Nearmiss Trending Analysis
Nearmiss Trending Analysis
Nearmiss Trending Analysis
Date
Location
Project
Reported By
Name
B/No.
Designation
2015/09/001
01-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
2015/09/002
02-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
2015/09/003
03-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
2015/09/004
04-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
2015/09/005
06-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
2015/09/006
10-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
2015/09/007
12-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
2015/09/008
15-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
2015/09/009
17-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
10
2015/09/010
19-Sep-15
ZWSC
AL-BURJ
272
23197
Muniyandi Boss
Fab. C/H
11
2015/09/011
20-Sep-15
ZWSC
AL-BURJ
272
34805
Jamsheed.P.T
12
2015/09/012
20-Sep-15
ZWSC
AL-BURJ
272
ADMA
Saeed
Operator
13
2015/09/013
21-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
14
2015/09/014
22-Sep-15
ZWSC
AL-BURJ
272
15752
Sunny Devassey
Rigging Supvr.
15
2015/09/015
22-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
16
2015/09/016
22-Sep-15
ZWSC
AL-BURJ
272
ADMA
Yasar K
17
2015/09/017
27-Sep-15
ZWSC
AL-BURJ
272
9587
Mohd.A.Aklie
18
2015/09/018
29-Sep-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
19
2015/10/001
1-Oct-15
ZWSC
AL-BURJ
272
36611
Rashid Ali
20
2015/10/002
4-Oct-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
21
2015/10/003
7-Oct-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
22
2015/10/004
14-Oct-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
23
2015/10/005
15-Oct-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
24
2015/10/006
27-Oct-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
25
2015/10/007
30-Oct-15
ZWSC
AL-BURJ
272
38710
Zafran Mahmood
Fire watcher
26
2015/10/008
31-Oct-15
ZWSC
AL-BURJ
272
34609
Rexon Paul
27
2015/10/009
31-Oct-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
28
2015/11/001
1-Nov-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
29
2015/11/002
3-Nov-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
30
2015/11/003
5-Nov-15
ZWSC
AL-BURJ
272
21480
Devan.K
31
2015/11/004
6-Nov-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
36
2015/11/005
11-Nov-15
ZWSC
AL-BURJ
272
SeaFox
Noble Mathew
37
2015/11/006
13-Nov-15
ZWSC
AL-BURJ
272
15498
Eggy Sudarsono
HSE
38
2015/11/007
13-Nov-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
39
2015/11/008
13-Nov-15
ZWSC
AL-BURJ
272
35010
Shahabudin PT
40
2015/11/009
14-Nov-15
ZWSC
AL-BURJ
272
ADMA
O. Radwan
CSP Team
41
2015/11/010
15-Nov-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
42
2015/11/011
19-Nov-15
ZWSC
AL-BURJ
272
ADMA
Federico Samson
HSE Rep.
Marine Rigger
Site Rep(E&P)
Barge Supt
HSE Rep.
Fire watcher
Electrician
HSE Rep.
Sr.Inst.Tech.
HSE Rep.
HSEO
Marine Rigger
Date
Location
Project
B/No.
Reported By
Name
Designation
Date
Location
Project
B/No.
Reported By
Name
Designation
Date
Location
Project
B/No.
Reported By
Name
Designation
Sub-Category
Scaffolders were erecting scaffold platform for cable routing at the main deck without wearing full body
harness and not even providing temporary access ladder to go up and down. The height was about 2.5
meters.
Unsafe Act
Lifting gears (chain block, web slings-SEAFOX ) were found at the main deck without current color code
Unsafe Condition
Pad eyes welded on the ceiling at the bow side winch area was observed without a safe working load
markings and certification.
Fire Extinguisher trolley (50 kg DCP) stationed beside the handrails at cantilever deck was blocked by
Hydro test equipment's.
Electrical cord attached on some of the portable oven at the cantilever deck was found bare and terminals
were exposed.
Unsafe Condition
Unsafe Condition
Unsafe Condition
Scaffolders were observed lifting and transferring of scaffold clamps by using plastic container with a rope,
from lower deck to upper deck of the platform area instead of standard material lifting bag with SWL rated
by manufacturer.
Unsafe Act
During erection of scaffold at ZWSC riser platform area, it was observed that scaffolders were tightening
the clamps on the tubing of the scaffold at elevation without securing and tied off hand tools.
Unsafe Act
E&I Crew was observed climbing up on an incomplete scaffold at the riser platform area to check the
measurement of the cable tray support, he was ignoring the "Red Tag" that was placed on the ladder
indicating " do not use scaffold".
Unsafe Act
Scaffolders were carrying out scaffolding erection overboard underneath the bridge nearby riser platform,
it was observed that operative was throwing scaffold clamp in order to pass to his fellow scaffolder who
was on the adjacent side of scaffold to secure the tubing.
Unsafe Act
An air hose connected with air manifold for the air supply in the hot work habitat at RP Platform (11 mtr.
Elevation) noted with pin hole . Where the pressurized air was leaking out.
Barge emergency shower at port side deck being observed water leaking / dripping from its fitting and
watering on the floor especially at the access way to gangway areas, posing slippery.
Unsafe Condition
Unsafe Condition
Observed one person going to CSP Boat landing area without wearing work vest.
Unsafe Act
Scaffolders were erecting scaffold area, it was observed that they were using a rope which was placed at
both sides section of the platform ledger and was secured on the structure in an angular position where
they inserted a piece of pipe in the middle of the rope and applied torsion in order to tighten the rope for
rising the platform to install the scaffold bracing support.
Unsafe Act
Waste oil tank ( ID NO. OT-94-01) mobilized from NPCC base to barge AL-BURJ for the waste oil collection. "
Observed that its discharge line /tap end was plugged up by inserted a wooden spike /piece instead of
Unsafe Condition
proper threaded plugging or a drain valve with a safe guard for transportation (see attached sketch)
Riggers were observed standing under the suspended load while the garbage container was being lifted in
Unsafe Act
order to transfer to supply boat from the port side main deck of the barge.
Observed that some loose materials (wooden pallets etc.) were off loaded from the barge Al-Burj to supply
Unsafe Condition
vessel (Stanford gold ) without using the material transfer basket.
During my routine visit at platform, it was observed that Gas cylinders( One oxygen & two acetylene )
belongs to contractors were observed free standing , not secure with chains or other securing device at
GG2 Platform nearby stair case area, could have a fall hazard.
Unsafe Condition
Fabricator was grinding a welding support inside the habitat at CSP area without wearing the face shield to
Unsafe Act
protect the face from grinding particles.
Hand tools - Right angle and other tools were observed on the scaffold platform elevation at RP, could
Unsafe Condition
have a potential falling objects to below working / passing personnel.
Chain block was observed attached and hang with a 4" Pipe line close by ceiling of the barge bow side for
Unsafe Condition
lifting operation
Scaffolders were shifting scaffold clamps using lifting bag from 1st level to 2nd level at CSP area , the
clamps then placed on the platform gratings. While scaffolder was picking up the clamps, one clamp went
through the hole on the grating and fell down to the 1st level of platform.
Safety latch on 1.5 ton "come along" was observed defective at the 2nd level of CSP area.
A pipe fitter was observed outside the handrail at B-4 Bridge top side area where he was pulling a 1/2"
pneumatic hose to connect to the air blower in the habitat in preparation for GRE pipe support without
wearing body harness and work vest.
Unsafe Condition
5 - Inadequate Warning
System
3 - Defective Tools,
Equip or Materials
7 - Others
7 - Others
2 - Inadeq. or Improper
Prot. Equip
8 - Substan.
Housekeeping Disorder
2 - Inadeq. or Improper
Prot. Equip
3 - Defective Tools,
Equip or Materials
Unsafe Act
Unsafe Condition
A Person was observed carrying materials (two air blowers) in two hands and descending through the stair
at Riser platform (RP).
Unsafe Act
A Fabricator was observed replacing the disc on the grinder without unplugging the power source and not
using proper tools. He was also performing grinding operations using the cutting disc instead of a grinding
disc.
Unsafe Act
Three scaffolding crew were observed carrying scaffolding clamps on both of their hands while stepping down on the stairway at WIP in
direction of Riser Platform.
Unsafe Act
E&I Crew was observed climbing in between the twin existing vertical cable tray and stood on the horizontal angular steel support of the
cable tray to cut the plastic tie straps in order to remove the existing cable tray cover at the 2nd level in CSP area without using access
ladder.
Unsafe Act
Observed that an E & I operative was not wearing ear plugs and respiratory protection while cutting a support with electrical cutter
machine in fabrication shop.
Unsafe Act
A Fabricator was observed performing grinding operation in the habitat at CSP area without wearing face shield, hand gloves and the
grinder tool that he was using without handle.
Unsafe Act
NPCC E&I Engineer observed repeatedly coming to mess hall with safety shoes without covers. Already advised several times by crew
and me (HSE Al Burj/Marine) but he still continue the same
Unsafe Act
During daily routine walkthrough around the barge. Observed at Muster Station No 4; some air hoses/pig tails of H2S Cascade System
were not attached to manifold its hung unintentional and also seen few units the air hoses not available there. The condition are dirty Unsafe Condition
because its let opened without proper cover
NPCC personnel were towing and pushing the trolley with loaded scaffold materials along the narrow pathway between PGB and CSP
area, the person passing by who already stepped aside as he was aware of the approaching trolley almost struck his knee against the
trolley when the trolley swerved to his position.
Unsafe Act
Observed an E&I worker was over reached and leaned to one side on stepladder as he was intended to tighten a cable tag.
Furthermore the ladder was not secured as standing freely nor griped by other operatives.
Unsafe Act
The aluminum ladder was brought from barge (AL -Bur) and being used by project personnel despite being informed its against ADMA
Regulations ADMA HSE Reg-102 Chapter 18 Section 5.3.3.C.
Unsafe Act
Operatives were performing grinding and welding operations on the GRE pipe support at the upper level of scaffold in WIP area. During
inspection inside the habitat, it was found out that the angle grinder electrical cord terminals were exposed and the handle on the unit
was removed.
Unsafe Act
Poor housekeeping was observed on the scaffold platform underneath the 1st level of CSP. Rubbish (rust of corroded metal) was left
unattended from the existing cable trays which was removed and replaced by E&I
5 - Inadequate Warning
System
5 - Inadequate Warning
System
8 - Substan.
Housekeeping Disorder
6 - Fire and Explosion
Hazards
Unsafe Act
E&I crews were installing instrument cable trays on scaffold at CSP area, it was observed that the access
Unsafe Condition
on the walk way platform was obstructed by improperly stacked GRE Pipe spool which was left unattended.
Observed that cable trays were placed in such ways that were obstructing the walkway.
Immediate Causes
Unsafe Condition
Unsafe Condition
8 - Substan.
Housekeeping Disorder
8 - Substan.
Housekeeping Disorder
7 - Others
8 - Substan.
Housekeeping Disorder
Sub-Category
Immediate Causes
Unsafe Condition
Sub-Category
Immediate Causes
Unsafe Condition
Sub-Category
Immediate Causes
Unsafe Condition
mmediate Causes
Unsafe Act
6 - Poor Judgment
Activity
9 - Scaffolding/ Working
at Height
8 - Inadequate
Inspection
8 - Inadequate
Inspection
2 - Marine Inspection/
Diving
1 - Crane/ Lifting
Operations
13 - Others
4 - Inadequate
Maintenance
Day
15 - Access/ Egress
13
15
12 - Electrical
12
7 - Improper Loading /
Placement
6 - Poor Judgment
9 - Scaffolding/ Working
at Height
10
3 - Failure to Secure
3 - Inadequate
Performance of Skill
9 - Scaffolding/ Working
at Height
12
2 - Failure to Warn
6 - Poor Judgment
12 - Electrical
15
12
8 - Improper Lifting
2 - Inadequate
Knowledge
9 - Scaffolding/ Working
at Height
17
11 - Fabrication
19
11
8 - Housekeeping
20
4 - Inadequate
Maintenance
8 - Inadequate
Inspection
6 - Failure to Use PPE
Properly
7 - Inadequate PPE
7 - Personnel Transfer
20
8 - Improper Lifting
2 - Inadequate
Knowledge
9 - Scaffolding/ Working
at Height
21
4 - Chemical/ Material
Handling
22
2 - Inadeq. Assess. of
Needs & Risks
9 - Improper Position for
Task
2 - Inadequate
Knowledge
12 - Inadequate Work
Planning
1 - Inadequate
Supervision
7 - Inadequate PPE
1 - Inadequate
Supervision
1 - Inadequate
Supervision
4 - Oper. / Working at
Improp. Speed
5 - Inadeq. Tools, Equip.
or Materials
7 - Inadequate PPE
12 - Inadequate Work
Planning
1 - Inadequate
Supervision
22
2
9
4
2
22
12
11 - Fabrication
27
11
10 - Welding / Grinding
29
9 - Scaffolding/ Working
at Height
1 - Crane/ Lifting
Operations
6 - Poor Judgment
1 - Crane/ Lifting
Operations
2 - Marine Inspection/
Diving
10
9 - Scaffolding/ Working
at Height
1 - Crane/ Lifting
Operations
14
11 - Fabrication
15
12 - Electrical
27
12
12
15 - Access/ Egress
30
15
4
3
6
5
9
1
11
3 - Inadequate
Performance of Skill
1 - Crane/ Lifting
Operations
31
3 - Failure to Secure
6 - Poor Judgment
11 - Fabrication
31
11
6 - Poor Judgment
14 - Cargo/Manual
Handling/Material
Shifting
14
2 - Inadequate
Knowledge
12 - Electrical
12
7 - Inadequate PPE
12 - Electrical
12
3 - Failure to Secure
6 - Poor Judgment
11 - Fabrication
11
2 - Failure to Warn
1 - Failure to Warn
3 - Others
11
3 - Others
13
4 - Inadequate
Maintenance
7 - Improper Loading /
Placement
9 - Poor Coordination
14 - Cargo/Manual
Handling/Material
Shifting
13
14
3 - Failure to Secure
5 - Improper
Placement/Position
12 - Electrical
13
12
12 - Others
6 - Poor Judgment
12 - Electrical
14
12
12
5 - Using Defective
Equipment
4 - Failure to Secure
10 - Welding / Grinding
15
10
8 - Housekeeping
19
1 - Inadequate
Supervision
mmediate Causes
Unsafe Act
Activity
Day
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
mmediate Causes
Unsafe Act
Activity
Day
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
mmediate Causes
Unsafe Act
Activity
Day
30
30
30
30
30
30
30
30
30
30
30
Offshore
Sept 2015
2
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Total
1. IMMEDIATE CAUSES
1
0
1
0
1
0
1
0
2
0
Others
1
0
1
0
1
0
1
0
1
0
1
0
1
0
Weather Conditions
1
0
1
0
2
0
1
0
5
0
16
B. UNSAFE ACTS (SUBSTANDARD PRACTICES)
1
Failure to Warn
Failure to Secure
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
4
0
1
0
1
0
Improper Lifting
1
0
1
0
1
0
Horse play
1
0
10
1
0
1
0
11
Housekeeping
12
Others
0
1
22
2. BASIC CAUSES
A. JOB FACTORS
1
Inadequate Supervision
Inadequate Engineering
1
0
1
0
1
0
1
0
1
0
1
0
1
0
Inadequate Maintenance
Abuse or Misuse
1
0
1
0
1
0
1
0
1
0
Inadequate Inspection
1
0
1
0
1
0
3
0
10
11
Poor Coordination
12
1
0
Others
1
0
13
2
1
16
B. PERSONAL FACTORS
1
Failure to Warn
Inadequate Knowledge
Failure to Secure
Improper Placement/Position
Poor Judgment
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
Inadequate PPE
2
0
1
0
Poor Coordination
10
Others
4
0
1
0
22
C.
ACTIVITIES
1
Others
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
Drills
1
0
5
6
1
0
Mooring/ Anchoring
Personnel Transfer
Housekeeping
1
0
1
0
1
0
1
0
Welding / Grinding
1
0
10
2
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
7
0
1
0
2
0
11
Fabrication
12
Electrical
13
1
0
14
15
Access/ Egress
1
0
16
1
0
1
0
38
IMMEDIATE CAUSES
A. UNSAFE CONDITIONS (SUBSTANDARD CONDITIONS)
1 - Inadequate Guards or Barriers
2 - Inadeq. or Improper Prot. Equip
3 - Defective Tools, Equip or Materials
4 - Congestion or Restrict Action
5 - Inadequate Warning System
6 - Fire and Explosion Hazards
7 - Others
8 - Substan. Housekeeping Disorder
9 - Weather Conditions
BASIC CAUSES
A. JOB FACTORS
1 - Inadequate Supervision
2 - Inadeq. Assess. of Needs & Risks
3 - Inadequate Engineering
4 - Inadequate Maintenance
5 - Inadeq. Tools, Equip. or Materials
6 - Abuse or Misuse
7 - Wear & Tear
8 - Inadequate Inspection
9 - Failure to Use PPE
10 - Inadequate Safety Devices
11 - Poor Coordination
12 - Inadequate Work Planning
13 - Others
B. PERSONAL FACTORS
1 - Failure to Warn
2 - Inadequate Knowledge
3 - Inadequate Performance of Skill
4 - Failure to Secure
5 - Improper Placement/Position
6 - Poor Judgment
7 - Inadequate PPE
8 - Employee Perceived Haste
9 - Poor Coordination
10 - Others
C. ACTIVITIES
1 - Crane/ Lifting Operations
2 - Inspection
3 - Others
4 - Chemical/ Material Handling
5 - Drills
6 - Mooring/ Anchoring
7 - Personnel Transfer
8 - Housekeeping
9 - Scaffolding/ Working at Height
10 - Welding / Grinding
11 - Fabrication
12 - Electrical
13 - Hot Work/ NDT/ Hydrotesting/X'Ray
14 - Cargo/Manual Handling/Material Shifting
15 - Access/ Egress
16 - Painting & Blasting
Others; 1; 6%
Inadequate Work Planning; 2; 13%
JOB FACTORS
ACTIVIT
Crane/ Lifting
Others
Drills
5%
5%5% 13%
5%
18%
3%
13%
5%
18%
3%
5%
Personnel Tra
Scaffolding/
Fabrication
Hot Work/ ND
Access/ Egre
Others; 1; 5%
Improper Position for Task; 4; 18%
Failure to Warn ; 2; 9%
Failure to Secure; 4; 18%
s; 2; 13%
19%
ONDITION
Improper Lifting; 2; 9%
5%
18%
5%
18%
9%
s; 1; 6%
5%
36%
5%
9%
s; 1; 6%
%
%
5%
5%
36%
Personal Factors
ACTIVITIES
Others
Drills
Mooring/ Anchoring
Personnel Transfer
Housekeeping
Welding / Grinding
Fabrication
Electrical
Cargo/Manual Handling/Material
Shifting
Access/ Egress
Immediate Causes
%
to Secure; 4; 18%
ctive Equipment; 1; 5%
3%
ARD PRACTICES
18%
5%
9%
5%
Day
1
2
3
4
6
10
12
15
17
19
20
20
21
22
22
22
27
22
22
22
27
29
1
4
7
14
15
27
30
31
31
1
3
5
6
11
13
13
13
14
UC
Basic Cause
UA
6
5
5
8
6
JF
8
8
13
4
7
3
2
8
5
3
6
3
6
2
4
8
6
8
7
7
2
2
9
7
2
7
PF
6
2
12
1
6
9
7
2
7
1
12
1
6
8
2
7
1
1
4
3
6
5
6
8
8
7
12
1
9
3
9
9
6
3
2
7
3
6
6
2
7
6
1
4
7
3
12
9
5
6
5%
rs
9%
5%
15
19
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5
8
4
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
ION
IMMEDIATE CAUSES
Activity
9
2
1
15
12
9
9
12
9
11
8
7
9
4
1
2
11
10
1
2
11
10
9
1
9
1
11
12
15
1
11
14
12
12
11
3
3
14
12
12
COUNT
Percentage
19
100.0%
0
3
2
0
3
1
5
5
0
24
0
2
4
1
1
6
2
2
5
0
0
1
0.0%
15.8%
10.5%
0.0%
15.8%
5.3%
26.3%
26.3%
0.0%
100.0%
0.0%
8.3%
16.7%
4.2%
4.2%
25.0%
8.3%
8.3%
20.8%
0.0%
0.0%
4.2%
19
7
1
0
3
1
0
0
3
0
0
0
3
1
23
1
4
100.0%
36.8%
5.3%
0.0%
15.8%
5.3%
0.0%
0.0%
15.8%
0.0%
0.0%
0.0%
15.8%
5.3%
100.0%
4.3%
17.4%
1 - Inadequate Supervision
2 - Inadeq. Assess. of Needs & Risks
3 - Inadequate Engineering
4 - Inadequate Maintenance
5 - Inadeq. Tools, Equip. or Materials
6 - Abuse or Misuse
7 - Wear & Tear
8 - Inadequate Inspection
9 - Failure to Use PPE
10 - Inadequate Safety Devices
11 - Poor Coordination
12 - Inadequate Work Planning
13 - Others
B. PERSONAL FACTORS
1 - Failure to Warn
2 - Inadequate Knowledge
10
8
2
1
1
8
5
0
1
0
42
6
3
2
1
0
0
1
2
7
3
6
7
0
2
2
0
8.7%
4.3%
4.3%
34.8%
21.7%
0.0%
4.3%
0.0%
100.0%
14.3%
7.1%
4.8%
2.4%
0.0%
0.0%
2.4%
4.8%
16.7%
7.1%
14.3%
16.7%
0.0%
4.8%
4.8%
0.0%
SUM
SUM
SUM
SUM
SUM