Complete GT Investigation Report Dt. 22.05.2013
Complete GT Investigation Report Dt. 22.05.2013
Jamal Mohideen,
CLIENT
STRUCTRAL
CONSULTANTS
ARCHITECTURAL
CONSULTANTS
Geo-Technical
CONSULTANTS
Project:
Title:
Report No.
Revision
BLDG-2013-9
R0
Revision Details:
R0
Rev.
Details
Init.
Prepared
Checked
Sign.
Approved
LIST OF CONTENTS
1.0
INTRODUCTION
Mr. K. Jamal Mohideen, Anna Nagar, Chennai 600 040 has awarded the work of conducting
detailed Geotechnical Investigations for proposed construction of Residential Building of (Stilt+3)
floors at Old No. 30, New No. 22, Y Block 5th Street, 5th Avenue, Anna Nagar, Chennai, TN to
M/s Indu Geo Solutions, Chennai. The Geotechnical investigations were completed on 18th & 19th
May 2013. This report contains the results of the Geotechnical Investigation completed to date
along with foundation recommendations. The proposed structure is of (Stilt+3) Residential
Apartment.
2.0
EXPLORATION PROGRAM
The scope of work completed at this site is summarized below:
Making of Two (02) number of Standard Soil Investigation Borehole upto 20m depth below or
upto Refusal strata, whichever is earlier on the existing Ground Level.
Conducting SPTs at regular depth intervals,
Collecting disturbed and undisturbed soil samples,
Conducting relevant field and laboratory tests,
Submitting report with field and laboratory test results and recommendations for suitable
foundation options.
3.0
DETAILS OF STRUCTURES
The proposed structure is residential building (Stilt+3) floors. The exact details of columns are not
available at the time of preparation of this report. Assuming approximate column spacing of 4 to
5m c/c considering this, central column load works about 120 to 150 tonnes for proposed building.
These loads are assumed for the purpose of foundation only and for the structural design, exact
loads are to be estimated based on a suitable structural analysis.
4.0
4.1
When the number of blows exceeded 50 to penetrate the first or second 15 cm length of the
sampler, the SPT N is regarded as more than 100 as described in IS 2131 - 1981. The test is
terminated in such case and a record of the penetration of the sampler under 50 blows is made. SPT
refusal is recorded when there is no penetration of the sampler at any stage and also when a
rebound of the sounding system is recorded. These tests were conducted at close intervals of 1.0m
so that a continuous SPT N profile is available.
Disturbed soil collected in the SPT sampler was preserved in polythene covers and transported to
the laboratory. Additional polythene cover was used to prevent the loss of moisture during the
transit period.
5.0
SUBSOIL PROFILE
LAYER I: Silty Clay
The top soil is silty clay of stiff in nature and is present up to the 9.0m from the existing ground
level. The SPT N value is 6 to 17. A sandy layer is sand witched by silty clay in borehole one (BH-1).
LAYER II: Silty Sand
The second layer of Silty sandy Clay is encountered from 9.0m to 15.0m with SPT N value is 24 to
31. This layer is dense in nature.
LAYER III: Silty Sand
The third layer of Silty sand is encountered and the borehole is termination in this layer. The
denseness of soil stratum is increasing towards the borehole termination. The ground water is not
encountered at the time of investigation (May 2013).
6.0
SHALLOW FOUNDATIONS
The Safe Bearing Capacity (SBC) recommendations are calculated for shallow footings for general
sub soil profile.
A properly designed foundation has to satisfy the following two limit states.
1) Limit state of collapse (i.e. Shear strength)
2) Limit state of serviceability (i.e. Settlement)
SHEAR CRITERIA:
The first criterion is depends on shear strength. The calculations are based on TERZAGHI bearing
capacity equation as recommended by IS: 6403 (with factor of Safety) which takes care of L/B ratio
(shape), foundation depth etc., along with other parameters.
The intensity of loading at the base of the foundation, which would cause shear failure of the soil
support, is termed as Ultimate Bearing Capacity (UBC).
Safe bearing capacity (SBC) is the maximum intensity of loading that the foundation will safely carry
without the risk of shear failure of soil irrespective of any settlement that may occur. Safe Bearing
Capacity can be obtained by dividing the UBC with suitable factor of safety.
SBC = UBC/2.5
SETTLEMENT CRITERIA:
The intensity of loading that will cause a permissible settlement or specified settlement of the
structure is termed as allowable bearing pressure. The settlement in this type of layer will be elastic
settlement.
These foundation settlements are evaluated using elastic theory. The pressure distribution below
the footing is assumed as 2 V: 1 H for estimating the settlement. Since rock formation is available at
shallow depth. The settlement will be within the permissible limit. Hence open foundation is
suitable.
without undergoing settlement in excess of the permissible value for the structure under
consideration but not exceeding the net safe bearing capacity (SBC).
7.0
DISCUSSION ON FOUNDATION
From sub soil profile and laboratory test data, it can be seen that brownish silty clay up to 9.0m
below ground level and followed by silty sandy clay up to 15.0m. Due to silty soft to stiff Clay, the
safe bearing capacity of this layer is less and settlements are more than permissible limit. Hence
shallow foundation is not feasible and pile foundation is recommended for the proposed building.
The pile shall be terminated in Silty Sand layer.
8.0
RECOMMENDATIONS
Pile foundations are envisaged for supporting structures carrying larger concentrated loads.
Based on the soil data, Bored cast-in-situ piles may be adopted.
Pile bearing capacity is arrived based on the static approach. Separate evaluation of shaft
friction and end bearing forms the basis of this approach. Safe bearing capacities of piles for
different diameters are calculated and respective capacities indicated below Table.
Table- Recommended safe pile capacities
Pile Dia. in
mm
Safe vertical
capacity in
Tonnes
Safe Uplift
capacity in
Tonnes
Safe Lateral
capacity in
Tonnes
450
50
2.0
19.0
500
60
10
3.0
18.0
The above safe loads suggested are tentative and these have to be confirmed by conducting
through pile load tests conducted as per IS 2911 part IV.
Project: Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at Y-Block 5th Street, Old
No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
Samples
(SPT)
15 cm 15 cm 15 cm
Type
NEC
Value
No
Remarks
Location
Soil Sampler Used
Drilling Method
Drilling Commenced
Drilling Completed
Depth (m)
Soil Log
Soil Classification
Strata Description
BH - 1 (N-E direction)
0
NEC
Vertical
20.00
BOREHOLE NO
Ground Elevation
Ground Water Table
Inclination
Depth of Boring, in meters
Silty Clay
CL
3.00
Silty CLAYEE
SAND
Silty Medium to
Fine SAND
Silty CLAY
1.00
SPT
2.00
SPT
3.00
12
14
26
SPT
4.00
13
19
18
37
SPT
5.00
17
SPT
6.00
10
SPT
7.50
SPT
9.00
11
SPT
10.50
12
13
25
SPT
12.00
10
18
28
SPT
13.50
11
16
27
SPT
15.00
-10.50
CL
13.50
SPT
-6.00
CL
10.50
12
-5.00
CL
6.00
-4.00
SM
5.00
-3.00
SC
4.00
-13.50
Project: Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at Y-Block 5th Street, Old
No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
SM
20.00
Samples
(SPT)
15 cm 15 cm 15 cm
Type
No
Value
19
30
40
70
SPT
16.50
16
24
36
60
SPT
18.00
14
30
30
60
SPT
20.00
-20.00
Location
Soil Sampler Used
Drilling Method
Drilling Commenced
Drilling Completed
Depth (m)
Soil Log
Soil Classification
Strata Description
Silty Medium to
Fine SAND
BH - 1 (N-E direction)
0
NEC
Vertical
20.00
BOREHOLE NO
Ground Elevation
Ground Water Table
Inclination
Depth of Boring, in meters
Remarks
Project: Geotechnical Investigation for Proposed Construction of Residential Building (Stilt+3) floors at Y-Block 5th Street,
Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
Samples
(SPT)
15 cm 15 cm 15 cm
Type
NEC
Value
No
Location
Soil Sampler Used
Drilling Method
Drilling Commenced
Drilling Completed
Depth (m)
Soil Log
Soil Classification
Strata Description
BH - 2 (S-W direction)
0
NEC
Vertical
20.00
BOREHOLE NO
Ground Elevation
Ground Water Table
Inclination
Depth of Boring, in meters
SC
1.00
Silty CLAY
18
SPT
1.00
SPT
2.00
10
SPT
3.00
SPT
4.00
10
SPT
5.00
16
SPT
6.00
SPT
7.50
11
SPT
9.00
19
11
13
24
SPT
10.50
10
12
14
26
SPT
12.00
12
15
16
31
SPT
13.50
-6.00
CL
9.00
10
-5.00
CL
6.00
Silty CLAY
CL
5.00
6
-1.00
-9.00
CL
13.50
-13.50
Remarks
Project: Geotechnical Investigation for Proposed Construction of Residential Building (Stilt+3) floors at Y-Block 5th Street,
Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
Samples
(SPT)
15 cm 15 cm 15 cm
Type
No
Value
Depth (m)
Soil Log
Soil Classification
Strata Description
Silty Medium to
Fine SAND
Location
Soil Sampler Used
Drilling Method
Drilling Commenced
Drilling Completed
14
16
18
34
SPT
15.00
18
24
32
56
SPT
16.50
14
26
34
60
SPT
18.00
16
32
34
66
SPT
20.00
SM
20.00
-20.00
BH - 2 (S-W direction)
0
NEC
Vertical
20.00
BOREHOLE NO
Ground Elevation
Ground Water Table
Inclination
Depth of Boring, in meters
Remarks
S. No.
-1
Borehole
.No.
-2
Lab Ref.
No. (Given
for testing)
Type of
Structure
-3
-4
Location
-5
Sample
Depth (m)
From
existing GL
SPT
"N"
Value
Natural
Moisture
Content
(%)
-6
-7
Plastic
Limit
Plasticity
Index
-8
-9
-10
-11
Specific
Gravity
-12
Gravel
Sand
-13
-14
-15
B.I.S.
Classificati
on of Soil
-16
BH-1/1
1.00
12
35
48
22
26
BH-1/2
3.00
32
45
23
22
BH-1/3
4.00
26
22
68
32
SC
BH-1/4
5.00
37
30
85
15
SM
BH-1/5
6.00
17
32
48
23
25
BH-1/6
10.50
11
28
42
20
22
BH-1/7
12.00
25
30
38
18
20
33
67
CI
BH-1/8
15.00
27
32
36
18
18
38
62
CI
BH-1/9
16.50
70
12
86
12
SM
10
BH-1/10
18.00
60
15
85
15
SM
11
BH-1/11
20.00
60
12
82
18
SM
12
BH-2/1
1.00
18
19
66
34
SC
13
BH-2/2
2.00
29
45
22
23
CI
14
BH-2/3
4.00
34
48
24
24
CI
15
BH-2/4
6.00
16
32
39
20
19
16
BH-2/5
9.00
11
30
43
22
21
BH-2/6
10.50
24
35
38
18
20
18
BH-2/7
13.50
31
31
40
19
21
19
BH-2/8
15.00
34
20
BH-2/9
16.50
21
BH-2/10
22
BH-2/11
17
BH-1
BH-2
Stilt+3
Annanagar
CI
2.7
CI
2.69
CI
CI
2.65
2.66
CI
2.68
CI
0
35
65
CI
32
68
CI
18
83
17
SM
56
15
88
12
SM
18.00
60
13
84
16
SM
20.00
66
12
86
14
SM
2.7
2.63
Project : Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at Y-Block 5th Street,
Particle Size
Sand %
68
32
BH-1
5.00
SPT
SM
85
15
BH-1
12.00
SPT
CL
33
67
BH-1
15.00
SPT
CL
38
62
BH-1
16.50
SPT
SM
86
12
Cu
Clay %
Silt
SAND
CLAY
GRAVEL
SILT
F
100
90
80
PERCENTAGE PASSING
70
60
50
40
30
20
10
0
0.001
0.010
0.100
1.000
10.000
D10 mm
Gravel %
SC
D30 mm
IS
SPT
D60 mm
Sample Type
4.00
Cc
Depth (m):
BH-1
Bore hole No
Symbol
Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
Project : Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at Y-Block 5th Street,
Particle Size
Sand %
85
15
BH-1
20.00
SPT
SM
82
18
BH-2
1.00
SPT
SC
66
34
BH-2
10.50
SPT
CL
35
65
BH-2
13.50
SPT
CL
32
68
Cu
Clay %
Silt
SAND
CLAY
GRAVEL
SILT
F
100
90
80
PERCENTAGE PASSING
70
60
50
40
30
20
10
0
0.001
0.010
0.100
1.000
10.000
D10 mm
Gravel %
SM
D30 mm
IS
SPT
D60 mm
Sample Type
18.00
Cc
Depth (m):
BH-1
Bore hole No
Symbol
Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
Project : Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at Y-Block 5th Street,
Particle Size
Sand %
83
17
BH-2
16.50
SPT
SM
88
12
BH-2
18.00
SPT
SM
84
16
BH-2
20.00
SPT
SM
86
14
GRAVEL
Cu
Clay %
Silt
SAND
CLAY
SILT
F
100
90
80
PERCENTAGE PASSING
70
60
50
40
30
20
10
0
0.001
0.010
0.100
1.000
10.000
D10 mm
Gravel %
SM
D30 mm
IS
SPT
D60 mm
Sample Type
15.00
Cc
Depth (m):
BH-2
Bore hole No
Symbol
Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.
Liquid limit
DEPTH(m)
No. of blows (N)
BH-1
1.00
48
27
12
61.90
78.62
93.20
52.40
53.80
55.30
66.30
73.50
49.00
49.20
39.60
40.50
43.10
30.30
31.60
BH No.
6.60
12.32
19.70
3.40
4.60
15.70
25.80
30.40
18.70
17.60
42.04
47.75
64.80
18.18
26.14
Liquid limit
DEPTH(m)
No. of blows
BH-1
3.00
Plastic limit
Plastic limit
45
26
15
43.30
50.30
55.20
51.20
51.60
40.45
44.20
46.80
46.80
48.40
Weight of container
32.50
30.50
28.60
30.30
31.20
Weight of water g
2.85
6.10
8.40
4.40
3.20
7.95
13.70
18.20
16.50
17.20
35.85
44.53
46.15
26.67
18.60
Moisture content %
100
90
80
70
60
50
40
30
20
10
0
No. of blows
10
100
(WL)
Plastic limit
Plasticity Index
BH NO :
Depth (m)
:%
(WP) : %
(IP): %
BH-1
1.00
48
22
26
BH-1
3.00
45
23
22
Liquid limit
S.No
Symbol
Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.
Liquid limit
DEPTH(m)
No. of blows (N)
BH-1
6.00
40
26
14
53.40
58.00
61.20
54.80
53.10
51.10
52.50
53.40
52.60
50.40
44.40
40.80
41.60
40.60
40.70
2.30
5.50
7.80
2.20
2.70
6.70
11.70
11.80
12.00
9.70
34.33
47.01
66.10
18.33
27.84
BH No.
Liquid limit
DEPTH (m)
No. of blows
BH-1
10.50
Plastic limit
Plastic limit
39
24
14
59.80
56.40
61.20
49.50
51.60
55.20
51.10
54.40
48.30
49.00
Weight of container
40.80
38.80
42.20
39.20
39.30
Weight of water g
4.60
5.30
6.80
1.20
2.60
14.40
12.30
12.20
9.10
9.70
Moisture content %
31.94
43.09
55.74
13.19
26.80
100
90
80
70
60
50
40
30
20
10
0
No. of blows
10
100
(WL)
Plastic limit
Plasticity Index
BH NO :
Depth (m)
:%
(WP) : %
(IP): %
BH-1
6.00
48
23
25
BH-1
10.50
42
20
22
Liquid limit
S.No
Symbol
Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.
Liquid limit
DEPTH(m)
No. of blows (N)
BH-1
12.00
36
24
18
63.80
64.60
67.50
53.50
53.00
57.80
54.60
58.60
52.20
50.40
40.70
28.60
39.30
41.30
39.60
6.00
10.00
8.90
1.30
2.60
17.10
26.00
19.30
10.90
10.80
35.09
38.46
46.11
11.93
24.07
BH No.
Liquid limit
DEPTH (m)
No. of blows
BH-1
15.00
Plastic limit
Plastic limit
39
27
14
61.50
55.30
63.50
49.50
51.60
54.20
51.80
52.40
48.60
49.00
Weight of container
34.60
42.10
30.30
39.10
39.30
Weight of water g
7.30
3.50
11.10
0.90
2.60
19.60
9.70
22.10
9.50
9.70
Moisture content %
37.24
36.08
50.23
9.47
26.80
100
90
80
70
60
50
40
30
20
10
0
No. of blows
10
100
(WL)
Plastic limit
Plasticity Index
BH NO :
Depth (m)
:%
(WP) : %
(IP): %
BH-1
12.00
38
18
20
BH-1
15.00
36
18
18
Liquid limit
S.No
Symbol
Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.
Liquid limit
DEPTH(m)
No. of blows (N)
BH-2
2.00
34
26
17
63.60
64.40
67.80
53.40
53.20
59.80
53.60
57.80
51.40
50.60
48.80
28.80
40.20
41.30
39.80
3.80
10.80
10.00
2.00
2.60
11.00
24.80
17.60
10.10
10.80
34.55
43.55
56.82
19.80
24.07
BH No.
Liquid limit
DEPTH (m)
No. of blows
BH-2
4.00
Plastic limit
Plastic limit
38
26
15
52.20
54.80
62.80
49.60
51.50
59.60
51.50
56.40
47.80
48.80
Weight of container
39.20
43.60
31.20
39.20
39.10
Weight of water g
-7.40
3.30
6.40
1.80
2.70
20.40
7.90
25.20
8.60
9.70
Moisture content %
-36.27
41.77
25.40
20.93
27.84
100
90
80
70
60
50
40
30
20
10
0
No. of blows
10
100
(WL)
Plastic limit
Plasticity Index
BH NO :
Depth (m)
:%
(WP) : %
(IP): %
BH-2
2.00
45
22
23
BH-2
4.00
48
24
24
Liquid limit
S.No
Symbol
Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.
Liquid limit
DEPTH(m)
No. of blows (N)
BH-2
6.00
36
24
13
53.60
57.40
60.80
54.70
52.90
53.40
52.50
53.40
53.20
50.40
42.20
40.80
41.60
41.40
41.20
0.20
4.90
7.40
1.50
2.50
11.20
11.70
11.80
11.80
9.20
1.79
41.88
62.71
12.71
27.17
BH No.
Liquid limit
DEPTH (m)
No. of blows
BH-2
9.00
Plastic limit
Plastic limit
38
23
15
59.60
56.20
60.80
49.50
51.60
54.10
51.15
54.40
47.60
49.40
Weight of container
42.60
39.20
42.20
39.20
39.30
Weight of water g
5.50
5.05
6.40
1.90
2.20
11.50
11.95
12.20
8.40
10.10
Moisture content %
47.83
42.26
52.46
22.62
21.78
100
90
80
70
60
50
40
30
20
10
0
No. of blows
10
100
(WL)
Plastic limit
Plasticity Index
BH NO :
Depth (m)
:%
(WP) : %
(IP): %
BH-2
6.00
39
20
19
BH-2
9.00
43
22
21
Liquid limit
S.No
Symbol
Project:- Geotechnical Investigation for Proposed Construction of Residential Building (G+4) floors at YBlock 5th Street, Old No. 30, New No. 22, 5th Avenue, Anna Nagar, Chennai, TN.
ATTERBERG LIMITS
BH No.
Liquid limit
DEPTH(m)
No. of blows (N)
BH-1
BH No.
10.00
38
24
16
52.60
57.20
60.40
53.60
52.80
55.40
52.40
53.40
51.50
51.20
42.40
41.20
42.40
40.60
41.40
-2.80
4.80
7.00
2.10
1.60
13.00
11.20
11.00
10.90
9.80
-21.54
42.86
63.64
19.27
16.33
Liquid limit
DEPTH (m)
No. of blows
BH-2
13.50
Plastic limit
Plastic limit
36
21
12
58.60
55.40
60.20
49.40
50.80
48.80
52.60
53.20
48.20
48.40
Weight of container
39.40
36.20
40.80
37.20
39.60
Weight of water g
9.80
2.80
7.00
1.20
2.40
9.40
16.40
12.40
11.00
8.80
104.26
17.07
56.45
10.91
27.27
100
90
80
70
60
50
40
30
20
10
0
No. of blows
10
100
(WL)
Plastic limit
Plasticity Index
BH NO :
Depth (m)
:%
(WP) : %
(IP): %
BH-1
10.00
38
18
20
BH-2
13.50
40
19
21
Liquid limit
S.No
Symbol
Layer thickness
Cohision Cu
25 kN/m2
0.5
Surface area(Asi)
Qf
Silty Clay
9m
14.14 m2
a * Cu* Asi
176.71 kN
Layer thickness
6.0 m
Cohision Cu
120 kN/m2
0.3
Surface area(Asi)
Qf
9.42 m2
a * Cu* Asi
339.29 kN
Layer thickness
3.0 m
35 deg
80 kN/m2
Tand = Tanf
Surface area(Asi)
Qf
Silty Sand
0.700
4.71 m2
1.2
K * Pdi * Tan d * Asi
316.77 kN
832.77 t
18 m
35 Deg
0.1963 m2
Nq
48
Ng
48.03
758.2 kN
80 kN/m2
Ap (0.5*D*g*Ng+Pd*Nq)
Qf + Qe
1591.0 kN
35.3 kN
{Qu/FOS} - Wp
601.1 kN
600 kN
35.3 t
2.5
(2/3)*(Qu)/FOS)+Wp
257.4 kN
100 kN
2.5
fck
=M
Moment of Inertia
Modulus of subgrade reaction
K = k1*0.3/(1.5B)
5000 (fck)1/2
2
25000 N/mm
2
25000 MN/m
4.5 MN/m3
1.8 MN/m3
25
0.50 m
4
0.0031 m
1/5
R = ( E * I / K1 B)
2.43 m
0m
= 2.15 * R
5.23 m
Allowable deflection,
0.005 m
12 y E I / (L1+Lf )3
32.2 kN
30.0 kN
(From IS
2911 part
I/sec 2)