Professional Documents
Culture Documents
PP
PP
PP
location:
2. Team:
Role
Site Engineer
Site Details
Manager
Schedule Meetings
3D Draftsmen (2)
3D Models
Receptionist
Intern (2)
3. Services
Urban Design
Architecture
Environmental Engineering
Interiors
Structural Engineering
Exhibit Design
Industrial Design
Research
Sustainability
4. Types of Projects:
It has developed a strong industrial design influence in every day
architecture, enhancing the experience of the detail. In a short
period of a decade it has done a wide range of work that includes
urban design, housing , public infrastructure, private houses,
offices, factories and product design
6. Hierarchy of Work:
The Firm has usually four projects running at a time. The four
projects are divided amongst two teams with one major and one
minor project with each.
Following is the Hierarchy/ Assembly Line in the Office:
Principal architect = core team
8. Recreation:
Turnover: 2 crores
Office
33%
Savings
33%
Income
33%