cause a permissible settlement or specified settlement of the
structure is termed as allowable bearing pressure. The settlement in this type of layer will be elastic
settlement.

These foundation settlements are evaluated using elastic theory. The pressure distribution below
the footing is assumed as 2 V: 1 H for estimating the settlement. Since rock formation is available at
shallow depth. The settlement will be within the permissible limit. Hence open foundation is
suitable.

ALLOWABLE BEARING CAPACITY:


Allowable Bearing capacity (ABC) is the net intensity of the loading which the foundation will carry

Report No. BLDG-2013-9

Geo-Technical Investigation Report for Proposed Construction


of (Stilt+3) floors Residential Building at Old No. 30, New No. 22,
th
th
Y Block 5 Street, 5 Avenue, Anna Nagar, Chennai, TN

without undergoing settlement in excess of the permissible value for the structure under
consideration but not exceeding the net safe bearing capacity (SBC).

7.0

DISCUSSION ON FOUNDATION
From sub soil profile and laboratory test data, it can be seen that brownish silty clay up to 9.0m
below ground level and followed by silty sandy clay up to 15.0m. Due to silty soft to stiff Clay, the
safe bearing capacity of this layer is less and settlements are more than permissible limit. Hence
shallow foundation is not feasible and pile foundation is recommended for the proposed building.
The pile shall be terminated in Silty Sand layer.

8.0

RECOMMENDATIONS
 Pile foundations are envisaged for supporting structures carrying larger concentrated loads.
Based on the soil data, Bored cast-in-situ piles may be adopted.
 Pile bearing capacity is arrived based on the static approach. Separate evaluation of shaft
friction and end bearing forms the basis of this approach. Safe bearing capacities of piles for
different diameters are calculated and respective capacities indicated below Table.
Table- Recommended safe pile capacities

Pile Dia. in
mm

Safe vertical
capacity in
Tonnes

Safe Uplift
capacity in
Tonnes

Safe Lateral
capacity in
Tonnes

Pile length below


ground level in
meters

450

50

2.0

19.0

500

60

10

3.0

18.0

The above safe loads suggested are tentative and these have to be confirmed by conducting
through pile load tests conducted as per IS 2911 part IV.

Report No. BLDG-2013-9

Geo-Technical Investigation Report for Proposed Construction


of (Stilt+3) floors Residential Building at Old No. 30, New No. 22,
th
th
Y Block 5 Street, 5 Avenue, Anna Nagar, Chennai, TN

ATTACHMENT A1: BORELOGS

Report No. BLDG-2013-9

Geo-Technical Investigation Report

Project: Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at Y-Block 5th Street, Old
No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.

Standard Penetration Test

Anna Nagar, Chennai


SPTs, UDSs & Rock Cores
Rotary Rig
18th May 2013
18th May 2013

Samples

(SPT)
15 cm 15 cm 15 cm

Type

NEC

Value

No

Remarks

Ground Water Level

Location
Soil Sampler Used
Drilling Method
Drilling Commenced
Drilling Completed

Depth (m)

Depth from GL (m)

Soil Log

Soil Classification

Strata Description

R.L of lower contact

BH - 1 (N-E direction)
0
NEC
Vertical
20.00

BOREHOLE NO
Ground Elevation
Ground Water Table
Inclination
Depth of Boring, in meters

Silty Clay

CL

3.00
Silty CLAYEE
SAND

Silty Medium to
Fine SAND

Dark Stiff CLAY

Silty CLAY

Silty SANDY CLAY

1.00

SPT

2.00

SPT

3.00

12

14

26

SPT

4.00

13

19

18

37

SPT

5.00

17

SPT

6.00

10

SPT

7.50

SPT

9.00

11

SPT

10.50

12

13

25

SPT

12.00

10

18

28

SPT

13.50

11

16

27

SPT

15.00

-10.50

CL

13.50

SPT

-6.00

CL

10.50

12

-5.00

CL
6.00

-4.00

SM
5.00

-3.00

SC
4.00

-13.50

Geo-Technical Investigation Report

Project: Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at Y-Block 5th Street, Old
No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.

SM

20.00

Standard Penetration Test

Anna Nagar, Chennai


SPTs, UDSs & Rock Cores
Rotary Rig
18th May 2013
18th May 2013

Samples

(SPT)
15 cm 15 cm 15 cm

Type

No

Value
19

30

40

70

SPT

16.50

16

24

36

60

SPT

18.00

14

30

30

60

SPT

20.00

-20.00

Borehole terminated at 20.00 m below Ground Level

Ground Water Level

Location
Soil Sampler Used
Drilling Method
Drilling Commenced
Drilling Completed

Depth (m)

Depth from GL (m)

Soil Log

Soil Classification

Strata Description
Silty Medium to
Fine SAND

R.L of lower contact

BH - 1 (N-E direction)
0
NEC
Vertical
20.00

BOREHOLE NO
Ground Elevation
Ground Water Table
Inclination
Depth of Boring, in meters

Remarks

Geo-Technical Inestigation Report

Project: Geotechnical Investigation for Proposed Construction of Residential Building (Stilt+3) floors at Y-Block 5th Street,
Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.

Standard Penetration Test

Anna Nagar, Chennai


SPTs, UDSs & Rock Cores
Rotary Rig
19th May 2013
19th May 2013

Samples

(SPT)
15 cm 15 cm 15 cm

Type

NEC

Value

No

Ground Water Level

Location
Soil Sampler Used
Drilling Method
Drilling Commenced
Drilling Completed

Depth (m)

Depth from GL (m)

Soil Log

Soil Classification

Strata Description

R.L of lower contact

BH - 2 (S-W direction)
0
NEC
Vertical
20.00

BOREHOLE NO
Ground Elevation
Ground Water Table
Inclination
Depth of Boring, in meters

Silty Clayee SAND

SC
1.00

Silty CLAY

18

SPT

1.00

SPT

2.00

10

SPT

3.00

SPT

4.00

10

SPT

5.00

16

SPT

6.00

SPT

7.50

11

SPT

9.00

19

11

13

24

SPT

10.50

10

12

14

26

SPT

12.00

12

15

16

31

SPT

13.50

-6.00

CL

9.00

Silty SANDY CLAY

10

-5.00

CL
6.00

Silty CLAY

CL

5.00

Dark Stiff CLAY

6
-1.00

-9.00

CL

13.50

-13.50

Remarks

Geo-Technical Inestigation Report

Project: Geotechnical Investigation for Proposed Construction of Residential Building (Stilt+3) floors at Y-Block 5th Street,
Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.

Standard Penetration Test

Anna Nagar, Chennai


SPTs, UDSs & Rock Cores
Rotary Rig
19th May 2013
19th May 2013

Samples

(SPT)
15 cm 15 cm 15 cm

Type

No

Value

Depth (m)

R.L of lower contact

Depth from GL (m)

Soil Log

Soil Classification

Strata Description
Silty Medium to
Fine SAND

Location
Soil Sampler Used
Drilling Method
Drilling Commenced
Drilling Completed

14

16

18

34

SPT

15.00

18

24

32

56

SPT

16.50

14

26

34

60

SPT

18.00

16

32

34

66

SPT

20.00

SM

20.00

-20.00

Borehole terminated at 20.00 m below Ground Level

Ground Water Level

BH - 2 (S-W direction)
0
NEC
Vertical
20.00

BOREHOLE NO
Ground Elevation
Ground Water Table
Inclination
Depth of Boring, in meters

Remarks

Geo-Technical Investigation Report for Proposed Construction


of (Stilt+3) floors Residential Building at Old No. 30, New No. 22,
th
th
Y Block 5 Street, 5 Avenue, Anna Nagar, Chennai, TN

ATTACHMENT A2: SUMMARY OF LABORATORY TEST RESULTS - SOIL

Report No. BLDG-2013-9

Geo-Technical Investigation Report

SUMMARY OF LABORATORY TEST RESULTS - SOIL

S. No.

-1

Borehole
.No.

-2

Lab Ref.
No. (Given
for testing)

Type of
Structure

-3

-4

Location

-5

Sample
Depth (m)
From
existing GL

SPT
"N"
Value

Natural
Moisture
Content
(%)

-6

-7

Gradation Properties (%)

Index Properties (%)


Liquid
Limit

Plastic
Limit

Plasticity
Index

-8

-9

-10

-11

Specific
Gravity

-12

Gravel

Sand

Silt & Clay

-13

-14

-15

B.I.S.
Classificati
on of Soil
-16

BH-1/1

1.00

12

35

48

22

26

BH-1/2

3.00

32

45

23

22

BH-1/3

4.00

26

22

68

32

SC

BH-1/4

5.00

37

30

85

15

SM

BH-1/5

6.00

17

32

48

23

25

BH-1/6

10.50

11

28

42

20

22

BH-1/7

12.00

25

30

38

18

20

33

67

CI

BH-1/8

15.00

27

32

36

18

18

38

62

CI

BH-1/9

16.50

70

12

86

12

SM

10

BH-1/10

18.00

60

15

85

15

SM

11

BH-1/11

20.00

60

12

82

18

SM

12

BH-2/1

1.00

18

19

66

34

SC

13

BH-2/2

2.00

29

45

22

23

CI

14

BH-2/3

4.00

34

48

24

24

CI

15

BH-2/4

6.00

16

32

39

20

19

16

BH-2/5

9.00

11

30

43

22

21

BH-2/6

10.50

24

35

38

18

20

18

BH-2/7

13.50

31

31

40

19

21

19

BH-2/8

15.00

34

20

BH-2/9

16.50

21

BH-2/10

22

BH-2/11

17

BH-1

BH-2

Stilt+3

Annanagar

CI
2.7

CI

2.69

CI
CI

2.65

2.66

CI

2.68

CI
0

35

65

CI

32

68

CI

18

83

17

SM

56

15

88

12

SM

18.00

60

13

84

16

SM

20.00

66

12

86

14

SM

2.7

2.63

Geo-Technical Investigation Report for Proposed Construction


of (Stilt+3) floors Residential Building at Old No. 30, New No. 22,
th
th
Y Block 5 Street, 5 Avenue, Anna Nagar, Chennai, TN

ATTACHMENT A3: TEST GRAPHS

Report No. BLDG-2013-9

Geo-Technical Invesigation Report

Project : Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at Y-Block 5th Street,

Particle Size

Sand %

68

32

BH-1

5.00

SPT

SM

85

15

BH-1

12.00

SPT

CL

33

67

BH-1

15.00

SPT

CL

38

62

BH-1

16.50

SPT

SM

86

12

Cu

Clay %

Silt

SAND
CLAY

GRAVEL

SILT
F

100
90
80
PERCENTAGE PASSING

70
60
50
40
30
20
10
0
0.001

0.010

0.100

1.000

GRAIN SIZE (mm)

10.000

D10 mm

Gravel %

SC

D30 mm

IS

SPT

D60 mm

Sample Type

4.00

Cc

Depth (m):

BH-1

Bore hole No

Symbol

Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.

Geo-Technical Investigation Report

Project : Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at Y-Block 5th Street,

Particle Size

Sand %

85

15

BH-1

20.00

SPT

SM

82

18

BH-2

1.00

SPT

SC

66

34

BH-2

10.50

SPT

CL

35

65

BH-2

13.50

SPT

CL

32

68

Cu

Clay %

Silt

SAND
CLAY

GRAVEL

SILT
F

100
90
80
PERCENTAGE PASSING

70
60
50
40
30
20
10
0
0.001

0.010

0.100

1.000

GRAIN SIZE (mm)

10.000

D10 mm

Gravel %

SM

D30 mm

IS

SPT

D60 mm

Sample Type

18.00

Cc

Depth (m):

BH-1

Bore hole No

Symbol

Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.

Geo-Technical Investigation Report

Project : Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at Y-Block 5th Street,

Particle Size

Sand %

83

17

BH-2

16.50

SPT

SM

88

12

BH-2

18.00

SPT

SM

84

16

BH-2

20.00

SPT

SM

86

14

GRAVEL

Cu

Clay %

Silt

SAND
CLAY

SILT
F

100
90
80
PERCENTAGE PASSING

70
60
50
40
30
20
10
0
0.001

0.010

0.100

1.000

GRAIN SIZE (mm)

10.000

D10 mm

Gravel %

SM

D30 mm

IS

SPT

D60 mm

Sample Type

15.00

Cc

Depth (m):

BH-2

Bore hole No

Symbol

Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.

Geo-Technical Investigation Report

Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.

Liquid limit

DEPTH(m)
No. of blows (N)

BH-1

1.00

48

27

12

Weight of wet specimen +


container (g)

61.90

78.62

93.20

52.40

53.80

Weight of dry specimen


+container (g)

55.30

66.30

73.50

49.00

49.20

Weight of container (g)

39.60

40.50

43.10

30.30

31.60

Weight of water (g)

BH No.

6.60

12.32

19.70

3.40

4.60

Weight of dry specimen (g)

15.70

25.80

30.40

18.70

17.60

Moisture content (%)

42.04

47.75

64.80

18.18

26.14

Liquid limit

DEPTH(m)
No. of blows

BH-1

3.00

Plastic limit

Plastic limit

45

26

15

Weight of wet specimen +


container g

43.30

50.30

55.20

51.20

51.60

Weight of dry specimen


+container g

40.45

44.20

46.80

46.80

48.40

Weight of container

32.50

30.50

28.60

30.30

31.20

Weight of water g

2.85

6.10

8.40

4.40

3.20

Weight of dry specimen g

7.95

13.70

18.20

16.50

17.20

35.85

44.53

46.15

26.67

18.60

Moisture content %

100

Moisture content [%]

90
80
70
60
50
40
30
20
10
0

No. of blows

10

100
(WL)

Plastic limit

Plasticity Index

BH NO :

Depth (m)

:%

(WP) : %

(IP): %

BH-1

1.00

48

22

26

BH-1

3.00

45

23

22

Liquid limit
S.No

Symbol

Geo-Technical Investigation Report

Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.

Liquid limit

DEPTH(m)
No. of blows (N)

BH-1

6.00

40

26

14

Weight of wet specimen +


container (g)

53.40

58.00

61.20

54.80

53.10

Weight of dry specimen


+container (g)

51.10

52.50

53.40

52.60

50.40

Weight of container (g)

44.40

40.80

41.60

40.60

40.70

Weight of water (g)

2.30

5.50

7.80

2.20

2.70

Weight of dry specimen (g)

6.70

11.70

11.80

12.00

9.70

34.33

47.01

66.10

18.33

27.84

Moisture content (%)

BH No.

Liquid limit

DEPTH (m)
No. of blows

BH-1

10.50

Plastic limit

Plastic limit

39

24

14

Weight of wet specimen +


container g

59.80

56.40

61.20

49.50

51.60

Weight of dry specimen


+container g

55.20

51.10

54.40

48.30

49.00

Weight of container

40.80

38.80

42.20

39.20

39.30

Weight of water g

4.60

5.30

6.80

1.20

2.60

Weight of dry specimen g

14.40

12.30

12.20

9.10

9.70

Moisture content %

31.94

43.09

55.74

13.19

26.80

100

Moisture content [%]

90
80
70
60
50
40
30
20
10
0

No. of blows

10

100
(WL)

Plastic limit

Plasticity Index

BH NO :

Depth (m)

:%

(WP) : %

(IP): %

BH-1

6.00

48

23

25

BH-1

10.50

42

20

22

Liquid limit
S.No

Symbol

Geo-Technical Investigation Report

Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.

Liquid limit

DEPTH(m)
No. of blows (N)

BH-1

12.00

36

24

18

Weight of wet specimen +


container (g)

63.80

64.60

67.50

53.50

53.00

Weight of dry specimen


+container (g)

57.80

54.60

58.60

52.20

50.40

Weight of container (g)

40.70

28.60

39.30

41.30

39.60

6.00

10.00

8.90

1.30

2.60

Weight of dry specimen (g)

17.10

26.00

19.30

10.90

10.80

Moisture content (%)

35.09

38.46

46.11

11.93

24.07

Weight of water (g)

BH No.

Liquid limit

DEPTH (m)
No. of blows

BH-1

15.00

Plastic limit

Plastic limit

39

27

14

Weight of wet specimen +


container g

61.50

55.30

63.50

49.50

51.60

Weight of dry specimen


+container g

54.20

51.80

52.40

48.60

49.00

Weight of container

34.60

42.10

30.30

39.10

39.30

Weight of water g

7.30

3.50

11.10

0.90

2.60

Weight of dry specimen g

19.60

9.70

22.10

9.50

9.70

Moisture content %

37.24

36.08

50.23

9.47

26.80

100

Moisture content [%]

90
80
70
60
50
40
30
20
10
0

No. of blows

10

100
(WL)

Plastic limit

Plasticity Index

BH NO :

Depth (m)

:%

(WP) : %

(IP): %

BH-1

12.00

38

18

20

BH-1

15.00

36

18

18

Liquid limit
S.No

Symbol

Geo-Technical Investigation Report

Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.

Liquid limit

DEPTH(m)
No. of blows (N)

BH-2

2.00

34

26

17

Weight of wet specimen +


container (g)

63.60

64.40

67.80

53.40

53.20

Weight of dry specimen


+container (g)

59.80

53.60

57.80

51.40

50.60

Weight of container (g)

48.80

28.80

40.20

41.30

39.80

3.80

10.80

10.00

2.00

2.60

Weight of dry specimen (g)

11.00

24.80

17.60

10.10

10.80

Moisture content (%)

34.55

43.55

56.82

19.80

24.07

Weight of water (g)

BH No.

Liquid limit

DEPTH (m)
No. of blows

BH-2

4.00

Plastic limit

Plastic limit

38

26

15

Weight of wet specimen +


container g

52.20

54.80

62.80

49.60

51.50

Weight of dry specimen


+container g

59.60

51.50

56.40

47.80

48.80

Weight of container

39.20

43.60

31.20

39.20

39.10

Weight of water g

-7.40

3.30

6.40

1.80

2.70

Weight of dry specimen g

20.40

7.90

25.20

8.60

9.70

Moisture content %

-36.27

41.77

25.40

20.93

27.84

100

Moisture content [%]

90
80
70
60
50
40
30
20
10
0

No. of blows

10

100
(WL)

Plastic limit

Plasticity Index

BH NO :

Depth (m)

:%

(WP) : %

(IP): %

BH-2

2.00

45

22

23

BH-2

4.00

48

24

24

Liquid limit
S.No

Symbol

Geo-Technical Investigation Report

Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.

Liquid limit

DEPTH(m)
No. of blows (N)

BH-2

6.00

36

24

13

Weight of wet specimen +


container (g)

53.60

57.40

60.80

54.70

52.90

Weight of dry specimen


+container (g)

53.40

52.50

53.40

53.20

50.40

Weight of container (g)

42.20

40.80

41.60

41.40

41.20

0.20

4.90

7.40

1.50

2.50

11.20

11.70

11.80

11.80

9.20

1.79

41.88

62.71

12.71

27.17

Weight of water (g)


Weight of dry specimen (g)
Moisture content (%)

BH No.

Liquid limit

DEPTH (m)
No. of blows

BH-2

9.00

Plastic limit

Plastic limit

38

23

15

Weight of wet specimen +


container g

59.60

56.20

60.80

49.50

51.60

Weight of dry specimen


+container g

54.10

51.15

54.40

47.60

49.40

Weight of container

42.60

39.20

42.20

39.20

39.30

Weight of water g

5.50

5.05

6.40

1.90

2.20

Weight of dry specimen g

11.50

11.95

12.20

8.40

10.10

Moisture content %

47.83

42.26

52.46

22.62

21.78

100

Moisture content [%]

90
80
70
60
50
40
30
20
10
0

No. of blows

10

100
(WL)

Plastic limit

Plasticity Index

BH NO :

Depth (m)

:%

(WP) : %

(IP): %

BH-2

6.00

39

20

19

BH-2

9.00

43

22

21

Liquid limit
S.No

Symbol

Geo-Technical Investigation Report

Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.

Liquid limit

DEPTH(m)
No. of blows (N)

BH-1

BH No.

10.00

38

24

16

Weight of wet specimen +


container (g)

52.60

57.20

60.40

53.60

52.80

Weight of dry specimen


+container (g)

55.40

52.40

53.40

51.50

51.20

Weight of container (g)

42.40

41.20

42.40

40.60

41.40

Weight of water (g)

-2.80

4.80

7.00

2.10

1.60

Weight of dry specimen (g)

13.00

11.20

11.00

10.90

9.80

Moisture content (%)

-21.54

42.86

63.64

19.27

16.33

Liquid limit

DEPTH (m)
No. of blows

BH-2

13.50

Plastic limit

Plastic limit

36

21

12

Weight of wet specimen +


container g

58.60

55.40

60.20

49.40

50.80

Weight of dry specimen


+container g

48.80

52.60

53.20

48.20

48.40

Weight of container

39.40

36.20

40.80

37.20

39.60

Weight of water g

9.80

2.80

7.00

1.20

2.40

9.40

16.40

12.40

11.00

8.80

104.26

17.07

56.45

10.91

27.27

Weight of dry specimen g


Moisture content %

100

Moisture content [%]

90
80
70
60
50
40
30
20
10
0

No. of blows

10

100
(WL)

Plastic limit

Plasticity Index

BH NO :

Depth (m)

:%

(WP) : %

(IP): %

BH-1

10.00

38

18

20

BH-2

13.50

40

19

21

Liquid limit
S.No

Symbol

Geo-Technical Investigation Report for Proposed Construction


of (Stilt+3) floors Residential Building at Old No. 30, New No. 22,
th
th
Y Block 5 Street, 5 Avenue, Anna Nagar, Chennai, TN

ATTACHMENT A4: PILE CAPACITY CALCULATIONS

Report No. BLDG-2013-9

Geo-Technical Investigation Report

1 PILE VERTICAL CAPACITY CALCULATIONS(BH-2): 500mm Dia BCIS Piles


I. Skin friction Resistance:
Pile cut off Level (COL)

0.00 m below EGL

Layer I (0.0m to 9.0m)


Type of soil

Layer thickness

Cohision Cu

25 kN/m2

0.5

Surface area(Asi)

Skin friction in Layer I (QfI)

Ultimate skin friction

Qf

Silty Clay
9m

14.14 m2
a * Cu* Asi
176.71 kN

Layer II (9.0m to 15m)


Type of soil

Layer thickness

6.0 m

Cohision Cu

120 kN/m2

0.3

Surface area(Asi)

Skin friction in Layer II (QfII)

Ultimate skin friction

Qf

Silty Sandy Clay

9.42 m2
a * Cu* Asi
339.29 kN

Layer III (15m to 18.0m)


Type of soil

Layer thickness

3.0 m

Angle of internal friction(f)


Overburden pressure(Pdi) (Restricted to
20*width*g')

35 deg

80 kN/m2

Tand = Tanf

Surface area(Asi)

Coeeficient of earth pressure(k)

Skin friction in Layer IV (QfIV)

Total Ultimate skin friction

Qf

Silty Sand

0.700
4.71 m2
1.2
K * Pdi * Tan d * Asi

316.77 kN

832.77 t

II. End Bearing resistance


Founding Depth from COL

18 m

Angle of internal friction(f)

35 Deg

Area of cross section of pile at toe, Ap


Overburden pressure(Pdi) (Restricted to
20*width*g')

0.1963 m2

Ultimate end bearing resistance, Qe

Nq

48

Ng

48.03

758.2 kN

80 kN/m2
Ap (0.5*D*g*Ng+Pd*Nq)

Geo-Technical Investigation Report

III. Safe Load Capacity of Pile:


Total ultimate bearing capacity of pile

Qf + Qe

1591.0 kN

Self weight of pile (Wp)

35.3 kN

Factor of Safety (FOS)

Safe vertical Load capacity of pile (Qs)

{Qu/FOS} - Wp

601.1 kN

600 kN

Self weight of pile (Wp)

35.3 t

Factor of Safety (FOS)

2.5

Safe Uplift capacity of pile (Qs)

(2/3)*(Qu)/FOS)+Wp

257.4 kN

100 kN

Recommended vertical capacity , P

2.5

2 Safe Uplift Capacity of Pile:

Recommended Uplift capacity, P


3 Safe Lateral Capacity of Pile:
Grade of Concrete,

fck

=M

Moment of Inertia
Modulus of subgrade reaction
K = k1*0.3/(1.5B)

5000 (fck)1/2

2
25000 N/mm

2
25000 MN/m

4.5 MN/m3

1.8 MN/m3

Concrete Elastic Modulus,

Size of the pile

25

0.50 m
4
0.0031 m

1/5

R = ( E * I / K1 B)

2.43 m

Free length of pile above ground (L1)

0m

For fixed head pile, Lf

= 2.15 * R

5.23 m

Allowable deflection,

0.005 m

Lateral capacity of fixed head pile Qh

Recommended lateral capacity of pile

12 y E I / (L1+Lf )3

32.2 kN

30.0 kN

(From IS
2911 part
I/sec 2)